ENTERGY OPERATIONS INCORPORATED l

ARKANSAS NUCLEAR ONE l

Arkansas Huc.!. ear One l

Russellville, Arkansas Date: 950213 l

MEMORANDUM TO:

103

  • Please return transmittal CC - NRC - WASHINGTON to Document Control, 3RD floor Admin Bldg
  • FROM:

DOCUMENT CONTROL Ref Key: 18183 i

SUBJECT:

PLANT MANUAL UPDATE: NEW REVISION TO PROCEDURE PROCEDURE / FORM NUMBER: OP-1903.03G t

REV. # 21 TC # 0 PC # 0 P"OCEDURE/ FORM TITLE: EVACUATION t

The following pages of the indicated procedure (s) contains items which-involve personal privacy or proprietary material. PLEASE REMOVE THE INDICATED MATERIAL PRIOR TO DISTRIBUTION TO PUBLIC DOCUMENT ROOMS, ETC.

PROCEDURE (S)

PAGE(S)

SIGNATURE:

DATE:

UPDATED PRINT NAME 1

1 i

j form title:

form no.

icht, TRANSMITTAL (PROCEDURE / WORK PLANS / CHANGES / FORMS) 1013.002H l

yQqre o ~ t

4. 11.<,

p V

1 9502220198 950209

.1 h I

PDR ADOCK 05000313

,( V 4

p PDR

ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE 60 of 75 O

PROCMORK PLAN NO.

REV.

TITLE: EVACUATION 1903.030 21 EXP.DATE SAFETY-RELATED N/A SYES ONO CONTROLLED COPY # /0.3

=

N

,40e, o, SNO Self Check.

2 3

to 4

5 6

Think

~

9 Act 12 O

iew 16 cause Nobody's pericok 8

19 VERIFIED BY DATE TIME 20 21 22 23 24 APPROVAL AUTHORITY:

APPROVAL DATE:

2 'l-W O

41. /

" au'" # 'r c"ve #^'

FOFdij NO.

REV.

FORM TITyi~

UST OF AFFECTED PAGES 1000.006A 42 PC-1 y

PROCJWORK M.AN NO.

ppnt m MtE/ WORK PLAN Tm.E:

PAGE:

1 Of 24

'1903.030 EVACUATION REV:

21 CHANGE-0 1.0-PURPOSE The purpose of this procedure is to provide the symptoms for which a Localized Evacuation, Plant Evacuation, Eyclusion Area Evacuation, or an Offsite Evacuation should be declared and the subsequent actions to be taken by plant personnel.

2.0 SCOPE This procedure is applicable to emergency situations involving Unit One and/or Unit Two.

3.0 REFERENCES

3.1 REFERENCES

USED IN PROCEDURES PREPARATION:

3.1.1 Emergency Plan 3.1.2 ANO Security Plan and Procedures 3.1.3 E-27 Sheets 1-4,

" Schematic Diagram for the Evacuation Warning System" 3.1.4 E-427, Sheets 1-7,

  • Schematic Diagram for the Evacuation l

Warning System"

3.2 REFERENCES

USED IN CONJUNCTION WITH THIS PROCEDURE:

)

3.2.1 1903.010, " Emergency Action Level Classification" 3.2.2 1903.011, " Emergency Response / Notifications" 3.2.3 1043.034, " Security at ANO and the EOF During an Emergency" 3.2.4 1904.XXX, "Offsite Dose Projections Series" 3.2.5 1903.064, " Emergency Response Facility - Control Room" 3.2.6 1903.065, " Emergency Response Facility - Technical Support Center (TSC) "

3.2.7 1903.066, "Dmergency Response Facility - Operational Support Center (OSC)"

3.2.8 1903.067, " Emergency Response racility - Emergency Operations Facility (EOF)"

3.2.9 1903.077, "U.S. Army Corps of Engineers" 3.3 RELATED ANO PROCEDURES:

3.3.1 1903.023, " Personnel Emergency" 3.3.2 1903.034, " Emergency Operations Facility Evacuation" 3.4 REGULATORY CORRESPONDENCE CONTAINING NRC COMMITMENTS WHICH ARE IMPLEMENTED IN THIS PROCEDURE:

3.4.1 OCAN078609, Response to Deficiency 313; 368/8612-04, Step 6.3.2.

PRecAv0RK PLAN NO.

PROCEDURE / WORK PLAN Tm.E:

PAGE:

2 of 24 e

21 1903.030 EVACUATION CHANGE:

3.4.2 OCAN128211, Response to IR 313/82-23; 368/02-20, Sections s

6.5.4 A-E 4.0 DEFINITIONS 4.1 The Protected Area is the area encompassed by physical barriers (1 e.,

1 the security fence) and to which access is controlled.

4.2 The Exclusion Area is that area surrounding ANO within a minimum radius of 0.65 miles of the reactor buildings, but outside the protected area (security fence) and controlled to the extent necessary by ANO during periods of emergency.

4.3 A Localized Evacuation is the orderly withdrawal of all personnel from selected areas within the protected area.

The area selected for a localized evacuation should have well defined boundaries and be easily controllable (e.g.,

Unit 1 and/or Unit 2 Auxiliary Buildings, Radwaste Building, Hydrogen Storage Area, etc.).

4.4 A Plant Evacuation is the orderly withdrawal of all personnel from the protected area except for those personnel required to respond to the situation.

4.5 An Exclusion Area Evacuation is the orderly withdrawal of personnel from that portion of the Exclusion Area which is affected by an emergency condition as described in Section 6.1.3 4.6 An Offsite Evacuation is the orderly withdrawal of personnel from that portion of the area outside of the Arkansas Nuclear One Exclusion Area which is affected by an emergency condition as described in Section 6.1.4.

4.7 An Immediate Evacuation is the immediate and orderly withdrawal of all personnel from the affected Emergency Response Facility.

4.8 A Precautionary Evacuation is a multi-stage evacuation of personnel located within an Emergency Response Facility (i.e. secondary group evacuates first followed by a primary group as directed by the facility director).

4.9 Technical Support Center - The location within the ANO Plant l

Administration Building equipped with instrumentation and communication systens and f acilities useful in monitoring the course of an accident; this center is located in the 3rd Floor Conference Room.

[

4.10 Operational Support Center - Emergency response center within the ANO Maintenance Facility where support is coordinated for the following functions:

Onsite Radiological Monitoring Maintenance Nuclear Chendstry Emergency Medical Support Fire Fighting Support i

The OSC serves as the assembly point and briefing area for repair and damage control teams and is located in the Maintenance Facility.

i

4 PRocJWORK PUW NO.

PROCEDURE / WORK PUW TITLE:

PAGE:

3 of 24 W

21 1903.030 EVACUATION CHANGE.

~

(y-4.11 Initial Accountability - Measures to account for all individuals remsining onsite af ter the declaration of a plant evacuation. The obfective is to ascertain the names of missing individuals within 30 minutes following the declaration of a plant evacuation.

l 4.12 Continuous Accountability Measures to maintain accountability for all individuals remaining onsite following a plant evacuation.

5.0 RESPONSIBILITY AND AUTHORITY 5.1 The TSC Director (or the affected unit's Shift Superintendent if the TSC Director is not available) is responsible for declaring a Localized, Plant, or Exclusion Area Evacuation when any of the symptoms contained in Sections 6.1.1, 6.1.2, or 6.1.3 are detected.

5.1.1 The TSC Director and/or Radiation Protection and Radwaste Manager should ensure that evacuated personnel are monitored (i.e., via portal monitors or manual frisking) prior to their release from the site.

5.2 Arkansas Department of Health (ADH) personnel are responsible for implementing an Offsite Evacuation. This shall be accomplished in accordance with the Protective Action Guidelines contained in the State of Arkansas Emergency Operations Plan, Annex V,

" Arkansas Nuclear One Radiological Incident Response Plan".

The individ.al responsible for Emergency Direction and Control (i.e., the Shift Superintendent, TSC Director, or Emergency Operations Facility Director) is responsible for recommending an offsite Evacuation in O'

accordance with Procedure 1903.011, " Emergency Response / Notifications", Attachment 6.

5.3 The Security Shift Commander is responsible to provide initial accountability information to the TSC Support Superintendent. This information should be available within 30 minutes following a plant evacuation.

5.4 The TSC Support Superintendent is responsible to ensure that continuous accountability stations are established (control rooms, Maintenance Facility, and Admin. building) and results reported to the TSC Director.

5.5 Emergency Response Organization (ERO) Personnel who remain onsite following a plant evacuation are responsible to carry out instructions for initial and continuous accountability as described in section 6.3 of this procedure.

6.0 INSTRUCTIONS 6.1 INITIATING CONDITIONS NOTE If releases of radioactivity are in progress or suspected, the 1904.XXX, "Offsite Dose Projections Series" procedures should be utilized to i

assess the potential doses. Once the doses have been assessed, a determination can be made as to whether or not the conditions warrant the declaration of an emergency class and the subsequent recommendation of protective actions for onsite and offsite personnel.

1

i PReCMORK PUW NO.

PROCEDURfm0RK PUW Tm.E:

PAGE:

4Of24 nm 21 1903.030 EVACUATION CHANGE:

6.1.1 Localized Evacuation A.

A localized evacuation will be initiated if any condition exists which in the opinion of the TSC Director (or the affected unit's Shift Superintendent if the TSC Director is not avaiable) may pose a threat to the health and safety of plant workers. The threat must be confined to a localized area (i.e.,

the area selected for evacuation should have well defined boundaries and be easily controllable).

B.

If the threat extends beyond a localized area, then consideration should be given for a Plant, Exclusion Area and/or Offsite Evacuation.

6.1.2 Plant Evacuation

,The principal consideration when contemplating a Plag Evacuation is the safety of plant personnel.

A plant evacuation shall be considered in response to the following conditions:

A.

Declaration of a Site Area or General Emergency.

B.

General area radiation levels outside of a Radiologically controlled Area exceeds 2.5 mrem /hr, which is attributed to a loss of control of s_)

radioactive material and the threat cannot be confined to a well-defined area.

C.

Unevaluated airborne radioactivity exceeds 9E-10 i

uCi/ce, which is attributed to a loss of control of radioactive material and the threat cannot be confined to a well-defined area.

D.

An uncontrolled toxic gas leak (originating either on-site or off-site) where the hazard is not confined to a local area.

The decision to evacuate non-essential personnel or retain them on-site should be based on the course of action which presents the minimum risk to employees.

For example:

An ongoing security threat within the protected area (consult with the Security Shift Commander to aid in determining the safest course of action).

Inclement weather (e.g., Tornado, high winds, 1

hazardous road conditions may preclude a safe evacuation of plant personnel).

Radiological hazards exist.

(Determine which action would result in lower dose to nonessential personnel).

iC Other hazards exist which might subject evacuees to a higher risk to personnel safety.

i

Pnoc>wasut PUW NO.

PROCEDUREJWORM PUW Tm.E:

PAGE:

5 of 24 e

21 1903.030 EVACUATION CHANGE:

r\\

6.1.3 Exclusion Area Evacuation A.

An exclusion area evacuation shall be initiated if unevaluated general area radiation levels exceed 2.5 MREM /hr within the Exclusion Area.

I B.

Personnel within the Exclusion Area could receive an exposure to a toxic gas (e. g., transportation accident involving truck, rail, or barge).

6.1.4 Offsite Evacuation A.

An offsite Evacuation shall be recommended in accordance with Procedure 1903.011, " Emergency Response / Notifications", Attachment 6.

6.1.5 EOF Evacuation A.

See Procedure 1903.034, " Emergency Operations Facility Evacuation" l

6.2 IMKEDIATE ACTIONS 6.2.1 Localized Evacuation A.

If the conditions listed in section 6.1.1 are observed, then a localized evacuation of the affected area (s) should be initiated.

\\

B.

Before making an announcement over the PA system, ensure that consideration is given for the following:

i 1.

Determine if any areas of the plant should be i

avoided during the localized evacuation.

2.

Determine, if necessary, any other special protective measures which should be taken by evacuees (such as ad hoc respiratory protection, etc.).

1 3.

Determine which portion, if any, of the Evacuation Alarm System should be activated (see step 6.2.1.D).

C.

Make the following announcement over the plant PA system (dial 197):

" Attention all personnel. Attention all personnel.

Due to (state reason) all personnel evacuate the (state the localized area to be evacuated). All other plant personnel continue normal activities until instructed otherwise."

D.

Activate the localized evacuation alarm, if evacuating the Reactor Building and/or the Auxiliary Buildings, for approximately 20 seconds. A brief description of the control room handswitch settings for the Evacuation Alarm System is outlined below:

1.

Unit 1 - Three (3) position handswitch 1

PRoCmoset PUW NO.

PROCEDUREMORK PtAN TITtE:

PAGE:

6 Of 24 Rm 21

'1903.030 EVACUATION CHANGE:

a.

REAC. BLD.

Activates the Unit 1 Reactor Building Alarm System only b.

OFF - Deactivates the Evacuatior, Alarm System j

c.

PHY. PLT.

Activates the Evacuation Alarm System for the entire physical plant including surrounding buildings located within the protected area.

2.

Unit 2 - Four (4) position handswitch a.

OFF - Deactivates the Evacuation Alarm System b.

CTMT - Activates the Unit 2 Reactor Building i

Alarm system only c.

CTMT AUX - Activates only the Unit 2 Reactor Building and Unit 2 portion of the Auxiliary Building Alarn System d.

PLANT - Activates the Evacuation Alarn System for the entire physical plant including surrounding buildings located within the protected area.

E.

Repeat the announcement in step 6.2.1.C in a slow, l

clear tone of voice several times (alternating the announcement with the activation of the localized evacuation alarm, if applicable).

6.2.2 Plant Evacuation i

i A.

The TSC Director (or the affected unit's Shift Superintendent if the TSC Director is not available) should refer to form 1903.030B, " Plant Evacuation i

checklist" to determine if a plant evacuation is advisable.

B.

Shift Operations personnel on duty should report to the Control Room.

Shift Operations personnel not on duty (training / support) should report to the OSC Assembly Area (located in the Maintenance Facility) and report to the OSC Director.

C.

The following groups should immediately report to their designated emergency work location and notify their immediate supervisor of their location for accountability purposes.

1.

Technical Support center Staff (TSC) j 2.

Operational Support Center Staff (OSC) j

()

3.

System Engineering Personnel (Adm. Building -

3rd Floor Library)

PR6CJWORK M.AN NO.

PROCEDURFJWORK PLAN Tm2:

PAGE:

7 Of 24 REV:

21 1903.030 EVACUATION CHANGE:

4.

All other shift personnel (i.e. affected unit Maintenance personnel, Nuclear Chemistry personnel, Health Physica personnel, etc.) should report to the OSC Assembly Area (located in the Maintenance Facility).

I D.

Maintenance personnel from the unaffected unit who are neither a part of the OSC staff or are not assigned a i

position or task in the Emergency Response organization, should report to the EOF and standby for instructions (See Procedure 1903.067, " Emergency Response Facility - Emergency Operation Facility

( EOF) ", for assembly location.)

E.

If the threat extends beyond the protected area, then consideration should be given for initiating an Exclusion Area Evacuation and/or recommending an evacuation (and/or sheltering) of offsite areas.

6.2.3 Exclusion Area Evacuation A.

If either of the conditions listed in section 6.1.3 are detected, then an exclusion area evacuation should be initiated.

B.

Coordinate with Security Personnel on the evacuation and control of the affected area (s) within the exclusion area (including the Generation Support Building).

C.

Contact the U.S. Army Corps of Engineers to request that boat access to the portions of Lake Dardanelle within the exclusinn v;ea be controlled.

D.

Make the following announcement over the plant (197) and EOF PA system (dial 199 and pause approx.15 sec.)

" Attention all personnel. Attention all personnel.

Due to (state reason) security will be restricting access to (state area). All personnel avoid this (these) area (s) until further notice.

E.

If the threat extends beyond the exclusion a:ea, then consideration should be given for recommending an evacuation (and/or sheltering) of offsite areas.

6.2.4 offsite Evacuation A.

Refer to Procedure 1903.011, " Emergency Response / Notifications", Attachment 6, to determine the appropriate offsite Protective Action Ree:onsnendation (PAR).

6.3 ACCOUNTABILITY k

6.3.1 The objective of Initial Accountability is to ascertain the names of missing individuals no later than 30 minutes after s

the decision has been made to evacuate non-essential personnel. This will be achieved in the following manner:

Paocswonx PLAN NO.

PROCEDURE /WCdtK PLAN TITLE:

PAGE:

8 Of 24 nm 21

'1903.030 EVACUATION CHANGE.

/

\\

A.

Plant evacuees are accounted for as they exit the plant and are logged offsite by the security computer.

B.

Emergency response personnel, who remain onsite are required to log in at the nearest security card reader using the special accountability code 0000 in lieu of

]

their PID.

C.

A list of missing individuals will be generated by the security computer based upon information acquired through steps 6.3.1.A and 6.3.1.B above. This list shall be available no later than 30 minutes after the decision has been made to evacuate non-essential l

personnel.

D.

The TSC Director shall initiate search and rescue ef forts to locate udssing personnel identified by the security computer.

6.3.2 Personnel who remain onsite following a plant evacuation are also to be accounted for on a continuous basis throughout an emergency.

A.

Continuous Accountability control points shall be established at entry / exit points to the Administration Building, Maintenance Facility and Control Rooms.

B.

Personnel entering or leaving the Administration l

O Building or Control Rooms are responsible to record their relocation on Form 1903.030A, "Onsite Continuous Accountability Log".

C.

Accountability information for onsite personnel who are not assembled in the Administration Building, Maintenance Facility or Control Rooms can be obtained from the ERO menber responsible for that particular task as described in section B of the Emergency Plan and the Emergency Response Facility Procedures -

1903.064, 1903.065, 1903.066 and 1903.067 (e.g.,

information on Nuclear Chemistry personnel can be obtained from the Nuclear Chemistry Manager.)

1.

Additional information for onsite personnel, including their department and the individual responsible for them while onsite, can be obtained through the Support Manager.

6.4 FOLLOW-UP ACTIONS 6.4.1 Determine if any Emergency Action Level criteria have been exceeded.

(Refer to 1903.010, " Emergency Action Level Classification")

6.4.2 Personnel (other than emergency response personnel) in the controlled Access Areas should proceed to the Controlled Access points and monitor themselves, if possible, or O-follow HP instructions at the Controlled Access points prior to exiting.

PROCJWORK PLAN NO.

MtOCEDURE/ WORK PLAN Tm.E:

PAGE:

9 Of 24 m:

21

'1903.030 EVACUATION CHANGE.

-)

6.4.3 Personnel other than the emergency response personnel j

should proceed to their respective guard house, turn in I

their personnel I.D. badge and their personnel dosimetry badge (TLD), exit the plant and proceed home or as directed by State and local authorities.

6.4.4 Security personnel should implement evacuation and personnel accountability measures per Procedure 1043.034,

" Security at ANO and the EOF During an Emergency".

6.4.5 If there are person (s) unaccounted for following a plant evacuation, the Shift Superintendent /TSC Director shall direct personnel to search for unaccounted individual (s).

6.4.6 When conditions have been determined to no longer r~;uire evacuation, the TSC Director (or the affected unit's shift Superintandent if the TSC Director is not available) may terminate the localized, exclusion area and/or plant evacuation. Termination of evacuations involving offsite areas must be coordinated with ADH personnel.

6.5 Evacuation of the Technical Support Center and Operational Support Center The Technical Support Center (TSC) and the Operational Support Center (OSC) are normally not evacuated in the event of a Plant Evacuation.

The Onsite Radiological Monitoring Section of the Emergency Radiation Team shall monitor radiation levels while the centers remain occupied.

However, if the following symptons are observed in the TSC/OSC, actions should be taken in accordance with Sections 6.5.2 and 6.5.3.

6.5.1 Symptoms A.

Area radiation levels above 2.5 mrem /hr.

B.

Unevaluated airborne radioactivity >9E'" pCi/cc.

6.5.2 Immediate Action A.

Notify the TSC Director (or the affected unit's Shift Superintendent if the TSC Director is not available) of the above condition (s).

B.

The TSC Director (or the affected unit's Shift Superintendent ** the TSC Director is not available) should determir." if the condition warrants further protective actions in accordance with Section 6.5.3. is provided for action guidance.

6.5.3 Follow-Up Actions A.

The Onsite Radiological Monitoring Section of the Emergency Radiation Team should increase surveillance of airborne radioactivity to once per hour.

B.

The Onsite Radiological Monitoring Section of the

[

(

Dmergency Radiation Team should determine the dose rates in the area approximately every 15 minutes.

Projected personnel accumulated doses should be evaluated and appropriate stay times should be established.

PROCJWORK PUW NO.

PROCEDURE / WORK PLAN TITLE:

PAGE:

10 of 24 m:

21 i

1903.030 EVACUATION CHANGE:

NOTE If necessary, additional respiratory protection equipment should be obtained from the Onsite Radiological Monitoring Section of the Emergency Radiation Team.

4 C.

If the iodine concentration exceeds 2.7E pCi/ce, an occupancy log must be kept to record DAC hours.

If the iodine concentration exceeds 4 DAC (8.0E" pCi/cc),

respiratory protection or evacuation is required.

D.

If the radiation level-is greater than 100 mrem /hr but less than 1 Rem /hr:

1.

30 minutes may be allowed to determine if it is a temporary condition or a long-term condition.

2.

If it is determined that a temporary condition exists, evaluate the projected pertonnel accumulated dose.

3.

If it is determined that a long-cerm condition exists, evacuation of the Technical Support Center and Operational Support Center will be required.

()

E.

If radiation levels reach 1 Rem /hr, immediate evacuation of the Technical Support and operational Support Center is required.

F.

If the Technical / Operational Support Centers are evacuated, Technical / Operational Support Center personnel should relocat? to the EOF (use west end, ground floor entrance).

NOTE After relocation to the Secondary TSC/OSC, Emergency Team Leaders are responsible for reporting accountability of team personnel to their supervisors.

Each TSC/OSC staff person is responsible for accounting himself to their supervisors.

Each manager shall report accountability information to the TSC Support Superintendent.

G.

If the Technical / Operational Support Centers are evacuated, security personnel should implement evacuation and personnel accountability measures per Procedure 1043.034. " Security at ANO and the EOF During an Emergency".

H.

Accountability results of emergency personnel should be reported to the TSC Director at the eor, or to the Shift Superintendent if the TSC Director caract be

g readily contacted.

j V

l I

i

PROCJWORK PUW NO.

PROCEDURE / WORM PLAN Tm.E:

PAGE:

11 Of 24 m:

21

'1903.030 EVACUATION CHANGE:

\\s '

I.

  • The Security Shift Commander, except for Control Room personnel, should be the last to exit the plant to assure security and accountability actions have been completed. They should advise the Shift Superintendent of the affected unit upon their exit of the plant.*

J.

When a Technical / Operational Support Center evacuation is declared, the TSC Director (or the affected unit's Shift Superintendent if the TSC Director is not available) should consider the need for an Exclusion Area Evacuation per Section 6.1.3 if not already declared.

6.5.4 Immediate Evacuation of TSC/OSC A.

The TSC Director should verify the need for and declare an immediate evacuation of the Technical / Operational Support Centers when symptons occur which require such action per Section 6.5.3.E.

B.

The TSC Director should contact the Main Guard Station and the Shift Superintendent to advise that an immediate evacuation has been declared.

C.

The TSC Director r.hould ensure that an evacuation announcement is made over the Public Address System, and the plant evacuation alarm is sounded. The TSC 5

Director should determine, at his discretion, the affected personnel to whom the announcement applies.

NOTE The evacuation announcement should state:

"An immediate evacuation of Technical Support Center and operational Support Center personnel has been declared.

(Affected personnel) implement evacuation procedures.

(Affected personnel) relocate to the EOF via (designated evacuation route)."

(This announcement and the evacuation alarm should be repeated several times, if possible).

D.

All Technical / Operational Support personnel should gather essential materials (e.g. log books, status sheets, drawings in-use, etc.) and equipment (e.g.

SCBA's, survey meters, protective clothing, etc.) and evacuate their respective areas without further delay.

E.

Prior to his relocation to the Secondary Technical Support Center, the TSC Director may, at his discretion, transfer his duties to the following individual who will function as interim TSC Director:

1.

If the Dmergency Operations Facility is not activated, the Shift Superintendent of the affected unit may temporarily assume the TSC O

Director duties; or

PROCJWORK PLAN NO.

PROCEDURE / WORK PUW TITLE:

PAGE:

12 Of 24 m:

21 1903.030 EVACUATION CHANGE:

f" f

2.

If the Emergency Operations Facility is operational, then a turnover of emergency functions to the EOF Director shall be performed in accordance with procecure 1903.065.

F.

After transferring these duties to the appropriate individual, the TSC Director should evacuate in accordance with Section 6.5.3.I.

G.

Upon arrival at the Secondary Technical Support Center, the TSC Director should establish communications with the interim TSC Director to receive a status update and to reassume Emergency Coordinator duties.

H.

Emergency response personnel should report to their preassigned work areas in the Emergency Operations Facility, unless directed otherwise, (see Procedure 1903.067, " Emergency Response Facility - Emergency Operations Facility (EOF)", for room assignments).

I.

The TSC Director should ensure that the NRC and State authorities are advised of the relocation to and operational status of the Secondary Technical / Operational Support Center (s).

J.

The TSC Director should advise the Shift Superintendent when the Secondary Technical Support Center is functional, j

K.

The TSC Director (or the affected unit's Shift Super-intendent if the TSC Director is not available) must approve reentry into the plant until the evacuation is terminated.

L.

When the plant is determined to have returned to a condition where the TSC/OSC evacuation is no longer required, the TSC Director (or the affected unit's Shift Superintendent if the TSC Director is not available) may terminate the TSC/OSC evacuation.

6.5.5 Precautionary Evacuation of TSC/OSC A.

The TSC Director should verify the need for and declare a precautionary evacuation of the Technical / Operational Support Centers when symptoms occur which require such action per Section 6.5.3.C and/or 6.5.3.D.

B.

The TSC Director should contact the Main Guard Station and Shif t Superintendent and advise them that a precautionary evacuation has been declared.

C.

The TSC Director should ensure that an evacuation announcement is made over the Public Address System, and the plant evacuation alarm is sounded. The TSC

)

Director should determine, at his discretion, the l

affected personnel to whom the announcement applies.

PAGE:

13 of 24 l

PROCMORK PLAN NO.

MtOCf. DURE / WORK PLAN Tm.E:

e 21 1903.030 EVACUATION CHANGE:

d NOTE The evacuation announcement should state:

"A t

Precautionary Evacuation of Technical Support Center and Operational Support Center personnel t

has been declared.

(Affected personnel) implement evacuation procedures.

(Affected personnel) relocate to the EOF via (designated evacuation route)."

(This announcement and the evacuation alarm should be repeated several times, if possible.)

D.

All Technical / Operational Support personnel shall gather necessary materials (e.g. log books, status sheets, drawings in-use, etc.) and equipment (e.g.

SCBA's, survey meters, protectf ve clothing, etc.) and evacuate their respective areas as instructed by the TSC Director per Section 6.5.5,E.

E.

A precautionary evacuation of the TSC/OSC should be accomplished by relocating a primary and a secondary group of emergency response personnel as identified in

>, or as otherwise designated by the TSC Director. The secondary TSC/OSC group should evacuate first; the primary group should evacuate upon the direction of the TSC Director, if practical after the secondary group is in place at the EOF.

  • Security

/~'N personnel will normally evacuate with the primary

(,,)

group *.

F.

Prior to his relocation to the Secondary Technical Support Center, the TSC Director may, at his i

discretion, transfer his duties to the following l

individual who will function as interim TSC Director:

1.

Shift Superintendent, as deemed necessary if the TSC Director is in a situation such that he could not perform TSC Director duties during the TSC to Secondary TSC transition, and 1.f the EOF is not activated; or 2.

EOF Director, if EOF is activated.

G.

After transferring these duties to the appropriate individual, the TSC Director and the primary TSC group should evacuate in accordance with Section 6.5.3.I.

H.

Upon arrival at the Secondary Technical Support Center, the TSC Director should establish communications with the interim TSC Director to receive a status update and to reassume Emergency j

Coordinator duties.

I.

Emergency response personnel should report to their 4

preassigned work areas in the EOF, unless directed i

otherwise.

(See procedure 1903.067, " Emergency O

Response Facility - Emergency Operations Facility (EOF)" for room assignments.)

e

PROCJWORK PUW NO.

PROCEDUREJWORK PLAN TITLE:

PAGE:

14 Of 24 nm 21

'1903.030 EVACUATION CHANGE:

O J.

The TSC Director should ensure that the NRC and State Emergency Operation Centers are advised of the relocation to and operational status of the Secondary Technical / Operational Support Center (s).

K.

The TSC Director should advise the Shift Superintendent when the Secondary Technical Support Center is functional.

L.

The TSC Director (or the affected unit's Shift Superintendent if the TSC Director is not available) must approve reentry into the plant until the evacuation is terminated.

M.

When the plant is determined to have returned to a condition where the plant evacuation is no longer required, the TSC Director may terminate the plant evacuation.

NOTE INFORMATION CONTAINED WITHIN THE SYMBOLS (*) IS PROPRIETARY OR PRIVATE INFORMATION 6.6 EOF EVACUATION 6.6.1 See Procedure 1903.034, " Emergency Operations Facility O

Evacuation" 6.7 ROAD BLOCKS 6.7.1 Road blocks restricting access to ANO should be manned by at least one ANO Security Officer. The ANO Security Officer should be capable of making radio contact with the Security Shif t Commander. The Security Shift Commander shall obtain verbal approval from the Shift Superintendent /TSC Director or the EOF Director before allowing passage of individual (s) who are not part of the response organization.

7.0 ATTACHMENTS AND FORMS 7.1 Form 1903.30A - Onsite Accountability 7.2 Form 1903.30B - Plant Evacuation Checklist 7.3 - Technical and Operational Support Center Evacuation Decision Flow Chart 7.4 - TSC/OSC Precautionary Evacuation Primary / Secondary Group Assignments

PROCJWORK PLAN NO.

PROCEDURE / WORK PLAN TITLE:

PAGE:

15 of 24 e

21 1H3.030 EVACUATION CHANGE.

r~)

t ATTACHMENT 1 Technical and Operational Support Center Evacuation Decision Flow Chart l

75C/05C ACTiv&TED l

4 ACTIONI MONITtpt ARE A RADI ATION ACTION:

and AlR80RNE LEVEL 5 t1i INCREASE AIR 80RNE SURVE!LL ANCE jf TO O*CE PER MOUR. g ARE ARE A RADI Afl0N LEVEL 5 > 2.5 prewnr (28 IONITOR ARE A DOSE RATES sui LESS TNAN 100 nr Wrr ond/or XE MR 15 WINUTES. g UNEVALuATED AIR 80RNE RADICACT!vlTY YES (31 EVALUATE PROJECTED INTEGRATED IN E CESS Or SE-10 pCs/cci PERSONNEL DOSES. a_nd idi ESTABLISM STAY-fines.

(Si EVACUAfl0N NOT usuALLY NECE55 ART.

NO ACTlW43

\\

ARE ICDINE CONCENTRATIONS t1i MalNTAlm OCCUPANCY LOG YE5 0F DAC MouR5

> 2. 7 E -9 p C l /CC T 121 IF ICDINE CONCENTRATICM

>4 OAC (8.0E-8 p CI/ccia tel RESPIRATORY PROTECTION RE0ulRED. r (D) PREtaufl0N Y EVACUATION REcutRED ARE AREA RADI ATION LEVEL 5

> 100 nroWrr suT <1 reWHRT 45 11I DETEftallt WITHIN 30 WINUTES IF TEtPORARY OR LONG-TERW CCN0lfl0N EXISTS. and_

(21 IF TEIPWLARY. EVALUATE PROJECTED INTEGRATED NO 831 IF LWsG-TERad PRFCAUY10 NARY EVACuafl0N REQUIRED.

lI ACTION:

l ARE RADI All0N LEVEL 5 21 rewtri YES

?

ItefDIATE E YACuaT ION fE QUIED i

U j

ACT1pN: NO SPECl AL ACT 10N RE QUIREO.

CDdTINUE NP AK A RADIATION and AIRB0HNE

)

LEVEL suRVE ILLANCE.

l PROCJWORK PLAN NO.

PROCEDURE / WORK PLAN Tm2:

PAGE:

16 Of 24 Rn:

21

'1903.030 EVACUATION CHANGE j

b ATTACHMENT 2 l

TSC/OSC Precautionary Evacuation Primary / Secondary Group Assignments (Note: TSC Director may alter assignments as he deems necessary) f Technical Support Center Primary Secondary TSC Director Operations Manager Engineering Manager Maintenance Manager Radiation Protection and Radwaste Manager TSC Support Superintendent x

Assistants / Communicators USNRC Personnel Operational Support Center:

Primary Secondary As determined by the TSC Director All OSC personnel not designated by the TSC Director to remain onsite.

1.

Minimal staffing for a re-covery team, cosidering on-going or short term repair requirements, and to in-clude at least one HP and one medical team member.

2.

Minimal security person nel as recommended by the Security Shift Supervisor /

Security Coordinator.

l l

i Page 17 cf 24 Location (circle one):

C.R.(U-1)

C.R.(U-2)

ADMIN BLDG MAINTENANCE FACTI.'Tv h

)

Return Time Retten Time j

Name ERO Postion Exit Time Destination (Estimate)

(Actual),,j

)

)

i O

FORM NO.

REV.

O FORM TITLE:

ONSITE CONTINUO'JS ACCOUNTABILITY LOG 1903.030A 21

Page 18 cf 24 Page 1 of 7

/)

(/

Section 1 - Evacuation Determination (TSCD or Shif t Superintendent).

Section 2 - Evacuation Preparation (TSCD or Shift Superintendent).

Section 3 - Evacuation Announcement Instructions (Shift Superintendent).

==========...................

====================================,==t

SECTION 1 CIRCLE ONE This secticn should be used to determine if a plant evacuation is advisable, based on the following steps.

1.0 Dete';mine if any Initiating conditions listed below are present (then proceed to step 2).

1.i Site Area or General Emergency has been declared.

Yes No 1.2 General area radiation levels outside of a Radiologically Yes No Controlled Area exceeds 2.5 mrem /hr, which is attributed to a loss of control of radioactive material and the threat cannot be confined to a well-defined area.

1.3 Unevaluated airborne radioactivity exceeds 9E-10 pCi/ce, Yes No which is attributed to a loss of control of radioactive material and the threat cannot be confined to a well defined area.

1.8 An uncontrolled toxic gas leak (originating either Yes No on-site or off-site) where the hazard is not confined to a local area.

2.0 Determine if any of the Extenuating Conditions listed below, which might preclude immediate evacuation, are present (then proceed to step 3).

2.1 An ongoing security threat within the protected area Yes No (consult with the Security Shift Commander to aid in determining the safest course of action).

2.2 Inclement weather (e.g., tornado, high winds, hazardous Yes No road conditions that may preclude a safe evacuation of 1

plant personnel),

2.3 Radiological or Hazardous Materials conditions exist Yes No which would subject evacuees to higher exposure / risk to 1

personnel safety.

2.4 Other hazards exist which might subject evacuees to a Yes No 1

higher risk te personnel safety.

O--

FORM NO.

REV.

F ORM TITLE:

PLANT EVA.CUATION CHECKLIST 1903.030B 21 l

Page 19 of 24 Page 2 of 7

(~~g)

CIRCLE ONE x.

3.0 COMPARE the risks presented by on-site and near-site conditions (identified in Sections 1.0 and 2.0) with the risks associated with evacuation of non-essential personnel.

THEN select the action listed below which presents the MINIMUM RISK to personnel safety.

IF plant conditions present NO RISK to on-site personnel, THEN select 3.2 below.

3.1 If EVACUATE non-essential personnel is selected, Yes No proceed to section 2.

3.2 If NOT EVACUATE non-essential personnel is selected, Yes No proceed to step 4.0 of this section.

INITIALS / TIME 4.0 NO PLANT EVACUATION 4.1 IF a plant evacuation WILL NOT be initiated, AND A SLte

/

Area or General Emergency has been declared, make the following announcement over the plant page (dial 197):

" Attention all personnel. Attention all personnel. A (Site Area Emergency / General Emergency) has been declared on Unit (One/Two).

/s Emergency response personnel report to your designated

()

assembly areas (or " continue emergency response activities", as appropriate). All other personnel continue normal activities unless instructed otherwise."

A.

Repeat the announcement using the EOF paging

/

system (dial 199 and pause approxinately 15 seconds).

4.2 Ensure that the conditions which prompted the potential evacuation are periodically monitored and re-evaluated.

(END OF SECTION 1)

FORM NO.

REV.

FORM TITLE:

1903.030B 21 PLANT EVACUATON CHECKUST t

Page 20 of 24 Page 3 of 7 U

SECTION 2 INITIALS / TIME This section is used to prepare for a plant evacuation.

1.

Determine the appropriate evacuation route (s) based on symptoms

/

and wind direction (see map below).

Evacuation route (s) to be used (circle one):

Route 1 Route 2 Both (routes 1 and 2) l ANO Emergency Operations Facility Location & Site Evacuation Routes l

./

-s N

1.a#

(

ua 4,

x N

-u m, m

. (B"

\\ s LLA c

JW LQ\\,

-W.

x x, w, - --

L w

/

C 1

NOTE: Circumference denotes Exclusion Area boundary (0.65 mile radius)

FORM NO.

REV.

FORM TITLE:

PLANT EVACUATION CHECKLIST 1903.030B 21

P80e 21 of 24 l

Page 4 of 7 tO Initials / Time 2.

Deterndne if any areas of the plant should be avoided during evacuation.

Plant areas to be avoided (or none):

3.

Deterudne any other special protective measures that should be taken by plant evacuees (such as ad hoc respiratory protection, etc.).

Special protective measures necessary (or none):

4.

Contact Security and direct them to perform initial accountability.

/

5.

Contact Health Physics:

5.1 Request HP coverage at the portal monitors located at plant

/

l exit locations.

5.2 If necessary, instruct HP personnel at the controlled access exit point to relax decontamination \\ radiation protection measures in order to expedite evacuation of the controlled access area.

\\-

6.

Choose the appropriate announcement to be made by Control Room personnel.

(circle one)

A B

f 6.1 For a plant evacuation due to declaration of a Site Area Emergency (SAE) or General Emergency (GE), choose announcement "A".

j l

A.

" Attention all personnel. Attention all personnel. A (Site Area 1

Emergency / General Emergency) has been declared on Unit (One/Two). All emergency response and emergency standby personnel report to your assembly areas immediately. All other personnel evacuate the plant and proceed home or as directed by offsite authorities."

(If applicable, also give the evacuation route (s ) to be used and/or any other special protective measures while taking into consideration that seferal emergency response personnel may be responding to the EOF from the plant.)

FORM NO.

REV.

\\

1903.0308 21 I

FORM TITLE:

PLANT EVACUATION CHECKUST J

i 1

Page 22 of 24 i

i 1

I Page 5 of 7

[}

Initials / Time J

N-6.2 For a plant evacuation due to a reason other than declaration of a SAE or GE, choose announcement "B" B.

" Attention all personnel. Attention all personnel. A plant evacuation has been declared on Unit (One/Two). All emergency response and emergency standby personnel report to your assembly areas immediately. All other personnel 5

evacuate the plant and proceed home or as directed by offsite authorities."

(If applicable, also give the evacuation routo(s) to be used and/or any other special protective measures while taking into consideration that several emergency response personnel may be responding to the EOF from the plant.)

7.

Contact the Shift Superintendent of the affected unit and direct

/

him to refer to section 3 of this checklist to coordinate making the evacuation announcement and sounding the evacuation alarm.

7.1 Direct the Shif t Superintendent to nake the announcement chosen in Step 6.

7.2 Provide information about the evacuation route (s) and/or special protective actions to be taken by plant evacuees.

(

i s

8.

Direct the ERO staf f to log in at a security card reader using

/

"0000".

9.

If the incident extends into Exclusion Area Evacuation, the Shift

/

Superintendent or the TSC Director shall perform the following:

9.1 Centact the U.S. Corps of Engineers (Section 6 of the 6

Emergency Telephone Directory) to request that boat access to the portions of Lake Dardanelle within the exclusion area be controlled.

l 9.2 Direct Security to evacuate the Generation Support Building (GSB) and all buildings outside of the security fence but within the exclusion area.

Performed by:

/

(Signature)

(Position)

(END OF SECTION 2)

FORM TITLE:

FORM NO.

REV.

PLANT EVACUATION CHECKUST 1903.030B 21

Page 23 0f 24 Page 6 of 7

\\- /

SECTION 3 This section contains tasks that should be completed from the control room.

1.

Evacuation announcement to be made (circle one): A B

/

A.

" Attention all personnel. Attention all personnel. A (Site Area Emergency / General Emergency) has been declared on Unit (One/Two). All emergency response and emergency standby personnel report to your assembly areas immediately. All other personnel evacuate the plant and proceed home or as directed by offsite authorities."

If necessary, include in the announcement the evacuetion route (s ) and/or special protective actions to be taken by plant evacuees:

B.

" Attention all personnel. Attention all personnel. A plant evacuation has been declared on Unit (One/Two). All emergency response and emergency standby personnel report A

to your assembly areas immediately. 7d1 other personnel evacuate the plant and proceed home or as directed by offsite authorities."

If necessary, include in the announcement the evacuation route (s) and/or special protective actions to be taken by plant evacuees:

2.

Make the appropriate announcement via the plant paging system

/

(dial 197).

3.

Make the appropriate announcement via the EOF paging system (dial

/

199 and pause approx. 15 seconds).

4.

Sound the plant evacuation alarm for approximately 20 seconds.

/

I FORM NO.

REV.

\\

FORM TITLE:

1903.030B 21 PLANT EVACUATION CHECKUST

Page 24 of 24 Page 7 of 7 O

Initials / Time 5.

Repeat the appropriate announcement in a slow, clear tone of voice

/

several times, alternating the announcement with the sounding of the plant evacuation alarm.

6.

Instruct control room personnel f rom both units to 1)g in to the

/

designated security card reader using "0000".

I Performed by:

/

(signature)

(position)

Date:

(END OF SECTION 3) s FORM NO.

REV.

F ORM TITLE:

PLANT EVACUATION CHECKUST 1903.030B 21 i

-.