Arkansas Nuclear One - Administrative Senices ENTERGY OPS, INC 1448 SR 333 Russellville, AR 72801 Document Control 11/2498 Controlled Document Transmittal COPYHOLDER NO:
102 TO:
NRC DOCUMENT CONTROL WASIIINGTON, D.C.
DOCUMENT TITLE:
UNIT II TECIINICAL REQUIREMENT MANUAL REV/ AMEND /CHG NO: APPROVED REV 01
SUBJECT:
EFFECTIVE DATE 11/23/98 f this box is checked, please sign, date, and return transmittal in O
envelope provided.
/
ANO-1 Docket 50-313 A
<%v/
7ANO-2 Docket 50-368 Signature Date 9812020128 981124
~
ADOCK0500g8 PDR
ATTACHMENT TO REVISION NO. "1" i~
FOR ANO-2 i
TECHNICAL REOUIREMENTS MANUAL (TRhD l
j-Revise the following pages of the TRM for ANO-2 with the attached pages. The revised pages are identified by Revision number and contain vertical lines indicating the area of change.
i l
INSERT PAGES REMOVE PAGES i
3.3-8 3.3-8 i
)
i i
J l
i lO i
0 I
1 l
1 i
O i
]
4 INSTRUMENTATION 3/4.3.4 TURBINE OVERSPEED PROTECTION LIMITING CONDITION FOR OPERATION 3.3.4.1 -
At least one turt>ine overspeed protection system shall be OPERABLE.
4 f
APPLICABILITY: MODES 1,2 and 3.
ACTION:
i
- a. With one stop valve and/or one control valve inoperable, and/or one reheat stop 2
j' valve and/or one intercept valve inoperable, restore the inoperable valve (s) to
~
OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or close the inoperable valve (s) or isolate the i
[
turbine from the steam supply within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
t i
- b. With the above required turt>ine overspeed pret.ction system otherwise inoperable, j
i within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> isolate the turbbe from the steam supply.
l t
j SURVEILLANCE REQUIREMENTS j
4.3.4.1.1 The provisions of Technical Specificabon 4.0.4 are not applicable.
j 4.3.4.1.2 The above required turt>ine overspeed protection system shall be demonstrated j
OPERABLE:
i
- a. At least once per 92 days
- by direct observation of the movement of each of the l
j foliowing valves through at least one complete cycle from the running position:
l,
- 1. Four high pressure turbine stop valves.
4 i
l
- 2. Four high pressure turbine control valves.
1 l
- 3. Four low pressure turbine reheat stop and intercept valves.
l j
- b. At least once per 18 months by performance of a CHANNEL CAUBRATION on the i
turbine overspeed protection systems.
l l
- c. At lemt once per 40 months by disassembling at least one of each of the above valves and performing a visual and surface inspechon of valve seats, disks and stems and verifying no unacceptable flaws or corrosion.
l i
i l
1 i
i l
m The 92 day frequency may be extended on a case by case basis for the high pressure turbine control valves with an approved ER evaluation that has been evalua'.sd under 50.59.
ANO-2 TRM 3.3-8 Rev. 1 1