IR 05000277/2018011
| ML18355A401 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/20/2018 |
| From: | Mel Gray Engineering Region 1 Branch 1 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| Gray M | |
| References | |
| IR 2018011 | |
| Download: ML18355A401 (9) | |
Text
December 20, 2018
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION - POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL - PHASE 4 INSPECTION REPORT 05000277/2018011 AND 05000278/2018011
Dear Mr. Hanson:
On November 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Peach Bottom Atomic Power Station, Units 2 and 3 and discussed the results of this inspection with Mr. Matthew Herr, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
In conducting the inspection, the team examined a sample of your Aging Management Programs to verify the effects of aging were being managed to ensure structures, systems, and components in the scope of these programs maintained the ability to perform their intended functions. The inspection involved review of your implementing procedures, evaluations, and corrective actions associated with your monitoring activities. The inspection also involved plant equipment walkdowns and interviews with station personnel.
The NRC inspectors did not identify any finding or violation of more than minor significance. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Mel Gray, Chief
Engineering Branch 1 Division of Reactor Safety
Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56
Enclosure:
Inspection Report 05000277/2018011 and 05000278/2018011
Inspection Report
Docket Numbers:
50-277 and 50-278
License Numbers:
Report Numbers:
05000277/2018011 and 05000278/2018011
Enterprise Identifier: I-2018-011-0052
Licensee:
Exelon Generation Company, LLC (Exelon)
Facility:
Peach Bottom Atomic Power Station, Units 2 and 3
Location:
Delta, Pennsylvania
Inspection Period:
November 26 - 30, 2018
Inspectors:
K. Mangan, Senior Reactor Inspector, Division of Reactor Safety (DRS),
Team Leader
M. Modes, Senior Reactor Inspector, DRS
N. Floyd, Senior Reactor Inspector, DRS
Approved By:
Mel Gray, Chief
Engineering Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at
Peach Bottom Atomic Power Station, Units 2 and 3 by conducting a Post-Approval Site Inspection for License Renewal - Phase 4 in accordance with the Reactor Oversight Process.
The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
No findings or more-than-minor violations were identified.
INSPECTION SCOPES
This inspection was conducted using the appropriate portions of the inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The team reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71003 - Post-Approval Site Inspection for License Renewal - Phase 4
The team selected for evaluation six aging management programs considering risk insights and programs that were enhanced or new under the renewed operating license. The team also considered for selection those programs with monitoring results that were performed for the first time or identified examination or test results not experienced in the past. The inspection performed by the team was conducted as outlined in NRC Inspection Procedure 71003. For the age management programs selected, the team reviewed records, interviewed plant staff, and conducted plant walk downs to evaluate whether age management program elements were being implemented Involving program scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmation process, administrative controls, and operating experience.
The following age management programs were evaluated by the team:
Q 1.1, Flow Accelerated Corrosion Program
Q 1.16, Maintenance Rule Structural Monitoring Program
Q 2.3, Ventilation System Inspection and Testing Activities
Q 2.5, Outdoor, Buried and Submerged Component Inspection Activities
Q 2.9, Fire Protection Activities
Q 3.5, In-accessible Medium Voltage Cables not subject to 10 CFR 50.49 Environmental Qualification Requirements
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On November 30, 2018, the inspectors presented the teams inspection results to Mr. Matthew Herr, Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Corrective Action Condition Reports
257959
01381435
01445365
01509144
01509209
01656419
2701330
2741249
01656419
03965606
04022739
04024134
04087238
04090201
04106712
04115606
04133867
04150564
04163257
04166806
04190107
04166806
04198726
04198906
04198912
04198906
Design and Licensing Basis Documents
PBAPS Updated Final Safety Analysis Report, Appendix Q - License Renewal Aging
Management UFSAR Supplement, Revision 26
UFSAR Change 2018-0013, Removing CST Statement from Q.2.5, dated 4/12/18
Drawings
280-E-1, Sh. 1, Single Line Diagram Station, Revision 58
LR-M-384, Shts. 2 and 3, License Renewal Drawing Control Room HVAC, Revision 0
LR-M-309, Sh. 1, License Renewal Drawing Condensate & Refueling Water Storage and
Transfer Systems, Revision 0
LR-M-309, Sh. 2, License Renewal Drawing Condensate & Refueling Water Storage and
Transfer Systems, Revision 0
LR-M-318, Sh. 1, License Renewal Drawing Fire Protection System, Revision 0
LR-M-318, Sh. 2, License Renewal Drawing Fire Protection System, Revision 0
Engineering Calculations and Evaluations
200.00-02, Peach Bottom Atomic Power Station Unit 2 FAC Susceptibility Non-Modeled
Evaluation (SNM), 2/3/2012
200.100-04, Peach Bottom Power Station Unit 3 FAC Susceptibility Non-Modeled Evaluation
(SNM), 2/3/2012
EP-2016-0079-01-TR, Exelon - Peach Bottom Atomic Power Station Unit 2 Erosion
Susceptibility Evaluation (ESE) Technical Report Revision 0
EP-2016-0079-02-TR, Exelon - Peach Bottom Atomic Power Station Unit 3 Erosion
Susceptibility Evaluation (ESE) Technical Report, Revision 0
PEA-05738, Failure Analysis of Fire Protection Piping, dated 11/1/18
PEA-71643, Selective Leaching Evaluation of One Fire Valve and One Piping Tee, dated
5/26/17
PEA-71646, Selective Leaching Evaluation of Fire Valves, dated 5/26/17
Miscellaneous
AMP Effectiveness Review for Fire Protection Activities, dated 6/25/18
AMP Effectiveness Review for Outdoor, Buried, and Submerged Component Inspection
Activities
Book 3.5, Peach Bottom Atomic Power Station Inaccessible Medium-Voltage Cables not subject
to 10 CFR 50.49 Environmental Qualification Requirements Aging Management
Program Result Binder, Revision 0
BOP-UT-18-032, UT Data Report for Unit 2 Refueling Water Storage Tank, dated 6/28/18
MFL Inspection Report for Unit 2 Condensate Storage Tank, dated 10/29/16
MM-AA-723-500, Inspection of Non EQ Cables and Connections for Managing Averse
Localized Environments, Revision 11
MO2, Aging Management Review Technical Report - Ventilation, Revision 3
NSAC-202L-R4, Recommendations for an Effective Flow-Accelerated Corrosion Program,
Revision 4
Vendor Field Service Report for Diesel Driven Fire Pump, dated 9/28/18
Procedures
ER-AA-300-150, Cable Condition Monitoring Program, Revision 5
ER-AA-3003, Cable Condition Monitoring Program, Revision 2
ER-AA-430, Conduct of Flow Accelerated Corrosion Activities, Revision 7
ER-AA-430-1001, Guidelines for Flow Accelerated Corrosion Activities, Revision 11
ER-AA-430-1002, Feedwater Heater Shell Inspection for Detection of Flow Accelerated
Corrosion, Revision 6
ER-AA-430-1003, Flow Accelerated Corrosion Program Performance Indicators, Revision 4
ER-AA-430-1004, Erosion in Piping and Components, Revision 1
ER-AA-5400, Underground (Buried) Piping and Raw Water Integrity Management Programs
Guide, Revision 10
ER-AA-5400-1002, Underground Piping and Tanks Examination Guide, Revision 9
ER-AA-700, License Renewal Implementation Program, Revision 7
ER-AA-700-1003, Screening and Evaluation of Potential Aging Issues, Revision 4
ER-AA-700-401, Selective Leaching Aging Management, Revision 1
ER-AA-700-403, Inspection of Internal Surfaces in Miscellaneous Piping and Duct Components
Aging Management Program, Revision 1
ER-AA-450, Structures Monitoring, Revision 7
ER-PB-450-1006, Peach Bottom Structures Monitoring Instructions, Revision 5
RT-O-100-911-2, Inspection of Aboveground Storage Tanks, Revision 12
SA-AA-117, Excavation, Trenching, and Shoring, Revision 21
ST-M-37D-380-2, Diesel Driven Fire Pump Inspection, Revision 3
Surveillance Tests
2-PEB-ISO-2-12-2-V01 D/S, Engineering Evaluation of UT Inspected Component, performed
10/28/2018
2-PEB-ISO-2-14-6-F01, Engineering Evaluation of UT Inspected Component, performed
10/23/2018
2-PEB-M-295-S77-E05, Engineering Evaluation of UT Inspected Component, performed
11/2/2016
3-PEB-FSK-M-3013-S13-E03, Engineering Evaluation of UT Inspected Component, performed
10/26/2017
3-PEB-FSK-M-3013-S13-E04, Engineering Evaluation of UT Inspected Component, performed
10/26/2017
3-PEB-HISO-656-R04, Engineering Evaluation of UT Inspected Component, performed
11/1/2017
3-PEB-ISO-3-02-15-V03 U/S, Engineering Evaluation of UT Inspected Component, performed
10/2/2015
3-PEB-iso-3-12-101-V01 D/S, Engineering Evaluation of UT Inspected Component, performed
10/2/2015
3-PEB-ISO-3-12-15-R02, Engineering Evaluation of UT Inspected Component, performed
10/7/2015
3-PEB-ISO3-12-15-R02, Engineering Evaluation of UT Inspected Component, performed
10/7/2015
ST-M-40D-601-2, Control Room Emergency Ventilation Filter Train B Test, performed 1/13/16
ST-M-40D-905-2, Control Room Emergency Ventilation Filter Train A Test, performed 6/6/16
Maintenance Rule Walkdown Datasheet, Room 414, Completed 12/16/1997, 1/29/2002,
2/8/2007, 12/4/2012, and 11/1/2016
Maintenance Rule Walkdown Datasheet, Room 457, Completed 6/17/1998, 4/2/2002,
6/22/2007, 12/26/2012, 8/14/2017
Work Orders
R1265418
C0234463
C0243177
261297
262165
275013
04587766
04625728
04718861