ML061040329: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML061040329
| number = ML061040329
| issue date = 04/14/2006
| issue date = 04/14/2006
| title = 04/11/2006 Public Meeting Summary with Florida Power and Light to Discuss Duane Arnold Energy Center End-of-Cycle Plant Performance Assessment
| title = Public Meeting Summary with Florida Power and Light to Discuss Duane Arnold Energy Center End-of-Cycle Plant Performance Assessment
| author name = Burgess B
| author name = Burgess B
| author affiliation = NRC/RGN-III/DRP
| author affiliation = NRC/RGN-III/DRP
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:April 14, 2006LICENSEE:Florida Power and Light FACILITY:Duane Arnold Energy Center
{{#Wiki_filter:April 14, 2006 LICENSEE:         Florida Power and Light FACILITY:         Duane Arnold Energy Center


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE APRIL 11, 2006, PUBLIC MEETING TO DISCUSS THEDUANE ARNOLD ENERGY CENTER END-OF-CYCLE PLANT PERFORMANCE ASSESSMENTOn April 11, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the PaloCommunity Center in Palo, Iowa. The meeting was between NRC Region III management andFlorida Power and Light representatives to discuss the NRC's assessment of the Duane ArnoldEnergy Center's safety performance for the period from January 1 through December 31, 2005.
OF THE APRIL 11, 2006, PUBLIC MEETING TO DISCUSS THE DUANE ARNOLD ENERGY CENTER END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 11, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Palo Community Center in Palo, Iowa. The meeting was between NRC Region III management and Florida Power and Light representatives to discuss the NRCs assessment of the Duane Arnold Energy Centers safety performance for the period from January 1 through December 31, 2005.
The meeting notice can be found in ADAMS as Accession Number ML060740683. A list of
The meeting notice can be found in ADAMS as Accession Number ML060740683. A list of NRC and licensee meeting participants and NRC presentation slides can be found in the attached Enclosures.
The NRC began the meeting with an overview of the NRCs Reactor Oversight Process (ROP),
national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the Duane Arnold Energy Centers performance in the calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. The NRC also discussed upcoming inspections and activities at the Duane Arnold Energy Center.
As part of this regulatory performance meeting, Florida Power and Light responded to the NRCs assessment and discussed initiatives to resolve the substantive cross-cutting issue in the area of Human Performance. Florida Power and Light representatives also discussed specific corrective actions to improve human performance in the area of engineering. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Questions received from members of the public pertained to planned changes to the facility, including power uprate and plant life extension and general questions regarding how the plant is regulated by the NRC.
                                              /RA/
Bruce Burgess, Chief Branch 2 Division of Reactor Projects Docket No. 50-331 License No. DPR-49


NRC and licensee meeting participants and NRC presentation slides can be found in theattached Enclosures.The NRC began the meeting with an overview of the NRC's Reactor Oversight Process (ROP),national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC's assessment of the Duane Arnold Energy Center's performance in the calendar year2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. The NRCalso discussed upcoming inspections and activities at the Duane Arnold Energy Center.As part of this regulatory performance meeting, Florida Power and Light responded to theNRC's assessment and discussed initiatives to resolve the substantive cross-cutting issue inthe area of Human Performance. Florida Power and Light representatives also discussed specific corrective actions to improve human performance in the area of engineering. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Questions received from members of the public pertained to planned changes to the facility, including power uprate and plant life extension and general questions regarding how theplant is regulated by the NRC. /RA/Bruce Burgess, ChiefBranch 2 Division of Reactor ProjectsDocket No. 50-331License No. DPR-49
==Enclosures:==
: 1.       Meeting attendees
: 2.       NRC presentation slides DISTRIBUTION: See next page


==Enclosures:==
April 14, 2006 LICENSEE:                 Florida Power and Light FACILITY:                 Duane Arnold Energy Center
1.Meeting attendees 2.NRC presentation slidesDISTRIBUTION:  See next page April 14, 2006LICENSEE:Florida Power and Light FACILITY:Duane Arnold Energy Center


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE APRIL 11, 2006, PUBLIC MEETING TO DISCUSS THEDUANE ARNOLD ENERGY CENTER END-OF-CYCLE PLANT PERFORMANCE ASSESSMENTOn April 11, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the PaloCommunity Center in Palo, Iowa. The meeting was between NRC Region III management andFlorida Power and Light representatives to discuss the NRC's assessment of the Duane ArnoldEnergy Center's safety performance for the period from January 1 through December 31, 2005.
OF THE APRIL 11, 2006, PUBLIC MEETING TO DISCUSS THE DUANE ARNOLD ENERGY CENTER END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 11, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Palo Community Center in Palo, Iowa. The meeting was between NRC Region III management and Florida Power and Light representatives to discuss the NRCs assessment of the Duane Arnold Energy Centers safety performance for the period from January 1 through December 31, 2005.
The meeting notice can be found in ADAMS as Accession Number ML060740683. A list of
The meeting notice can be found in ADAMS as Accession Number ML060740683. A list of NRC and licensee meeting participants and NRC presentation slides can be found in the attached Enclosures.
The NRC began the meeting with an overview of the NRCs Reactor Oversight Process (ROP),
national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the Duane Arnold Energy Centers performance in the calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. The NRC also discussed upcoming inspections and activities at the Duane Arnold Energy Center.
As part of this regulatory performance meeting, Florida Power and Light responded to the NRCs assessment and discussed initiatives to resolve the substantive cross-cutting issue in the area of Human Performance. Florida Power and Light representatives also discussed specific corrective actions to improve human performance in the area of engineering. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Questions received from members of the public pertained to planned changes to the facility, including power uprate and plant life extension and general questions regarding how the plant is regulated by the NRC.
                                                                          /RA/
Bruce Burgess, Chief Branch 2 Division of Reactor Projects Docket No. 50-331 License No. DPR-49


NRC and licensee meeting participants and NRC presentation slides can be found in theattached Enclosures.The NRC began the meeting with an overview of the NRC's Reactor Oversight Process (ROP),national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC's assessment of the Duane Arnold Energy Center's performance in the calendar year2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. The NRCalso discussed upcoming inspections and activities at the Duane Arnold Energy Center.As part of this regulatory performance meeting, Florida Power and Light responded to theNRC's assessment and discussed initiatives to resolve the substantive cross-cutting issue inthe area of Human Performance. Florida Power and Light representatives also discussed specific corrective actions to improve human performance in the area of engineering. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Questions received from members of the public pertained to planned changes to the facility, including power uprate and plant life extension and general questions regarding how theplant is regulated by the NRC. /RA/Bruce Burgess, ChiefBranch 2 Division of Reactor ProjectsDocket No. 50-331License No. DPR-49
==Enclosures:==
: 3.          Meeting attendees
: 4.          NRC presentation slides DISTRIBUTION: See next page DOCUMENT NAME:E:\Filenet\ML061040329.wpd G Publicly Available                        G Non-Publicly Available                  G Sensitive              G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII                                    RIII                        RIII                              RIII NAME                Bburgess for SSheldon:sls              BBurgess DATE                04/14/2006                              04/14/2006 OFFICIAL RECORD COPY


==Enclosures:==
Florida Power and Light                       cc w/encl:   J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chairman, Linn County Board of Supervisors D. McGhee, Iowa Department of Public Health
3.Meeting attendees 4.NRC presentation slidesDISTRIBUTION:  See next pageDOCUMENT NAME:E:\Filenet\ML061040329.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence  box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEBburgess for SSheldon:slsBBurgessDATE04/14/200604/14/2006OFFICIAL RECORD COPY Florida Power and Light-2-cc w/encl:J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chairman, Linn County Board of Supervisors D. McGhee, Iowa Department of Public Health Florida Power and Light-3-ADAMS Distribution
 
:JLD DWS RidsNrrDirsIrib
Florida Power and Light ADAMS Distribution:
JLD DWS RidsNrrDirsIrib GEG KGO GAW1 CAA1 DRPIII DRSIII PLB1 JRK1


GEG KGO GAW1 CAA1 DRPIII DRSIII PLB1 JRK1  PUBLIC MEETING PRINCIPAL ATTENDEESApril 11, 2006 NRCBruce BurgessChief, Branch 2, Division of Reactor ProjectsGeorge WilsonSenior Resident Inspector, Duane Arnold Energy Center Robert OrlikowskiResident Inspector, Monticello Randall BakerResident Inspector, Duane Arnold Energy CenterFlorida Power and LightGary Van MiddlesworthSite Vice President, Duane Arnold Energy CenterJohn Bjorseth Site Director, Duane Arnold Energy Center D. Curtland Plant Manager, Duane Arnold Energy Center and othersMembers of the PublicArlotta HenryCitizen Dave WilsonIndependent Contractor Bruce LacyLacy Consulting Alan MenglerCommissioner, Palo City Council Russ SwainPolice Officer, Palo Police Force}}
PUBLIC MEETING PRINCIPAL ATTENDEES April 11, 2006 NRC Bruce Burgess                    Chief, Branch 2, Division of Reactor Projects George Wilson                    Senior Resident Inspector, Duane Arnold Energy Center Robert Orlikowski                Resident Inspector, Monticello Randall Baker                    Resident Inspector, Duane Arnold Energy Center Florida Power and Light Gary Van Middlesworth            Site Vice President, Duane Arnold Energy Center John Bjorseth                   Site Director, Duane Arnold Energy Center D. Curtland                     Plant Manager, Duane Arnold Energy Center and others Members of the Public Arlotta Henry                    Citizen Dave Wilson                      Independent Contractor Bruce Lacy                      Lacy Consulting Alan Mengler                    Commissioner, Palo City Council Russ Swain                      Police Officer, Palo Police Force Enclosure 1}}

Latest revision as of 19:38, 7 December 2019

Public Meeting Summary with Florida Power and Light to Discuss Duane Arnold Energy Center End-of-Cycle Plant Performance Assessment
ML061040329
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/14/2006
From: Burgess B
Division Reactor Projects III
To:
References
Download: ML061040329 (5)


Text

April 14, 2006 LICENSEE: Florida Power and Light FACILITY: Duane Arnold Energy Center

SUBJECT:

SUMMARY

OF THE APRIL 11, 2006, PUBLIC MEETING TO DISCUSS THE DUANE ARNOLD ENERGY CENTER END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 11, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Palo Community Center in Palo, Iowa. The meeting was between NRC Region III management and Florida Power and Light representatives to discuss the NRCs assessment of the Duane Arnold Energy Centers safety performance for the period from January 1 through December 31, 2005.

The meeting notice can be found in ADAMS as Accession Number ML060740683. A list of NRC and licensee meeting participants and NRC presentation slides can be found in the attached Enclosures.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Process (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the Duane Arnold Energy Centers performance in the calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. The NRC also discussed upcoming inspections and activities at the Duane Arnold Energy Center.

As part of this regulatory performance meeting, Florida Power and Light responded to the NRCs assessment and discussed initiatives to resolve the substantive cross-cutting issue in the area of Human Performance. Florida Power and Light representatives also discussed specific corrective actions to improve human performance in the area of engineering. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Questions received from members of the public pertained to planned changes to the facility, including power uprate and plant life extension and general questions regarding how the plant is regulated by the NRC.

/RA/

Bruce Burgess, Chief Branch 2 Division of Reactor Projects Docket No. 50-331 License No. DPR-49

Enclosures:

1. Meeting attendees
2. NRC presentation slides DISTRIBUTION: See next page

April 14, 2006 LICENSEE: Florida Power and Light FACILITY: Duane Arnold Energy Center

SUBJECT:

SUMMARY

OF THE APRIL 11, 2006, PUBLIC MEETING TO DISCUSS THE DUANE ARNOLD ENERGY CENTER END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On April 11, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Palo Community Center in Palo, Iowa. The meeting was between NRC Region III management and Florida Power and Light representatives to discuss the NRCs assessment of the Duane Arnold Energy Centers safety performance for the period from January 1 through December 31, 2005.

The meeting notice can be found in ADAMS as Accession Number ML060740683. A list of NRC and licensee meeting participants and NRC presentation slides can be found in the attached Enclosures.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Process (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the Duane Arnold Energy Centers performance in the calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. The NRC also discussed upcoming inspections and activities at the Duane Arnold Energy Center.

As part of this regulatory performance meeting, Florida Power and Light responded to the NRCs assessment and discussed initiatives to resolve the substantive cross-cutting issue in the area of Human Performance. Florida Power and Light representatives also discussed specific corrective actions to improve human performance in the area of engineering. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Questions received from members of the public pertained to planned changes to the facility, including power uprate and plant life extension and general questions regarding how the plant is regulated by the NRC.

/RA/

Bruce Burgess, Chief Branch 2 Division of Reactor Projects Docket No. 50-331 License No. DPR-49

Enclosures:

3. Meeting attendees
4. NRC presentation slides DISTRIBUTION: See next page DOCUMENT NAME:E:\Filenet\ML061040329.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME Bburgess for SSheldon:sls BBurgess DATE 04/14/2006 04/14/2006 OFFICIAL RECORD COPY

Florida Power and Light cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chairman, Linn County Board of Supervisors D. McGhee, Iowa Department of Public Health

Florida Power and Light ADAMS Distribution:

JLD DWS RidsNrrDirsIrib GEG KGO GAW1 CAA1 DRPIII DRSIII PLB1 JRK1

PUBLIC MEETING PRINCIPAL ATTENDEES April 11, 2006 NRC Bruce Burgess Chief, Branch 2, Division of Reactor Projects George Wilson Senior Resident Inspector, Duane Arnold Energy Center Robert Orlikowski Resident Inspector, Monticello Randall Baker Resident Inspector, Duane Arnold Energy Center Florida Power and Light Gary Van Middlesworth Site Vice President, Duane Arnold Energy Center John Bjorseth Site Director, Duane Arnold Energy Center D. Curtland Plant Manager, Duane Arnold Energy Center and others Members of the Public Arlotta Henry Citizen Dave Wilson Independent Contractor Bruce Lacy Lacy Consulting Alan Mengler Commissioner, Palo City Council Russ Swain Police Officer, Palo Police Force Enclosure 1