ML18045A355: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/09/1980
| issue date = 07/09/1980
| title = Forwards Sixty-Day Response to NRC IE Bulletin 80-11.
| title = Forwards Sixty-Day Response to NRC IE Bulletin 80-11.
| author name = HOFFMAN D P
| author name = Hoffman D
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name = KEPPLER J G
| addressee name = Keppler J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| docket = 05000255
| docket = 05000255
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:consumers Power company*
{{#Wiki_filter:consumers Power company*
* General Offices: 212 West Michigan Avenue, Jackson, 49201
General Offices: 212 West Michigan Avenue, Jackson, Mlchiga~ 49201
* Area Code 517 788-0550 j I July 9, 1980 Mr James G Keppler Office of Inspection and Enforcement Region III US Nuclear Reg1f1atory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 -LICENSE DPR..:20 -PALISADES PLANT -RESPONSE TO IE BULLETIN 80-11 MASONRY WALL DESIGN Consumers Power Company was requested by IE Bulletin 80-11, Masonry Wall*. Design dated May 8, 1980, to identify any masonary walls which are in proximity to or have attachments from safety-related piping, and provide a re-evaluation of the design adequacy of the walls. Our response for the Palisades Plant to these items is attached (Bechtel Power Corporation report titled "Sixty-Day Response to NRC IE Bulletin 80-11", dated June 30, 1980). Justification for the Re-Eva1uation wiil be submitted with the Re-Evaluation Report within 180 days of the date of the receipt of this bulletin.
* Area Code 517 788-0550 j I July 9, 1980 Mr James G Keppler Office of Inspection and Enforcement Region III US Nuclear Reg1f1atory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR..:20 -
David P Hoffman (Signed) David P Hoffman Nuclear Licensing Administrator CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector-Palisades 800715 Q}}
PALISADES PLANT - RESPONSE TO IE BULLETIN 80-11 MASONRY WALL DESIGN Consumers Power Company was requested by IE Bulletin 80-11, Masonry Wall*.
Design dated May 8, 1980, to identify any masonary walls which are in proximity to or have attachments from safety-related piping, and provide a re-evaluation of the design adequacy of the walls.
Our response for the Palisades Plant to these items is attached (Bechtel Power Corporation report titled "Sixty-Day Response to NRC IE Bulletin 80-11", dated June 30, 1980). Justification for the Re-Eva1uation Crit~ria wiil be submitted with the Re-Evaluation Report within 180 days of the date of the receipt of this bulletin.
David P Hoffman (Signed)
David P Hoffman Nuclear Licensing Administrator CC     Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector-Palisades 800715 <80~'
Q}}

Latest revision as of 14:26, 3 February 2020

Forwards Sixty-Day Response to NRC IE Bulletin 80-11.
ML18045A355
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/09/1980
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML18045A356 List:
References
IEB-80-11, NUDOCS 8007150803
Download: ML18045A355 (1)


Text

consumers Power company*

General Offices: 212 West Michigan Avenue, Jackson, Mlchiga~ 49201

  • Area Code 517 788-0550 j I July 9, 1980 Mr James G Keppler Office of Inspection and Enforcement Region III US Nuclear Reg1f1atory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR..:20 -

PALISADES PLANT - RESPONSE TO IE BULLETIN 80-11 MASONRY WALL DESIGN Consumers Power Company was requested by IE Bulletin 80-11, Masonry Wall*.

Design dated May 8, 1980, to identify any masonary walls which are in proximity to or have attachments from safety-related piping, and provide a re-evaluation of the design adequacy of the walls.

Our response for the Palisades Plant to these items is attached (Bechtel Power Corporation report titled "Sixty-Day Response to NRC IE Bulletin 80-11", dated June 30, 1980). Justification for the Re-Eva1uation Crit~ria wiil be submitted with the Re-Evaluation Report within 180 days of the date of the receipt of this bulletin.

David P Hoffman (Signed)

David P Hoffman Nuclear Licensing Administrator CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector-Palisades 800715 <80~'