{{#Wiki_filter:0                                                                PMP EPP INDEX INDIANA a MICHIGAN        POWER COMP~N'(
DONALD C. COOK  NUCLEAR  PLANT PLANT MANAGER PROCEDURE Index Identification                        Ti tie Revi s'.on No.i                  Comments Number                                                  And Date PMP  2081 EPP.014  Off-Site      Dose Assessments        Revision          0 4-1-81 EPP.015  Sampling and Analysis          of      Revision          0 Waterborne Releases                    4-1-81 EPP.016  Collection      and Analysis of      Revision          0 Liquid and      Gaseous Samples        4-1-81 EPP.017  Interpretation of Liquid              Revision          0 and Gaseous      Samples              4-1-81 EPP.018  Transpor    tati  on  Accidents      Revision 0 Involving Radioactive                  4-1-81
                  'aterial EPP.019  AEP    Emergency Response              Revision          0 Organization Activation and            4-1-8)
Management EPP.020  Activation      and Operation of      Revision          0 TP-1,11-16-81 Exp N/A the Technical Support Center          4-1-81 (TSC)
EPP.021  Activati on      and Operati on o  f  Revision 0          TP-1,11-16-81 Exp N/A the Operations Staging Ar:ea          4-1-81 (OSA) and Personnel Accountability                                              P ~4,~~( C, p @gay EPP.022  Activation      and Operation    of            'evision 0
the Recovery Center (RC) (An          4-1-81 Emergency Operations                                                      ~ ~
Faci  1 i ty)
EPP.023  Activation      and Operation    of  Revision          0 the  Emer  gency Control Center      4-1-81 (ECC) (An Emergency Operations      Facility)
EPP.024  Activation and Operation of Revision                    0 Pl the Joint Public Information          4-1-81 Center (JPIC) (An Emergency Operations Facility)                                            >> <<C.
3 I< 8i i2040323 81 i20i        i PDR ADOCK 05000315'ORE
 
p p "Q  Q~ Qg,t, ~V '
C'I,
 
                                      ~,
                              /PJB'/APJA Br                  H//.8/GAi
                                                                                    ~ "J ECECTRIC COINPAIJY DONALD C. COOK NUCLEAR Pl Ai>)'T instruction or Procedure Temporary Sheet                                                : EMPQRARY This temporary sheet applies to Acttvation and Operation Qf the TSC                                    SHEET NO.
Instruction or Procedure No. PMP 2081 EPP .020 Revision No. 0 The following change ( X )            new requirement (    )    shall be instituted effective (Date)                  -8 Add  the following after 4.3.4:
Note:      The Technical      Director shall perform this accotIntability only in the event the Security Computer is not used. Normally, the accountability is performed by the OSAM using the computer listing.
Reason:      Roll call is used      for  back-up only.      Accountability is normally p'erformed by computer.
                                                                                      ~;s~    w ng ir>>~>>
                                                                                                    >>j>>g
                                                                                      )tJ  <i g    ~
I This change should be made    a permanent revision to the Instruction or Procedure:
CIYES          a NO            0 NOT KNOWN, addittonal review required Expir'ation Date    Procedure Revision                          Standard Dist. List No.:
Originator:                                                      Distribution:
Management  Staff:
I Senior PNSRC Rant Manager Form No. 4330              REVISED 7128                                                            ORIGI:IAL CANARY            ORIGINATOR COPY PINK          iVORKING COPY FORM NO. PMI 201&4    REV. 2
 
U 0
ll V III II
 
1 i '
g 5
~
J
          \
                                            /PJ J'/A/VA                  M//:8/GAPJ EIECTRIC      COMPAIV        Y DONALD C. COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet                                      TEMPORARY This temporary sheet applies to        Activation  and Operation      of the OSA and        SHEET NO.
Instruction or procedure No. Personnel Accountability PMP  2081  EPP  .021 Revision No.
The following change ( X )            new requirement  (    )    shall be 11-16-81 instituted effective (Date)
Add  the following after 3.1.3.3:
Note:      Roll call for accountability needgonly to be used in the event the computer is unavailable to perform accountability.
Reason:      Roll call is used for back-up only.              Accountability is normally performed by computer.
                                                                                                ~1 J r
This change should be made    a permanent revision to the Instruction or Procedure:
g YES          aNO            0 NOT KNOWN, additional review required Procedure Revision                          Standard Dist. List No.:
Originator:                                                      Distribution:
ibhnagement  Staff:
Senior Reac PNSRC                              Cate Rant Manager Form No. 4330              REVISED 717$                                              WHITE  ORIGINAL CANARY  ORIGINATOR COPY PINK    WORKING COPY FORM iNO. PMI 201~    REV. 2}}

Latest revision as of 07:40, 29 October 2019

Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures PMP 2081 EPP.020 Re Activation & Operation of Technical Support Ctr & PMP 2081 EPP.021 Re Personnel Accountability
ML17319B096
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/19/1981
From:
INDIANA MICHIGAN POWER CO.
To:
Shared Package
ML17319B094 List:
References
PROC-811119-01, NUDOCS 8112040323
Download: ML17319B096 (6)


Text

0 PMP EPP INDEX INDIANA a MICHIGAN POWER COMP~N'(

DONALD C. COOK NUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification Ti tie Revi s'.on No.i Comments Number And Date PMP 2081 EPP.014 Off-Site Dose Assessments Revision 0 4-1-81 EPP.015 Sampling and Analysis of Revision 0 Waterborne Releases 4-1-81 EPP.016 Collection and Analysis of Revision 0 Liquid and Gaseous Samples 4-1-81 EPP.017 Interpretation of Liquid Revision 0 and Gaseous Samples 4-1-81 EPP.018 Transpor tati on Accidents Revision 0 Involving Radioactive 4-1-81

'aterial EPP.019 AEP Emergency Response Revision 0 Organization Activation and 4-1-8)

Management EPP.020 Activation and Operation of Revision 0 TP-1,11-16-81 Exp N/A the Technical Support Center 4-1-81 (TSC)

EPP.021 Activati on and Operati on o f Revision 0 TP-1,11-16-81 Exp N/A the Operations Staging Ar:ea 4-1-81 (OSA) and Personnel Accountability P ~4,~~( C, p @gay EPP.022 Activation and Operation of 'evision 0

the Recovery Center (RC) (An 4-1-81 Emergency Operations ~ ~

Faci 1 i ty)

EPP.023 Activation and Operation of Revision 0 the Emer gency Control Center 4-1-81 (ECC) (An Emergency Operations Facility)

EPP.024 Activation and Operation of Revision 0 Pl the Joint Public Information 4-1-81 Center (JPIC) (An Emergency Operations Facility) >> <<C.

3 I< 8i i2040323 81 i20i i PDR ADOCK 05000315'ORE

p p "Q Q~ Qg,t, ~V '

C'I,

~,

/PJB'/APJA Br H//.8/GAi

~ "J ECECTRIC COINPAIJY DONALD C. COOK NUCLEAR Pl Ai>)'T instruction or Procedure Temporary Sheet  : EMPQRARY This temporary sheet applies to Acttvation and Operation Qf the TSC SHEET NO.

Instruction or Procedure No. PMP 2081 EPP .020 Revision No. 0 The following change ( X ) new requirement ( ) shall be instituted effective (Date) -8 Add the following after 4.3.4:

Note: The Technical Director shall perform this accotIntability only in the event the Security Computer is not used. Normally, the accountability is performed by the OSAM using the computer listing.

Reason: Roll call is used for back-up only. Accountability is normally p'erformed by computer.

~;s~ w ng ir>>~>>

>>j>>g

)tJ <i g ~

I This change should be made a permanent revision to the Instruction or Procedure:

CIYES a NO 0 NOT KNOWN, addittonal review required Expir'ation Date Procedure Revision Standard Dist. List No.:

Originator: Distribution:

Management Staff:

I Senior PNSRC Rant Manager Form No. 4330 REVISED 7128 ORIGI:IAL CANARY ORIGINATOR COPY PINK iVORKING COPY FORM NO. PMI 201&4 REV. 2

U 0

ll V III II

1 i '

g 5

~

J

\

/PJ J'/A/VA M//:8/GAPJ EIECTRIC COMPAIV Y DONALD C. COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet TEMPORARY This temporary sheet applies to Activation and Operation of the OSA and SHEET NO.

Instruction or procedure No. Personnel Accountability PMP 2081 EPP .021 Revision No.

The following change ( X ) new requirement ( ) shall be 11-16-81 instituted effective (Date)

Add the following after 3.1.3.3:

Note: Roll call for accountability needgonly to be used in the event the computer is unavailable to perform accountability.

Reason: Roll call is used for back-up only. Accountability is normally performed by computer.

~1 J r

This change should be made a permanent revision to the Instruction or Procedure:

g YES aNO 0 NOT KNOWN, additional review required Procedure Revision Standard Dist. List No.:

Originator: Distribution:

ibhnagement Staff:

Senior Reac PNSRC Cate Rant Manager Form No. 4330 REVISED 717$ WHITE ORIGINAL CANARY ORIGINATOR COPY PINK WORKING COPY FORM iNO. PMI 201~ REV. 2