Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage
ML20210K357
Person / Time
Site: Arkansas Nuclear 
Issue date: 07/29/1999
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20210K354 List:
References
NUDOCS 9908060083
Download: ML20210K357 (4)


Text

4 9

.g 9

'O PROPOSED ~ECHNICAL SPECIFICATION CIRNGES f

1 9908060083 990729 PDR ADOCK 05000368 P

PM

REACTOR COOLANT SYSTEM l

STEAM GENERATORS LIMITING CONDITION FOR OPERATION 3.4.5 Each steam generator shall be OPERABLE.

APPLICABILITY: MODES 1,2, 3 and 4.

ACTION:

With one or more steam generators inoperable, restore the inopetable generator (s) to OPERABLE status prior to increasing Tavg above 200*F.

SURVEILLANCE REQUIREMENTS 4.4.5.0 Each steam generator shall be demonstrated OPERABLE by performance I

of the following augmer.ted inservice inspection program and the requirements j

of Specification 4.0.5.

Note: The surveillance requirements of Specification 3.4.5 do not apply to the special steam generator tube inspection to be performed during the 2P99 l

outage scheduled to begin in November 1999. The scope and expansion I

criteria for tFt 'nspection are specified in correspondence to the NRC submitted undel aparate cover. The scope and expansion criteria shall be approved by the NRC prior to entering Mode 4.

The results of the special inspection shall be reviewed by the Plant Safety Committee prior to entering Mode 4 and reported to the NRC within 30 days of entering Mode 4.

4.4.5.1 Steam Generator Sample Selection and Inspection - Each steam l

generator shall be determined OPERABLE during shutdown by selecting and inspecting at least the minimum number of steam generators specified in j

Table 4.4-1.

l 4 4.5.2 Steam Generator Tube Sample Selection and Inspection - The steam generator tube minimum sample size, inspection result classification, and the corresponding action required shall be as specified in Tables 4.4-2 and 4.4-3.

The inservice inspection of steam generator tubes shall be performed l

at the frequencies specified in specification 4.4.5.3 and the inepected tubes shall be verified acceptable per the acceptance criteria of Specification 4.4.5.4.

The tubes selected for each inservice inspection shall include at least 3% of the total number of tubes in all steam generators and at least 20% of each type of installed sleeves; the tubes selected for these inspections shall be selected on a random basis except:

l a.

Where experience in similar plants with similar water chemistry indicates critical areas to be inspected, then at least 50% of g

l the tubes inspected shall be from these critical areas.

l l

b.

The first sample of tubes selected for each inservice inspection (subsequent to the preservice inspection) of each steam generator shall includes i

{

i ARKANSAS - UNIT 2 3/4 4-6 Amendment No.MS,M7,

9 8

a O

MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS (FORINFORMATION ONLY)

.i i

R,EACTOR COOLANT SYSTEM STRAM GENERATORS LIMITING CONDITION FOR OPERATION i

1 3.4.5 Each steam generator shall be OPERABLE.

APPLICABILITY: MODES 1,2, 3 and 4.

ACTION:

With one or more steam generators inoperable, restore the inoperable generator (s) to OPERABLE Jtatus prior to increasing Tavg above 200*F.

4 SURVEILLANCE REQUIREMENTS 4.4.5.0 Each steam generator shall be demonstrated OPERABLE by performance of the following augmented inservice inspection progra.n and the requirements of Specification 4.0.5.

Note: The surveillance reauirements of Specill_qatisfi 3.4.5 d_q not appjv to the special steam aenerator tube inspection to be_ performed durina the 2P99 outace scheduled to becin in Novembec 1999.

The scope and expansion criteria for the insotetion are specnfied in correspondence to the NRC submitted under secarate cover. The scope and expansion criteria shall be REE12ygp by the NRC orfor to entgrina Mode 4.

The results of the special i

inspect.on shall be reviewec. by the Plant Sa_fety Committee or%og_tg enterina Mode 4 and reportec to the NRC withip 30 days of enterina Mode 4.

l 4.4.5.1 Steam Generator Sample selection and Inspection - Each staam generator shall be determined OPERABLE during shutdown by selecting and

]

inspecting at least the minimum number of steam generators specified in Table 4.4-1.

4.4.5.2 steam Generator Tube Sample selection and Inspection - The steam generator tube minimum sample size, inspection result classification, and j

the corresponding action required shall be as specified in Tables 4.4-2 and i

4.4-3.

The inservice inspection of steam generator tubes shall be performed at the frequencies specified in specification 4.4.5.3 and the inspected tubes shall be verified acceptable per the acceptance criteria of specification 4.4.5.4.

The tubes selected for each inservice inspection shall include at least 3% of the total number of tubes in all steam generators and at least 20% of each type of installed sleeves; the tubes selected for these inspections shall be selected on a random basis excepts a.

Where experience in similar plants with similar water chemi.try indicates critical areas to be inspected, then at least 50% of the tubes inspected shall be from these critical areas.

b.

The first sample of tubes selected for each inservice inspection (subsequent to the preservice inspection) of each steam generator shall include:

ARKANSAS - UNIT 2 3/4 4-6 Amendment No.MS,1M,