{{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL DOCKET NO." UNIT NAME DATE QL1295 COMPLETED BY~MQQ RIES!JQu MONTH: July 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1223 17 1226 1215 18 1227 1220 19 1224 1154 20 1224 1218 21 1223 1218 22 1221 1220 23 1223 1218 24 1220 1221 25 1216 10 1217 26 1221 1217 27 1221 12, 1220 28 1222 13 1224 29 1222 14 1219 30 1220 15 1222 31 1221 16 1222 REFUELING INFORMATION DOCKET NO.UNIT NAME DATE QLQLK COMPLETED BY~gg~Scheduled date for next refueling shutdown.The 6th refueling outage is scheduled to begin on 09/21/96.Scheduled date for restart following refueling.
{{#Wiki_filter:AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
11/04/96.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
UNIT NAME DATE         QL1295 COMPLETED BY ~MQQ RIES!JQu MONTH: July 1996 DAY         AVERAGE DAILYPOWER LEVEL           DAY   AVERAGE DAILYPOWER LEVEL 1223                     17               1226 1215                     18               1227 1220                     19               1224 1154                     20               1224 1218                     21               1223 1218                     22               1221 1220                     23               1223 1218                     24               1220 1221                     25               1216 10                   1217                     26               1221 1217                     27               1221 12 ,               1220                     28               1222 13                   1224                     29               1222 14                   1219                     30               1220 15                   1222                     31               1221 16                   1222
 
REFUELING INFORMATION DOCKET NO.
UNIT NAME DATE                 QLQLK COMPLETED BY         ~gg~
Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled to begin on 09/21/96.
Scheduled date for restart following refueling.
11/04/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No Scheduled date for submitting proposed licensing action and supporting information.
No Scheduled date for submitting proposed licensing action and supporting information.
5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.The number of fuel assemblies b)In the spent fuel storage pool.Licensed spent fuel storage capacity.Intended change in spent fuel storage capacity.~lit Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).
None.
M t t  
The number of fuel assemblies b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity. ~lit Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
M t


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.SLQZG UNIT NAME LVHG.R1 DATE QLQL96 COMPLETED BY~USQUE 07/01 0000 07/04 0206 07/04 0335 07/04 1500 07/31 2359 Unit began the month in Mode 1 at 100%power..Commenced RX power decrease to 85%for MT CV¹4 card replacement.
OF OPERATING EXPERIENCE FOR THE MONTH t
RX power stabilized at 88%.RX power at 100%.Unit ended the month in Mode 1 at 100%power.
DOCKET NO. SLQZG UNIT NAME   LVHG.R1 DATE         QLQL96 COMPLETED BY ~USQUE 07/01 0000 Unit began the month in Mode 1 at 100% power..
SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO UNIT NAME~g(~DATE QQ355 COMPLETED BY JJ2JAtQQ Date Outage Method of Duration Shutting Down Type" Hours Reason2 Reactor3 LER No.System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.1F Forced S-Scheduled Reason: A-Equipment Failure(Explain)
07/04 0206 Commenced RX power decrease to 85% for MT CV¹4 card replacement.
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)5Exhibit H-Same Source
07/04 0335 RX power stabilized at 88%.
07/04 1500 RX power at 100%.
07/31 2359 Unit ended the month in Mode 1 at 100% power.


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.SL522 UNIT NAME j'EKiR2 DATE QLQLK COMPLETED BY~~~lHQQ IHRUHJBZ MONTH: July 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1250 17 1255 1250 18 1256 1249 19 1256 1249 20 1254 1249 21 1254 1248 22 1254 1250 23 1254 1249 24 1252 1250 25 1243 10 1250-26 1252 1250 27 1248 12 1252 28 1251 13 1248 29 1251 14 1245 30 1250 15 1249 31 1251 16 1251 REFUELING INFORMATION DOCKET NO.UNIT NAME/VVI~DATE QL13LK COMPLETED BY Scheduled date for next refueling shutdown.The 7th refueling outage is scheduled for 09/20/97.Scheduled date for restart following refueling.
SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO UNIT NAME DATE
11/09/97.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
                                                                                                                                          ~g(~
QQ355 COMPLETED BY          JJ2JAtQQ Outage                    Method of Duration                Shutting Down                        System Component      Cause and Corrective Action Date      Type"      Hours      Reason2        Reactor3            LER No.        Code4  Code5        to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.
1F Forced              Reason:                                    3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled            A-Equipment Failure(Explain)                1-Manual                                  of the Data Entry Sheets for Licensee B-Maintenance or Test                      2-Manual Scram                            Event Report (LER) File (NUREG 0161)
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training 8 License              5-Reduction of 20% or Greater in the    5Exhibit H-Same Source Examination                                Past 24 Hours F-Administrative                            9-Other-(Explain)
G-Operational Error H-Other (Explain)
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SL522 UNIT NAME     j'EKiR2 DATE         QLQLK COMPLETED BY ~~~lHQQ IHRUHJBZ MONTH: July 1996 DAY       AVERAGE DAILYPOWER LEVEL         DAY     AVERAGE DAILYPOWER LEVEL 1250                     17             1255 1250                     18             1256 1249                     19             1256 1249                     20             1254 1249                     21             1254 1248                     22             1254 1250                     23             1254 1249                     24             1252 1250                     25             1243 10                 1250                   - 26             1252 1250                     27             1248 12                 1252                     28             1251 13                 1248                     29             1251 14                   1245                     30             1250 15                   1249                     31             1251 16                   1251
 
REFUELING INFORMATION DOCKET NO.
UNIT NAME         /VVI~
DATE             QL13LK COMPLETED BY Scheduled date for next refueling shutdown.
The 7th refueling outage is scheduled for 09/20/97.
Scheduled date for restart following refueling.
11/09/97.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Scheduled date for submitting proposed licensing action and supporting information.
Scheduled date for submitting proposed licensing action and supporting information.
N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
N/A The number of fuel assemblies.
N/A a) tn the core. ~
a)tn the core.~b)In the spent fuel storage pool.~~Licensed spent fuel storage capacity.'929 Intended change in spent fuel storage capacity.~~I II Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).  
The number of fuel assemblies.
b) In the spent fuel storage pool. ~~
Licensed spent fuel storage capacity.       '929 Intended change in spent fuel storage capacity. ~~     I           II Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).


t t  
t                                 t


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.5¹529 UNIT NAME EZHG.M DATE BLQLK COMPLETED BY~~QQ RIUSRJRZ July lBK 07/01 0000 Unit began the month in Mode 1 at 100%RX power.07/31'2359 Unit ended the month in Mode 1 at 100%RX power.  
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 5¹529 UNIT NAME   EZHG.M DATE         BLQLK COMPLETED BY ~~QQ RIUSRJRZ July lBK 07/01     0000 Unit began the month in Mode 1 at 100% RX power.
07/31     '2359 Unit ended the month in Mode 1 at 100% RX power.


SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO UNIT NAME/VV(~DATE EiZK COMPLETED BY~)~gg~No.Outage Method of Duration Shutting Down Date Type" Hours Reason2 Reactor3 LER No.System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996."F-Forced S-Scheduled Reason: A-Equipment Failure(Explain)
SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO UNIT NAME             /VV(~
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entiy Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source t~I  
DATE                   EiZK COMPLETED BY           ~)~gg~
Outage                   Method of Duration                 Shutting Down                         System Component      Cause and Corrective Action No.          Date       Type"       Hours     Reason2       Reactor3             LER No.       Code4   Code5         to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.
"F-Forced             Reason:                                    3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled           A-Equipment Failure(Explain)                 1-Manual                                  of the Data Entiy Sheets for Licensee B-Maintenance or Test                       2-Manual Scram                            Event Report (LER) File (NUREG 0161)
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training 8 License              5-Reduction of 20% or Greater in the     Exhibit H-Same Source Examination                                Past 24 Hours F-Administrative                            9-Other-(Explain)
G-Operational Error H-Other (Explain) t
  ~ I


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.SL539 UNIT NAME EV'N%~~DATE QL13$6 COMPLETED BY L9~6tQQ MONTH: July 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1249 17 1255 2 1249 18 1257 1251 19 1256 1251 20 1248 1251 21 1247 1243 22 1252 1242 23 1252 1247 24 1244 1250 25 1247 10 1251 26 1247 1250 27 1247 12 1251 28 1245 13 1246 29"1250 14 1241 30 1250 15 1251 31 1250 16 1252 REFUELING INFORMATION DOCKET NO.UNIT NAME EEKBM DATE QLQLK COMPLETED BY>LE)MUHQQ ERLBIJKI Scheduled date for next refueling shutdown.The 6th refueling outage is scheduled for 2/22/97.Scheduled date for restart following refueling.
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SL539 UNIT NAME     EV'N%~~
4/13/97.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment7 None.Scheduled date for submitting proposed licensing action and supporting information.
DATE         QL13$ 6 COMPLETED BY L9~6tQQ MONTH: July 1996 DAY       AVERAGE DAILYPOWER LEVEL         DAY     AVERAGE DAILYPOWER LEVEL 1249                   17               1255 2                   1249                   18               1257 1251                   19               1256 1251                     20               1248 1251                   21               1247 1243                     22               1252 1242                     23               1252 1247                     24               1244 1250                     25               1247 10                 1251                     26               1247 1250                     27               1247 12                 1251                     28               1245 13                   1246                   29               "1250 14                   1241                   30               1250 15                   1251                   31               1250 16                   1252
None.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
 
None.The number of fuel assemblies.
REFUELING INFORMATION DOCKET NO.
b)In the spent fuel storage pool.Intended change in spent fuel storage capacity.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).  
UNIT NAME           EEKBM DATE                 QLQLK COMPLETED BY         >LE)MUHQQ ERLBIJKI Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled for 2/22/97.
Scheduled date for restart following refueling.
4/13/97.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment7 None.
Scheduled date for submitting proposed licensing action and supporting information.
None.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
b) In the spent fuel storage pool.
Intended change in spent fuel storage capacity.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.59-'539 UNIT NAME DATE QLQLK COMPLETED BY 07/01 0000 Unit began the month in Mode 1 at 100%RX power.07/31 2359 Unit ended the month in Mode 1 at 100%'RX power.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 59-'539 UNIT NAME DATE         QLQLK COMPLETED BY 07/01 0000 Unit began the month in Mode 1 at 100% RX power.
SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO~5-+UNIT NAME PVNi~DATE~6/3/96 COMPLETED BY~JD Ful o No.Outage Method of Duration Shutting Down Date Type" Hours Reason2 Reactor3 LER No.System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.1F-Forced S-Scheduled Reason: A-Equipment Failure(Explain)
07/31 2359 Unit ended the month in Mode 1 at 100%'RX power.
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source-15-}}
SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO             ~5- +
UNIT NAME             PVNi~
DATE                   ~6/ 3/96 COMPLETED BY           ~JD Ful o Outage                   Method of Duration                 Shutting Down                         System Component      Cause and Corrective Action No.          Date       Type"       Hours     Reason2       Reactor3             LER No.       Code4   Code5       to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.
1F-Forced             Reason:                                    3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled             A-Equipment Failure(Explain)                 1-Manual                                  of the Data Entry Sheets for Licensee B-Maintenance or Test                       2-Manual Scram                            Event Report (LER) File (NUREG 0161)
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training 8 License              5-Reduction of 20% or Greater in the     Exhibit H-Same Source Examination                                  Past 24 Hours F-Administrative                            9-Other-(Explain)
G-Operational Error H-Other (Explain)
                                                                                }}

Latest revision as of 03:33, 4 February 2020

Monthly Operating Repts for July 1996 for Pvngs,Units 1,2 & 3
ML17312A918
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/31/1996
From: Fulton J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17312A917 List:
References
NUDOCS 9608200095
Download: ML17312A918 (22)


Text

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT NAME DATE QL1295 COMPLETED BY ~MQQ RIES!JQu MONTH: July 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1223 17 1226 1215 18 1227 1220 19 1224 1154 20 1224 1218 21 1223 1218 22 1221 1220 23 1223 1218 24 1220 1221 25 1216 10 1217 26 1221 1217 27 1221 12 , 1220 28 1222 13 1224 29 1222 14 1219 30 1220 15 1222 31 1221 16 1222

REFUELING INFORMATION DOCKET NO.

UNIT NAME DATE QLQLK COMPLETED BY ~gg~

Scheduled date for next refueling shutdown.

The 6th refueling outage is scheduled to begin on 09/21/96.

Scheduled date for restart following refueling.

11/04/96.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

No Scheduled date for submitting proposed licensing action and supporting information.

5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

None.

The number of fuel assemblies b) In the spent fuel storage pool.

Licensed spent fuel storage capacity.

Intended change in spent fuel storage capacity. ~lit Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

M t

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH t

DOCKET NO. SLQZG UNIT NAME LVHG.R1 DATE QLQL96 COMPLETED BY ~USQUE 07/01 0000 Unit began the month in Mode 1 at 100% power..

07/04 0206 Commenced RX power decrease to 85% for MT CV¹4 card replacement.

07/04 0335 RX power stabilized at 88%.

07/04 1500 RX power at 100%.

07/31 2359 Unit ended the month in Mode 1 at 100% power.

SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO UNIT NAME DATE

~g(~

QQ355 COMPLETED BY JJ2JAtQQ Outage Method of Duration Shutting Down System Component Cause and Corrective Action Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.

1F Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the 5Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SL522 UNIT NAME j'EKiR2 DATE QLQLK COMPLETED BY ~~~lHQQ IHRUHJBZ MONTH: July 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1250 17 1255 1250 18 1256 1249 19 1256 1249 20 1254 1249 21 1254 1248 22 1254 1250 23 1254 1249 24 1252 1250 25 1243 10 1250 - 26 1252 1250 27 1248 12 1252 28 1251 13 1248 29 1251 14 1245 30 1250 15 1249 31 1251 16 1251

REFUELING INFORMATION DOCKET NO.

UNIT NAME /VVI~

DATE QL13LK COMPLETED BY Scheduled date for next refueling shutdown.

The 7th refueling outage is scheduled for 09/20/97.

Scheduled date for restart following refueling.

11/09/97.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Scheduled date for submitting proposed licensing action and supporting information.

N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

N/A a) tn the core. ~

The number of fuel assemblies.

b) In the spent fuel storage pool. ~~

Licensed spent fuel storage capacity. '929 Intended change in spent fuel storage capacity. ~~ I II Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

t t

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 5¹529 UNIT NAME EZHG.M DATE BLQLK COMPLETED BY ~~QQ RIUSRJRZ July lBK 07/01 0000 Unit began the month in Mode 1 at 100% RX power.

07/31 '2359 Unit ended the month in Mode 1 at 100% RX power.

SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO UNIT NAME /VV(~

DATE EiZK COMPLETED BY ~)~gg~

Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.

"F-Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entiy Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain) t

~ I

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SL539 UNIT NAME EV'N%~~

DATE QL13$ 6 COMPLETED BY L9~6tQQ MONTH: July 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1249 17 1255 2 1249 18 1257 1251 19 1256 1251 20 1248 1251 21 1247 1243 22 1252 1242 23 1252 1247 24 1244 1250 25 1247 10 1251 26 1247 1250 27 1247 12 1251 28 1245 13 1246 29 "1250 14 1241 30 1250 15 1251 31 1250 16 1252

REFUELING INFORMATION DOCKET NO.

UNIT NAME EEKBM DATE QLQLK COMPLETED BY >LE)MUHQQ ERLBIJKI Scheduled date for next refueling shutdown.

The 6th refueling outage is scheduled for 2/22/97.

Scheduled date for restart following refueling.

4/13/97.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment7 None.

Scheduled date for submitting proposed licensing action and supporting information.

None.

Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

None.

The number of fuel assemblies.

b) In the spent fuel storage pool.

Intended change in spent fuel storage capacity.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 59-'539 UNIT NAME DATE QLQLK COMPLETED BY 07/01 0000 Unit began the month in Mode 1 at 100% RX power.

07/31 2359 Unit ended the month in Mode 1 at 100%'RX power.

SHUTDOWNS AND POWER REDUCTIONS July 1996 DOCKET NO ~5- +

UNIT NAME PVNi~

DATE ~6/ 3/96 COMPLETED BY ~JD Ful o Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of July 1996.

1F-Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)