{{#Wiki_filter:PRIORITY 1 (ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9510160011          DOC.DATE:
FACIL:STN-50-528 Palo Verde Nuclear Station, DOCKET Unit 1, Arizona Publi 05000528 I
P STN-50-529 Palo Verde Nuclear Station,          Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station,          Unit 3, Arizona Publi 05000530 AUTH. NAME          AUTHOR AFFILIATION FULTON,J.D.        Arizona Public Service Co.        (formerly Arizona Nuclear Power LEVINE,J.M.        Arizona Public Service Co.        (formerly Arizona Nuclear Power RECIP.NAME          RECIPIENT AFFILIATION
 
==SUBJECT:==
Monthly operating repts for Sept 1995          for  Palo Verde Nuclear Generating Station.W/~51011 1tr.
DISTRIBUTION 'CODE: IE24D      COPIES RECEIVED:LTR          ENCL    SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES:STANDARDIZED PLANT                                                        05000528 Standardized plant.                                                      05000529  T Standardized plant.                                                      05000530 RECIPIENT          COPIES            RECIPIENT          COPIES ID  CODE/NAME        LTTR ENCL        ID  CODE/NAME      LTTR ENCL PD4-2 PD                1      1      HOLIAN, B              1    1 TRAN,L                  1      1      THOMAS,C                1    1 INTERNAL: ACRli  ~~
          ~IL~CEggER~        1 10 1
10 1
AEOD/SPD/RRAB
* NRR/DISP/PIPB 1
1 1
1 NRR/DRPM/PECB            1      1      RGN4                    1  . 1 EXTERNAL: LITCO BRYCE,J H          1      1      NOAC NRC PDR                  1      1 N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
P r
TOTAL NUMBER OF COPIES REQUIRED: LTTR            22  ENCL    22
 
~~
Arizona Public Service Company PALO VEROE NUCLEAR GENERATING STATION P.O. BOX 52034  ~    PHOENIX, ARIZONA85D72-2D34 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION                                                      182-06100-JML/JLT/JDF October 11, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
 
==Dear Sirs:==
 
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for September 1995 Enclosed are the Monthly Operating Reports for September 1995, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
If you have any questions, please contact Judy Fulton at (602) 393-5277.
Sincerely, JML/JLT/JDF/clj
 
==Enclosures:==
September 1995 Monthly Operating Reports cc:    L. J. Callan                    (all w/enclosures)
K. E. Perkins NRC Senior Resident Inspector INPO Records Center Utility Data Institute Z(pP
              ,'P5ioihooii 950930 IPDR. ADOCK    05000528                                                        I R                    PDR              I..l ..
 
H
  ~
E
 
I' AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.    ~25 UNIT NAME    EEKi&1 DATE          XEQlK COMPLETED BY  sLRJMQQ llHIJHZE MONTH: September 1995 DAY      AVERAGE DAILYPOWER LEVEL          DAY    AVERAGE DAILYPOWER LEVEL 1226                    17              1235 1217                    18              1235 1232                    19              1238 1228                    20              1237 1217                    21              1239 1214                    22              1238 1220                    23              1238 1219                    24              1236 1218                    25              1237 10                  1224                    26              1237 1230                    27              1235 12                  1242                    28              1231 13                  1239                    29              1242 1237                    30              1241 15                  1237                    31 16                  1234
 
0
,1
    ;I
 
REFUELING INFORMATION DOCKET NO.          QL525 UNIT NAME ALLIS DATE COMPLETED BY        ~I,    lfgn date for next refueling shutdown.
                                                                                                      'cheduled The 6th refueling outage is scheduled to begin on 09/07/96.
Scheduled date for restart following refueling.
11/01/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No Scheduled date for submitting proposed licensing action and supporting information.
5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity. ~~
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
t 2005 (18 Month reloads and full core discharge capability).
 
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
UNIT NAME DATE        1GLLUK COMPLETED BY ~U!  fQQ 09/01 0000 Unit began the month in Mode 1 with Rx power at 100%.
09/30 2400 Unit ended the month in Mode 1 with Rx power at 100%.
SHUTDOWNS AND POWER REDUCTIONS September 1995 NO,'g-'QQ DOCKET UNIT NAME DATE
                                                                                                                                          ~PV
                                                                                                                                          ~1/1 i~
COMPLETED BY          J. D.~FI gg LKEMZ2 Outage                    Method of Duration                Shutting Down                        System Component      Cause and Corrective Action No.          Date      Type"      Hours      Reason2        Reactor3            LER No.        Code4    Code5        to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of September 1995 1F-Forced            2Reason:                                    3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled            A-Equipment Failure(Explain)                1-Manual                                  of the Data Entry Sheets for Licensee B-Maintenance or Test                      2-Manual Scram                            Event Report (LER) File (NUREG 0161)
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training 8 License              5-Reduction of 20% or Greater in the    Exhibit H-Same Source Examination                                Past 24 Hours F-Administrative                            9-Other-(Explain)
G-Operational Error H-Other (Explain)
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 5~29, UNIT NAME      LV.HGM DATE          KL11LK COMPLETED BY  JJ2 EUHQQ MONTH: September 1995 DAY      AVERAGE DAILYPOWER LEVEL          DAY    AVERAGE DAILYPOWER LEVEL 1243                      17              1246 1242                      18              1246 1248                      19              1248 1244                      20              1247 1236                      21              1249 1241                      22              1248 1243                      23              1242 8                1242                      24              1249 9                1244                      25              1249 10                1246                      26              1248 1249                      27              1245 12                1252                      28              1244 13                1252                      29              1253 14                1248                      30              1256 15                  1247                  . 31 16                  1244
 
0 REFUELING INFORMATION DOCKET NO.          ~RR UNIT NAME            /VV!~
DATE                iQLLUK COMPLETED BY          ~UHQQ eeeeec Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled for 03/16/96.
Scheduled date for restart following refueling.
05/10/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Technical Specification change to Note 5 of Table 4.3-1 for the proposed          installation of a cycle independent shape annealing matrix.
: b.        Technical Specification 3.2.6 "Reactor Coolant Cold Leg Temperature" figure 3.2-1 to establish new 100%
power operation allowable temperature to 560'F to 550'F.
Scheduled date for submitting proposed licensing action and supporting information.
12/08/95.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
Stretch Power to 102%.
e) tn the core. ~
The number of fuel assemblies.
b) In the spent fuel storage pool. ~~
Licensed spent fuel storage capacity.    ~Q9 Intended change in spent fuel storage capacity.  ~~
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
I'
                          ~
 
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 24529 UNIT NAME    MHGR2 DATE        KLL1lK COMPLETED BY ~hlfQll 09/01 0000 Unit began the month in Mode 1 at 100% Rx power.
09/30 2400 Unit ended the month in Mode 1 at 100% Rx power.
I SHUTDOWNS AND POWER REDUCTIONS September 1995 DOCKET NO         
                                                                                                                                          ~50-52 UNIT NAME            EVVGE-2 DATE                  ~0~95 COMPLETED BY          ~~uo fKRlKLSZ Outage                    Method of Duration                Shutting Down                        System Component      Cause and Corrective Action Date        Type"      Hours      Reason2        Reactor3            LER No.        Code4    Code5        to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of September 1995.
1F-Forced            2Reason:                                    3Method:                                  Exhibit F - Instructions for Preparation S-Scheduled            A-Equipment Failure(Explain)                1-Manual                                  of the Data Entry Sheets for Licensee B-Maintenance or Test                      2-Manual Scram                            Event Report (LER) File (NUREG 0161)
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training 8 License              5-Reduction of 20% or Greater in the    Exhibit H-Same Source Examination                                Past 24 Hours F-Administrative                            9-Other-(Explain)
G-Operational Error H-Other (Explain)
I 1
 
                            ~                            ~
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. flag-'QQ UNIT NAME DATE          ALMS COMPLETED BY  ~ultan MONTH: September 1995 DAY      AVERAGE DAILYPOWER LEVEL          DAY      AVERAGE DAILYPOWER LEVEL 1240                      17              1244 1240                      18              1246 1244                      19              1248 1243                      20              1247 1235                      21              1250 1238                      22              1252 1241                      23              1250 1240                      24              1249 1240                      25              1248 10                1242                      26              1246 1246                      27              1246 12                1251                      28              1243 13                1251                      29              1251 1246                      30              1254 15                  1245                    31 16                  1245
 
REFUELING INFORMATION DOCKET NO.          QQ-53Q UNIT NAME            ~g(~
DATE                KLLllK COMPLETED BY        JJ)~fQQ SliSRIVZ Scheduled date for next refueling shutdown.,
The 5th refueling outage is scheduled to begin 10/14/95.
Scheduled date for restart following refueling.
12/23/95.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Technical SpeciTication change to Note 5 of Table 4.3-1 for the proposed            installation of a cycle independent shape annealing matrix. (approved by NRC 9/20/95).
: b.        Technical Specification change to revise list of analytical methods in 6.9.1.10. (submitted 8/4/95 to NRC)
Scheduled date for submitting proposed licensing action and supporting information.
None.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
b) In the spent fuel storage pool.
Intended change in spent fuel storage capacity.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
 
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. QL53Q UNIT NAME    @VVII~
DATE        1QLLllK COMPLETED BY ~Dui~
IEILRMlE 09/01 0000 Unit began the month in Mode 1 at 100% power.
09/30 2400 Unit ended the month in Mode 1 at 100% power.
(
SHUTDOWNS AND POWER REDUCTIONS September 1995 DOCKET NO UNIT NAME              /VVI~
DATE                  ~/1~1/
COMPLETED BY          ~DgggQ Outage                    Method of Duration                Shutting Down                        System Component      Cause and Corrective Action No.          Date      Type"      Hours      Reason2        Reactor3            LER No.        Code4    Code5        to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of September, 1995.
"F-Forced            2R                                          3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled            A-Equipment Failure(Explain)                1-Manual                                  of the Data Entry Sheets for Licensee B-Maintenance or Test                      2-Manual Scram                            Event Report (LER) File (NUREG 0161)
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training & License              5-Reduction of 20% or Greater in the    Exhibit H-Same Source Examination                                Past 24 Hours F-Administrative                            9-Other-(Explain)
G-Operational Error H-Other (Explain)
    ~l    ~
        'S C
13
'L}}

Latest revision as of 03:52, 4 February 2020

Monthly Operating Repts for Sept 1995 for Palo Verde Nuclear Generating Station.W/951011 Ltr
ML17311B222
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/30/1995
From: Fulton J, James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
182-06100-JML-J, 182-6100-JML-J, NUDOCS 9510160011
Download: ML17311B222 (29)


Text

PRIORITY 1 (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9510160011 DOC.DATE:

FACIL:STN-50-528 Palo Verde Nuclear Station, DOCKET Unit 1, Arizona Publi 05000528 I

P STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,J.D. Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Sept 1995 for Palo Verde Nuclear Generating Station.W/~51011 1tr.

DISTRIBUTION 'CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 T Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 HOLIAN, B 1 1 TRAN,L 1 1 THOMAS,C 1 1 INTERNAL: ACRli ~~

~IL~CEggER~ 1 10 1

10 1

AEOD/SPD/RRAB

  • NRR/DISP/PIPB 1

1 1

1 NRR/DRPM/PECB 1 1 RGN4 1 . 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC NRC PDR 1 1 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5DS (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

P r

TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22

~~

Arizona Public Service Company PALO VEROE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85D72-2D34 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 182-06100-JML/JLT/JDF October 11, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for September 1995 Enclosed are the Monthly Operating Reports for September 1995, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Judy Fulton at (602) 393-5277.

Sincerely, JML/JLT/JDF/clj

Enclosures:

September 1995 Monthly Operating Reports cc: L. J. Callan (all w/enclosures)

K. E. Perkins NRC Senior Resident Inspector INPO Records Center Utility Data Institute Z(pP

,'P5ioihooii 950930 IPDR. ADOCK 05000528 I R PDR I..l ..

H

~

E

I' AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. ~25 UNIT NAME EEKi&1 DATE XEQlK COMPLETED BY sLRJMQQ llHIJHZE MONTH: September 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1226 17 1235 1217 18 1235 1232 19 1238 1228 20 1237 1217 21 1239 1214 22 1238 1220 23 1238 1219 24 1236 1218 25 1237 10 1224 26 1237 1230 27 1235 12 1242 28 1231 13 1239 29 1242 1237 30 1241 15 1237 31 16 1234

0

,1

I

REFUELING INFORMATION DOCKET NO. QL525 UNIT NAME ALLIS DATE COMPLETED BY ~I, lfgn date for next refueling shutdown.

'cheduled The 6th refueling outage is scheduled to begin on 09/07/96.

Scheduled date for restart following refueling.

11/01/96.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

No Scheduled date for submitting proposed licensing action and supporting information.

5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

None.

The number of fuel assemblies.

b) In the spent fuel storage pool.

Licensed spent fuel storage capacity.

Intended change in spent fuel storage capacity. ~~

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

t 2005 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

UNIT NAME DATE 1GLLUK COMPLETED BY ~U! fQQ 09/01 0000 Unit began the month in Mode 1 with Rx power at 100%.

09/30 2400 Unit ended the month in Mode 1 with Rx power at 100%.

SHUTDOWNS AND POWER REDUCTIONS September 1995 NO,'g-'QQ DOCKET UNIT NAME DATE

~PV

~1/1 i~

COMPLETED BY J. D.~FI gg LKEMZ2 Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of September 1995 1F-Forced 2Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 5~29, UNIT NAME LV.HGM DATE KL11LK COMPLETED BY JJ2 EUHQQ MONTH: September 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1243 17 1246 1242 18 1246 1248 19 1248 1244 20 1247 1236 21 1249 1241 22 1248 1243 23 1242 8 1242 24 1249 9 1244 25 1249 10 1246 26 1248 1249 27 1245 12 1252 28 1244 13 1252 29 1253 14 1248 30 1256 15 1247 . 31 16 1244

0 REFUELING INFORMATION DOCKET NO. ~RR UNIT NAME /VV!~

DATE iQLLUK COMPLETED BY ~UHQQ eeeeec Scheduled date for next refueling shutdown.

The 6th refueling outage is scheduled for 03/16/96.

Scheduled date for restart following refueling.

05/10/96.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix.

b. Technical Specification 3.2.6 "Reactor Coolant Cold Leg Temperature" figure 3.2-1 to establish new 100%

power operation allowable temperature to 560'F to 550'F.

Scheduled date for submitting proposed licensing action and supporting information.

12/08/95.

Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

Stretch Power to 102%.

e) tn the core. ~

The number of fuel assemblies.

b) In the spent fuel storage pool. ~~

Licensed spent fuel storage capacity. ~Q9 Intended change in spent fuel storage capacity. ~~

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

I'

~

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 24529 UNIT NAME MHGR2 DATE KLL1lK COMPLETED BY ~hlfQll 09/01 0000 Unit began the month in Mode 1 at 100% Rx power.

09/30 2400 Unit ended the month in Mode 1 at 100% Rx power.

I SHUTDOWNS AND POWER REDUCTIONS September 1995 DOCKET NO

~50-52 UNIT NAME EVVGE-2 DATE ~0~95 COMPLETED BY ~~uo fKRlKLSZ Outage Method of Duration Shutting Down System Component Cause and Corrective Action Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of September 1995.

1F-Forced 2Reason: 3Method: Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)

I 1

~ ~

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. flag-'QQ UNIT NAME DATE ALMS COMPLETED BY ~ultan MONTH: September 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1240 17 1244 1240 18 1246 1244 19 1248 1243 20 1247 1235 21 1250 1238 22 1252 1241 23 1250 1240 24 1249 1240 25 1248 10 1242 26 1246 1246 27 1246 12 1251 28 1243 13 1251 29 1251 1246 30 1254 15 1245 31 16 1245

REFUELING INFORMATION DOCKET NO. QQ-53Q UNIT NAME ~g(~

DATE KLLllK COMPLETED BY JJ)~fQQ SliSRIVZ Scheduled date for next refueling shutdown.,

The 5th refueling outage is scheduled to begin 10/14/95.

Scheduled date for restart following refueling.

12/23/95.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Technical SpeciTication change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix. (approved by NRC 9/20/95).

b. Technical Specification change to revise list of analytical methods in 6.9.1.10. (submitted 8/4/95 to NRC)

Scheduled date for submitting proposed licensing action and supporting information.

None.

Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

None.

The number of fuel assemblies.

b) In the spent fuel storage pool.

Intended change in spent fuel storage capacity.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. QL53Q UNIT NAME @VVII~

DATE 1QLLllK COMPLETED BY ~Dui~

IEILRMlE 09/01 0000 Unit began the month in Mode 1 at 100% power.

09/30 2400 Unit ended the month in Mode 1 at 100% power.

(

SHUTDOWNS AND POWER REDUCTIONS September 1995 DOCKET NO UNIT NAME /VVI~

DATE ~/1~1/

COMPLETED BY ~DgggQ Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of September, 1995.

"F-Forced 2R 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training & License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)