{{#Wiki_filter:seem,mam oonmmx orsx m"row svsxmr Ci~REGULA INFORMATION DISTRIBUTI YSTEM (RIDS)ACCESSION NBR:9303190385 DOC.DATE: 93/02/28 NOTARIZED:
{{#Wiki_filter:Ci ~
NO DOCKET FACIAL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.
seem,mam   REGULA oonmmx INFORMATION DISTRIBUTI orsx       m"row svsxmr YSTEM (RIDS)
Washington Public Power Supply System BAKER,J.W.
ACCESSION NBR:9303190385             DOC.DATE:     93/02/28   NOTARIZED:   NO       DOCKET FACIAL:50-397 WPPSS Nuclear         Project, Unit 2, Washington Public         Powe 05000397 AUTH. NAME           AUTHOR AFFILIATION HUTCHISON,L.         Washington Public Power Supply System BAKER,J.W.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Feb 1993 for Washington Nuclear Plant 2.W/undated ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD5 LA CLIFFORD,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN5 EXTERNAL: EG6G BRYCE,J.H NSIC COPIES LTTR ENCZ 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA NRR DORS/OEAB EG FIL 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept for Feb 1993 for Washington Nuclear Plant 2.W/undated         ltr.
I'LEASE HELP US'fO REDUCE WASTE!CONTACT TIIE DOCUMENT CON'fROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 1 aw (q., s, t'0~'sn I'I vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 G02-93-059 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555  
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR           ENCL       SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT             COPIES              RECIPIENT          COPIES ID CODE/NAME             LTTR ENCZ          ID CODE/NAME      LTTR ENCL PD5 LA                       3      3      PD5 PD                  1    1 CLIFFORD,J                 1      1 INTERNAL: ACRS                         10    10      AEOD/DOA                1    1 AEOD/DSP/TPAB               1      1      NRR DORS/OEAB          1    1 NRR/DRIL/RPEB               1      1        EG  FIL      01      1    1 RGN5                       1      1 EXTERNAL: EG6G BRYCE,J.H               1       1     NRC PDR                 1     1 NSIC                        1       1 NOTE TO ALL"RIDS" RECIPIENTS:
I'LEASE HELP US 'fO REDUCE WASTE! CONTACT TIIE DOCUMENT CON'fROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 24   ENCL   24
 
                '0
                      ~
t aw 1
( q ., s, sn I
                    'I
 
vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 G02-93-059 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555


==Dear Sir:==
==Dear Sir:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT FEBRUARY, 1993 Transmitted herewith is the Monthly Operating Report for the month of February, 1993 as required by our Technical Specifications 6.9.1.6.Very truly ours, J.W.Baker WNP-2 Plant Manager (MD 927M)LBH/hh cc: Mr.Mr.Ms.Mr.Mr.Mr.W;: H.Lovelace, NRC, Washington, DC J.B.Martin, NRC Region V Dottie Sherman, ANI, Farmington, CT R.C.Barr, NRC Resident Inspector (901A)J.T.Wheelock, INPO F.Yost, Utility Data Institute tgyta I~9303i90385 930228,'PDR ADOCK 05000397 R'-'"-.PDR 4 g*wj 1 P I', N.4 fl,lt~., l'I~
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT FEBRUARY, 1993 Transmitted herewith is the Monthly Operating Report for the month             of February, 1993 as required by our Technical Specifications 6.9.1.6.
OPERATING DATA REPORT WNP-2 DATE: March 1, 1993 DOCKET: 50-397 REPORTING PERIOD: Feb-93 OUTAGE+ON-LINE HOURS: 672 3.UTILITY CONTACT: Leonard Hutchison (509)377-2486 4 5.6.7.8.9.LICENSED THERMAL POWER (MWt)'AMEPLATE RATING (GROSS MWe): DESIGN ELECTRICAL RATING (NET MWe): MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): MAXIMUM DEPENDABLE CAPACITY (NET MWe): IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE 3323 1200.9 1120 1165 1112 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): REASONS FOR RESTRICTIONS, IF ANY: N NE 12.13.14.15.16.17.18.19.20.21.22.23.24.25.REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY (MWH)GROSS ELECTRICAL ENERGY (he<)NET ELECTRICAL ENERGY (MWH)UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (MDC NET)UNIT CAPACITY FACTOR (DER NET)UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS MONTH 672.0 435.9 0.0 386.5 0.0 1,057,089 361,160 339,012 57.5%57.5%45.4%45.0%33,3%192.8 YEAR 1,416.0 968.3 0.0 878.3 0.0 2,668,613 924,470 873,977 62.0%62.0%55.5%55.1%30.9%392.5 CUMULATIVE 71,984.2 50,116.9 340.4 48,186.0 381.7 139,833,263 46,773,560 44,824,396 66.9%67.5%56.9%56.6%13.7%7,665.8 26.SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION: REF ELIN TA E R8 S BED LED F R APRIL 30 1 93 FOR 4 DAY 27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
Very truly ours, J. W. Baker WNP-2 Plant Manager (MD 927M)
0 I ,)I I-DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: MARCH 8;1993 COMPLETED BY: LB HUTCHISON TELEPHONE:
LBH/hh cc:     Mr. W;: H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington, CT Mr. R. C. Barr, NRC Resident Inspector (901A)
(509)377-~6 UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: FEBRUARY, 1993 NO.DATE TYPE HOURS REASON METHOD I.ER NO SYSTEM COMPONENT CAUSE&CORRECTIVE ACTION TO PREVENT RECURRENC 93-03 2/01/93 S 92.74 B 9344 2/06/93 F 32.42 A 93%5 2/10/93 F 160.38 A N/A HA Turbine 93~CB Pumpxx 93-007 CH Pumpxx Turbine bearing vibration reached unacceptable levels, resulting in plant shutdown.After completion of turbine balance, plant startup was further delayed due to containment isolation valve problems.After valves were repaired, the plant was returned to service.Reactor was manually scrammed when reactor recirc pump failed to transfer to 60 HZ operation due to false signal (noise)in the pump control circuitry.
Mr. J. T. Wheelock, INPO Mr. F. Yost, Utility Data Institute tgyta I ~
Reactor automatically scrammed on low level due to loss of reactor feedwater pump.The cause of failure was an electric coil in the feed pump governor control circuitry.
9303i90385 930228,
After repairs were performed, startup activities were placed on administrative hold while an assessment was performed on recent plant problems.After compl of assessment, the plant was returned to service.
'PDR R
ADOCK 05000397
                - .     PDR
 
4 g*   wj 1
P
. 4 fl,lt~., N I',
l'I ~
 
OPERATING DATA REPORT WNP-2 DATE: March         1, 1993 DOCKET: 50-397 REPORTING PERIOD:     Feb-93                   OUTAGE + ON-LINE HOURS:       672
: 3. UTILITYCONTACT:       Leonard Hutchison       (509) 377-2486 4   LICENSED THERMAL POWER (MWt)                                                 3323
: 5.              RATING (GROSS MWe): 'AMEPLATE 1200.9
: 6. DESIGN ELECTRICAL RATING (NET MWe):                                           1120
: 7. MAXIMUMDEPENDABLE CAPACITY (GROSS MWe):                                       1165
: 8. MAXIMUMDEPENDABLE CAPACITY (NET MWe):                                         1112
: 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE
: 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
REASONS FOR RESTRICTIONS, IF ANY:             N NE MONTH              YEAR  CUMULATIVE
: 12. REPORT PERIOD HOURS                            672.0          1,416.0      71,984.2
: 13. HOURS REACTOR CRITICAL                          435.9            968.3      50,116.9
: 14. RX RESERVE SHUTDOWN HOURS                        0.0              0.0        340.4
: 15. HOURS GENERATOR ON LINE                         386.5            878.3      48,186.0
: 16. UNIT RESERVE SHUTDOWN HOURS                       0.0              0.0          381.7
: 17. GROSS THERMAL ENERGY (MWH)                 1,057,089        2,668,613    139,833,263
: 18. GROSS ELECTRICAL ENERGY (he<)               361,160          924,470    46,773,560
: 19. NET ELECTRICAL ENERGY (MWH)                   339,012          873,977    44,824,396
: 20. UNIT SERVICE FACTOR                          57.5%             62.0%         66.9%
: 21. UNIT AVAILABILITY FACTOR                      57.5%             62.0%         67.5%
: 22. UNIT CAPACITY FACTOR (MDC NET)                45.4%           55.5%          56.9%
: 23. UNIT CAPACITY FACTOR (DER NET)                45.0%            55.1%          56.6%
: 24. UNIT FORCED OUTAGE RATE                        33,3%           30.9%           13.7%
: 25. FORCED OUTAGE HOURS                              192.8            392.5      7,665.8
: 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:
REF ELIN     TA E R8 S BED LED F R APRIL 30 1 93 FOR 4 DAY
: 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
 
0 I
  , )I I-
 
DOCKET NO.:           50-397 UNIT NAME:             WNP-2 DATE:                 MARCH 8; 1993 COMPLETED BY:         LB HUTCHISON TELEPHONE:             (509) 377-~6 UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: FEBRUARY, 1993 NO. DATE   TYPE   HOURS REASON METHOD   I.ER NO SYSTEM COMPONENT   CAUSE     & CORRECTIVE ACTION TO           PREVENT RECURRENC 93-03   2/01/93 S     92.74   B                 N/A   HA   Turbine     Turbine bearing vibration reached unacceptable levels, resulting in plant shutdown. After completion of turbine balance, plant startup was further delayed due to containment isolation valve problems. After valves were repaired, the plant was returned to service.
9344    2/06/93  F    32.42  A              93~      CB    Pumpxx      Reactor was manually scrammed when reactor recirc pump failed to transfer to 60 HZ operation due to false signal (noise) in the pump control circuitry.
93%5    2/10/93  F    160.38  A              93-007    CH    Pumpxx      Reactor automatically scrammed on low level due to loss of reactor feedwater pump. The cause of failure was an electric coil in the feed pump governor control circuitry. After repairs were performed, startup activities were placed on administrative hold while an assessment was performed on recent plant problems. After compl of assessment, the plant was returned to service.


==SUMMARY==
==SUMMARY==
: F-FORCED S-SCHED REASON A-EQUIP FAILURE B-MAINT OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING&LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER METHOD 1-MANUAL 2-MANUAL SCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER SYSTEM&COMPONENT EXHIBIT F&H INSTRUCTIONS FOR PREPARATION OF DATA ENTRY SHEET LICENSEE EVENT REPORT (LER)FILE (NUREG-0161)  
REASON                                      METHOD                          SYSTEM    & COMPONENT F-FORCED         A-EQUIP FAILURE         F-ADMIN            1-MANUAL                        EXHIBIT F & H S-SCHED          B-MAINTOR TEST          G-OPER ERROR       2-MANUALSCRAM                  INSTRUCTIONS FOR C-REFUELING              H-OTHER             3-AUTO SCRAM                   PREPARATION OF D-REGULATORY RESTRICTION                    4-CONTINUED                     DATA ENTRY SHEET E-OPERATOR TRAINING &                        5-REDUCED LOAD                 LICENSEE EVENT REPORT LICENSE EXAM                              9-OTHER                         (LER) FILE (NUREG -0161)
'4 lt~~LWW-4 A C  
 
~4+f~~0 AVERAGE DAILY VNIT POWER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
4 lt   ~
50-397 WNP-2 FEBRUARY, 1993 LB HUTCHISON (509)377-2486 MONTH: FEBRUARY, 1993 DAY AVERAGE DAILY POWER LEVEL (M We-NET)DAY'AVERAGE DAILY POWER LEVEL (MWe-NET)&2 17.102 2.18.823 3.19.1078 4.20.1075 5.6.72 21.I 22.1110 7.27 23.1106 8.24.9.948 1113 10.o 657 26.1091 27.1103 12, 28.1108 13.14.15.16.INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH.COMPUTE TO THE NEAREST WHOLE MEGAWATT.THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH.NOTE THAT WHEN MAXIMUM DEPENDABLE CAPACITY IS USED FOR THE NET ELECTRICAL RATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100Fo LINE (OR THE RESTRICTED POWER LEVEL LINE).IN SUCH CASES, THE AVERAGE DAILY UNIT POWER OUTPUT SHEET , SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.}}
~ LWW   4 A C
 
~ 4 +   f   ~ ~
0 AVERAGE DAILYVNIT POWER LEVEL DOCKET NO.:         50-397 UNIT:                WNP-2 DATE:                FEBRUARY, 1993 COMPLETED BY:        LB HUTCHISON TELEPHONE:          (509) 377-2486 MONTH:     FEBRUARY, 1993 DAY AVERAGE DAILYPOWER LEVEL                      DAY 'AVERAGE DAILYPOWER LEVEL (MWe-NET)                                             (MWe-NET)
                          &2                             17.             102
: 2.                                             18.             823
: 3.                                             19.             1078
: 4.                                             20.             1075
: 5.                                             21.
I
: 6.             72                               22.             1110
: 7.             27                               23.             1106
: 8.                                               24.
: 9.             948                                               1113
: 10. o         657                             26.             1091
: 27.             1103 12,                                               28.             1108 13.
14.
15.
16.
INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100Fo LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET
      , SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.}}

Latest revision as of 07:31, 4 February 2020

Monthly Operating Rept for Feb 1993 for Washington Nuclear Plant 2.W/undated Ltr
ML17289B226
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1993
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-059, GO2-93-59, NUDOCS 9303190385
Download: ML17289B226 (9)


Text

Ci ~

seem,mam REGULA oonmmx INFORMATION DISTRIBUTI orsx m"row svsxmr YSTEM (RIDS)

ACCESSION NBR:9303190385 DOC.DATE: 93/02/28 NOTARIZED: NO DOCKET FACIAL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1993 for Washington Nuclear Plant 2.W/undated ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCZ ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR DORS/OEAB 1 1 NRR/DRIL/RPEB 1 1 EG FIL 01 1 1 RGN5 1 1 EXTERNAL: EG6G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

I'LEASE HELP US 'fO REDUCE WASTE! CONTACT TIIE DOCUMENT CON'fROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

'0

~

t aw 1

( q ., s, sn I

'I

vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 G02-93-059 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT FEBRUARY, 1993 Transmitted herewith is the Monthly Operating Report for the month of February, 1993 as required by our Technical Specifications 6.9.1.6.

Very truly ours, J. W. Baker WNP-2 Plant Manager (MD 927M)

LBH/hh cc: Mr. W;: H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington, CT Mr. R. C. Barr, NRC Resident Inspector (901A)

Mr. J. T. Wheelock, INPO Mr. F. Yost, Utility Data Institute tgyta I ~

9303i90385 930228,

'PDR R

ADOCK 05000397

- . PDR

4 g* wj 1

P

. 4 fl,lt~., N I',

l'I ~

OPERATING DATA REPORT WNP-2 DATE: March 1, 1993 DOCKET: 50-397 REPORTING PERIOD: Feb-93 OUTAGE + ON-LINE HOURS: 672

3. UTILITYCONTACT: Leonard Hutchison (509) 377-2486 4 LICENSED THERMAL POWER (MWt) 3323
5. RATING (GROSS MWe): 'AMEPLATE 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1120
7. MAXIMUMDEPENDABLE CAPACITY (GROSS MWe): 1165
8. MAXIMUMDEPENDABLE CAPACITY (NET MWe): 1112
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

REASONS FOR RESTRICTIONS, IF ANY: N NE MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 672.0 1,416.0 71,984.2
13. HOURS REACTOR CRITICAL 435.9 968.3 50,116.9
14. RX RESERVE SHUTDOWN HOURS 0.0 0.0 340.4
15. HOURS GENERATOR ON LINE 386.5 878.3 48,186.0
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 1,057,089 2,668,613 139,833,263
18. GROSS ELECTRICAL ENERGY (he<) 361,160 924,470 46,773,560
19. NET ELECTRICAL ENERGY (MWH) 339,012 873,977 44,824,396
20. UNIT SERVICE FACTOR 57.5% 62.0% 66.9%
21. UNIT AVAILABILITY FACTOR 57.5% 62.0% 67.5%
22. UNIT CAPACITY FACTOR (MDC NET) 45.4% 55.5% 56.9%
23. UNIT CAPACITY FACTOR (DER NET) 45.0% 55.1% 56.6%
24. UNIT FORCED OUTAGE RATE 33,3% 30.9% 13.7%
25. FORCED OUTAGE HOURS 192.8 392.5 7,665.8
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:

REF ELIN TA E R8 S BED LED F R APRIL 30 1 93 FOR 4 DAY

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

0 I

, )I I-

DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: MARCH 8; 1993 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-~6 UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: FEBRUARY, 1993 NO. DATE TYPE HOURS REASON METHOD I.ER NO SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENC 93-03 2/01/93 S 92.74 B N/A HA Turbine Turbine bearing vibration reached unacceptable levels, resulting in plant shutdown. After completion of turbine balance, plant startup was further delayed due to containment isolation valve problems. After valves were repaired, the plant was returned to service.

9344 2/06/93 F 32.42 A 93~ CB Pumpxx Reactor was manually scrammed when reactor recirc pump failed to transfer to 60 HZ operation due to false signal (noise) in the pump control circuitry.

93%5 2/10/93 F 160.38 A 93-007 CH Pumpxx Reactor automatically scrammed on low level due to loss of reactor feedwater pump. The cause of failure was an electric coil in the feed pump governor control circuitry. After repairs were performed, startup activities were placed on administrative hold while an assessment was performed on recent plant problems. After compl of assessment, the plant was returned to service.

SUMMARY

REASON METHOD SYSTEM & COMPONENT F-FORCED A-EQUIP FAILURE F-ADMIN 1-MANUAL EXHIBIT F & H S-SCHED B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING H-OTHER 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT LICENSE EXAM 9-OTHER (LER) FILE (NUREG -0161)

4 lt ~

~ LWW 4 A C

~ 4 + f ~ ~

0 AVERAGE DAILYVNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: FEBRUARY, 1993 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: FEBRUARY, 1993 DAY AVERAGE DAILYPOWER LEVEL DAY 'AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET)

&2 17. 102

2. 18. 823
3. 19. 1078
4. 20. 1075
5. 21.

I

6. 72 22. 1110
7. 27 23. 1106
8. 24.
9. 948 1113
10. o 657 26. 1091
27. 1103 12, 28. 1108 13.

14.

15.

16.

INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100Fo LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET

, SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.