Arkansas Nuclear One - Administrative Services Document Control Wednesday, July 10,1996 Document Update Notification i

4 i

l COPYHOLDER NO: 103 TO: NRC - WASHINGTON ADDRESS: NRC l

l DOCUMENTNO: OP-1903.065 l

I TITLE: EMERGENCY RESPONSE FACILITY TSC i

l REVISIONNO:

11 CHANGENO: PC-03

SUBJECT:

PERMANENT CHANGE (PC)

If this box is checked, please sign, date, and return transmittal in envelopeprovided i

ANO-1 Docket 50-313 1 ANO-2 Docket 50-368 150061 Signature Date

~

9607160009 960710 0 \

PDR ADOCK 05000313 F PDR l

'ENTERGY OPERATIONS INCORPORATED f]ENTERGY e ARKANSAS NUCLEAR ONE 63 of '19

'" - -'-~- -

O tit's: ~cvR o~E ac>u'v-TECHNICAL SUPPORT CENTER (TSC) 1903.065 11 EXP.DATE SAFETYJtELATED N/A EVES CNC int am ;

CONTROLLED COPY # /03 . ,,,, , o, ,

PAGE REV CHG PAGE REV CHG l PAGE REV CHO I PAGE REV CH l 35 11 Pc I 45 11 1 11 Pc L 14 11 2 11 19 11 se 11 Pc I 4e 11 37 11 FC l 47 11 M 3 11 20 11 4 11 21 11 34 11 f 0'I 44 11 f 0

5 11 [0'A 22 11 39 11 49 11 6 11 23 11 40 11 50 11 /d'2 7 11 24 11 41 11 PC- % 51 11M J/89; 42 11 Pc 52 11 8 11 Pc- L 25 11 43 11 53 11 P 9 11 26 11 54 11 P 10 11 27 11 44 11

- VERIFIED SY DATE TIM 11 11- 28 11 12 11 N'3 29 11 13 11 ' 30 11 fd-3 14 11 31 11 15 11 32 11 16 11 33 11 17 11 34 11 PC -1 APPROVALAUTHORITY: APPROVAL DATE:

/ 97 REQUIRED EFFECTIVE DATE:

- FORM M. M FORM 18

  • UST OF AFFECTED PAGES

I

  • PROCJWORK PLAN NO. PROCEDURE / WORK PLAN TITLE: ,, PAIE: 12 cf 62

~

EMER3 ENCY RESPONSE FAciUTY TECHNICAL SUPPORT E 11 1903,065 CENTER (TSC) cumann pg y POSITION GUIDE A

\ Page 3 of 4 ENGINEERING MANAGER

d. Ensure adequate office space, equipment, supplies and communications equipment are readily available to the Engineering group.
e. Provide for the timely collection, retention and transmittal of engineering information to the ERO as requested. I
f. If reactor sump recire has been established, then refer to your

, handbook guide for establishing possible filtration on the BWST

( and/or RWT located at your desk.

g. Using Form 1903.065D, "TSC Director Status Update Guide", provide current updates to the TSC Director.

I

h. Coordinate with the Operations Manager to develop emergency work '

l plans and procedures regarding abnormal systems or equipment  !

l operations. )

i. Coordinate with the Nuclear Chemistry Manager in the OSC (ext.

6613) to obtain Post Accident Sampling System (PASS) analytical results for core damage assessment.

l j. Coordinate with the Accident Assessment Manager in the EOF (ext. i 7860) to develop potential long-term accident projections that '

the ERO will have to contend with. l I

l I

k. Review recovery efforts on a continuous basis to ensure that job )

priorities are consistent and accurate. J W) j[ 1. Coordinate with the TSC Director to ensure that job priorities are reviewed and revised as necessary.

t

m. Oversee plant design modifications to ensure adequate core surveillance and protection is available and all temporary j

modifications are documented.

n. Coordinate with the Operations Manager to provide for the timely resolution of NRC questions regarding abnormal operation and/or changes to Technical Specifications and SAR's in accordance with ANO procedures.
o. Coordinate with collocated NRC officials and ensure that an open communications dialogue is maintained throughout the event.

I

p. Monitor consultant activities where outside assistance is being provided.
q. Ensure that documentation of all maintenance activities is maintained using the ERO Chronological Logs provided in the

! Emergency Kit. .

I

l

. PROC / WORK PLAN NO. PROCEDUREJWORK PLAN TIT.'LE: s. PAGE: 30 cf 62 EMER2ENCY RESPONSE FACILITY TECHNICAL SUPPORT REV: 11

  • 1903S65

' CENTER (TSC) CHANGE: ' pg 3 j l

/~~s 1

( ) POSITION GUIDE D l

\~ / Page 3 of 4 RADIATION PROTECTION AND RADWASTE MANAGER l

e. If the emergency event has dictated the use of reactor sump recire, then inform the H.P. Supervisor in the OSC to begin I monitoring the BWST and/or RWT line monitors on RMS for activity.

l l f. Monitor radiation levels in the TSC/OSC and, using the guidelines l on Attachment 2 of Procedure 1903.030, recommend any protective actions to the TSC Director.

l

g. Using Form 1903.065D, "TSC Director Status Update Guide", provide current updates to the TSC Director.

l

h. Using Procedure 1903.035, assess the need for the administration of Potassium Iodide and' advise the TSC Director of any such l recommendations.
1. Develop plans, procedures, and methods for keeping radiation exposure of recovery personnel as low as reasonably achievable (ALARA). I
j. Coordinate with Dosimetry to ensure personnel TLDs are read and updated computer listings are provided.
k. Ensure that the TSC RADAC's Operator monitors the status of any offsite radiological release. ,

l l l m 1. Coordinate with the Health Physics staff to develop l

  • decontamination plans to support the recovery effort.

N m. Provide information and recommendations to the TSC Director concerning future operations that could affect the plant or the environment.

n. Coordinate with collocated NRC officials and ensure that an open l communications dialogue is maintained throughout the event.
o. Recommend equipment needed for use in accomplishing radwaste l processing and monitoring activities,
p. Advise the Plant Modifications group as necessary concerning radwaste system additions and modifications.
q. Coordinate with the EOF Support Superintendent at ext. 6470 to request services that may be needed from offsite sources.
r. Coordinate with the TSC Support Superintendent to obtain l Technical Assistants, as necessary.

l l

l s. Monitor consultant activities where outside assistance is being provided.

t. Ensure that documentation of all Radiation Protection activities is maintained using the ERO Chronological Logs.

l k