Rev 11,Change AP-11,to OP-1903.034, Emergency Operations Facility Evacuation
ML20140C095
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/26/1997
From: Cotton S
ENTERGY OPERATIONS, INC.
To:
References
1903.034, NUDOCS 9704020073
Download: ML20140C095 (20)


Text

.. __ _ _ _ . . . . _ . - _ . . . _ . _ _ _ _ __ . . _ .

O Arkansas Nuclear One - Administrative Senices Document Control l Wednesday, March 26,1997

, Document Update Notification i

l COPYHOLDER NO: 103 j

TO: NRC - WASIIINGTON ADDRESS: DOC CNTRL DESK MAIL STOP PI-37 WASIIINGTON DC 20555

! DOCUMENTND- OP-I903.034 77TLE. EMERGENCY OPERATIONS FACILITY j EVACUATION i

l REVISION NO: 11-00-00 4

1 l

) CHANGE NO: AP-11  !

SUBJ iCT: NEW REVISION i l

f ifthis box is checked, please sign, date, andreturn transmittal in envelopeprovided.

ANO-1 Docket 50-313 ANO-2 Docket 50-368

(

oI I 4

Signature O -

9704020073 970326 Date PDR ADOCK 05000313 F FDR lllgg;glllljj]llgl]$

020020 S

i ENTERGY OhERATIONS INCORPORATED i ARKANSAS NUCLEAR ONE O TiTte: eMeRee cv 0FeRA1,o~e FAc,<,Tv EVACUATION e oc' eex '

1903.034

~e. ev.

11 l

EXP. DATE SAFETY-RELATED N/A SYES ONO

= e  !

CONTROLLED COPY #/p3 gAce , og ,

@NO l

PAGE CHG PAGE CHG / PAGE CHG PAGE CHG l 2 l 3 -

to

Think

~ l 5

! e Act i

7 O 8 iew 1 i

9 l

.. ecause Nobody's perfe 10 VERIFIED BY DATE TIME I

11 l 12 13 14 15 16 17 O FORM TITLE:

~

FORM NO. REV.

I 1000.006A 45 LIST OF AFFECTED PAGES

1 ENTERGY OPERATIONS INCORPORATED l i

ARKANSAS NUCLEAR ONE O TITLE: EMERGENCY OPERATIONS FACILITY PROCN/ORKPLAN NO. REV.

11 I

1903.034 EVACUATION  :

PROCEDURE SAFETY-RELATED AFFECTED UNIT wOaxeLau O EXP. @YES ONO PAGE 1 OF 1

@1 @2 DATE N/A REASON FOR REVISION /NEW PROCEDURE: l To update the pacedure. l l

i 4

DESCRIPTION OF REVISION:

. Throughout procedure - Minor Administrative, typo, etc. changes.

. 3.4 - Remove commitment note and commitment (3.4.1) 6.3.2 and Attachment 3 - Added note for Room 15.

6.3.2.D - Added Shift Superintendent 6.35 and Attachment 3 - Added note for Altemate EOF telephone numbers.

7.5 and 7.6 - Added Attachment to list.

j Attachment 3, A.7 - Added Room 15 Setup step.

j Attachment 4 - Modified floor plan, modified room assignments.

Attachment 5 - Added Room 15 Layout and Work Locations.

[ Attachment 6 - Changed Attachment number.

l \

Does this red.sion alte* or delete an existing Regulatory Committnent?' SYEs [JNO Supersedes or Replaces Another Procedure? OYES ONO If Yes, coordinate with Ucensing BEFORE implementing g gjog If Yes, Complete and Attach Form 1000.006H' Was MEF used as source document? O YES ONO DOES THIS DOCUMENT: Yes No l

OTHER SECTION LEADER (S): (Required for assignment of j

Change MTCL to be Untrue?, O E responsibiiity outside of responsibte section ieader. section)

DATE:

Create an intent Change? O @

Implement or Change IPTE Requirements? O E $

Require a 10CFR50.59 Review l

! per step 6.3.2 of 1000.131 O O

-~

UNIT SURVEILLANCE COORDINATOR: DATE:

DAT OR{lNATO%L-/$, s/7l*4 7 v/A SECTIO L ER- DATE:

DT T %EVIE3AfER: DATE:

L S-to - P7

, W1/9 7 DATE:

DATEi QUALITY ASSURANCE: '

ENGINEEftlNG:

Ath M DATE: PSC CH I N/T HNIC L REVIEWER:* DATE:

QUALITV:

i:L -. .5-fo -S~)

O . PPROVAL: ATE: REQUIRED EFFECTIVE DATE:

G FiZtkl 2.W sS& 3hel97 FORM NO. REV.

FORM TITLE:

1000.006B 45 PROCEDURE / WORK PLAN REQUEST

'(ICAN108904) *(OCNAo4Nb.) '(OCAN058107) '(OCNA128509)

PROCJWORK PLAN NO. PROCEDURE / WORK PLAN ITILE: PAGE: 1Of17 REV: 11 1903.034 EMERCENCY CPERATIONS FACILITY EVACUATION CHANGE:

O V 1.0 PURPOSE The purpose of this procedure is to address the activities related to the relocation of the Emergency Response Organization to an alternate emergency response facility in the event that evacuation of the Emergency Operations Facility (EOF) is necessary.

2.0 SCOPE 4

This procedure is applicable to emergency situations involving Unit 1 and/or Unit 2 for which EOF evacuation is required. In general this procedure l provides guidance for determining the necessity for EOF evacuation, for l maintaining Emergency Direction and Control and for re-establishing a functional emergency center at the backup facility.

3.0 REFERENCES

3.1 REFERENCES

USED IN PROCEDURE PREPARATION: j 1

3.1.1 Emergency Plan

3.2 REFERENCES

USED IN CONJUNCTION WITH THIS PROCEDURE:

3.2.1 Procedure 1903.067, " Emergency Response Facility - f Emergency Operation Facility (EOF)"

3.3 RELATED ANO PROCEDURES: l I

{ \ None  ;

\s /  !

3.4 REGULATORY CORRESPONDENCE CONTAINING NRC COMMITMENTS WHICH ARE IMPLEMENTED IN THIS PROCEDURE: ,

None 4.0 DEFINITIONS l 4.1 Emergency Response Organization (ERO) - The organization which is composed of the Initial Response staff, the EOF staff, the TSC staff, the OSC staff, and the Emergency Team members. It has the capability to provide manpower and other resources necessary for immediate and long-term response to an emergency situation.

5.0 RESPONSIBILITY AND AUTHORITY 5.1 The responsibility for declaring an EOF evacuation rests with the Emergency Operations Facility Director (EOF Director), or with the Shift Superintendent / Technical Support Center Director (TSC Director) it. the absence of the EOF Director.

6.0 INSTRUCTIONS 6.1 THE MECHANISM FOR EVACUATING THE EOF IS BASED ON THE FOLLOWING CONCEPTS:

u)

___--.__7 l

PAGE: 2 of 17 PROCJWORK PL 85 G. PROCEDURE / WORK Pt.AN TITLE:

REV: 11

,. iv03.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

i ,

n 6.1.1 The decision for EOF evacuation is based on the ss consideration of protective actions as a result of offsite l dose projections and/or EOF radiation alarms and Health

- Physics surveys.

6.1.2 Unless an immediate evacuation is required due to a rapid  ;

deterioration of conditions, the EOF evacuation would usually occur in stages. Media and non-essential personnel in the Emergency News Center and radiologically uninhabitable areas may be required to evacuate first, followed by a secondary ERO group, and then a primary ERO 9toup thus completing the EOF evacuation. The EOF Director or the TSC Director, as appropriate, will determine the exact schedules, priorities, and the designation of groups and/or selection of personnel affected by the EOF evacuation declaration.

6.1.3 Transportation to the Alternate EOF will be via personal and available ANO vehicles. Special transportation needs should be directed to the EOF Support Superintendent. l 6.1.4 Media personnel are to relocate to the announced assembly area as designated by the Communications Manager or his/her designee (See Procedure 1903.068).

ERO personnel are to relocate to the Entergy Arkansas, Inc.

6.1.5 Russellville District Office unless otherwise instructed by the EOF Director, or TSC Director. (Directions to the

("'% Alternate EOF are on Attachment 6) .

( ,) l 6.2 EOF EVACUATION CRITERIA 6.2.1 Guidance for determining the necessity for EOF evacuation is provided in Attachment 1.

6.2.2 Precautionary evacuation is a stepwise relocation of the ERO such that the Alternate EOF is activated and partially staffed before complete EOF evacuation. Attachments 2 and 3 provide checklists for evacuation of the EOF and activation of the Alternate EOF. l 6.2.3 An immediate evacuation is a rapid and complete evacuation of the entire EOF at once without delays.

l 6.3 RESPONSIBILITIES / IMPLEMENTATION l 6.3.1 Declarata.on of an EOF evacuation and subsequent actf.ons are l to be determined by the EOF Director or TSC Director, as l appropriate, after considering the following: j A. The specific conditions that exist.

B. REAM / Dose Assessment Supervisor and EOF HP Supervisor's recommendation for action based upon trends / projections of conditions; and the guidance of 1

-- Attachment 1.

V i

l

PROCJWORK PLAN NO, PROCEDUREJWORK PLAN itTLE: PAGE: 3of17 REV: 11 1903.034 EMERIENCY OPERATIONS FACILITY EVACUATION CHANGE:

C. _ REAM / Dose Assessment Supervisor and EOF HP f Supervisor's report on the radiological habitability of the Alternate EOF based upon offsite dose projections and/or area survey measurements.

D. Determination of mininal ERO personnel staf fing to 1 temporarily continue emergency support activities.

E. Any alternate or additional actions that otherwise may be appropriate based on professional judgment.

After consideration of Steps A-E, if the prudent sction is to evacuate the EOF, then the EOF Director /TSC Director, as appropriate, should advise NRC, State and Local authorities of the need to implement this action. ANO ERO personnel (i.e.,

Communication Manager, Communications Liaison, Support l i

Manager, EOF Maintenance Coordinator, Radiological / Environmental Assessment Manager / Dose Assessment Supervisor, and TSC Director as i appropriate) should also be advised of this action. l 1

1 i

6.3.2 The EOF Director /TSC Director shall determine the exact schedules, priorities, and selection of personnel affected l j

by the EOF evacuation declaration, dependent upon tbt 1 situation. Consider the following actions:

/"' A. Contact the Entergy Arkansas, Inc. Customer Service Manager at the Russellville District Office (Phone (N) number is located in Section 3 of the Emergency Telephone Directory). Inform him that ANO personnel will be relocating to the Alternate EOF. Request his assistance in preparing the facility for the relocation (refer to Attachment 3, Section A.2) l NOTE See I Room 15 serves as the alternate equivalent of the EOF Command Room.

Attachment 5. l l

B. Direct the Support Manager / EOF Maintenance Coordinator to relocate to the Alternate EOF if habitable, and activate the Alternate EOF with the assistance of the Entergy Arkansas, Inc. Customer Service Manager (see l

I Attachments 4 and 5 for building layout).

C. Direct all EOF personnel, except those designated for l any necessary minimal support effort, to evacuate and take essential materials and equipment to the Alternate EOF.

O V

- - . . . . - . - - .- . . ~ _ ~ _ _ _ - _ -

PROCEDURE / WORK PLAN TITLE: PAGE: 4 of 17 PROCJWORK PLAN NO.

RFV: 11

> 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

D Perform a turnover of emergency responsibilities in

\_- D.

accordance with procedure 1903.067, " Emergency Response Facility - Emergency Operations Facility (EOF)" to the TSC Director, or Shif t Superintendent, as applicable, prior to relocating to the Alternate EOF. This will ensure a continuity of ERO Emergency Direction and Control during the relocation.

E. After the Alternate EOF has become operational, i instruct the remaining EOF minimal support personnel to evacuate and secure the area. ,

i 6.3.3 If the Secondary Technical / Operational Support Center is  !

operational, the TSC Director shall instruct the TSC/OSC staff to gather plant drawings, maps, logbooks, status reports, and other essential technical materials and  ;

portable equipment or instrumentation (e.g. RDACS terminal J and modem, etc.) in preparation for evacuation. The TSC ,

Director should advise the Shift Superintendent of an EOF j evacuation, and coordinate the evacuation with the EOF j j

Director.

6.3.4 The Communications Manager shall ensure that the Emergency News Center is evacuated and relocated in accordance with Procedure 1903.068, " Emergency Response Facility -

Emergency News Center", Section 6.1.3 and Section'II of Attachment 4.

6.3.5 The support Manager /TSC Support Superintendent shall ensure

( f that the following are accomplished:

A. Superintendent, Plant Security is advised of an EOF evacuation or potential evacuation. Plant security is responsible for ensuring that: .

1. EOF security personnel implement evacuation procedures.
2. State / local law enforcement is advised, and traffic control is requested when necessary.
3. Security is established and maintained at the Alternate EOF, utilizing security personnel. J
4. Accountability of ERO personnel is performed at the Alternate EOF.
5. The EOF and plant site is adequately secured j l

after evacuation.

1 O

PROCEDURE / WORK PLAN TITLE:

PAGE: 6Cf17 j PROCJWORK PLAN NO.

  • 11

- 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

NOTE ,

Telephone numbers for the Alternate EOF are located in Section 3 of the l l

Emergency Telephone Directory. l B. Telecommunucations Support Personnel (Task F1) are advised of an EOF evacuation. Telecommunications personnel shall be responsible for ensuring thac communication links between the Alternate EOF and the Control Room are operational.

C. Purchasing and Procurement Support Personnel (Task F2) obtain support for any special needs for the transport of evacuees and/or for the operation of the Alternate EOF (e.g., office trailers, supplies, etc.).

6.4 ALTERNATE EOF 6.4.1 The Alternate EOF is the Entergy Arkansas, Inc.

Russellville District Office located at 305 South Knoxville Street, uvssellville. Assigned ERO work areas are identified in Attachments 4 and 5. A map showing routes to the Alternate EOF is provided in Attachment 6.

6.4.2 The REAM / Dose Assessment Supervisor should instruct the EOF g HP Supervisor to implement the following actions:

A. A radiological survey of the Alternate EOF is performed to confirm adequate habitability.

B. Establish health physics teams at Alternate EOF entry points to perform radiological monitoring of personnel prior to entry.

C. Establish a decontamination team, as required, at the Alternate EOF to perform personnel decontamination actions.

D. Direct radiation and airborne survey measurements of the Alternate EOF to be periodically taken, recorded, and monitored.

6.4.3 After arrival at the Alternate EOF, the EOF Director should:

A. Ascertain the operational status of the Alternate EOF.

B. Obtain a briefing from the REAM / Dose Assessment i Supervisor and Support Manager / EOF Maintenance Coordinator.

m U

l

.i PROCEDUREUWORK PLAN'TTTLE:

PAGE: 6of17 i PROCJWORK PLAN NO. '

RW: 11 1903.034 EMER2ENCY OPERATIONS FACILITY EVACUATION CHANGE: .

)

C. When the Alternate EOF is operational, perform the  !

V steps necessary per procedure 1903.067, " Emergency  :

Response Facility - Emergency Operations Facility l

( EOF) ", to transfer responsibility for emergency functions from the TSC Director.

D. When appropriate, instruct any remaining EOF minimal support staff to relocate to the Alternate EOF. .

E. Ensure that the Shif t Superintendent and Federal,  !

State, and local emergency operation centers are  ;

advised of the relocation to and operational status of i

the Alternate EOF.

6.4.4 Upon the conclusion of the emergency, ensure the Alternate  ;

EOF is deactivated and returned to normal operations.

7.0 ATTACHMENTS AND FORMS 7.1 Attachment 1 " EOF Evacuation Guidance" 7.2 Attachment 2 " Emergency Operations Facility Evacuttion Checklist" 7.3 Attachment 3 " Alternate EOF Activation Checklist" 7.4 Attachment 4 " Alternate EOF Work Areas and Room Assignments" I

7.5 Attachment 5 " Alternate EOF - Room 15, Room Layout / Work Locations" 7.6 Attachment 6 " Directions to Alternate EOF" 1

4 l

l 1

O V

PROCJWORK PLAN NO. PROCEDURE / WORK PLANTITLE:

PAGE: 7Of17 REV: 11

, 1903.034 EMER0ENCY OPERATIONS FACILITY EVACUATION CHANGE: j

'N j ATTACHMENT 1 Page 1 of 2 i

. EOF EVACUATION GUIDANCE f CONDITION RECOMMENDED ACTIONS

1. Plant Evacuation declared, EOF Consider relocation of media and/or i Evacuation likely to occur. non-essential personnel.

Direct the Superintendent, Plant

] Security to call in additional Security i

personnel to establish security at the Alternate EOF.

2. Exclusion Arec and/or Area Evacuation Consider protective action for media declared and/or non-essential personnel consistent with the protective. action j recommendations made for the general public per the applicable EPIP.
3. Area Survey Measurements Exceed 2.5 Consider evacuation of all nonessential mrem /hr in Unprotected Areas of EOF personnel from the unprotected areas of the EOF.
4. EOF Protected Area Radiation Monitor Verify EOF ARM alarm.

Warning Alarm (1 mr/hr) conduct area radiation survey of gs

() unprotected areas of EOF and evacuate s

I all personnel in those areas if  !

necessary.  ;

consider having all ERO personnel, other than activated Emergency Response Teams, to remain sheltered in the protected area of the EOF, unless otherwise instructed by the EOF Director.

5. EOF Protected Area Radiation Monitor Verify EOF ARM alarm alarms Hi (2.5 mr/hr) and/or iodine concentration exceeds 2.7E 9 pCi/cc.

Consider evacuation of all non-essential personnel from the protected areas of the EOF.

All ERO personnel should remain sheltered in the EOF protected area.

Increase frequency of airborne and direct radiation monitor 1ng of EOF, insure EOF filtered ventilation is operational; record DAC hours.

a

4 PROCEDURE / WORK PLAN TITLE:

PAGE: 8of17 PRocJwoRK PLAN NO.

REV: 11 1903.034 EMERCENCY OPERATIONS FACILITY EVACUATION CHANGE:

O ATTACHMENT 1 Page 2 of 2 EOF EVACUATION GUIDANCE CONDITION RECOMMENDED ACTIONS

6. EOF Protected Area radiation levels If conditions are estimated to be

, exceed 100 mrem /hr but less than 1 temporary (less than 30 minutes), ,

Rem /hr, and/or iodine concentration continue on-going protective actions.

exceeds 1 DAC (2E-* pCi/cc) .

If conditions are estimated to be longterm (greater than 30 minutes),

initiate EOF evacuation.

7. EOF Protected Area radiation levels Immediate evacuation of the EOF is exceed 1 Rem /hr, and/or iodine required.

l concentration exceeds 4 DAC.

4 a

I 4

(j d  ;

a j

d e

I .

O

PAGE: 9of17 PROCJWORK Pt.AN NO. PROCEDUREMf0RK PLAN title:

RN 11 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

O ATTACHMENT 2 Page 1 of 2 EMERGENCY OPERATIONS FACILITY ( EOF) l EVACUATION CHECKLIST EOF Director /TSC Director Actions Initial I

1. Determine the need for EOF evacuation af ter considering the follow-ing input:  !
a. The specific conditions that threaten the habitability of the EOF, i
b. Radiological / Environmental Assessment Manager's/ Dose .

Assessment Supervisor recommendation for action based upon l trends / projections of conditions and probability of situation improvement, (i.e. may include offsite dose projections and {

l area survey measurements).

2. If deemed necessary, declare a precautionary evacuation or an immediate evacuation and take the following actions: '

i

a. Select the Alternate EOF facility.

(1) Russellville District Office if habitable based on Dose Assessment Supervisor's report; (2) Otherwise, the location specified by the EOF Director or TSC Director.

b. Advise NRC. Corporate Emergency Center (CEC) Manager, and i State and Local authorities of EOF evacuation declaration.
c. Advise TSC Director, REAM / Dose Assessment Supervisor, Communications Manager, Support Manager / EOF Maintenance .

Coordinator, Communications Liaison and the Superintendent, Plant Security, as appropriate, of EOF evacuation declaration.

3. Determine relocation schedules, priorities, personnel assignments, and other logistical actions as necessary to implement an orderly evacuation. .
4. Direct the Support Manager / EOF Maintenance Coordinator to advise the following personnel of an EOF evacuation:

a Entergy Arkansas, Inc. Customer Service Manager (see Section 6.3.2.A of this procedure)

b. Superintendent, Plant Security I
c. Communications Manager or ENC Coordinator O

PROCEDURE / WORK PLAN TdLE: PAGE: 10 of 17 PROCJWORK PLAN NO.

REV: 11 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION 4

CHANGE j

1 i ATTACHMENT 2 Page 2 of 2 EMERGENCY OPERATIONS FACILITY ( EOF)

EVACUATION CHECKLIST 1

EOF Director /TSC Director Actions Initial l l

I d. Telecommunications personnel 1 1

5. Ensure that an announcement is made to advise all EOF personnel of 1

the situation, and actions to be taken. l

6. Direct the Support Manager / EOF Maintenance Coordinator, or his j designated representative, to relocate to the Alternate EOF if habitable, and activate the Alternate EOF with the assistance of f the Entergy Arkansas, Inc. Customer Service Manager. l l
7. After consultation with the TSC Director, Support Manager, EOF Maintenance Coordinator and the Superintendent, Plant Security, determine minimal ERO personnel staffing to temporarily continue emergency support activities, and advise designated personnel 3 accordingly.

J

8. Direct all EOF personnel, except those designated for any necessary minimal support effort, to evacuate and take essential materials

[ and equipment to the Alternate EOF at the appropriate time. l 1

9. Perform a turnover of responsibility per Procedure 1903.067, to the TSC Director.
10. After arrival at the Alternate EOF, the EOF Director should:
a. Obtain a briefing from the Radiological / Environmental Assessment Manager and the Support Manager.
b. Ascertain the operational status of the Alternate EOF.
c. If the Alternate EOF is operational, perform a turnover from the TSC Director per Procedure 1903.067.
d. If the Alternate EOF has become operational, instruct the remaining EOF minimal support personnel to secure their areas and evacuate to the Alternate EOF.
e. Make certain the Shift Superintendent and Federal, State, and local emergency operation centers are advised of the relocation,to and operational status of the Alternate EOF.
11. Upon the conclusion of the emergency instruct appropriate personnel to deactivate the Alternate EOF and rLturn to normal operations.

10 4 V

PROCEDURE / WORK PLAN TlYLE:

PAGE: 11 of 17 PROCJWORK PLAN NO.

REV: 11 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

\- / ATTACEMENT 3 Page 1 of 2 ALTERNATE EOF ACTIVATION CHECKLIST d

s (Russellville District Office) ,

1 Support Manager Actions

A. Upon being advised by the EOF Director that an EOF evacuation to the Alternate

~

EOF (Russellville District Office) is required, obtain all necessary support ,

and take the following actions:

Initial j 1. Confer with the REAM / Dose Assessment Supervisor to obtain status of of fsite radiological habitability in the area of

  1. the Alternate EOF, and ensure that monitoring tasks will be 4 performed.
2. Request that the Entergy Arkansas, Inc. Customer Service Manager perform the following:

4

a. Utilize staff assistance to prepare the Russellville

) District office for use by ERO personnel and maintain i contact with ANO.

c i (R)

\s_, b. Advise all field personnel to return and secure their vehicles and equipment. Maintain a minimal line crew for emergency repair capability. Advise all non-essential office personnel to proceed home and await further instructions (obtain status of offsite radiological conditions prior to releasing office personnel,

c. Upon arrival of ANO personnel, provide assistance as necessary.

- 3. Request that the Superintendent, Plant Security, dispatch security personnel to the Alternate EOF to establish and l maintain security at the facility.

NOTE Alternate EOF telephone numbers are located in Section 3 of the Emergency Telephone Directory.

4. Dispatch Telecommunications Task personnel to the Alternate EOF to ensure that communications links are established and maintained between the facility and ANO (i.e., ANO radio and telephones).

j)N c

1

, l PAGE: 12 cf 17 l PROCJWORK PLAN NO. PROCEDURElWORK PLAN title:

RM 11 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

f-'s

\ss ATTACHMENT 3 Page 2 of 2 ALTERNATE EOF ACTIVATION CHECKLIST l

(Russellville District Office) i Initial l 1

5. Obtain support personnel as necessary, and relocate to the Alternate EOF.
6. After arrival at the Alternate EOF, obtain 1) status of the I facility from the Customer Service Manager, 2) status of operability of communications links from Telecommunications, and 3) status of security control for the facility.

NOTE Room 15 serves as the alternate equivalent to the EOF Command Room.

7. Ensure that Room 15 is set up in accordance with Attachment 5 of this procedure. Tables and emergency telephone lines  !

should be obtained from the telephone room, and each phone l connected to its corresponding line and jack. l B. Advise Purchasing and Procurement Task personnel of the need l I for additional facility operational support, as necessary.

N)' Advise the EOF Director of the operational status of the 9.

Alternate EOF.

B. Upon termination of the emergency, coordinate with the customer Service Manager to assist in returning the facility to normal operations.

l O

V l

l

.. ._...___._____.__._.____.____._______..____,_,,,___,__________m, __

I PROCAVORK PLAN NO. PROCEDURE / WORK PLAN TrrLE: PAGE: 13 cf 17

' RN 11 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

ATTACHMENT 4

! Page 1 of 3 l ALTERNATE EOF WORK AREAS AND ROOM ASSIGNMENTS i

i j .

l l l 2 2 \

1 N l

C- 3 .I 3 --

FP l l 21 4 22[  ! 20 1 19 5

6 23 l 18 6 24 17 i

- - r-pA '_ l Y h A /'  !

MI " E-O Storage J -

l 15 16 -

Wi ____l 1 l 7 _lEEI 12 e u.

ANO 8 - Store Room 0 andio 11 ja

-. 13 Storage 9 10 t

- m, s e s e s See following page for room assignments.

O

PAGE: 14of17 PROCJWORK PLAN NO. PROCEDURElWORK PLAN TITLE:

REV: 11 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

f%

iN ATTACHMENT 4 Page 2 of 3 ALTERNATE EOF WORK AREAS AND ROOM ASSIGNMENTS POSITION ROOM NUMBER EMERGENCY OPERATIONS FACILITY (EOF) PERSONNEL 15 EOF Director 15 EOF Support Superintendent 15 EOFD Assistant 15 Radiological Environmental Accident Manager REAM 15 l REAM Assistant Support Manager 15 l 15 Communications Liaison 15 Communicators 15 Accident Assessment Manager 15 EOFD Administrative Assistant Dose Assessment Supervisor 12/7 l

RDACS Computer 12/7 12/7 Dose Assessment Team

[ 8 Offsite Monitoring Supervisor 8

Offsite Monitoring Teams Staging Area 8

Offsite Monitoring Radio / Operator Admin. Assistant Supervisor / Admin Tech's 18 1 1

15 l EOF H.P. Supe rvis.ar 15 EOF Maintenance coordinator 8

Telecommunications TECHNICAL SUPPORT CENTER (TSC) PERSONNEL 24 TSC Director i 24 Maintenance Manager 24 Engineering Manager 24 l Operations Manager Radiation Protection and Radwaste Manager 24 24 TSC Support Superintendent 19/20 Engineering Support 22 Security OPERATIONAL SUPPORT CENTER (OSC) PERSONNEL f

13/14 l N OSC Director l

f

1

, 1 PROCEDURE / WORK PLAN TITLE:

PAGE: 15cf17 PROC./ WORK PLAN NO.

RN 11 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

/

ATTACHMENT 4 Page 3 of 3 ALTERNATE EOF WORK AREAS AND ROOM ASSIGNMENTS l

POSITION ROOM NUMBER Maintenance Superintendent 14 Electrical Maintenance Supervisor 14 14 I & C Supervisor Mechanical Maintenance Supervisor 14 Nuclear Chemistry Manager 14 j 14 l Health Physics Supervisor OSC ASSEMBLY AREA PERSONNEL 10/11 Maintenance Personnel 10/11 Nuclear Chemistry Personnel 10/11 Radwaste Personnel 10/11 Health Physics Personnel 10/11 Offsite Monitoring Staging Area 10/8 21 Emergency Medial Team Area ARKANSAS DEPARTMENT OF HEALTH (ADH) PERSONNEL 15 O- State Radiation Response Team Leader 15 State TOCD 15 State TOCD Administrative Assistant State Operations Officer 15 15 State Local Govt. Liaison Office of Emergency Service (OES) Director 15 l

Ark. Dept. of Health Work Area 2/3 1

ADH TOCD Work Area NUCLEAR REGULATORY COMMISSION (NRC) PERSONNEL 15 NRC Protective Measures coordinator 15 NRC Protective Measures Communicator NRC Reactor Saftey Coordinator Communicator (EOF /TSC) 15/24 NRC Reactor Safety Coordinator (EOF /TSC) 15/24 i

15 NRC DSO Administrative Assistant NRC Director Site Operations 15 NRC Energency Response Coordinator 15 15 NRC Govt. Liaison Coord.

15 FEMA 1 D  :

PROCJWORK PLAN NO. PROCEDURE / WORK PLAN title: PAGE: 16 of 17 REV: 11 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

l k ATTACHMENT 5 ALTERNATE EOF - ROOM 15 ROOM LAYOUT / WORK LOCATIONS Telephone Spare Room ami 3 l

Spare i 1

....s I

12 1110 l1 2g S 3 6 7 13 I 8 14 i -

15 4

- 5 16 s 21 17 18l19 20 i >

ROOM 15 l

l l

l ANO PERSONNEL ADH/OES PERSONNEL NRC/ FEMA PERSONNEL

1. EOF Director 10. ADH TOCD/ Admin. Asst. 16. Dir. Site Ops. (DSO)
2. EOFD Assistant 11. ADH Local Govt. Liaison 17. Emer. Response Coord.
3. REAM / REAM Assistant 12. ADH Operations Officer. 18. Reactor Safety Coord.
4. Support Manager 13. ADH Rad. Resp. Team Lead 19. Prot. Measures Coord.
5. EOF support Supt. 14. State OES Director 20. Prot. Measures Comm.
6. Accident Assess. Mngr. 15. Spare 21. FEMA Director
7. EOF H.P. Superviwor
8. EOF Maint. Coordinator
9. Communications Liaison

/^N

PROCEDURE / WORK PLAN TITtE: PAGE: 17Cf17 PROC./ WORK PLAN NO.

REV: 11 1903.034 EMERGENCY OPERATIONS FACILITY EVACUATION CHANGE:

ATTACHMENT 6 DIRECTIONS TO ALTERNATE EOF RUSSELLVILLE, ARKANSAS l

l S7 140 ,

J U.S.64 ,,

4 l

~

4th Street BRusselMile District l Office j 3

333 2 , /

Directions From ANO take Highway 333 northeast to Highway 64. Travel east on Highway 64 to Highway 7T (Knoxville Street) and turn south. Travel on 7T south for approximately three blocks. The Russellville District Office will be on the east side of the street. (305 South Knoxville Street).

N/