0 PMP EPP INDEX INDIANA a MICHIGAN POWER COMP~N'(
DONALD C.
COOK NUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification Number Titie Revi s'.on No.i And Date Comments PMP 2081 EPP.014 Off-Site Dose Assessments EPP.015 Sampling and Analysis of Waterborne Releases EPP.016 Collection and Analysis of Liquid and Gaseous Samples EPP.017 Interpretation of Liquid and Gaseous Samples EPP.018 Transpor tati on Accidents Involving Radioactive
'aterial EPP.019 AEP Emergency
Response
Organization Activation and Management Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
4-1-81 Revision 0
4-1-8)
EPP.020 Activation and Operation of Revision 0
the Technical Support Center 4-1-81 (TSC)
TP-1,11-16-81 Exp N/A EPP.021 EPP.022 EPP.023 Activati on and Operati on of the Operations Staging Ar:ea (OSA) and Personnel Accountability Activation and Operation of the Recovery Center (RC)
(An Emergency Operations Faci 1 ity)
Activation and Operation of the Emer gency Control Center (ECC)
(An Emergency Operations Facility)
Revision 0
4-1-81
'evision 0 4-1-81 Revision 0
4-1-81 TP-1,11-16-81 Exp N/A P ~4,~~(
C, p
@gay
~
~
Activation and Operation of the Joint Public Information EPP.024 Revision 0
4-1-81 Center (JPIC)
(An Emergency Operations Facility)
I< 8i i2040323 81 i20i i PDR ADOCK 05000315'ORE 3
>> <<C.
Pl
p p "Q Q~ Qg,t, ~V C'I,
~,
~
/PJB'/APJA Br H//.8/GAi "J ECECTRIC COINPAIJY DONALD C. COOK NUCLEAR Pl Ai>)'T instruction or Procedure Temporary Sheet This temporary sheet applies to Acttvation and Operation Qf the TSC Instruction or Procedure No.
.020 Revision No. 0
- EMPQRARY SHEET NO.
The following change
(
X )
instituted effective (Date) new requirement
(
)
shall be
-8 Add the following after 4.3.4:
Note:
The Technical Director shall perform this accotIntability only in the event the Security Computer is not used.
Normally, the accountability is performed by the OSAM using the computer listing.
Reason:
Roll call is used for back-up only.
Accountability is normally p'erformed by computer.
~;s~
w n ir>>~>>
)tJ >j>>g I
This change should be made a permanent revision to the Instruction or Procedure:
CIYES a NO 0 NOT KNOWN, addittonal review required Expir'ation Date Procedure Revision Originator:
Management Staff:
Senior I
PNSRC Rant Manager Standard Dist. List No.:
Distribution:
Form No. 4330 REVISED 7128 FORM NO. PMI 201&4 REV. 2 ORIGI:IAL CANARY ORIGINATOR COPY PINK iVORKINGCOPY
U 0
ll V
III II
1
~g i '
\\
J
/PJ J'/A/VA 5 M//:8/GAPJ EIECTRIC COMPAIVY DONALD C. COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet This temporary sheet applies to Activation and Operation of the OSA and Instruction or procedure No.
Personnel Accountability PMP 2081 EPP
.021 Revision No.
TEMPORARY SHEET NO.
The following change
(
X )
instituted effective (Date) new requirement
(
)
shall be 11-16-81 Add the following after 3.1.3.3:
Note:
Roll call for accountability needgonly to be used in the event the computer is unavailable to perform accountability.
Reason:
Roll call is used for back-up only.
Accountability is normally performed by computer.
~ 1J r
This change should be made a permanent revision to the Instruction or Procedure:
g YES aNO 0 NOT KNOWN, additional review required Procedure Revision Originator:
ibhnagement Staff:
Senior Reac PNSRC Cate Rant Manager Standard Dist. List No.:
Distribution:
Form No. 4330 REVISED 717$
FORM iNO. PMI 201~