|
|
(One intermediate revision by the same user not shown) |
Line 9: |
Line 9: |
| | docket = 05000305 | | | docket = 05000305 |
| | license number = DPR-043 | | | license number = DPR-043 |
| | contact person = Feintuch K D, NRR/DORL/LPL3-1, 415-3079 | | | contact person = Feintuch K, NRR/DORL/LPL3-1, 415-3079 |
| | case reference number = TAC MD7112 | | | case reference number = TAC MD7112 |
| | document type = E-Mail | | | document type = E-Mail |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Feintuch, Karl Sent: Thursday, August 05, 2010 11:29 AM To: 'Jack Gadzala' Cc: Bedi, Gurjendra | | {{#Wiki_filter:From: Feintuch, Karl Sent: Thursday, August 05, 2010 11:29 AM To: 'Jack Gadzala' Cc: Bedi, Gurjendra |
|
| |
|
| ==Subject:== | | ==Subject:== |
| RE: Snubber Replacement Reporting | | RE: Snubber Replacement Reporting I contacted the cognizant technical branch (CPTB = Component Performance and Testing Branch) about this matter and identified the affected items to them: |
| | |
| I contacted the cognizant technical branch (CPTB = Component Performance and Testing Branch) about this matter and identified the affected items to them: | |
| * Containment Spray 6 inch line (qty 1) | | * Containment Spray 6 inch line (qty 1) |
| * Reactor Coolant System 2 inch line (qty 2) | | * Reactor Coolant System 2 inch line (qty 2) |
Line 29: |
Line 27: |
| * Safety Injection 2 inch line (qty 1) | | * Safety Injection 2 inch line (qty 1) |
| Your action to enter this condition into the Kewaunee Power Station corrective action program and include the missing (replaced) snubbers in the next routine report is acceptable. | | Your action to enter this condition into the Kewaunee Power Station corrective action program and include the missing (replaced) snubbers in the next routine report is acceptable. |
| Karl Feintuch Project Manager USNRC 301-415-3079 From: Jack Gadzala [mailto:jack.gadzala@dom.com] Sent: Monday, August 02, 2010 2:50 PM To: Feintuch, Karl | | Karl Feintuch Project Manager USNRC 301-415-3079 From: Jack Gadzala [mailto:jack.gadzala@dom.com] |
| | Sent: Monday, August 02, 2010 2:50 PM To: Feintuch, Karl |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Snubber Replacement Reporting Karl, Attached is the KPS 2009 ISI Summary Report that was submitted to NRC on January 4, 2010. | | Snubber Replacement Reporting |
| | : Karl, Attached is the KPS 2009 ISI Summary Report that was submitted to NRC on January 4, 2010. |
| | As we discussed, 5 snubber replacements were not included in that report (Form NIS-2 Owners Report For Repair/Replacement Activity) as required by paragraph IWA-6230 of ASME Section XI. This condition has been entered into the KPS corrective action program. Unless the staff desires the information sooner, we plan to report the 5 snubber replacements in the next routine report. |
| | Jack Dominion KPS Licensing 920-388-8604 CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and |
|
| |
|
| As we discussed, 5 snubber replacements were not included in that report (Form NIS-2 Owner's Report For Repair/Replacement Activity) as required by paragraph IWA-6230 of ASME Section XI. This condition has been entered into the KPS corrective action program. Unless the staff desires the information sooner, we plan to report the 5 snubber replacements in the next routine report.
| | may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you. |
| Jack Dominion KPS Licensing 920-388-8604 CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of th e contents of this info rmation is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.
| | E-mail Properties Mail Envelope Properties (26E42474DB238C408C94990815A02F090A76C3F588) |
| E-mail Properties Mail Envelope Properties (26E42474DB238C408C94990815A02F090A76C3F588) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| RE: Snubber Replacement Reporting | | RE: Snubber Replacement Reporting Sent Date: 8/5/2010 11:33:29 AM Received Date: 8/5/2010 11:33:00 AM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients: |
| | |
| Sent Date: 8/5/2010 11:33:29 AM Received Date: 8/5/2010 11:33:00 AM From: Feintuch, Karl | |
| | |
| Created By: Karl.Feintuch@nrc.gov | |
| | |
| Recipients: | |
| jack.gadzala@dom.com ('Jack Gadzala') | | jack.gadzala@dom.com ('Jack Gadzala') |
| Tracking Status: None Gurjendra.Bedi@nrc.gov (Bedi, Gurjendra) | | Tracking Status: None Gurjendra.Bedi@nrc.gov (Bedi, Gurjendra) |
| Tracking Status: None | | Tracking Status: None Post Office: |
| | | HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 12514 8/5/2010 Options Expiration Date: |
| Post Office: | | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} |
| HQCLSTR01.nrc.gov | |
| | |
| Files Size Date & Time MESSAGE 12514 8/5/2010 | |
| | |
| Options Expiration Date: | |
| Priority: olImportanceNormal ReplyRequested: False Return Notification: False | |
| | |
| Sensitivity: olNormal Recipients received:}} | |
Letter Sequence Other |
---|
|
|
MONTHYEARML1022103312010-08-0505 August 2010 E-mail MD7112 Snubber Replacement Reporting Response 2010-08-05 Project stage: Other ML1201100282012-01-0303 January 2012 NRR E-mail Capture - Kewaunee Part 26 Question Project stage: Other ML12306A0822012-10-31031 October 2012 NRR E-mail Capture - FW: Dominion New(S) Release Announcing Kewaunee Shutdown - October 22, 2012 Project stage: Other ML12319A4022012-11-15015 November 2012 Notice of Forthcoming Meeting with Dominion Energy Kewaunee to Discuss Plans by Kewaunee Power Station to Implement Orders from Lessons Learned from Events in Fukushima, Japan Project stage: Meeting ML12328A1042012-11-21021 November 2012 NRR E-mail Capture - Kewaunee Public Meeting Call in Information - Response Contains Conference Call and Pass Code Information Project stage: Meeting ML12346A2472012-12-11011 December 2012 NRR E-mail Capture - MD7112 - November 27, 2012 Kewaunee Public Meeting - Presentation Notes (for Meeting Summary) Project stage: Meeting ML12352A2822012-12-31031 December 2012 Summary of Meeting with Dominion Energy Kewaunee on Implementation of Orders Japan Lessons Learned Effort Project stage: Meeting ML13014A0972013-01-13013 January 2013 NRR E-mail Capture - MD7112 - Kewaunee Plant Closure - Reply to Part 171 Fee Reduction Questions Project stage: Other ML13036A3042013-01-30030 January 2013 NRR E-mail Capture - FW: Conference Call Attendees - and Presentation Powerpoint (Attached) Project stage: Other ML13063A2482013-02-26026 February 2013 Redacted - Kewaunee Power Station, Post-Shutdown Decommissioning Activities Report Project stage: Other ML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests Project stage: Withholding Request Acceptance ML13116A3262013-04-30030 April 2013 Forthcoming Closed Meeting with Dominion Energy Kewaunee Staff to Discuss Planning for Physical Security at Kewaunee Power Station Project stage: Meeting ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events Project stage: Other ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results Project stage: Acceptance Review ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing Project stage: Other ML13143A3682013-05-29029 May 2013 Notice of Forthcoming Meeting with Dominion Energy Kewaunee to Discuss Plans for Kewaunee Power Station Regarding Emergency Preparedness Project stage: Meeting ML13170A3692013-06-14014 June 2013 Record of Discussion of Regulations for Parent Financial Guarantees Project stage: Other 2013-01-30
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 ML16054A2382015-10-14014 October 2015 E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (Areva) for Kewaunee Power Station ML15090A4872015-03-26026 March 2015 OEDO-15-00251 - Michael Mulligan, Citizen Ltr 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15071A2752015-03-12012 March 2015 NRR E-mail Capture - Request for Additional Information on Kewaunee 50.54(p) Changes to Physical Security Plan - TAC MF5779 ML15057A2192015-02-25025 February 2015 NRR E-mail Capture - Acceptance Review: Dominion Fleet-Request for Approval of Cyber Security Plan (CSP) Revised Implementation Schedule ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14251A0972014-08-22022 August 2014 NRR E-mail Capture - Draft RAI to Kewaunee Power Station on Control Room Staffing Issue ML14164A0742014-06-0202 June 2014 NRR E-mail Capture - Draft Request for Additional Information Concerning Dek'S Request for Exemption from Conducting Annual Force-on-Force Exercises at Kewaunee Power Station ML14132A2062014-04-27027 April 2014 NRR E-mail Capture - Kewaunee Amendment Request for Emergency Plan Changes MF3411 - Draft RAIs ML14155A0402014-04-0707 April 2014 NRR E-mail Capture - Summarry of Kewaunee Mitigation Strategy Phone Call Last Week ML14134A5872014-04-0707 April 2014 NRR E-mail Capture - Minor Editorial/Typographical Changes to License Condition TAC MF1771) ML14097A5112014-04-0101 April 2014 NRR E-mail Capture - Draft RAI Related to Kewaunee Proposed Deletion of License Condition on Mitigation Strategy ML14069A3832014-03-0606 March 2014 NRR E-mail Capture - Draft RAI on Kewaunee Permanently Defueled Technical Specifications ML13312A2422013-11-0707 November 2013 NRR E-mail Capture - MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information ML13297A0482013-10-23023 October 2013 NRR E-mail Capture - MF2567 - Kewaunee Eplan RAI #1 and Comparable Wording from Other Eplans ML13295A5672013-10-22022 October 2013 NRR E-mail Capture - MF2567 Kewaunee Exemption Nlar 102 (50.47 and 10 CFR Appendix E) Includes Kewaunee EP Briefing - 19 June 2013 Handout ML13275A0772013-10-0101 October 2013 NRR E-mail Capture - MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information ML13275A0722013-10-0101 October 2013 NRR E-mail Capture - FW: MF1771-MF1952 RAI 9-27-2013.docx ML13275A0622013-09-27027 September 2013 NRR E-mail Capture - FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) Training - (Corrected) Request for Additional Information (RAI) ML13246A0032013-08-30030 August 2013 NRR E-mail Capture - Record of Docketing of Certifications Pertaining to Decommissioning of Kewaunee Power Station (KPS) ML13218B3722013-08-0606 August 2013 NRR E-mail Capture - MF1952 KPS Permanently Defueled License and TS - Request for Additional Information - MF1952-RAII-SCVB-Heida-001-2013-08-06 ML13186A0212013-07-0303 July 2013 NRR E-mail Capture - MF1771 - Correction to Stated Date Due for Request for Information Dated 6/26/2013 (ML13178A011) ML13178A0112013-06-26026 June 2013 NRR E-mail Capture - MF1771 (and Part of MF1952) - KPS - Record of Clarification Call and Associated Request for Additional Information (RAI) Deletion of License Condition 2.C.(15) ML13151A2452013-05-29029 May 2013 NRR E-mail Capture - Kewaunee Correspondence - Dispositioning Flawed Document, Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML13149A0412013-05-28028 May 2013 NRR E-mail Capture - MF1771 - Kewaunee LAR 255 Deletion of Licensing Condition 2.C.(15) - LIC-109 Acceptance Review Results ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13133A0862013-05-10010 May 2013 NRR E-mail Capture - FW: MF1438 KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events 2024-01-26
[Table view] |
Text
From: Feintuch, Karl Sent: Thursday, August 05, 2010 11:29 AM To: 'Jack Gadzala' Cc: Bedi, Gurjendra
Subject:
RE: Snubber Replacement Reporting I contacted the cognizant technical branch (CPTB = Component Performance and Testing Branch) about this matter and identified the affected items to them:
- Safety Injection 2 inch line (qty 1)
Your action to enter this condition into the Kewaunee Power Station corrective action program and include the missing (replaced) snubbers in the next routine report is acceptable.
Karl Feintuch Project Manager USNRC 301-415-3079 From: Jack Gadzala [1]
Sent: Monday, August 02, 2010 2:50 PM To: Feintuch, Karl
Subject:
Snubber Replacement Reporting
- Karl, Attached is the KPS 2009 ISI Summary Report that was submitted to NRC on January 4, 2010.
As we discussed, 5 snubber replacements were not included in that report (Form NIS-2 Owners Report For Repair/Replacement Activity) as required by paragraph IWA-6230 of ASME Section XI. This condition has been entered into the KPS corrective action program. Unless the staff desires the information sooner, we plan to report the 5 snubber replacements in the next routine report.
Jack Dominion KPS Licensing 920-388-8604 CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and
may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.
E-mail Properties Mail Envelope Properties (26E42474DB238C408C94990815A02F090A76C3F588)
Subject:
RE: Snubber Replacement Reporting Sent Date: 8/5/2010 11:33:29 AM Received Date: 8/5/2010 11:33:00 AM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:
jack.gadzala@dom.com ('Jack Gadzala')
Tracking Status: None Gurjendra.Bedi@nrc.gov (Bedi, Gurjendra)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 12514 8/5/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: