ML20205P693

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2
ML20205P693
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/09/1999
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20205P689 List:
References
NUDOCS 9904200293
Download: ML20205P693 (7)


Text

l i

j 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Limiting Conditions for Operation and ACTION requirements shall be applicable during the OPERATIONAL MODES or other conditions specified for each specification.

3.0.2 Adherence to the requirements of the Limiting condition for Operation and/or associated ACTION within the specified tima interval shall constitute compliance with the specification, except as provided in Specification 3.0.6.

In the event the Limiting condition for Operation is restored prior to expiration of the specified time interval, completion of the ACTION statement is not required.

3.0.3 In the event a Limiting Condition for Operation and/or associated ACTION requirements cannot be satisfied because of circumstances in excess of those addressed in the specification within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, action shall be initiated to place the unit in a mode in which the specification does not apply by placing it, as applicable, in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless corrective measures are l

completed that permit operation under the permissible ACTION statements for the specified time interval as measured from initial discovery or until the reactor is placed in a MODE in which the specification is not applicable.

Exceptions to these requirements shall be stated in the individual specification.

3.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made when the conditions of the Limiting Condition for Operation are not met and the associated ACTION requires a shutdown if they are not met within a specified time interval.

Entry into an OPERATIONAL MODE or other specified condition may be made in accordance with ACTION requirement when conformance to them permits continued operation of the facility for an unlimited period of time.

This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.

Exceptions to these requirements are stated in the individual specifications.

3.0.5 When a system, subsystem, train, component or device is determined to be inoperable solely because its emergency power source is inoperable, or solely because its normal power source is inoperable, it may be considered OPERABLE for the purpose of satisfying the requirements of its applicable Limiting condition for Operation, provided (1) its corresponding normal or emergency power source is OPERABLE; and (2) all of its redundant system (s), subsystem (s), train (s), component (s), and device (s) are OPERABLE, or likewise satisfy the requirements of this specification.

Unless both conditions (1) and (2) are satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, action shall be initiated to place the unit in a MODE in which the applicable Limiting Condition for Operation does not apply by placing it, as applicable, in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This specification is not applicable in MODES 5 or 6.

3.0.6 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

ARKANSAS - UNIT 2 3/4 0-1 Amendment No. M,M4, 9904200293 990409 PDR ADOCK 05000368 P

PDR

l APPLICABILITY BASES (continued) emergency diesel generator instead, provided the other specified conditions are' satisfied.

In this case, this would mean that the corresponding normal a

power source must be OPERABLE, and all redundant systems, subsystems, j

trains, components, and devicet must be OPERABLE, or otherwise satisfy t

Specification 3.0.5 (i.e.,

be capable of performing their design function j

and have at least one normal or one emergency power source OPERABLE).

If they are not satisfied, action is required in accordance with this specification.

4 i

As a further example, Specification 3.8.1.1 requires in part that two physically independent circuits between the offsite transmission network and the onsite Class IE distribution system be OPERABLE.

The ACTION statement provides a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> out-of-service time when both required offsite circuits are not OPERABLE.

If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystenu, trains, components and devices supplied by the inoperable normal power l

sources, both of the offsite circuits, would also be inoperable.

This would dictate invoking the applicable ACTION statements for each of the applicable LCOs.

However, the provisions of Specification 3.0.5 perndt the time limits for continued operation to be consistent with the ACTION statement for the inoperable normal power sources instead, provided the other specified conditions are satisfied.

In this case, this would mean that for one division the emergency power source must be OPERABLE (as need be the components supplied by the emergency power source) and all redundant i

systems, subsystenu, trains, components and devices in the other division must be OPERABLE, or likewise satisfy Specification 3.0.5 (i.e.,

be capable of performing their design functions and have an emergency power source OPERABLE).

In other words, both emergency power sources must be OPERABLE and all redundant systems, subsystenm, trains, components and devices in both divisions must also be OPERABLE.

If these conditions are not satisfied, action is required in accordance with this specification.

In MODES 5 OR 6, Specification 3.0.5 is not applicable, and thus the individual ACTION statements for each applicable Limiting condition for

)

Operation in these MODES must be adhered to.

i 3.0.6 This LCO establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared inoperable to comply with ACTIONS. The sole purpose of this Specification is to provide an exception to LCO 3.0.2 (e.g.,

to not comply with the applicable ACTIONS) to allow the performance of Surveillance Requirements (SRs) to demonstrates a.

The OPERABILITY of the equipment being returned to service; or b.

The OPERABILITY of other equipment.

The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary to perform the allowed SRs.

This Specification does not provide time to perform any other preventive or corrective maintenance.

An example of demonstrating the OPERABILITY of the equipment being returned to service is reopening a containment isolation valve that has been closed to comply with ACTIONS and must be reopened to perform the SRs.

An example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to prevent ARKANSAS - UNIT 2 B 3/5 0-ld Amendment No. 434,

APPLICABILITY J

BASES (Continued) the trip function from occurring during the performance of an SR on another channel in the other trip system. A similar example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to permit the logic to function and indicate the appropriate response during the performance of an SR on another channel in the same trip system.

4.0.1 through 4.0.5 establish the general requiremenes applicable to Surveillance Requirements. These requirements are based on the Surveillance Requirements stated in the Code of Federal Regulations, 10CFR

50. 36 (c) (3) :

" Surveillance Requirements are requirements relatir.g to test, calibration, or inspection to ensure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions of operation will be met."

4.0.1 establishes the requirement that surveillances must be performed during the OPERATIONAL MODES or other conditions for which the requirements of the Limiting Conditions for Operation apply unless otherw2 se stated in an individual Surveillance Requirement. The purpose of this apecification is to ensure that surveillances are performed to verify the operational status of systems and components and that parameters are within specified limits to ensure safe operation of the facility when the plant is in a mode or other specified condition for which the associsted Limiting Conditions for Operation are applicable.

Surveillance Requirements do not Lave to be performed when the facility is in an OPERATIONAL MODE for which the requirements of the associated Limiting Condition for Operation do not apply unless otherwise specified.

The Surveillance Requirements associated with a Special Test Exception are only applicable when the Special Test Exception is used as an allowable exception to the requirements of a specification.

4.0.2 establishes the limit for which the specified time interval for Surveillance Requirements may be extended.

It permits an allowable extension of the normal surveillance interval to facilitate surveillance scheduling and consideration of plant operating conditions that may not be suitable for conducting the surveillance; e.g.,

transient conditions or cther ongoing surveillance or maintenance activities.

It also provides flexibility to accommodate the length of a fuel cycle for surveillances that are performed at each refueling outage and are specified with an 18-month surveillance interval.

It is not intended that this provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are not performed during refueling outages. The limitation of Specification 4.0.2 is based on engineering judgement and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance with the Surveillance Requirements.

This provision is sufficient to ensure that the reliability ensured through surveillance activities is not significantly degraded beyond that obtained from the specified surveillance intervals.

ARKANSAS - UNIT 2 B 3/4 0-2 Amendment No. W3, G4,

O B

e MARKUP OF CURRENT ANO-2 TECHNICAL SPECIFICATIONS i

I l

[

1

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLAMCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Limiting Conditions for Operation and ACTION requirements shall be applicable during the OPERATIONAL MODES or other conditions specified for each specification.

3.0.2 Adherence to the requirements of the Limiting Condition for Operation and/or associated ACTION within the specified time interval shall constitute compliance with the specification, except as provided in arts 111sA11sn 3.0.6.

In the event the Limiting condition for Operation is restored prior to expiration of the specified time interval, completion of the ACTION statement is not required.

3.0.3 In the event a Limiting Condition for Operation and/or associated ACTION requirements cannot be satisfied because of circumstances in excess of those addressed in the specification within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, action shall be initiated to place the unit in a mode in which the specification does not apply by placing it, as applicable, in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless corrective measures are completed that permit operation under the permissible ACTION statements for the specified time interval as measured from initial discovery or until the reactor is placed in a MODE in which the specification is not applicable.

Exceptions to these requirements shall be stated in the individual specification.

3.0.4 Entry into an OPERATIONAL MODE or other specified condition shall i

not be made when the conditions of the Limiting condition for Operation are not met and the associated ACTION requires a shutdown if they are not met within a specified time interval.

Entry into an OPERATIONAL MODE or other specified condition may be made in accordance with ACTION requirement when conformance to them permits continued operation of the facility for an unlimited period of time.

This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.

Exceptions to these requirements are stated in the individual specifications.

3.0.5 When a system, subsystem, train, component or device is determined to be inoperable solely because its emergency power source is inoperable, or solely because its normal power source is inoperable, it may be considered OPERABLE for the purpose of satisfying the requirements of its applicable Limiting condition for Operation, provided: (1) its corresponding normal or emergency power source is OPERABLE; and (2) all of its redundant system (s), subsystem (s), train (s), component (s), and device (s) are OPERABLE, or likewise satisfy the requirements of this specification. Unless both conditions (1) and (2) are satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, action shall be initiated to place the unit in a MODE in which the applicable Limiting Condition for Operation does not apply by placing it, as applicable, in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This specification is not applicable in MODES 5 or 6.

3.0.6 Eaqipment removed from service or declared ingp.eLa*

o comolv with s

ACTIONS mav_pe returned to service under administrative ccL 91 solelv to perform testina reautred to demon. strate its OPERABILITY or the OPERABILITY _of other eauipment.

Thns is an exceptaon to LCO 3.0.2 for the system returned to service under administrative control to cerform the testino recuired to d_e_m_onstrate OPERABILITY.

ARKANSAS - UNIT 2 3/4 0-1 Amendment No. M,M4,

APPLICABILITY BASES (continued) emergency diesel generator instead, provided the other specified conditions are ' satis fied.

In this case, this would mean that the corresponding normal power source must be OPERABLE, and all redundant systems, subsystems, trains, components, and devices must be OPERABLE, or otherwise satisfy Specification 3.0.5 (i.e.,

be capable of performing their design function and have at least one normal or one emergency power source OPERABLE).

If they are not satisfied, action is required in accordance with this specification.

Am a further example, Specification 3.8.1.1 requires in part that two physically independent circuits between the offsite transmission network and the onsite Class IE distribution system be OPERABLE.

The ACTION statement provides a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> out-of-service time when both required offsite circuits are not OPERABLE.

If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems, trains, components and devices supplied by the inoperable norum1 power sources, both of the offsite circuits, would also be inoperable. This would dictate invoking the applicable ACTION statements for each of the applicable LCOs.

However, the provisions of Specification 3.0.5 permit the time limits for continued operation to be consistent with the ACTION statement for the inoperable normal power sources instead, provided the other specified conditions are satisfied.

In this case, this would mean that for one division the emergency power source must be OPERABLE (as need be the components supplied by the emergency power source) and all redundant systems, subsystenm, trains, components and devices in the other division must be OPERABLE, or likewise satisfy Specification 3.0.5 (i.e., be capable of performing their design functions and have an emergency power source OPERABLE).

In other words, both emergency power sources must be OPERABLE and all redundant systems, subsystems, trains, components and devices in both divisions must also be OPERABLE.

If these conditions are not satisfied, action is required in accordance with this specification.

In MODES 5 OR 6, Specification 3.0.5 is not applicable, and thus the individual ACTION statements for each applicable Limiting Condition for Operation in these MODES must be adhered to.

3.0.6 This LCO establishes the allowance for restorina eculement to service under administrative controls when it has been removed from service or declared inoperable to comolv with ACTIONS. The sole ourpose of this Speciftcation is__to provide an exg_eotion to LCO 3.0.2 (e.a.,

to not comolv with the applicable ACTIONS) to allow the performance of Surveillance Recuirements (SRs) to demonstrate:

The OPERABILITY of the eauipment beina returned to servicer or a.

b.

The OPERABILITY of other equipment.

The_a_dministrative controls ensure the time the eauipment is returned to serv. ice in conflict with the reouirements of the ACTIONS is limited to the time absolutely necessary to perform the allowed SRs.

This Specification does not Erovide time to perfoJm any other preventive or corrective maintenance.

An example of demonstratina the OPERABILITY of the equipment beina retRInsd to service is reopenina a containment isolation valve that has been closed to gggply with ACTIONS and must be reopened to perform the SRs.

An example of demonstratina the OPERABILITY of other equipment is takina,3n inoperable channel or trio system out of the trioped cond111on to prevent ARKANSAS - UNIT 2 B 3/5 0-ld Amendment No. 444,

APPLICABILYTY BASES (Continued) gle_trjo functi_on_from occurring durina the performance of an SR on another channel in the other trip system. A similar example of demonstratino the OPERABILITY of other cauipment is takina an inoperable channel or trio system j

out of the tripped condition _to oermit ths.loaic to function and indiqate the 32pl9pIlati_1enons3 durina the performaILge of an SR on another channel in the e

same trip system.

j 4.0.1 through 4.0.5 establish the general requirements applicable to Surveillance Requirements. These requirements are based on the Surveillance Requirements stated in the Code of Federal Regulations, 10CFR 50.36 (c) (3) :

" Surveillance Requirements are requirements relating to test, calibration, or inspection to ensure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions of operation will be met."

4.0.1 establishes the requirement that surveillances must be performed during the OPERATIONAL MODES or other conditions for which the requirements of the Limiting Conditions for Operation apply unless otherwise stated in an individual Surveillance Requirement. The purpose of this specification is to ensure that surveillances are performed to verify the operational status of systems and components and that parameters are within'apecified limits to ensure safe operation of the facility when the plant is in a mode or other specified condition for which the associated Limiting conditions for Operation are applicable.

Surveillance Requirements do not have to be performed when the facility is in an OPERATIONAL MODE for which the requirements of the associated Limiting condition for Operation do not apply unless otherwise specified. The Surveillance Requirements associated with a Special Test Exception are only applicable when the Special Test Exception is used as an allowable exception to the requirements of a specification.

4.0.2 establishes the limit for which the specified time interval for Surveillance Requirements may be extended.

It perndts an allowable extension of the normal surveillance interval to facilitate surveillance scheduling and consideration of plant operating conditions that may not be suitable for conducting the surveillance; e.g.,

transient conditions or other ongoing surveillance or maintenance activities.

It also provides flexibility to accommodate the length of a fuel cycle for surveillances that are performed at each refueling outage and are specified with an 18-month surveillance interval.

It is not intended that this provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are not performed during refueling outages. The limitation of Specification 4.0.2 is based on engineering judgement and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance with the Surveillance Requirements. This provision is sufficient to ensure that the reliability ensured through surveillance activities is not significantly degraded beyond that obtained from the specified surveillance intervals.

ARKANSAS - UNIT 2 B 3/4 0-2 Amendment No. Ma,4-34,