ML17311B182: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 08/31/1995 | | issue date = 08/31/1995 | ||
| title = Monthly Operating Repts for Aug 1995 for Palo Verde Nuclear Generating Station.W/950913 Ltr | | title = Monthly Operating Repts for Aug 1995 for Palo Verde Nuclear Generating Station.W/950913 Ltr | ||
| author name = | | author name = Fulton J, Levine J | ||
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | | author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:PRZORXTY j.(ACCELERATED RIDS PROCESSING) | {{#Wiki_filter:PRZORXTY j. | ||
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS), ACCESSION NBR:9509190226 DOC.DATE:-95+at.NOTARIZED: | (ACCELERATED RIDS PROCESSING) | ||
NO DOCKET g FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION FULTON,J'.D. | REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS), | ||
Arizona Public Service Co.(formerly Arizona Nuclear Power LEVINE,J.M. | ACCESSION NBR:9509190226 DOC.DATE: -95+at. NOTARIZED: NO DOCKET g FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,J'.D. Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M. | ||
Arizona Public Service Co.(formerly Arizona Nuclear Power I | RECIP.NAME Arizona Public Service Co. | ||
RECIPIENT AFFILIATION (formerly Arizona Nuclear Power I 0 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating repts fo Aug 1995 for Palo Verde Nuclear Generating Station.W 950 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES STANDARDIZED PLANT Standardized plant.Standardized plant.RECIPIENT | Monthly operating repts fo Aug 1995 for Palo Verde Nuclear Generating Station.W 950 ltr. | ||
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN 5D8 (415-2083) | DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: | ||
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22 | TITLE: Monthly Operating Report (per Tech Specs) | ||
NOTES STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 Y | |||
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME PD4-2 LTTR ENCL ID CODE/NAME LTTR ENCL PD 1 1 HOLIAN, B 1 1 TRAN, L 1 1 THOMAS,C 1 1 INTERNAL: ACRS~ 10 10 AEOD/SPD/RRAB 1 1 | |||
~FIWE =CEN.TQ~ 01 1 1 NRR/DISP/PIPB 1 1 D AW//)RPM/PECB 1 1 RGN4 1 1 EXTERNAL LITCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 N | |||
NOTE TO ALL "RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22 | |||
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX, | Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 182-06095-JML/JLT/JDF September 13, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555 | ||
==Dear Sirs:== | ==Dear Sirs:== | ||
==Subject:== | ==Subject:== | ||
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Monthly Operating Reports for August 1995 Enclosed are the Monthly Operating Reports for August 1995, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.If you have any questions, please contact Judy Fulton at (602)393-5277.Sincerely, JML/J LT/J DF/gez | Palo Verde Nuclear Generating Station (PVNGS) | ||
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for August 1995 Enclosed are the Monthly Operating Reports for August 1995, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses. | |||
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV. | |||
If you have any questions, please contact Judy Fulton at (602) 393-5277. | |||
Sincerely, JML/J LT/J DF/gez | |||
==Enclosures:== | ==Enclosures:== | ||
August 1995 Monthly Operating Reports cc: L. J. Callan (all w/enclosures) | |||
K. E. Perkins NRC Senior Resident Inspector INPO Records Center Utility Data Institute | |||
,An 9509190226 950831 PDR 'ADOCK 05000S28 R PDR | |||
1 r | |||
A I | |||
I | |||
't t | 't t | ||
~'EFUELING INFORMATION DOCKET NO.52526 UNIT NAME DATE 9902LK COMPLETED BY JJ2~fQG" r.Scheduled date for next refueling shutdown.The 6th refueling outage is scheduled to begin on 09/07/96.Scheduled date for restart following refueling. | lI Fl l | ||
11/01/96.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments No Scheduled date for submitting proposed licensing action and supporting information. | lt | ||
5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis m'ethods, significant changes in fuel design, and new operating procedures None.The number of fuel assemblies. | |||
Licensed spent fuel storage capacity.Intended change in spent fuel storage capacity.~no Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability). | AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SLGZG UNIT NAME DATE 99L12LK COMPLETED BY ~~tQQ MONTH: August 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1227 17 1217 1217 18 1218 1216 19 1219 1226 20 1222 1227 21 1081 1230 22 1217 1223 23 1210 1223 24 1219 1224 25 1205 10 1212 26 393 1212 27 376 12 1225 28 781 13 1222 29 1228 14 1217 30 1221 15 1222 31 1228 16 1219 | ||
( | |||
I R | |||
J | |||
~ | |||
~ | |||
'EFUELING INFORMATION DOCKET NO. 52526 UNIT NAME DATE 9902LK COMPLETED BY JJ2~fQG " | |||
r. | |||
Scheduled date for next refueling shutdown. | |||
The 6th refueling outage is scheduled to begin on 09/07/96. | |||
Scheduled date for restart following refueling. | |||
11/01/96. | |||
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments No Scheduled date for submitting proposed licensing action and supporting information. | |||
5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis m'ethods, significant changes in fuel design, and new operating procedures None. | |||
The number of fuel assemblies. | |||
Licensed spent fuel storage capacity. | |||
Intended change in spent fuel storage capacity. ~no Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. | |||
2005 (18 Month reloads and full core discharge capability). | |||
( | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.SL526 UNIT NAME EEK~DATE QBL12LK COMPLETED BY~MglfQQ 08/01 0000 | OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. SL526 UNIT NAME EEK~ | ||
0, SHUTDOWNS AND POWER REDUCTIONS August 1995 DOCKET NO UNIT NAME | DATE QBL12LK COMPLETED BY ~MglfQQ 08/01 0000 Unit began the month in Mode 1 with Rx power at 100%. | ||
B-Maintenance or Test | 08/25 2204 Commenced Rx power decrease to 40% due to condenser tube leak. | ||
. 08/26 0148 Rx power at 40%. | |||
08/28 0750 Commenced Rx power increase to 100%. | |||
= | |||
08/28 2308 Rx power returned to 100%. | |||
08/31 2400 Unit ended the month in Mode 1 with Rx power at 100%. | |||
0, SHUTDOWNS AND POWER REDUCTIONS August 1995 DOCKET NO 5HRG UNIT NAME EbK>K DATE 9902 LK COMPLETED BY JJXEulhn TELEPHONE Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence 95-03 08/25/95 73.1 N/A N/A N/A Power reduction to 40% due to condenser tube leak. | |||
1F Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161) | |||
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain) | |||
G-Operational Error H-Other (Explain) | |||
Eg 1 | |||
C | |||
AVERAGE | AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. ¹52R UNIT NAME MEGRIM DATE QBL12lK COMPLETED BY ~ultQQ MONTH: August 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1247 17 1241 1242 18 1246 1242 19 1243 1244 20 1242 1245 21 1240 1248 22 1240 1242 23 1241 1240 24 1243 1240 25 1239 10 1238 26 1243 1233 27 1248 12 1185 28 1247 13 1229 29 1247 14 1238 30 1243 15 1241 31 1245 16 1241 | ||
REFUELING INFORMATION DOCKET NO.2L523 UNIT NAME DATE QBL12lK COMPLETED BY~glen Scheduled date for next refueling shutdown.The 6th refueling outage is scheduled for 03/16/96.I Scheduled date for restart following refueling. | REFUELING INFORMATION DOCKET NO. 2L523 UNIT NAME DATE QBL12lK COMPLETED BY ~glen Scheduled date for next refueling shutdown. | ||
05/10/96.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment'P Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix.b.Technical Specification 3.2.6"Reactor Coolant Cold Leg Temperature" figure 3.2-1 to power operation allowable temperature to 560'F to 550'F. | The 6th refueling outage is scheduled for 03/16/96. | ||
12/08/95.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures. | I Scheduled date for restart following refueling. | ||
Stretch Power to 102% | 05/10/96. | ||
e)In the core.~b)In the spent fuel storage pool.~~Licensed spent fuel storage capacity.~29 Intended change in spent fuel storage capacity.~ng Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability). | Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment'P Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix. | ||
t | : b. Technical Specification 3.2.6 "Reactor Coolant Cold Leg Temperature" figure 3.2-1 to establish new 100% | ||
power operation allowable temperature to 560'F to 550'F. | |||
Scheduled date for submitting proposed licensing action and supporting information. | |||
12/08/95. | |||
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures. | |||
Stretch Power to 102%. | |||
e) In the core. ~ | |||
The number of fuel assemblies. | |||
b) In the spent fuel storage pool. ~~ | |||
Licensed spent fuel storage capacity. ~29 Intended change in spent fuel storage capacity. ~ng Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. | |||
2005 (18 Month reloads and full core discharge capability). | |||
t | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.~QQ UNIT NAME DATE QBL12LK COMPLETED BY JJ.)~glfga | OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. ~QQ UNIT NAME DATE QBL12LK COMPLETED BY JJ.)~glfga | ||
~08/01 | ~ 08/01 0000 Unit began the month in Mode 1 at 100% Rx power. | ||
0 F | 08/12 0520 Reduced Rx power to 88% due to Drain Pump trip. | ||
08/12 1130 Commenced Rx power increase to 100%. | |||
08/12 1400 Rx power returned to 100%. | |||
4 08/31 2400 Unit ended the month in Mode 1 at 100% Rx power. | |||
0 F | |||
SHUTDOWNS AND POWER REDUCTIONS August 1995 DOCKET NO UNIT NAME P~(~ | |||
DATE 9K'~ | |||
COMPLETED BY ~gJf~ | |||
Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of August 1995. | |||
F-Forced 2R 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161) | |||
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain) | |||
G-Operational Error H-Other (Explain) | |||
I, | |||
REFUELING INFORMATION DOCKET NO.QL5;g}UNIT NAME MUGS DATE QBLQ$5 COMPLETED BY~DUlfQQ Scheduled date for next refueling shutdown.The 5th refueling outage is scheduled to begin 10/14/95.Scheduled date for restart following refueling. | kl AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. | ||
12/23/95.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment? | UNIT NAME DATE . | ||
22~ | |||
None.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures. | 5Q=HQ QBL12LK COMPLETED BY JJ;~ML6tQll MONTH: August 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL | ||
None.The number of fuel assemblies. | "'244 17 1240 1237 18 1243 1235 19 1068 1242 20 1051 1244 21 1147 1245 22 1235 1241 23 1237 1240 24 1240 1239 25 1239 10 1236 26 1239 1231 27 1243 12 1240 28 1242 13 1237 29 1243 14 15 16 1238'1 1238 1239 30 1240 1242 | ||
b)In the spent fuel storage pool.Licensed spent fuel storage capacity.Intended change in spent fuel storage capacity.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and fuII core discharge capability). | |||
REFUELING INFORMATION DOCKET NO. QL5;g} | |||
UNIT NAME MUGS DATE QBLQ$5 COMPLETED BY ~DUlfQQ Scheduled date for next refueling shutdown. | |||
The 5th refueling outage is scheduled to begin 10/14/95. | |||
Scheduled date for restart following refueling. | |||
12/23/95. | |||
Will refueling or resumption of operation thereafter require a Technical Specification change or other ll license amendment? | |||
: a. Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix. (submitted 12/7/94 to NRC). | |||
: b. Technical Specification change to revise list of analytical methods in 6.9.1.10. (submitted 8/4/95 to NRC) | |||
Scheduled date for submitting proposed licensing action and supporting information. | |||
None. | |||
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures. | |||
None. | |||
The number of fuel assemblies. | |||
b) In the spent fuel storage pool. | |||
Licensed spent fuel storage capacity. | |||
Intended change in spent fuel storage capacity. | |||
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. | |||
2005 (18 Month reloads and fuII core discharge capability). | |||
t | |||
't II | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.SLY UNIT NAME EEK~DATE | OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. SLY UNIT NAME EEK~ | ||
m, I'(!Ty SHUTDOWNS AND POWER REDUCTIONS August 1995 DOCKET NO K=539 UNIT NAME PVN95-3 DATE 9':12/%-COMPLETED BY JJ3~QQ | DATE BY JJ>~UHQQ 9902'OMPLETED hugusUMi 08/01 0000 Unit began the month in Mode 1 at 100% power. | ||
B-Maintenance or Test | 08/31 2400 Unit ended the month in Mode 1 at 100% power. | ||
m, I' | |||
(! | |||
Ty | |||
SHUTDOWNS AND POWER REDUCTIONS August 1995 DOCKET NO K=539 UNIT NAME PVN95-3 DATE 9':12/%- | |||
COMPLETED BY JJ3 ~QQ Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of August, 1995. | |||
"F-Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161) | |||
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain) | |||
G-Operational Error H-Other (Explain) 1 I | |||
II 1J}} |
Latest revision as of 03:52, 4 February 2020
ML17311B182 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 08/31/1995 |
From: | Fulton J, James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
182-06095-JML-J, 182-6095-JML-J, NUDOCS 9509190226 | |
Download: ML17311B182 (33) | |
Text
PRZORXTY j.
(ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS),
ACCESSION NBR:9509190226 DOC.DATE: -95+at. NOTARIZED: NO DOCKET g FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,J'.D. Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M.
RECIP.NAME Arizona Public Service Co.
RECIPIENT AFFILIATION (formerly Arizona Nuclear Power I 0
SUBJECT:
Monthly operating repts fo Aug 1995 for Palo Verde Nuclear Generating Station.W 950 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 Y
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME PD4-2 LTTR ENCL ID CODE/NAME LTTR ENCL PD 1 1 HOLIAN, B 1 1 TRAN, L 1 1 THOMAS,C 1 1 INTERNAL: ACRS~ 10 10 AEOD/SPD/RRAB 1 1
~FIWE =CEN.TQ~ 01 1 1 NRR/DISP/PIPB 1 1 D AW//)RPM/PECB 1 1 RGN4 1 1 EXTERNAL LITCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN 5D8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 182-06095-JML/JLT/JDF September 13, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for August 1995 Enclosed are the Monthly Operating Reports for August 1995, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
If you have any questions, please contact Judy Fulton at (602) 393-5277.
Sincerely, JML/J LT/J DF/gez
Enclosures:
August 1995 Monthly Operating Reports cc: L. J. Callan (all w/enclosures)
K. E. Perkins NRC Senior Resident Inspector INPO Records Center Utility Data Institute
,An 9509190226 950831 PDR 'ADOCK 05000S28 R PDR
1 r
A I
I
't t
lI Fl l
lt
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SLGZG UNIT NAME DATE 99L12LK COMPLETED BY ~~tQQ MONTH: August 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1227 17 1217 1217 18 1218 1216 19 1219 1226 20 1222 1227 21 1081 1230 22 1217 1223 23 1210 1223 24 1219 1224 25 1205 10 1212 26 393 1212 27 376 12 1225 28 781 13 1222 29 1228 14 1217 30 1221 15 1222 31 1228 16 1219
I R
J
~
~
'EFUELING INFORMATION DOCKET NO. 52526 UNIT NAME DATE 9902LK COMPLETED BY JJ2~fQG "
r.
Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled to begin on 09/07/96.
Scheduled date for restart following refueling.
11/01/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments No Scheduled date for submitting proposed licensing action and supporting information.
5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis m'ethods, significant changes in fuel design, and new operating procedures None.
The number of fuel assemblies.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity. ~no Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
(
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. SL526 UNIT NAME EEK~
DATE QBL12LK COMPLETED BY ~MglfQQ 08/01 0000 Unit began the month in Mode 1 with Rx power at 100%.
08/25 2204 Commenced Rx power decrease to 40% due to condenser tube leak.
. 08/26 0148 Rx power at 40%.
08/28 0750 Commenced Rx power increase to 100%.
=
08/28 2308 Rx power returned to 100%.
08/31 2400 Unit ended the month in Mode 1 with Rx power at 100%.
0, SHUTDOWNS AND POWER REDUCTIONS August 1995 DOCKET NO 5HRG UNIT NAME EbK>K DATE 9902 LK COMPLETED BY JJXEulhn TELEPHONE Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence 95-03 08/25/95 73.1 N/A N/A N/A Power reduction to 40% due to condenser tube leak.
1F Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)
G-Operational Error H-Other (Explain)
Eg 1
C
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. ¹52R UNIT NAME MEGRIM DATE QBL12lK COMPLETED BY ~ultQQ MONTH: August 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1247 17 1241 1242 18 1246 1242 19 1243 1244 20 1242 1245 21 1240 1248 22 1240 1242 23 1241 1240 24 1243 1240 25 1239 10 1238 26 1243 1233 27 1248 12 1185 28 1247 13 1229 29 1247 14 1238 30 1243 15 1241 31 1245 16 1241
REFUELING INFORMATION DOCKET NO. 2L523 UNIT NAME DATE QBL12lK COMPLETED BY ~glen Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled for 03/16/96.
I Scheduled date for restart following refueling.
05/10/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment'P Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix.
- b. Technical Specification 3.2.6 "Reactor Coolant Cold Leg Temperature" figure 3.2-1 to establish new 100%
power operation allowable temperature to 560'F to 550'F.
Scheduled date for submitting proposed licensing action and supporting information.
12/08/95.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
Stretch Power to 102%.
e) In the core. ~
The number of fuel assemblies.
b) In the spent fuel storage pool. ~~
Licensed spent fuel storage capacity. ~29 Intended change in spent fuel storage capacity. ~ng Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
t
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. ~QQ UNIT NAME DATE QBL12LK COMPLETED BY JJ.)~glfga
~ 08/01 0000 Unit began the month in Mode 1 at 100% Rx power.
08/12 0520 Reduced Rx power to 88% due to Drain Pump trip.
08/12 1130 Commenced Rx power increase to 100%.
08/12 1400 Rx power returned to 100%.
4 08/31 2400 Unit ended the month in Mode 1 at 100% Rx power.
0 F
SHUTDOWNS AND POWER REDUCTIONS August 1995 DOCKET NO UNIT NAME P~(~
DATE 9K'~
COMPLETED BY ~gJf~
Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of August 1995.
F-Forced 2R 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)
G-Operational Error H-Other (Explain)
I,
kl AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
UNIT NAME DATE .
22~
5Q=HQ QBL12LK COMPLETED BY JJ;~ML6tQll MONTH: August 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL
"'244 17 1240 1237 18 1243 1235 19 1068 1242 20 1051 1244 21 1147 1245 22 1235 1241 23 1237 1240 24 1240 1239 25 1239 10 1236 26 1239 1231 27 1243 12 1240 28 1242 13 1237 29 1243 14 15 16 1238'1 1238 1239 30 1240 1242
REFUELING INFORMATION DOCKET NO. QL5;g}
UNIT NAME MUGS DATE QBLQ$5 COMPLETED BY ~DUlfQQ Scheduled date for next refueling shutdown.
The 5th refueling outage is scheduled to begin 10/14/95.
Scheduled date for restart following refueling.
12/23/95.
Will refueling or resumption of operation thereafter require a Technical Specification change or other ll license amendment?
- a. Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix. (submitted 12/7/94 to NRC).
- b. Technical Specification change to revise list of analytical methods in 6.9.1.10. (submitted 8/4/95 to NRC)
Scheduled date for submitting proposed licensing action and supporting information.
None.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and fuII core discharge capability).
t
't II
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. SLY UNIT NAME EEK~
DATE BY JJ>~UHQQ 9902'OMPLETED hugusUMi 08/01 0000 Unit began the month in Mode 1 at 100% power.
08/31 2400 Unit ended the month in Mode 1 at 100% power.
m, I'
(!
Ty
SHUTDOWNS AND POWER REDUCTIONS August 1995 DOCKET NO K=539 UNIT NAME PVN95-3 DATE 9':12/%-
COMPLETED BY JJ3 ~QQ Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of August, 1995.
"F-Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)
G-Operational Error H-Other (Explain) 1 I
II 1J