MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21259A2122021-09-13013 September 2021 SUNSI and Proprietary Review Determination Email Regarding: Tn Request Regarding ASME Code Alternative for CoC 1004 ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML20260H0462020-09-14014 September 2020 E-mail: Approval of Withholding Information from Public Disclosuresponse to Request for Additional Information - Application for Amendment 17 to Standardized NUHOMS (CoC No. 1004) ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19235A0362019-08-20020 August 2019 8/20/19 - Email to Dshaw (Tn) from Ngarcia Santos (NRC)-Graded Approach Clarification Questions-FQTs, Model No. Nuhoms, A16 (72-1004) ML19148A1142019-05-23023 May 2019 Concurrence: IR 72-1004/2019-201, March 26-29, 2019 and April 12, 2019, at Tn Americas Division LLC, Columbia, MD, NRC Form 591S, Safety Inspection Report and Compliance Inspection, Inspector'S Notes and Cover Sheet ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 ML16054A2322016-02-0909 February 2016 E-44108 Attachment 3 E-mail from Kevin Donovan (Exelon Generation Company, LLC) to Don Shaw (Areva) for R.E. Ginna Nuclear Power Plant, Limerick Generating Station, Nine Mile Point Nuclear Station, and Oyster Creek Nuclear Generating Statio ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML16054A2422015-12-30030 December 2015 E-44108 Attachment 12 E-mail from Richard Mcintosh (Talen Energy) to Don Shaw (Areva) for Susquehanna Steam Electric Station ML16054A2402015-12-10010 December 2015 E-44108 Attachment 10 E-mail from Steven Edwards (Due Energy) to Don Shaw (Areva) for Brunswick Nuclear Plant, Oconee Nuclear Station, and Robinson Nuclear Plant ML16054A2382015-10-14014 October 2015 E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (Areva) for Kewaunee Power Station ML16054A2302015-10-0909 October 2015 E-44108 Attachment 1 E-mail from Bryan Woyak (NextEra Energy Point Beach) to Don Shaw (Areva) for Point Beach Nuclear Plant ML16054A2312015-10-0808 October 2015 E-44108 Attachment 2 E-mail from J. Michael Davis (NextEra Energy Duane Arnold) to Don Shaw (Areva) for Duane Arnold Energy Center ML16054A2332015-10-0202 October 2015 E-44108 Attachment 4 E-mail from David B. Blakeney (Millstone Power Station) to Don Shaw (Areva) for Millstone Power Station ML16054A2342015-10-0101 October 2015 E-44108 Attachment 5 E-mail from Peter A. Gardner (Xcel Energy/Northern States Power Company) to Don Shaw (Areva) for Monticello Nuclear Generating Plant ML16054A2372015-09-29029 September 2015 E-44108 Attachment 7 E-mail from Jim Shaw (Cooper Nuclear Station) to Don Shaw (Areva) for Cooper Nuclear Station ML16054A2392015-09-14014 September 2015 E-44108 Attachment 9 E-mail from Greg Halnon (Firstenergy Nuclear Operating Company) to Don Shaw (Areva) for Beaver Valley Power Station and Davis-Besse Power Station ML15090A4872015-03-26026 March 2015 OEDO-15-00251 - Michael Mulligan, Citizen Ltr 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15071A2752015-03-12012 March 2015 NRR E-mail Capture - Request for Additional Information on Kewaunee 50.54(p) Changes to Physical Security Plan - TAC MF5779 ML15057A2192015-02-25025 February 2015 NRR E-mail Capture - Acceptance Review: Dominion Fleet-Request for Approval of Cyber Security Plan (CSP) Revised Implementation Schedule ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14251A0972014-08-22022 August 2014 NRR E-mail Capture - Draft RAI to Kewaunee Power Station on Control Room Staffing Issue ML14164A0742014-06-0202 June 2014 NRR E-mail Capture - Draft Request for Additional Information Concerning Dek'S Request for Exemption from Conducting Annual Force-on-Force Exercises at Kewaunee Power Station ML14132A2062014-04-27027 April 2014 NRR E-mail Capture - Kewaunee Amendment Request for Emergency Plan Changes MF3411 - Draft RAIs ML14155A0402014-04-0707 April 2014 NRR E-mail Capture - Summarry of Kewaunee Mitigation Strategy Phone Call Last Week ML14134A5872014-04-0707 April 2014 NRR E-mail Capture - Minor Editorial/Typographical Changes to License Condition TAC MF1771) ML14097A5112014-04-0101 April 2014 NRR E-mail Capture - Draft RAI Related to Kewaunee Proposed Deletion of License Condition on Mitigation Strategy ML14069A3832014-03-0606 March 2014 NRR E-mail Capture - Draft RAI on Kewaunee Permanently Defueled Technical Specifications ML13312A2422013-11-0707 November 2013 NRR E-mail Capture - MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information ML13297A0482013-10-23023 October 2013 NRR E-mail Capture - MF2567 - Kewaunee Eplan RAI #1 and Comparable Wording from Other Eplans 2024-01-26
[Table view] |
Text
E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (AREVA) for Kewaunee Power Station
WILLIFORD Dennis (RS/IB)
From: Stewart J Yuen (Generation - 4) <stewart.j.yuen@dom.com>
Sent: Wednesday, October 14, 2015 2:09 PM To: SHAW JR Donis (BE/LO)
Cc: WILLIFORD Dennis (RS/IB); william.zipp@dom.com; Jack Gadzala (Generation - 4); Cary Laroe (Generation - 6); Richard Ridder (Generation - 6); Kent J Wietharn (Generation -
6)
Subject:
Voluntary Agreement to Implement CoC 1004 Amendment Revisions Which Remove the Requirement for a Spent Fuel Pool To: Don Shaw, AREVA TN Licensing Manager From: Stewart J. Yuen, Plant Manager, Kewaunee Power Station
Reference:
AREVA Inc. letter E-42575, from Paul Triska (AREVA) to NRC Document Control Desk, Application for Revision to the Standardized NUHOMS System - CoC 1004, Amendments 0 through 11 and Amendment 13, Docket 72-1004, dated August 24, 2015 The purpose of this communication is to confirm the following:
- Dominion Energy Kewaunee is aware of and understands the proposed AREVA Inc. changes to the CoC 1004 Standardized NUHOMS System Technical Specifications and the associated UFSAR changes, which are detailed in the letter referenced above for all approved amendments.
- We understand that these changes will result in Revision 1 to each currently approved CoC 1004 amendment.
- We understand that the previous version of the associated amendments will be superseded in their entirety by Revision 1.
- We agree to voluntarily implement these changes for our general licensee independent spent fuel storage installations (ISFSIs) at the following site, which operates CoC 1004 Standardized NUHOMS Systems under one or more amendments:
Kewaunee Power Station
- In order to allow sufficient time to incorporate these changes in a quality manner, we request that AREVA work with the NRC to provide its general licensees a maximum 180-day period after the effective date of the revised amendments during which we can complete incorporation and begin storage operations under the revised amendments.
Stewart J. Yuen Plant Manager, Kewaunee Power Station 920-388-8497 CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer 1
relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.
2
E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (AREVA) for Kewaunee Power Station
WILLIFORD Dennis (RS/IB)
From: Stewart J Yuen (Generation - 4) <stewart.j.yuen@dom.com>
Sent: Wednesday, October 14, 2015 2:09 PM To: SHAW JR Donis (BE/LO)
Cc: WILLIFORD Dennis (RS/IB); william.zipp@dom.com; Jack Gadzala (Generation - 4); Cary Laroe (Generation - 6); Richard Ridder (Generation - 6); Kent J Wietharn (Generation -
6)
Subject:
Voluntary Agreement to Implement CoC 1004 Amendment Revisions Which Remove the Requirement for a Spent Fuel Pool To: Don Shaw, AREVA TN Licensing Manager From: Stewart J. Yuen, Plant Manager, Kewaunee Power Station
Reference:
AREVA Inc. letter E-42575, from Paul Triska (AREVA) to NRC Document Control Desk, Application for Revision to the Standardized NUHOMS System - CoC 1004, Amendments 0 through 11 and Amendment 13, Docket 72-1004, dated August 24, 2015 The purpose of this communication is to confirm the following:
- Dominion Energy Kewaunee is aware of and understands the proposed AREVA Inc. changes to the CoC 1004 Standardized NUHOMS System Technical Specifications and the associated UFSAR changes, which are detailed in the letter referenced above for all approved amendments.
- We understand that these changes will result in Revision 1 to each currently approved CoC 1004 amendment.
- We understand that the previous version of the associated amendments will be superseded in their entirety by Revision 1.
- We agree to voluntarily implement these changes for our general licensee independent spent fuel storage installations (ISFSIs) at the following site, which operates CoC 1004 Standardized NUHOMS Systems under one or more amendments:
Kewaunee Power Station
- In order to allow sufficient time to incorporate these changes in a quality manner, we request that AREVA work with the NRC to provide its general licensees a maximum 180-day period after the effective date of the revised amendments during which we can complete incorporation and begin storage operations under the revised amendments.
Stewart J. Yuen Plant Manager, Kewaunee Power Station 920-388-8497 CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer 1
relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.