IR 05000277/2018410: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/28/2018
| issue date = 08/28/2018
| title = Security Inspection Report 05000277/2018410 and 05000278/2018410 and Independent Spent Fuel Storage Installation Security Inspection Report 07200029/2018401 (Letter Only)
| title = Security Inspection Report 05000277/2018410 and 05000278/2018410 and Independent Spent Fuel Storage Installation Security Inspection Report 07200029/2018401 (Letter Only)
| author name = McKinley R R
| author name = Mckinley R
| author affiliation = NRC/RGN-I/DRS/PSB1
| author affiliation = NRC/RGN-I/DRS/PSB1
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000277, 05000278, 07200029
| docket = 05000277, 05000278, 07200029
| license number = DPR-044, DPR-056
| license number = DPR-044, DPR-056
| contact person = McKinley R R
| contact person = McKinley R
| document report number = IR 2018401, IR 2018410
| document report number = IR 2018401, IR 2018410
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ust 28, 2018
[[Issue date::August 28, 2018]]


Mr. Bryan Senior Vice President, Exelon Generation President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
==SUBJECT:==
 
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SECURITY INSPECTION REPORT 05000277/2018410 AND 05000278/2018410 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200029/2018401
SUBJECT: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SECURITY INSPECTION REPORT 05000277/2018410 AND 05000278/2018410 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200029/2018401


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
On August 9, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Peach Bottom Atomic Power Station, Units 2 and 3. The NRC inspectors discussed the results of this inspection with Mr. Pat Navin, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
On August 9, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Peach Bottom Atomic Power Station, Units 2 and 3. The NRC inspectors discussed the results of this inspection with Mr. Pat Navin, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.


NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements.
NRC inspectors documented one finding of very low security significance (Green) in this report.


If you contest this violation or the significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Peach Bottom
This finding involved a violation of NRC requirements.


Atomic Power Station.
If you contest this violation or the significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Peach Bottom Atomic Power Station.


One cross-cutting aspect was assigned to the finding in the area of Human Performance, Procedure Adherence. The finding had a cross-cutting aspect in the area of Human Performance, Procedure Adherence, [H.8], specifically, Peach Bottom failed to follow processes, procedures, and work instructions. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRC resident inspector at the Peach Bottom Atomic Power Station.
One cross-cutting aspect was assigned to the finding in the area of Human Performance, Procedure Adherence. The finding had a cross-cutting aspect in the area of Human Performance, Procedure Adherence, [H.8], specifically, Peach Bottom failed to follow processes, procedures, and work instructions. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRC resident inspector at the Peach Bottom Atomic Power Station.


Enclosure contains Sensitive Unclassified, Non-Safeguards Information. When separated from Enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC's Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Enclosure contains Sensitive Unclassified, Non-Safeguards Information. When separated from Enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.


However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390",
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,
Sincerely,
/RA/ Raymond R. McKinley, Chief Plant Support Branch  
/RA/
 
Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Enclosure:
Division of Reactor Safety  
Non-Public Inspection Report 05000277/2018410, 05000278/2018410, and 07200029/2018401 (OUO-SRI)
 
cc w/o encl; w/o OUO-SRI:
Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Enclosure:
Distribution via ListServ cc w/encl; w/OUO-SRI:
Non-Public Inspection Report 05000277/2018410, 05000278/2018410, and 07200029/2018401 (OUO-SRI)  
S. Griffith, Manager, Site Security D. Allard, Director, PA DEP M. Griffen, MD Emergency Response Director ML18241A123 (Cover letter- Pub)
 
ADAMS ACCESSION NUMBER: ML18241A138 (Cover letter w/Enclosure Non-Public)
cc w/o encl; w/o OUO-SRI: Distribution via ListServ  
Cover Letter: Non-Sensitive Publicly Available SUNSI Review  Sensitive  Non-Publicly Available Cover Letter w/ Enclosure: Non-Sensitive Publicly Available SUNSI Review  Sensitive  Non-Publicly Available OFFICE RI/DRS RII/DRS RI/DRS RI/DRP RI/DRS NAME SMcCarver KHussar/JCherubini for JCherubini JGreives RMcKinley DATE 08/16/2018 08/28/2018 08/28/2018 08/16/2018 08/28/2018
 
cc w/encl; w/OUO-SRI: S. Griffith, Manager, Site Security D. Allard, Director, PA DEP M. Griffen, MD Emergency Response Director  
 
ML18241A123 (Cover letter- Pub) ADAMS ACCESSION NUMBER:
ML18241A138 (Cover letter w/Enclosure Non-Public) Cover Letter: SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/ Enclosure: SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RII/DRS RI/DRS RI/DRP RI/DRS NAME SMcCarver KHussar/JCherubini for JCherubini JGreives RMcKinley DATE 08/16/2018 08/28/2018 08/28/2018 08/16/2018 08/28/2018
}}
}}

Latest revision as of 16:48, 20 October 2019

Security Inspection Report 05000277/2018410 and 05000278/2018410 and Independent Spent Fuel Storage Installation Security Inspection Report 07200029/2018401 (Letter Only)
ML18241A123
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/28/2018
From: Raymond Mckinley
Plant Support Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
McKinley R
References
IR 2018401, IR 2018410
Download: ML18241A123 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ust 28, 2018

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SECURITY INSPECTION REPORT 05000277/2018410 AND 05000278/2018410 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200029/2018401

Dear Mr. Hanson:

On August 9, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Peach Bottom Atomic Power Station, Units 2 and 3. The NRC inspectors discussed the results of this inspection with Mr. Pat Navin, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements.

If you contest this violation or the significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Peach Bottom Atomic Power Station.

One cross-cutting aspect was assigned to the finding in the area of Human Performance, Procedure Adherence. The finding had a cross-cutting aspect in the area of Human Performance, Procedure Adherence, [H.8], specifically, Peach Bottom failed to follow processes, procedures, and work instructions. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRC resident inspector at the Peach Bottom Atomic Power Station.

Enclosure contains Sensitive Unclassified, Non-Safeguards Information. When separated from Enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Enclosure:

Non-Public Inspection Report 05000277/2018410, 05000278/2018410, and 07200029/2018401 (OUO-SRI)

cc w/o encl; w/o OUO-SRI:

Distribution via ListServ cc w/encl; w/OUO-SRI:

S. Griffith, Manager, Site Security D. Allard, Director, PA DEP M. Griffen, MD Emergency Response Director ML18241A123 (Cover letter- Pub)

ADAMS ACCESSION NUMBER: ML18241A138 (Cover letter w/Enclosure Non-Public)

Cover Letter: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RII/DRS RI/DRS RI/DRP RI/DRS NAME SMcCarver KHussar/JCherubini for JCherubini JGreives RMcKinley DATE 08/16/2018 08/28/2018 08/28/2018 08/16/2018 08/28/2018