ML17310A547: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE SH26 EHG.ki QEQBM EREAtund MONTH: July 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 10 12 13 14 15 1192 1180 1174 1169 1159 1154 1138 1126 1113 1105 1099 1100 1100 1103 1102 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1100 1101 1097 1086 1072 1065 1056 1046 1037 1026 1017 1005 994 983 971 16 1104 REFUELING INFORMATION DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE SH25 MbLG&1 9953M KRXaldund Scheduled date for next refueling shutdown.09/04/93, 4th refueling.
{{#Wiki_filter:I AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SH26 UNIT NAME     EHG.ki DATE          QEQBM COMPLETED BY  EREAtund TELEPHONE MONTH: July 1993 DAY   AVERAGE DAILYPOWER LEVEL                     DAY   AVERAGE DAILYPOWER LEVEL 1192                                             1100 1180                                 18          1101 1174                                 19          1097 1169                               20            1086 1159                               21            1072 1154                               22            1065 1138                               23            1056 1126                               24            1046 1113                               25            1037 10              1105                               26            1026 1099                               27            1017 12              1100                               28            1005 13              1100                               29            994 14              1103                               30            983 15              1102                               31           971 16             1104
 
REFUELING INFORMATION DOCKET NO.           SH25 UNIT NAME           MbLG&1 DATE                9953M COMPLETED BY        KRXaldund TELEPHONE Scheduled date for next refueling shutdown.
09/04/93, 4th refueling.
Scheduled date for restart following refueling.
Scheduled date for restart following refueling.
11/23/93.Will refueling or resumption of operation thereafter require a Technical Specification change or other'icense amendment?
11/23/93.
Yes, required to add topical report"Sys 80" Inlet Flow distribution to Tech.Spec Section 6.9.1.10.Scheduled date for submitting proposed licensing action and supporting Information.
Will refueling or resumption of operation thereafter require           a Technical Specification change or other
08/30/93.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
'icense amendment?
APS intends to use GuardianŽdebris resistant grids in Unit 1 Batch G fuel and has submitted, for NRC review, a Topical Report,"System 80" Inlet Flow Distribution, Supplement 1-P to Enclosure 1-P to LD-82-054," that discusses a revision to the analysis method.The number of fuel assemblies.
Yes, required to add topical report "Sys 80" Inlet Flow distribution to Tech. Spec Section 6.9.1.10.
e)In Inc cere.~b)In the spent fuel storage pool.Licensed spent fuel storage capacity.Intended change in spent fuel storage capacity.~og Projected date of last'refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).
Scheduled date for submitting proposed licensing action and supporting Information.
I~  
08/30/93.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
APS intends to use Guardian' debris resistant grids in Unit 1 Batch G fuel and has submitted, for NRC review, a Topical Report, "System 80" Inlet Flow Distribution, Supplement 1-P to Enclosure 1-P to LD-82-054," that discusses a revision to the analysis method.
e) In Inc cere. ~
The number of fuel assemblies.
b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity.   ~og Projected date of last'refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
I~


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 2L526 MKik1 QBLQBL93 L'Mukluk AM!SR'7/01 07/10 07/1 8 07/31 0000 2045 2000 2400 Unit began the month in Mode 1, approximately 96%RX power, with end of core life coastdown in progress.RX power reached 89%.Commenced T-cold portion of the coastdown.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.           2L526 UNIT NAME             MKik1 DATE                 QBLQBL93 COMPLETED BY         L 'Mukluk TELEPHONE AM!SR'7/01 0000   Unit began the month in Mode 1, approximately 96% RX power, with end of core life coastdown in progress.
Reactor power will be held, constant at 89%while T-cold is allowed to decrease from 565'to 560'.T-cold reached 560'.Commenced portion of coastdown where T-cold will be held constant at 560'and reactor power will be allowed to decrease to 72%.Unit ended the month in Mode 1, approximately 89%RX power, with end of core life coastdown in progress.
07/10      2045  RX power reached 89%. Commenced T-cold portion of the coastdown. Reactor power will be held, constant at 89% while T-cold is allowed to decrease from 565' to 560'.
SHUTDOWNS AND POWER REDUCTIONS July 1993 DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE 8=25~PV gS~~08/)~/3'S~ERLuad 34 4 No.Outage Duration Date Type" Hours Method of Shutting Reason Down Reactor LER No.System Code4 Component Code5 Cause and Corrective Action to Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month."F-Forced S-Scheduled Reason: A-Equipment Failure(Explain)
07/1 8    2000  T-cold reached     560'. Commenced portion of coastdown where T-cold will be held constant at 560'     and reactor power will be allowed to decrease to 72%.
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain)
07/31      2400  Unit ended the month in Mode 1, approximately 89% RX power, with end of core life coastdown in progress.
Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source
 
SHUTDOWNS AND POWER REDUCTIONS July 1993 DOCKET NO             8=25 UNIT NAME              ~PV gS~ '
DATE                  ~08/)~/3 COMPLETED BY              S~ERLuad TELEPHONE                  34 4 Cause and Outage                          Method of                                                            Corrective Action Duration                        Shutting                                System Component              to Prevent No.         Date       Type"       Hours           Reason         Down Reactor           LER No.         Code4 Code5                 Recurrence No reactor shutdowns or significant power reductions occurred during the month.
"F-Forced                             Reason:                                      3Method:                        Exhibit F-Instructions S-Scheduled                           A-Equipment Failure(Explain)                   1-Manual                      for Preparation of the Data B-Maintenance or Test                         2-Manual Scram                Entry Sheets for Licensee C-Refueling                                   3-Automatic Scram              Event Report (LER) File D-Regulatory Restriction                     4-Continuation from            (NUREG 0161)
E-Operator Training 8 License                       Previous Month Examination                            5-Reduction of 20% or F-Administrative                                    Greater in the Past     Exhibit H-Same Source G-Operational Error                                24 Hours H-Other (Explain)                              9-Other-(Explain)
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SLUR UNIT NAME      EHG&2 DATE          QB LOBED COMPLETED BY  L KZalduad TELEPHONE MONTH: July 1993 DAY    AVERAGE DAILYPOWER LEVEL                      DAY  AVERAGE DAILYPOWER LEVEL 17 18 19 20 21 22 23 24 25 10                                                  26 27 12                                                  28 13                                                  29 14                                                  30 15                                                  31 16


AVE RAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE SLUR EHG&2 QB LOBED L KZalduad MONTH: July 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 REFUELING INFORMATION DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 2822 EbKK QEGBL92 9'Makluad Scheduled date for next refueling shutdown.The 5th refueling outage is tentatively scheduled for 09/17/94.Scheduled date for restart following refueling.
REFUELING INFORMATION DOCKET NO.         2822 UNIT NAME           EbKK DATE               QEGBL92 COMPLETED BY       9 'Makluad TELEPHONE Scheduled date for next refueling shutdown.
12/06/94.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
The 5th refueling outage is tentatively scheduled for 09/17/94.
Scheduled date for restart following refueling.
12/06/94.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
A change may be required to Technical Specification 3.9.6 to raise the overload cutoff limit to accommodate the new fuel assembly modification.
A change may be required to Technical Specification 3.9.6 to raise the overload cutoff limit to accommodate the new fuel assembly modification.
Scheduled date for submitting proposed licensing action and supporting information.
Scheduled date for submitting proposed licensing action and supporting information.
N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
The fuel assembly will consist of a denser fuel pellet, Erbia burnable absorber and guardian grid.The number of fuel assemblies.
The fuel assembly will consist of a denser fuel pellet, Erbia burnable absorber and guardian grid.
a)Inthecore.
The number of fuel assemblies.
~~b)In the spentfuel storage pool.~~Licensed spent fuel storage capacity.~29 Intended change in spent fuel storage capacity.~rig Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).  
a) Inthecore.   ~~ ~~
b) In the spentfuel storage pool.
Licensed spent fuel storage capacity.     ~29 Intended change   in spent fuel storage capacity. ~rig Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE K-'i29 ELbLGR2 QGLOKQ 9'Makluad 07/01 07/31 0000 2400 Unit began the month in Mode 5, 4th refueling outage in progress.Unit ended the month in Mode 5, 4th refueling outage in progress.  
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. K-'i29 UNIT NAME      ELbLGR2 DATE          QGLOKQ COMPLETED BY  9 'Makluad TELEPHONE 07/01 0000   Unit began the month in Mode 5, 4th refueling outage in progress.
07/31 2400  Unit ended the month in Mode 5, 4th refueling outage in progress.


SHUTDOWNS AND POWER REDUCTIONS July 1993 DOCKET NO 50-'~2 UNIT NAME EVVGS-2 DATE Qgj//9 f93 COMPLETED BY~BF+c~ud No.Date Outage Duration Type" Hours Reason Method of Shutting Down Reactor LER No.System Code" Component Code5 Cause and Corrective Action to Prevent Recurrence 93-02 03/19/93 S 744.0 N/A N/A N/A Fourth refueling outage continued.
SHUTDOWNS AND POWER REDUCTIONS July 1993 DOCKET NO             50-'~2 UNIT NAME             EVVGS-2 DATE                   Qgj//9 f93 COMPLETED BY           ~BF+c~ud Cause and Outage                        Method of                                                            Corrective Action Duration                      Shutting                                System Component              to Prevent No.       Date     Type" Hours           Reason         Down Reactor           LER No.         Code" Code5                 Recurrence 93-02       03/19/93 S     744.0                                                 N/A             N/A   N/A                   Fourth refueling outage continued.
1F Forced S-Scheduled Reason: A-Equipment Failure(Explain)
1F Forced                   Reason:                                      3Method:                        Exhibit F-Instructions S-Scheduled                 A-Equipment Failure(Explain)                   1-Manual                      for Preparation of the Data B-Maintenance or Test                         2-Manual Scram                Entry Sheets for Licensee C-Refueling                                   3-Automatic Scram              Event Report (LER) File D-Regulatory Restriction                     4-Continuation from            (NUREG 0161)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain)
E-Operator Training 8 License                       Previous Month Examination                            5-Reduction of 20% or F-Administrative                                    Greater in the Past     Exhibit H-Same Source G-Operational Error                                24 Hours H-Other (Explain)                             9-Other-(Explain)
Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE K=HO ERG.&2 QEQKK ELGJRlduod MONTH: July 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 10 12 13 14 15 16 1266 1257 1257 1267 1267 1265 1262 1264 1266 1266 1265 1267 1264 1264 1263 1262 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1260 1263 1264 1262 1262 1262 1262 1261 1260 1261 1263 1261 1262 1258 1257 REFUELING INFORMATION DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE K=GZ EbKzH QE99L92!duad Scheduled date for next refueling shutdown.03/12/94, 4th refueling.
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. K=HO UNIT NAME      ERG.&2 DATE          QEQKK COMPLETED BY  ELGJRlduod TELEPHONE MONTH: July 1993 DAY   AVERAGE DAILYPOWER LEVEL                     DAY   AVERAGE DAILYPOWER LEVEL 1266                               17            1260 1257                               18            1263 1257                               19            1264 1267                               20            1262 1267                               21            1262 1265                               22           1262 1262                               23            1262 1264                                24            1261 1266                                25            1260 10              1266                                26            1261 1265                                27            1263 12              1267                                28            1261 13              1264                                29            1262 14              1264                                30            1258 15              1263                                31            1257 16              1262
 
REFUELING INFORMATION DOCKET NO.             K=GZ UNIT NAME             EbKzH DATE                   QE99L92 COMPLETED BY                   !duad TELEPHONE Scheduled date for next refueling shutdown.
03/12/94, 4th refueling.
Scheduled date for restart following refueling.
Scheduled date for restart following refueling.
05/31/94.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
05/31/94.
Yes.Scheduled date for submitting proposed licensing action and supporting information.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Mid to latter part of 1993.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
Yes.
U3C5 will incorporate a new higher maximum enrichment level of 4.30%U235 and will also utilize a new integral burnable absorber, Erbium.The NRC granted a license amendment (No.35)which allows the use of 80 fuel rods clad with advanced zirconium based alloys (other than Zircaioy<)
Scheduled date for submitting proposed licensing action and supporting information.
in two fuel assemblies during Unit 3 Cycles 4, 5, and 6 for in-reactor performance evaluation.
Mid to latter part of 1993.
Date of issuance was July 20, 1992.The number of fuel assemblies.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
e)In the core.~b)In the spent fuel storage pool.Licensed spent fuel storage capacity.Intended change in spent fuel storage capacity.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).  
U3C5 will incorporate a new higher maximum enrichment level of 4.30% U235 and will also utilize a new integral burnable absorber, Erbium.
The NRC granted a license amendment (No. 35) which allows the use of 80 fuel rods clad with advanced zirconium based alloys (other than Zircaioy<) in two fuel assemblies during Unit 3 Cycles 4, 5, and 6 for in-reactor performance evaluation. Date of issuance was July 20, 1992.
e) In the core. ~
The number of fuel assemblies.
b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE SLY MK&QEQBLK~Rklund 07/01 07/31 0000 2400 Unit began the month in Mode 1, 100%RX power.Unit ended the month in Mode 1, 100%RX power.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. SLY UNIT NAME DATE MK&
SHUTDOWNS AND POWER REDUCTIONS July 1993 DOCKET NO$4539 UNIT NAME@VVI~~DATE Qf//I~I COMPLETED BY~B UKRUK4M No.Outage Duration Date Type Hours Method of Shutting Reason Down Reactor LER No.System Code4 Component Code5 Cause and Corrective Action to Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month.1F-Forced S-Scheduled 2Reason A-Equipment Failure(Explain)
QEQBLK COMPLETED BY ~Rklund TELEPHONE 07/01 0000   Unit began the month in Mode 1, 100% RX power.
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source ENCLOSURE 2 REVISED PAGE FOR JANUARY 1993 UNIT 1 MONTHLY OPERATING REPORT  
07/31 2400  Unit ended the month in Mode 1, 100% RX power.
~v}}
SHUTDOWNS AND POWER REDUCTIONS July 1993 DOCKET NO             $ 4539 UNIT NAME             @VVI~~
DATE                   Qf//I~I COMPLETED BY           ~B UKRUK4M Cause and Outage                          Method of                                                            Corrective Action Duration                      Shutting                                System Component              to Prevent No.         Date       Type         Hours           Reason         Down Reactor           LER No.         Code4 Code5                 Recurrence No reactor shutdowns or significant power reductions occurred during the month.
1F-Forced                           2Reason                                        3Method:                        4Exhibit F-Instructions S-Scheduled                           A-Equipment Failure(Explain)                   1-Manual                      for Preparation of the Data B-Maintenance or Test                         2-Manual Scram                  Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram              Event Report (LER) File D-Regulatory Restriction                     4-Continuation from            (NUREG 0161)
E-Operator Training 8 License                       Previous Month Examination                            5-Reduction of 20% or F-Administrative                                    Greater in the Past     Exhibit H-Same Source G-Operational Error                                  24 Hours H-Other (Explain)                             9-Other-(Explain)
ENCLOSURE 2 REVISED PAGE FOR JANUARY 1993 UNIT 1 MONTHLYOPERATING REPORT
 
~
v}}

Latest revision as of 04:09, 4 February 2020

Monthly Operating Repts for Jul 1993 for Palo Verde Nuclear Generating Station Units 1,2 & 3
ML17310A547
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/31/1993
From: Ecklund B
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17310A546 List:
References
NUDOCS 9308190122
Download: ML17310A547 (21)


Text

I AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SH26 UNIT NAME EHG.ki DATE QEQBM COMPLETED BY EREAtund TELEPHONE MONTH: July 1993 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1192 1100 1180 18 1101 1174 19 1097 1169 20 1086 1159 21 1072 1154 22 1065 1138 23 1056 1126 24 1046 1113 25 1037 10 1105 26 1026 1099 27 1017 12 1100 28 1005 13 1100 29 994 14 1103 30 983 15 1102 31 971 16 1104

REFUELING INFORMATION DOCKET NO. SH25 UNIT NAME MbLG&1 DATE 9953M COMPLETED BY KRXaldund TELEPHONE Scheduled date for next refueling shutdown.

09/04/93, 4th refueling.

Scheduled date for restart following refueling.

11/23/93.

Will refueling or resumption of operation thereafter require a Technical Specification change or other

'icense amendment?

Yes, required to add topical report "Sys 80" Inlet Flow distribution to Tech. Spec Section 6.9.1.10.

Scheduled date for submitting proposed licensing action and supporting Information.

08/30/93.

Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

APS intends to use Guardian' debris resistant grids in Unit 1 Batch G fuel and has submitted, for NRC review, a Topical Report, "System 80" Inlet Flow Distribution, Supplement 1-P to Enclosure 1-P to LD-82-054," that discusses a revision to the analysis method.

e) In Inc cere. ~

The number of fuel assemblies.

b) In the spent fuel storage pool.

Licensed spent fuel storage capacity.

Intended change in spent fuel storage capacity. ~og Projected date of last'refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

I~

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 2L526 UNIT NAME MKik1 DATE QBLQBL93 COMPLETED BY L 'Mukluk TELEPHONE AM!SR'7/01 0000 Unit began the month in Mode 1, approximately 96% RX power, with end of core life coastdown in progress.

07/10 2045 RX power reached 89%. Commenced T-cold portion of the coastdown. Reactor power will be held, constant at 89% while T-cold is allowed to decrease from 565' to 560'.

07/1 8 2000 T-cold reached 560'. Commenced portion of coastdown where T-cold will be held constant at 560' and reactor power will be allowed to decrease to 72%.

07/31 2400 Unit ended the month in Mode 1, approximately 89% RX power, with end of core life coastdown in progress.

SHUTDOWNS AND POWER REDUCTIONS July 1993 DOCKET NO 8=25 UNIT NAME ~PV gS~ '

DATE ~08/)~/3 COMPLETED BY S~ERLuad TELEPHONE 34 4 Cause and Outage Method of Corrective Action Duration Shutting System Component to Prevent No. Date Type" Hours Reason Down Reactor LER No. Code4 Code5 Recurrence No reactor shutdowns or significant power reductions occurred during the month.

"F-Forced Reason: 3Method: Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training 8 License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SLUR UNIT NAME EHG&2 DATE QB LOBED COMPLETED BY L KZalduad TELEPHONE MONTH: July 1993 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 31 16

REFUELING INFORMATION DOCKET NO. 2822 UNIT NAME EbKK DATE QEGBL92 COMPLETED BY 9 'Makluad TELEPHONE Scheduled date for next refueling shutdown.

The 5th refueling outage is tentatively scheduled for 09/17/94.

Scheduled date for restart following refueling.

12/06/94.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

A change may be required to Technical Specification 3.9.6 to raise the overload cutoff limit to accommodate the new fuel assembly modification.

Scheduled date for submitting proposed licensing action and supporting information.

N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

The fuel assembly will consist of a denser fuel pellet, Erbia burnable absorber and guardian grid.

The number of fuel assemblies.

a) Inthecore. ~~ ~~

b) In the spentfuel storage pool.

Licensed spent fuel storage capacity. ~29 Intended change in spent fuel storage capacity. ~rig Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. K-'i29 UNIT NAME ELbLGR2 DATE QGLOKQ COMPLETED BY 9 'Makluad TELEPHONE 07/01 0000 Unit began the month in Mode 5, 4th refueling outage in progress.

07/31 2400 Unit ended the month in Mode 5, 4th refueling outage in progress.

SHUTDOWNS AND POWER REDUCTIONS July 1993 DOCKET NO 50-'~2 UNIT NAME EVVGS-2 DATE Qgj//9 f93 COMPLETED BY ~BF+c~ud Cause and Outage Method of Corrective Action Duration Shutting System Component to Prevent No. Date Type" Hours Reason Down Reactor LER No. Code" Code5 Recurrence 93-02 03/19/93 S 744.0 N/A N/A N/A Fourth refueling outage continued.

1F Forced Reason: 3Method: Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training 8 License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. K=HO UNIT NAME ERG.&2 DATE QEQKK COMPLETED BY ELGJRlduod TELEPHONE MONTH: July 1993 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1266 17 1260 1257 18 1263 1257 19 1264 1267 20 1262 1267 21 1262 1265 22 1262 1262 23 1262 1264 24 1261 1266 25 1260 10 1266 26 1261 1265 27 1263 12 1267 28 1261 13 1264 29 1262 14 1264 30 1258 15 1263 31 1257 16 1262

REFUELING INFORMATION DOCKET NO. K=GZ UNIT NAME EbKzH DATE QE99L92 COMPLETED BY !duad TELEPHONE Scheduled date for next refueling shutdown.

03/12/94, 4th refueling.

Scheduled date for restart following refueling.

05/31/94.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes.

Scheduled date for submitting proposed licensing action and supporting information.

Mid to latter part of 1993.

Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

U3C5 will incorporate a new higher maximum enrichment level of 4.30% U235 and will also utilize a new integral burnable absorber, Erbium.

The NRC granted a license amendment (No. 35) which allows the use of 80 fuel rods clad with advanced zirconium based alloys (other than Zircaioy<) in two fuel assemblies during Unit 3 Cycles 4, 5, and 6 for in-reactor performance evaluation. Date of issuance was July 20, 1992.

e) In the core. ~

The number of fuel assemblies.

b) In the spent fuel storage pool.

Licensed spent fuel storage capacity.

Intended change in spent fuel storage capacity.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. SLY UNIT NAME DATE MK&

QEQBLK COMPLETED BY ~Rklund TELEPHONE 07/01 0000 Unit began the month in Mode 1, 100% RX power.

07/31 2400 Unit ended the month in Mode 1, 100% RX power.

SHUTDOWNS AND POWER REDUCTIONS July 1993 DOCKET NO $ 4539 UNIT NAME @VVI~~

DATE Qf//I~I COMPLETED BY ~B UKRUK4M Cause and Outage Method of Corrective Action Duration Shutting System Component to Prevent No. Date Type Hours Reason Down Reactor LER No. Code4 Code5 Recurrence No reactor shutdowns or significant power reductions occurred during the month.

1F-Forced 2Reason 3Method: 4Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training 8 License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain)

ENCLOSURE 2 REVISED PAGE FOR JANUARY 1993 UNIT 1 MONTHLYOPERATING REPORT

~

v