| | author name = Peterson H | | | author name = Peterson H |
| | author affiliation = NRC/RGN-III/DRS/OB | | | author affiliation = NRC/RGN-III/DRS/OB |
| | addressee name = Pardee C G | | | addressee name = Pardee C |
| | addressee affiliation = Exelon Generation Co, LLC | | | addressee affiliation = Exelon Generation Co, LLC |
| | docket = 05000373, 05000374 | | | docket = 05000373, 05000374 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:ber 7, 2008 |
| [[Issue date::October 7, 2008]]
| |
|
| |
|
| Mr. Charles Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555
| | ==SUBJECT:== |
| | | LASALLE COUNTY STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000373/2008301(DRS); |
| SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000373/2008301(DRS); 05000374/2008301(DRS) | | 05000374/2008301(DRS) |
|
| |
|
| ==Dear Mr. Pardee:== | | ==Dear Mr. Pardee:== |
Line 32: |
Line 31: |
| We will gladly discuss any questions you have concerning this examination. | | We will gladly discuss any questions you have concerning this examination. |
|
| |
|
| Sincerely,/RA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License No. NPF-11; NPF-18 | | Sincerely, |
| | /RA/ |
| | Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License No. NPF-11; NPF-18 |
|
| |
|
| ===Enclosures:=== | | ===Enclosures:=== |
| 1. Operator Licensing Examination Report 05000373/2008301(DRS); 05000374/2008301(DRS) 2. Simulation Facility Report 3. Written Examinations and Answer Keys (RO and SRO) | | 1. Operator Licensing Examination Report 05000373/2008301(DRS); 05000374/2008301(DRS) |
| | 2. Simulation Facility Report 3. Written Examinations and Answer Keys (RO and SRO) |
|
| |
|
| cc w/encls 1 & 2: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission cc w/encls 1, 2, & 3: J. White, Training Manager In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| | REGION III== |
| | Docket No. 50-373; 50-374 License No. NPF-11; NPF-18 Report No: 05000373/2008301(DRS); 05000374/2008301(DRS); |
| | Licensee: Exelon Generation Company, LLC Facility: LaSalle County Station, Units 1 and 2 Location: Marseilles, Illinois Dates: August 18 - 29, 2008 Examiners: B. Palagi, Chief Examiner C. Phillips, Examiner R. Walton, Examiner Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1 |
|
| |
|
| We will gladly discuss any questions you have concerning this examination.
| | =SUMMARY OF FINDINGS= |
| | | ER 05000373/2008301(DRS); 05000374/2008301(DRS); 08/18/08 - 08/29/08; |
| Sincerely,/RA/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License No. NPF-11; NPF-18
| |
| | |
| ===Enclosures:===
| |
| 1. Operator Licensing Examination Report 05000373/2008301(DRS); 05000374/2008301(DRS) 2. Simulation Facility Report 3. Written Examinations and Answer Keys (RO and SRO)
| |
| | |
| cc w/encls 1 & 2: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission cc w/encls 1, 2, & 3: J. White, Training Manager DISTRIBUTION See next page DOCUMENT NAME: G:\DRS\Work in Progress\LaSalle 2008 301 DRS OL.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME BPalagi:co HPeterson DATE 10/06/08 10/07/08 OFFICIAL RECORD COPY
| |
| | |
| Letter Charles from Hironori Peterson dated October 7, 2008.
| |
| | |
| SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000373/2008301(DRS); 05000374/2008301(DRS)
| |
| DISTRIBUTION
| |
| : Tamara Bloomer RidsNrrDorlLpl3-2 RidsNrrPMLaSalle RidsNrrDirsIrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn Cynthia Pederson (hard copy - IR's only) DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov
| |
| | |
| Enclosure 1 U. S. NUCLEAR REGULATORY COMMISSION REGION III Docket No. 50-373; 50-374 License No. NPF-11; NPF-18 Report No: 05000373/2008301(DRS); 05000374/2008301(DRS);
| |
| | |
| Licensee: Exelon Generation Company, LLC Facility: LaSalle County Station, Units 1 and 2 Location: Marseilles, Illinois Dates: August 18 - 29, 2008 Examiners: B. Palagi, Chief Examiner C. Phillips, Examiner R. Walton, Examiner Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety
| |
|
| |
|
| Enclosure 1 1
| | Exelon Generation Company, LLC, LaSalle County Station, Units 1 and 2; Initial License Examination Report. |
|
| |
|
| =SUMMARY OF FINDINGS=
| | The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9 Supplement 1. |
| ER 05000373/2008301(DRS); 05000374/2008301(DRS); 08/18/08 - 08/29/08; Exelon Generation Company, LLC, LaSalle County Station, Units 1 and 2; Initial License Examination Report.
| |
|
| |
|
| The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9 Supplement 1.
| | $ Nine license examinations were administered (four reactor operators and five senior reactor operators). |
|
| |
|
| $ Nine license examinations were administered (four reactor operators and five senior reactor operators). | | $ All applicants passed all sections of their examinations, resulting in the issuance of four reactor operator and five senior reactor operator licenses. |
|
| |
|
| $ All applicants passed all sections of their examinations, resulting in the issuance of four reactor operator and five senior reactor operator licenses. .
| | . |
| | |
| 2
| |
|
| |
|
| =REPORT DETAILS= | | =REPORT DETAILS= |
Line 80: |
Line 65: |
|
| |
|
| ====a. Examination Scope==== | | ====a. Examination Scope==== |
| The NRC examiners conducted an announced operator licensing initial examination during the week of August 18, 2008. The Nuclear Regulatory Commission (NRC) examiners and members of the facility licensee's staff used the guidance prescribed in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9 Supplement 1, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensee's staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of July 21, 2008, with the assistance of members of the facility licensee's staff. The NRC examiners administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of August 18, 2008. The facility licensee administered the written examination on August 25, 2008. | | The NRC examiners conducted an announced operator licensing initial examination during the week of August 18, 2008. The Nuclear Regulatory Commission (NRC)examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9 Supplement 1, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensees staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of July 21, 2008, with the assistance of members of the facility licensees staff. The NRC examiners administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of August 18, 2008. The facility licensee administered the written examination on August 25, 2008. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| Written Examination The NRC examiners determined that the written examination, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination. All changes made to the submitted examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," and documented on Form ES-401-9, "Written Examination Review Worksheet." The licensee submitted post-examination comments by letter dated August 29, 2008. | | Written Examination The NRC examiners determined that the written examination, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination. |
| | |
| | All changes made to the submitted examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet. The licensee submitted post-examination comments by letter dated August 29, 2008. |
|
| |
|
| Neither the facility licensee nor any of the candidates requested a change to the as administered examination. The recommendations were from applicants who suggested that three of the written questions be reformatted. | | Neither the facility licensee nor any of the candidates requested a change to the as administered examination. The recommendations were from applicants who suggested that three of the written questions be reformatted. |
Line 91: |
Line 78: |
| The recommendation was from an applicant who suggested that the initiation cue for one of the Job Performance Measures be changed to add clarity. | | The recommendation was from an applicant who suggested that the initiation cue for one of the Job Performance Measures be changed to add clarity. |
|
| |
|
| 3 Examination Results Nine applicants passed all sections of their examinations resulting in the issuance of five senior reactor operator and four reactor operator licenses.
| | Examination Results Nine applicants passed all sections of their examinations resulting in the issuance of five senior reactor operator and four reactor operator licenses. |
|
| |
|
| ===.2 Examination Security=== | | ===.2 Examination Security=== |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The NRC examiners briefed the facility contact on the NRC's requirements and guidelines related to examination physical security (e.g., access restrictions and simulator considerations) and integrity in accordance with 10 CFR 55.49, "Integrity of Examinations and Tests," and NUREG-1021, "Operator Licensing Examination Standard for Power Reactors." The examiners reviewed and observed the licensee's implementation and controls of examination security and integrity measures (e.g., security agreements) throughout the examination process. | | The NRC examiners briefed the facility contact on the NRCs requirements and guidelines related to examination physical security (e.g., access restrictions and simulator considerations) and integrity in accordance with 10 CFR 55.49, Integrity of Examinations and Tests, and NUREG-1021, Operator Licensing Examination Standard for Power Reactors. The examiners reviewed and observed the licensees implementation and controls of examination security and integrity measures (e.g., |
| | security agreements) throughout the examination process. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| No findings of significance were identified. | | No findings of significance were identified. |
| | | {{a|4OA6}} |
| {{a|4OA6}} | |
| ==4OA6 Meetings== | | ==4OA6 Meetings== |
|
| |
|
| Exit Meeting The chief examiner presented the examination team's preliminary observations and findings with Mr. D. Rhoades and other members of the licensee management and staff on August 26, 2008. An exit via teleconference was held on September 10, 2008, with Mr. J. White of the licensee staff following receipt of the site post-examination comments. The inspectors stated that they had reviewed proprietary information during the preparation and administration of the examination, but that the proprietary information would not be included in the examination report. The licensee acknowledged the observations provided. | | Exit Meeting The chief examiner presented the examination teams preliminary observations and findings with Mr. D. Rhoades and other members of the licensee management and staff on August 26, 2008. An exit via teleconference was held on September 10, 2008, with Mr. J. White of the licensee staff following receipt of the site post-examination comments. The inspectors stated that they had reviewed proprietary information during the preparation and administration of the examination, but that the proprietary information would not be included in the examination report. The licensee acknowledged the observations provided. |
|
| |
|
| ATTACHMENT: | | ATTACHMENT: |
|
| |
|
| =SUPPLEMENTAL INFORMATION= | | =SUPPLEMENTAL INFORMATION= |
|
| |
|
| 1SUPPLEMENTAL INFORMATION
| | Enclosure 1 |
| | SUPPLEMENTAL INFORMATION |
| KEY POINTS OF CONTACT | | KEY POINTS OF CONTACT |
| Licensee | | Licensee |
| : [[contact::D. Rhoades]], LaSalle Plant Manager | | : [[contact::D. Rhoades]], LaSalle Plant Manager |
| : [[contact::J. White]], Training Director | | : [[contact::J. White]], Training Director |
| : [[contact::L. Blunk]], Operations Training Manager | | : [[contact::L. Blunk]], Operations Training Manager |
| : [[contact::M. Entwistle]], Examination Author | | : [[contact::M. Entwistle]], Examination Author |
| NRC | | NRC |
| : [[contact::B. Palagi]], Chief Examiner | | : [[contact::B. Palagi]], Chief Examiner |
| : [[contact::R. Walton]], Examiner | | : [[contact::R. Walton]], Examiner |
| : [[contact::C. Phillips]], Examiner | | : [[contact::C. Phillips]], Examiner |
| : [[contact::G. Roach]], LaSalle Senior Resident Inspector | | : [[contact::G. Roach]], LaSalle Senior Resident Inspector |
| : [[contact::F. Ramírez]], LaSalle Resident Inspector | | : [[contact::F. Ramírez]], LaSalle Resident Inspector |
| ITEMS OPENED, CLOSED, AND DISCUSSED | | ITEMS OPENED, CLOSED, AND DISCUSSED |
| Opened, Closed, and Discussed | | Opened, Closed, and Discussed |
| None. LIST OF ACRONYMS | | None. |
| | | LIST OF ACRONYMS |
| ADAMS Agency-Wide Document Access and Management System CFR Code of Federal Regulations | | ADAMS Agency-Wide Document Access and Management System |
| CR Condition Report DRS Division of Reactor Safety ILT Initial License Training NRC Nuclear Regulatory Commission PARS Publicly Available Records System | | CFR Code of Federal Regulations |
| RO Reactor Operator SCR Silicon Controlled Rectifier SDP Significance Determination Process SRO Senior Reactor Operator SWO Simulator Work Order | | CR Condition Report |
| | | DRS Division of Reactor Safety |
| | ILT Initial License Training |
| | NRC Nuclear Regulatory Commission |
| | PARS Publicly Available Records System |
| | RO Reactor Operator |
| | SCR Silicon Controlled Rectifier |
| | SDP Significance Determination Process |
| | SRO Senior Reactor Operator |
| | SWO Simulator Work Order |
| | Attachment |
| SIMULATION FACILITY REPORT | | SIMULATION FACILITY REPORT |
| | | Facility Licensee: LaSalle County Station Units 1 and 2 |
| Facility Licensee: LaSalle County Station Units 1 and 2 | |
| Facility Licensee Docket No. 50-373; 50-374 | | Facility Licensee Docket No. 50-373; 50-374 |
| Operating Tests Administered: August 18 - 22, 2008 | | Operating Tests Administered: August 18 - 22, 2008 |
| | The following documents observations made by the NRC examination team during the initial |
| | operator license examination. These observations do not constitute audit or inspection findings |
| | and are not, without further verification and review, indicative of non-compliance with |
| | CFR 55.45(b). These observations do not affect NRC certification or approval of the |
| | simulation facility other than to provide information which may be used in future evaluations. |
| | No licensee action is required in response to these observations. |
| | During the conduct of the simulator portion of the operating tests, the following items were |
| | observed: |
| | ITEM DESCRIPTION |
| | none |
|
| |
|
| The following documents observations made by the NRC examination team during the initial operator license examination. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of non-compliance with 10 CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information which may be used in future evaluations. No licensee action is required in response to these observations.
| |
| During the conduct of the simulator portion of the operating tests, the following items were observed:
| |
| ITEM DESCRIPTION
| |
| none
| |
| WRITTEN EXAMINATIONS AND ANSWER KEYS (RO/SRO) | | WRITTEN EXAMINATIONS AND ANSWER KEYS (RO/SRO) |
| RO/SRO Initial Examination ADAMS Accession #ML082770491 | | RO/SRO Initial Examination ADAMS Accession #ML082770491 |
| | Enclosure 3 |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000373/20244012024-09-27027 September 2024 County Station – Security Baseline Inspection Report 05000373/2024401 and 05000374/2024401 IR 05000373/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Lasalle County Station (Report 05000373/2024005; 05000374/2024005) IR 05000373/20244022024-08-28028 August 2024 County Station - Cyber Security Inspection Report 05000373/2024402 and 05000374/2024402 IR 05000373/20240022024-08-13013 August 2024 County Station - Integrated Inspection Report 05000373/2024002 and 05000374/2024002 IR 05000373/20244202024-08-0505 August 2024 County Station - Security Baseline Inspection Report 05000373 2024420 and 05000374 2024420 IR 05000373/20240102024-05-29029 May 2024 County Station - Commercial Grade Dedication Inspection Report 05000373/2024010 and 05000374/2024010 IR 05000373/20240012024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 ML24131A1512024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 IR 05000373/20244032024-05-0202 May 2024 Public Lasalle County Station - Security Baseline Inspection Report 05000373/2024403 and 05000374/2024403; NRC Investigation Report No. 3-2023-006 IR 05000373/20230062024-02-28028 February 2024 Annual Assessment Letter for Lasalle County Station, Units 1 and 2 (Report 05000373/2023006; 05000374/2023006) IR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 IR 05000373/20234022023-12-20020 December 2023 County Station - Security Baseline Inspection Report 05000373/2023402 and 05000374/2023402 IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 IR 05000373/20234012023-11-0707 November 2023 County Station Security Baseline Inspection Report 05000373/2023401 and 05000374/2023401 IR 05000374/20230102023-10-11011 October 2023 NRC Inspection Report 05000374/2023010 IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 IR 05000373/20230022023-08-0101 August 2023 County Station - Integrated Inspection Report 05000373/2023002 and 05000374/2023002 IR 05000373/20230112023-06-26026 June 2023 County Station - Quadrennial Fire Protection Team Inspection Report 05000373/2023011 and 05000374/2023011 IR 05000373/20230012023-05-10010 May 2023 County Station - Integrated Inspection Report 05000373/2023001 and 05000374/2023001 IR 05000373/20220062023-03-0101 March 2023 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2022006 and 05000374/2022006) IR 05000373/20220042023-01-31031 January 2023 County Station - Integrated Inspection Report 05000373/2022004 and 05000374/2022004 IR 05000373/20224042022-12-21021 December 2022 County Station - Material Control and Accounting Program Inspection Report 05000373/2022404 and 05000374/2022404 IR 05000373/20225012022-12-0505 December 2022 County Station - Emergency Preparedness Biennial Exercise Inspection Report 05000373/2022501 and 05000374/2022501 IR 05000373/20224022022-11-17017 November 2022 County Station - Security Baseline Inspection Report 05000373/2022402 and 05000374/2022402 IR 05000373/20220032022-11-0101 November 2022 County Station - Integrated Inspection Report 05000373/2022003 and 05000374/2022003 IR 05000373/20220112022-11-0101 November 2022 County Station Design Basis Assurance Inspection (Teams) Inspection Report 05000373/2022011 and 05000374/2022011 IR 05000373/20224032022-09-15015 September 2022 County Station - Cyber Security Inspection Report 05000373/2022403 and 05000374/2022403 IR 05000373/20220052022-08-22022 August 2022 Updated Inspection Plan for Lasalle County Station (Report 05000373/2022005; 05000374/2022005) IR 05000373/20220022022-08-10010 August 2022 County Station - Integrated Inspection Report 05000373/2022002 and 05000374/2022002 IR 05000373/20224012022-05-18018 May 2022 County Station - Security Baseline Inspection Report 05000373/2022401 and 05000374/2022401 IR 05000373/20220012022-04-26026 April 2022 County Station - Integrated Inspection Report 05000373/2022001 and 05000374/2022001 ML22108A2802022-04-19019 April 2022 Information Request for an NRC Triennial Baseline Design Bases Assurance Inspection (Team) Inspection Report 05000373/2022011 05000374/20220 IR 05000373/20220102022-03-15015 March 2022 County Station License Renewal Phase 2 Report 05000373/2022010 IR 05000373/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000373/2021006 and 05000374/2021006) IR 05000373/20210042022-02-0707 February 2022 County Station Integrated Inspection Report 05000373/2021004 and 05000374/2021004 IR 05000373/20210132022-01-20020 January 2022 County Station Biennial Problem Identification and Resolution Inspection Report 05000373/2021013 and 05000374/2021013 IR 05000373/20214022021-12-15015 December 2021 County Station - Security Baseline Inspection Report 05000373/2021402 and 05000374/2021402 IR 05000373/20210032021-11-0808 November 2021 County Station Integrated Inspection Report 05000373/2021003; 05000374/2021003 and 07200070/2021001 IR 05000373/20210022021-11-0101 November 2021 County Station Integrated Inspection Report 05000373/2021002 and 05000374/2021002 IR 05000373/20210122021-10-28028 October 2021 County Station- 50.59 Team Inspection Report 05000373/2021012 and 05000374/2021012 IR 05000373/20210052021-09-0101 September 2021 Updated Inspection Plan for Lasalle County Station, Units 1 and 2; Report 05000373/2021005 and 05000374/2021005 IR 05000373/20210112021-08-23023 August 2021 County Station - Design Basis Assurance Inspection (Programs) Inspection Report 05000373/2021011 and 05000374/2021011 IR 05000373/20215012021-06-16016 June 2021 County Station - Emergency Preparedness Biennial Exercise Inspection Report 05000373/2021501 and 05000374/2021501 IR 05000373/20214012021-05-18018 May 2021 County Station - Security Baseline Inspection Report 05000373/2021401 and 05000374/2021401 IR 05000373/20210012021-05-0404 May 2021 Lssalle County Station - Integrated Inspection Report 05000373/2021001 and 05000374/2021001 IR 05000374/20210102021-04-0505 April 2021 County Station - Post-Approval Site Inspection for License Renewal (Phase I) Report 05000374/2021010 IR 05000373/20200042021-03-0505 March 2021 Reissue - Lasalle County Station - Integrated Inspection Report 05000373/2020004; 05000374/2020004; 05000373/2020501; 05000374/2020501; 05000373/2020011 and 05000374/2020011 IR 05000373/20200062021-03-0404 March 2021 Annual Assessment Letter for Lasalle County Station Units 1 and 2 (Report 05000373/2020006 and 05000374/2020006) ML21043A1982021-02-12012 February 2021 County Station - Integrated Inspection Report 05000373/2020004; 05000374/2020004; 05000373/2020501 and 05000374/2020501 2024-09-27
[Table view] Category:Letter
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000373/LER-2023-001-01, Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate2024-10-0909 October 2024 Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000373/20244012024-09-27027 September 2024 County Station – Security Baseline Inspection Report 05000373/2024401 and 05000374/2024401 ML24263A2062024-09-19019 September 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000373/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Lasalle County Station (Report 05000373/2024005; 05000374/2024005) IR 05000373/20244022024-08-28028 August 2024 County Station - Cyber Security Inspection Report 05000373/2024402 and 05000374/2024402 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 05000373/LER-2024-004-01, Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer2024-08-22022 August 2024 Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer IR 05000373/20240022024-08-13013 August 2024 County Station - Integrated Inspection Report 05000373/2024002 and 05000374/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000373/20244202024-08-0505 August 2024 County Station - Security Baseline Inspection Report 05000373 2024420 and 05000374 2024420 05000373/LER-2024-003, Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded2024-07-31031 July 2024 Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions ML24178A2522024-06-27027 June 2024 County Station – Acknowledgement of Response to NRC Inspection Report 05000373/2024001 and 05000374/2024001 and Disputed Non-Cited Violation RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20240102024-05-29029 May 2024 County Station - Commercial Grade Dedication Inspection Report 05000373/2024010 and 05000374/2024010 ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24131A1512024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 IR 05000373/20240012024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24108A1562024-04-15015 April 2024 Updated Final Safety Analysis Report (Ufsar), Revision 26 and Fire Protection Report (Fpr), Revision 11 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24071A2122024-03-12012 March 2024 County Station - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection IR 05000373/20230062024-02-28028 February 2024 Annual Assessment Letter for Lasalle County Station, Units 1 and 2 (Report 05000373/2023006; 05000374/2023006) RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24018A0682024-02-0909 February 2024 Issuance of Amendment Nos. 262 and 247 Revised Design Bases of Lower Downcomer Braces ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 ML23354A2902024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0028 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report IR 05000373/20234012023-11-0707 November 2023 County Station Security Baseline Inspection Report 05000373/2023401 and 05000374/2023401 RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans 2024-09-06
[Table view] Category:License-Operator Examination Report
MONTHYEARML23192A5272023-07-12012 July 2023 NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML17095A9142016-11-16016 November 2016 2016 LaSalle County Station Initial License Examination Administered JPMs RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-05-29029 May 2014 (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20103012010-10-26026 October 2010 Er 05000373/10-301(DRS), 05000374/10-301(DRS), 09/13/2010 - 09/23/2010, LaSalle County Station, Units 1 and 2. Initial License Examination Report IR 05000373/20083012008-10-0707 October 2008 Er 05000373-08-301(DRS), 05000374-08-301(DRS), on 08/18/08 - 08/29/08, Exelon Generation Company, LLC, LaSalle County Station, Units 1 and 2, Initial License Examination Report IR 05000373/20063012007-01-29029 January 2007 Er 05000373-2006-301(DRS), 05000374-2006-301(DRS); 11/14/2006 - 11/22/2006; Exelon Generation Company, LLC, LaSalle County Station. Initial License Examination Report ML0703606182006-11-13013 November 2006 Various Checklists for the LaSalle Initial Examination - November 2006 IR 05000373/20023012002-05-17017 May 2002 Er 05000373/2002-301(DRS), 05000374/2002-301(DRS), on 04/08-19/2002, Exelon Generation Company, LLC, LaSalle County Station, Units 1 and 2. Initial License Examination Report ML0213506152002-04-19019 April 2002 Initial RO Examination 04/2002 ML0213506422002-04-19019 April 2002 Initial SRO Examination 04/2002 2023-07-12
[Table view] |
Text
ber 7, 2008
SUBJECT:
LASALLE COUNTY STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000373/2008301(DRS);
05000374/2008301(DRS)
Dear Mr. Pardee:
On August 29, 2008, Nuclear Regulatory Commission (NRC) examiners completed the initial operator licensing examination process for an examination administered at your LaSalle County Station, Units 1 and 2. The enclosed report documents the results of the examination which were discussed during a debrief on August 26, 2008, with Mr. D. Rhoades, and other members of your staff. An exit meeting was conducted by telephone on September 10, 2008, between Mr. J. White, Training Manager, of your staff and Mr. B. Palagi, NRC Chief Examiner, to review the proposed final grading of the examination for the license applicants. During the telephone conversation the NRC review of post examination comments received by the NRC on August 29, 2008, were discussed.
The NRC examiners administered an initial license examination operating test during the week of August 18, 2008. The written examination was administered by LaSalle training department personnel on August 25, 2008. Five (5) Senior Reactor Operator (SRO) and four (4) Reactor Operator (RO) applicants were administered license examinations. The results of the examination were finalized on September 24, 2008. All nine (9) applicants passed all sections of their respective examinations and were issued applicable operator licenses. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License No. NPF-11; NPF-18
Enclosures:
1. Operator Licensing Examination Report 05000373/2008301(DRS); 05000374/2008301(DRS)
2. Simulation Facility Report 3. Written Examinations and Answer Keys (RO and SRO)
REGION III==
Docket No. 50-373; 50-374 License No. NPF-11; NPF-18 Report No: 05000373/2008301(DRS); 05000374/2008301(DRS);
Licensee: Exelon Generation Company, LLC Facility: LaSalle County Station, Units 1 and 2 Location: Marseilles, Illinois Dates: August 18 - 29, 2008 Examiners: B. Palagi, Chief Examiner C. Phillips, Examiner R. Walton, Examiner Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS
ER 05000373/2008301(DRS); 05000374/2008301(DRS); 08/18/08 - 08/29/08;
Exelon Generation Company, LLC, LaSalle County Station, Units 1 and 2; Initial License Examination Report.
The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9 Supplement 1.
$ Nine license examinations were administered (four reactor operators and five senior reactor operators).
$ All applicants passed all sections of their examinations, resulting in the issuance of four reactor operator and five senior reactor operator licenses.
.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations
a. Examination Scope
The NRC examiners conducted an announced operator licensing initial examination during the week of August 18, 2008. The Nuclear Regulatory Commission (NRC)examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9 Supplement 1, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensees staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of July 21, 2008, with the assistance of members of the facility licensees staff. The NRC examiners administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of August 18, 2008. The facility licensee administered the written examination on August 25, 2008.
b. Findings
Written Examination The NRC examiners determined that the written examination, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination.
All changes made to the submitted examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet. The licensee submitted post-examination comments by letter dated August 29, 2008.
Neither the facility licensee nor any of the candidates requested a change to the as administered examination. The recommendations were from applicants who suggested that three of the written questions be reformatted.
Operating Test The NRC examiners developed the Operating Test. Operating Test changes agreed upon between the NRC and licensee were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The licensee submitted one post examination comment by letter dated August 29, 2008. Neither the facility licensee nor any of the candidates requested a change to the as administered examination.
The recommendation was from an applicant who suggested that the initiation cue for one of the Job Performance Measures be changed to add clarity.
Examination Results Nine applicants passed all sections of their examinations resulting in the issuance of five senior reactor operator and four reactor operator licenses.
.2 Examination Security
a. Inspection Scope
The NRC examiners briefed the facility contact on the NRCs requirements and guidelines related to examination physical security (e.g., access restrictions and simulator considerations) and integrity in accordance with 10 CFR 55.49, Integrity of Examinations and Tests, and NUREG-1021, Operator Licensing Examination Standard for Power Reactors. The examiners reviewed and observed the licensees implementation and controls of examination security and integrity measures (e.g.,
security agreements) throughout the examination process.
b. Findings
No findings of significance were identified.
4OA6 Meetings
Exit Meeting The chief examiner presented the examination teams preliminary observations and findings with Mr. D. Rhoades and other members of the licensee management and staff on August 26, 2008. An exit via teleconference was held on September 10, 2008, with Mr. J. White of the licensee staff following receipt of the site post-examination comments. The inspectors stated that they had reviewed proprietary information during the preparation and administration of the examination, but that the proprietary information would not be included in the examination report. The licensee acknowledged the observations provided.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
Enclosure 1
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- D. Rhoades, LaSalle Plant Manager
- J. White, Training Director
- L. Blunk, Operations Training Manager
- M. Entwistle, Examination Author
NRC
- B. Palagi, Chief Examiner
- R. Walton, Examiner
- C. Phillips, Examiner
- G. Roach, LaSalle Senior Resident Inspector
- F. Ramírez, LaSalle Resident Inspector
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None.
LIST OF ACRONYMS
ADAMS Agency-Wide Document Access and Management System
CFR Code of Federal Regulations
CR Condition Report
DRS Division of Reactor Safety
ILT Initial License Training
NRC Nuclear Regulatory Commission
PARS Publicly Available Records System
RO Reactor Operator
SCR Silicon Controlled Rectifier
SDP Significance Determination Process
SRO Senior Reactor Operator
SWO Simulator Work Order
Attachment
SIMULATION FACILITY REPORT
Facility Licensee: LaSalle County Station Units 1 and 2
Facility Licensee Docket No. 50-373; 50-374
Operating Tests Administered: August 18 - 22, 2008
The following documents observations made by the NRC examination team during the initial
operator license examination. These observations do not constitute audit or inspection findings
and are not, without further verification and review, indicative of non-compliance with
CFR 55.45(b). These observations do not affect NRC certification or approval of the
simulation facility other than to provide information which may be used in future evaluations.
No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were
observed:
ITEM DESCRIPTION
none
WRITTEN EXAMINATIONS AND ANSWER KEYS (RO/SRO)
RO/SRO Initial Examination ADAMS Accession #ML082770491
Enclosure 3