ML18142B361: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18142B361
| number = ML18142B361
| issue date = 02/06/1978
| issue date = 02/06/1978
| title = R.E. Ginna - Forwards Monthly Operating Status Report for Month of January 1978
| title = Forwards Monthly Operating Status Report for Month of January 1978
| author name = Lang L S
| author name = Lang L
| author affiliation = Rochester Gas & Electric Corp
| author affiliation = Rochester Gas & Electric Corp
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:F REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DISTRIBUTION FOR INCOMING MATERIAL 50-244 ORG: LANG L S ROCHESTER GAS 8.ELEC DOCTYPE: LETTER NOTARIZED:
{{#Wiki_filter:F REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO  
DISTRIBUTION FOR INCOMING MATERIAL                                   50-244 ORG: LANG L S                           DOCDATE: 02/06/78 ROCHESTER GAS 8. ELEC               DATE RCVD: 02/23/78 DOCTYPE: LETTER       NOTARIZED: NO                                             COPIES RECEIVED


==SUBJECT:==
==SUBJECT:==
l" , MONTHLY OPERATING REPT FOR THE MONTH OF JANUARY'978.
l" LTR 1      ENCL 10 MONTHLY OPERATING REPT FOR THE MONTH OF           JANUARY'978.
DOCDATE: 02/06/78 DATE RCVD: 02/23/78 COPIES RECEIVED LTR 1 ENCL 10 PLANT NAME: RE GINNA-UNIT 1 REV IEI JER IN I T I AL: X JM DISTRIBUTOR INITIAL: DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.(DISTRIBUTION CODE AQQ3)FOR ACTION." BR CHIEF Z IEMANN4+W/2 ENCL INTERNAL: REG FT'ENCL OR ACTION++W/2 ENCL NRC,PDR+4l J/ENCL EXTERNAL: LPDR S ROCHESTER'Y++W/ENCL T I C+wW/ENCL NS I C+~W/ENCL Bhli(NATLAB)++W/ENCL ACRS CAT 8++4/0 ENCL i DISTRIBUTION:
PLANT NAME: RE GINNA UNIT       1                               REV IEI JER IN I T I AL: X JM DISTRIBUTOR       INITIAL:
LTR 10 ENCL 10 SIZE: 1 P+4P END'CONTROL NBR: 780550018 4 I L%r t yzmwzz(ezz IIFeIIM'R;PI I)."~I('i7 i'~.r.<IIII'II Z'~ZuZiZ ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649 TELEPHONE AREA cooK 7IK 546-2700 Ginna Station February 6, 1978 Director, Office of Inspection and.Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 Sub)ect: Monthly Report for January, 1978 Operating Status Information R.E.Ginna Nuclear Power Plant Unit No.1 Docket No.50-244 Gentlemen:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
Pursuant to Technical Specification 6.9.l.c attached.herewith is the monthly operating status report for Ginna Station for the month of January, 1978.Also, ten additiona1 copies of the attach-ment are enclosed..
(DISTRIBUTION CODE AQQ3)
Very truly yours, LSL:fah Attachments cc: Mr.Boyce H.Grier (1)Mr.William G.McDona1d, NRC (2)Lee S.Lang Superintendent 7505500i5~
FOR ACTION."       BR CHIEF Z IEMANN4+W/2 ENCL INTERNAL:           REG FT     'ENCL                        NRC,PDR+4l J/ENCL OR   ACTION++W/2 ENCL EXTERNAL:         LPDR S ROCHESTER'Y++W/ENCL T I C+wW/ENCL NS I C+~W/ENCL Bhli(NATLAB)++W/ENCL ACRS     CAT   8++4/0 ENCL i
A 0~~tQ'(VUQ 833lhU3s nairngt>i,'s~g
DISTRIBUTION:   LTR 10         ENCL 10                             CONTROL NBR:        780550018 SIZE: 1 P+4P END
<<H S f",.f~;)l 44 H:~An~00 0~~~.:-aaz OPERATING DATA REPORT DOCKET NO.5 244 DATE Fe ruar 3 1978 COMPLETED BY Andrew E.McNamara, Operations Aide OPERATING STATUS l.Unit Name'GINNA STATION 490 2.Reporting Period: 3.Licensed.Thermal Power (MWt): 4.Nameplate Bating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWc): 7.Maximum Dependable Capacity (Net MWe): 8.If Changes Occur in Capacity Ratings (Items 490 470 TELEPHONE 1-716-546-2700 Ext.291-205 at Ginna Notes Line 11: The number of hours in Reporting Period, Cumula-tive, are from date of Initial, on-line of generator, not date of commercial operation.
 
Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level to Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr.-to-Date Cumulative 744 587 872,256 239,624 79%72%72%21%ll.Hours In Reporting Period 744 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line jal 15.Unit Reserve Shutdown Hours 872,256 16.Gross Thermal Energy Generated (MWH)18.Net Electrical Energy Gcncrated (MWH)239,624 79%19.Unit Service Factor 20.Unit Availability Factor 2 Et/21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using,DFR Net)23.Unit Forced Outage Rate 24.Shutdowns Schcdulcd Over Next 6 Months (Type, Date and Duration of Each): Refueling-March 17, 1978-6 weeks 71 736 54,625.62',101.09
4 I
*8.5*.69,309,298 22 427 484 74%70%70%12%25.If Shut Down At End Of Report.Period, Estimated Date of Startup: February 26.Units In Test Status (Prior to Commercial Operation):
L
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achtcved*Cumulative Data Commencing January 1, 1975 40~88 (Rcv 1/7dl
  %r
~~E AVERAGE DAILY UNIT POWER UNIT MONTH January, 1978 DAY AVERAGE DAILY POWER LEVEL (M We-Net)DOCKET NO.50 244 UNIT Nl@irma Stat'o Februar 3 1978 COMPLETED BY Andrew E.McNamara, Operations Aide TELEPHONE 1-716-546-2700, Ext.291-205, at Ginna DAY, AVERAGE DAILY POWER LEVEL (MWe-Net)10 12 13 14 16 415 415 416 ,415 417 416 416 416 414 376 367 411 349 315 415 17 18 1S 20 21 22 23 25 26'fc*28 29*30*31 415 415 416 415 415 416 416 416 357*Unit Shutdown INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month,'ompute to the nearest whole megawatt.48~87 (REVe I/78l C 4 I J UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH DOCKET NO.N1 Ginna Station DATE Februar 3 1978 COMPLEl ED I3Y Andrew E.McNamara, Ope ations AitII'.l'ELEPHONF 1-716-546-2700 Ext.291-205 At Ginna No.Date 0 I-0 se 0 0 0 X:.n-c 0 Vl 0 Cl Pl L 01 o-0 c u Cl 0lh C 0 n Licensee Event Report lw Em-0!0 Vl 0 0 l/l C o ul c 0 0 0 oU 0 Cause&Corrective Action to Prevent Recurrence 780125 F 157 A 78-03.CB HTEXCH"B" Steam Generator, Tube Leak (Refer to L.E.R.78-03 for Corrective Actions)F: Forced S: Scheduled 49.89 (Rave 1/78)Reason: A-Equipmcnt Failure (Explain)I3-hfaintenancc or Test C-Rcfucling D-Regulatory Restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)hlcthod: 1-hlanual 2-hlanual Scram.3-Automatic Scram.4-Other (Explain)Exhibit~Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)Exhibit~-Same Source sl>c., l'', I Ql L t~I~C.il'J I NARRATIVE  
 
t yzmwzz( ezz IIFeIIM'R;PI I)."~I('i7 i'~.r. <IIII'II Z'~ ZuZiZ ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA cooK 7IK   546-2700 Ginna Station February 6, 1978 Director, Office of Inspection       and. Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Sub)ect:       Monthly Report for January, 1978 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:
Pursuant to Technical Specification 6.9.l.c attached. herewith is the monthly operating status report for Ginna Station for the month of January, 1978. Also, ten additiona1 copies of the attach-ment are enclosed..
Very truly yours, Lee S. Lang Superintendent LSL:fah Attachments cc:     Mr. Boyce H. Grier (1)
Mr. William G. McDona1d,   NRC   (2) 7505500i5~
 
A 0                         ~ ~
tQ'(VUQ 833lhU3s nairngt>i,'s~g
            <<H S f",.
f~;)l 44 H:~An~00 0~~~.:-aaz
 
OPERATING DATA REPORT DOCKET NO.       5 244 DATE     Fe ruar   3     1978 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE          1-716-546-2700 OPERATING STATUS                                                                   Ext. 291-205 at Ginna
: l. Unit Name'GINNA STATION                                           Notes      Line 11:
: 2. Reporting Period:                                                    The number of hours in
: 3. Licensed. Thermal Power (MWt):                                      Reporting Period, Cumula-490                          tive, are from date of
: 4. Nameplate Bating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):                                  Initial,    on-line of
: 6. Maximum Dependable Capacity (Gross MWc):        490                generator, not date of 470                commercial operation.
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level to Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month           Yr.-to-Date       Cumulative ll. Hours   In Reporting Period                           744                   744 587 71 736
: 12. Number of Hours Reactor Was Critical                                                         54,625.62',101.09
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On-Line                             jal Unit Reserve Shutdown Hours 8.5
* 15.
872,256              872,256           .69,309,298
: 16. Gross Thermal Energy Generated (MWH) 239,624              239,624            22 427 484
: 18. Net Electrical Energy Gcncrated (MWH) 79%                   79%                      74%
: 19. Unit Service Factor
: 20. Unit Availability Factor 2 Et/               72%                      70%
: 21. Unit Capacity Factor (Using MDC Net) 72%                      70%
: 22. Unit Capacity Factor (Using,DFR Net)                                                                   12%
21%
: 23. Unit Forced Outage Rate
: 24. Shutdowns Schcdulcd Over Next 6 Months (Type, Date and Duration of Each):
Refueling March 17, 1978 6 weeks
: 25. If Shut Down At End Of Report. Period, Estimated Date of Startup: February
: 26. Units In Test Status (Prior to Commercial Operation):                   Forecast           Achtcved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 40 ~ 88  (Rcv      1/7dl
* Cumulative Data       Commencing January 1, 1975
 
  ~ ~
E
 
AVERAGE DAILY UNIT POWER UNIT DOCKET NO. 50 244 Stat'o UNIT Nl @irma Februar     3   1978 COMPLETED BY Andrew E. McNamara, Operations Aide 1-716-546-2700, TELEPHONE Ext. 291-205, at Ginna MONTH January, 1978 DAY AVERAGE DAILY POWER LEVEL                        DAY, AVERAGE DAILY POWER       LEVEL (M We-Net)                                        (MWe-Net) 415 17 415                                                    415 18 415                                                     416 1S 416                                                     415 20
                ,415                                                     415 21 417                                                     416 22 416                                                     416 23 416                                                    416 416                                                    357 25 414 10                                                    26
                                                  'fc 376 367
* 12                                                    28 411 13                                                    29 14              349
* 30 315
* 31 415 16
* Unit Shutdown INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, to the nearest whole megawatt.                                                                     'ompute 48 ~ 87 (REVe I/78l
 
C 4 I J
 
DOCKET NO.
N1 Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS                    DATE Februar         3   1978 COMPLEl ED I3Y Andrew E. McNamara, Ope         ations AitII'.
REPORT MONTH                          l'ELEPHONF 1-716-546-2700           Ext. 291-205 At Ginna Pl L
0 01 o-                               C c ul 0 se     c      c u      Licensee        Em-        o              Cause & Corrective 0                0                                0 0 !
0 No.           Date            0 0     Vl         Cl    Event            0      0 0                  Action to 0                               Vl I-     .n 0 X:    Cl 0lh   C     Report lw l/l 0 0
oU               Prevent Recurrence 0
n 780125   F       157       A               78-03           .CB     HTEXCH "B" Steam Generator, Tube Leak (Refer to L.E.R. 78-03 for Corrective Actions)
F: Forced         Reason:                                        hlcthod:                        Exhibit~ Instructions S: Scheduled       A-Equipmcnt Failure (Explain)                 1-hlanual                        for Preparation of Data I3-hfaintenancc or Test                       2-hlanual Scram.                Entry Sheets for Licensee C-Rcfucling                                   3-Automatic Scram.              Event Report (LER) File (NUREG-D-Regulatory Restriction                       4-Other (Explain)                0161)
E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain) 49.89 (Rave 1/78)     H-Other (Explain)                                                               Exhibit~- Same   Source
 
sl
    , I
        ., l''
          >  c Ql L
t     ~
I ~
C.
I il'J
 
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.0-2 UNIT DATE February 3, 1978 COBPLETED BY Andrew E.McNamara, Operations Aide MONTH JANUARY, 1978 TEI,EpHONE 1-716-546-2700, Ext.291-205 at Ginna The Reactor Power Level averaged 100%in the Report Month.The exceptions were: Two unit power level reductions to~48%to repair condenser tube leaks, on 1/ll and 1/14, respectively.
OF OPERATING EXPERIENCE DOCKET NO.       0-2 UNIT DATE   February 3, 1978 COBPLETED BY Andrew E. McNamara,   Operations Aide TEI,EpHONE   1-716-546-2700,     Ext. 291-205 at Ginna MONTH    JANUARY, 1978 The Reactor Power   Level averaged   100% in the Report Month. The exceptions were:
A unit shutdown on 1/25 to effect repairs on the"B" steam generator, tube leak.The unit remained shutdown at the end of the Report Period.40~IE3 u/78) 4 a}}
Two unit power level reductions to ~ 48% to repair condenser tube leaks, on 1/ll and 1/14, respectively.
A unit shutdown on 1/25 to   effect repairs on the "B" steam   generator, tube leak.
The unit remained shutdown   at the end of the Report Period.
40 ~ IE3 u/78)
 
4 a}}

Latest revision as of 23:33, 2 February 2020

Forwards Monthly Operating Status Report for Month of January 1978
ML18142B361
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/06/1978
From: Lang L
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B361 (12)


Text

F REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-244 ORG: LANG L S DOCDATE: 02/06/78 ROCHESTER GAS 8. ELEC DATE RCVD: 02/23/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

l" LTR 1 ENCL 10 MONTHLY OPERATING REPT FOR THE MONTH OF JANUARY'978.

PLANT NAME: RE GINNA UNIT 1 REV IEI JER IN I T I AL: X JM DISTRIBUTOR INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.

(DISTRIBUTION CODE AQQ3)

FOR ACTION." BR CHIEF Z IEMANN4+W/2 ENCL INTERNAL: REG FT 'ENCL NRC,PDR+4l J/ENCL OR ACTION++W/2 ENCL EXTERNAL: LPDR S ROCHESTER'Y++W/ENCL T I C+wW/ENCL NS I C+~W/ENCL Bhli(NATLAB)++W/ENCL ACRS CAT 8++4/0 ENCL i

DISTRIBUTION: LTR 10 ENCL 10 CONTROL NBR: 780550018 SIZE: 1 P+4P END

4 I

L

%r

t yzmwzz( ezz IIFeIIM'R;PI I)."~I('i7 i'~.r. <IIII'II Z'~ ZuZiZ ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA cooK 7IK 546-2700 Ginna Station February 6, 1978 Director, Office of Inspection and. Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Sub)ect: Monthly Report for January, 1978 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to Technical Specification 6.9.l.c attached. herewith is the monthly operating status report for Ginna Station for the month of January, 1978. Also, ten additiona1 copies of the attach-ment are enclosed..

Very truly yours, Lee S. Lang Superintendent LSL:fah Attachments cc: Mr. Boyce H. Grier (1)

Mr. William G. McDona1d, NRC (2) 7505500i5~

A 0 ~ ~

tQ'(VUQ 833lhU3s nairngt>i,'s~g

<<H S f",.

f~;)l 44 H:~An~00 0~~~.:-aaz

OPERATING DATA REPORT DOCKET NO. 5 244 DATE Fe ruar 3 1978 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE 1-716-546-2700 OPERATING STATUS Ext. 291-205 at Ginna

l. Unit Name'GINNA STATION Notes Line 11:
2. Reporting Period: The number of hours in
3. Licensed. Thermal Power (MWt): Reporting Period, Cumula-490 tive, are from date of
4. Nameplate Bating (Gross MWe):
5. Design Electrical Rating (Net MWe): Initial, on-line of
6. Maximum Dependable Capacity (Gross MWc): 490 generator, not date of 470 commercial operation.
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative ll. Hours In Reporting Period 744 744 587 71 736

12. Number of Hours Reactor Was Critical 54,625.62',101.09
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line jal Unit Reserve Shutdown Hours 8.5
  • 15.

872,256 872,256 .69,309,298

16. Gross Thermal Energy Generated (MWH) 239,624 239,624 22 427 484
18. Net Electrical Energy Gcncrated (MWH) 79% 79% 74%
19. Unit Service Factor
20. Unit Availability Factor 2 Et/ 72% 70%
21. Unit Capacity Factor (Using MDC Net) 72% 70%
22. Unit Capacity Factor (Using,DFR Net) 12%

21%

23. Unit Forced Outage Rate
24. Shutdowns Schcdulcd Over Next 6 Months (Type, Date and Duration of Each):

Refueling March 17, 1978 6 weeks

25. If Shut Down At End Of Report. Period, Estimated Date of Startup: February
26. Units In Test Status (Prior to Commercial Operation): Forecast Achtcved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 40 ~ 88 (Rcv 1/7dl
  • Cumulative Data Commencing January 1, 1975

~ ~

E

AVERAGE DAILY UNIT POWER UNIT DOCKET NO. 50 244 Stat'o UNIT Nl @irma Februar 3 1978 COMPLETED BY Andrew E. McNamara, Operations Aide 1-716-546-2700, TELEPHONE Ext. 291-205, at Ginna MONTH January, 1978 DAY AVERAGE DAILY POWER LEVEL DAY, AVERAGE DAILY POWER LEVEL (M We-Net) (MWe-Net) 415 17 415 415 18 415 416 1S 416 415 20

,415 415 21 417 416 22 416 416 23 416 416 416 357 25 414 10 26

'fc 376 367

  • 12 28 411 13 29 14 349
  • 30 315
  • 31 415 16
  • Unit Shutdown INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, to the nearest whole megawatt. 'ompute 48 ~ 87 (REVe I/78l

C 4 I J

DOCKET NO.

N1 Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE Februar 3 1978 COMPLEl ED I3Y Andrew E. McNamara, Ope ations AitII'.

REPORT MONTH l'ELEPHONF 1-716-546-2700 Ext. 291-205 At Ginna Pl L

0 01 o- C c ul 0 se c c u Licensee Em- o Cause & Corrective 0 0 0 0  !

0 No. Date 0 0 Vl Cl Event 0 0 0 Action to 0 Vl I- .n 0 X: Cl 0lh C Report lw l/l 0 0

oU Prevent Recurrence 0

n 780125 F 157 A 78-03 .CB HTEXCH "B" Steam Generator, Tube Leak (Refer to L.E.R. 78-03 for Corrective Actions)

F: Forced Reason: hlcthod: Exhibit~ Instructions S: Scheduled A-Equipmcnt Failure (Explain) 1-hlanual for Preparation of Data I3-hfaintenancc or Test 2-hlanual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain) 49.89 (Rave 1/78) H-Other (Explain) Exhibit~- Same Source

sl

, I

., l

> c Ql L

t ~

I ~

C.

I il'J

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 0-2 UNIT DATE February 3, 1978 COBPLETED BY Andrew E. McNamara, Operations Aide TEI,EpHONE 1-716-546-2700, Ext. 291-205 at Ginna MONTH JANUARY, 1978 The Reactor Power Level averaged 100% in the Report Month. The exceptions were:

Two unit power level reductions to ~ 48% to repair condenser tube leaks, on 1/ll and 1/14, respectively.

A unit shutdown on 1/25 to effect repairs on the "B" steam generator, tube leak.

The unit remained shutdown at the end of the Report Period.

40 ~ IE3 u/78)

4 a