MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 ML16054A2382015-10-14014 October 2015 E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (Areva) for Kewaunee Power Station ML15090A4872015-03-26026 March 2015 OEDO-15-00251 - Michael Mulligan, Citizen Ltr 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15071A2752015-03-12012 March 2015 NRR E-mail Capture - Request for Additional Information on Kewaunee 50.54(p) Changes to Physical Security Plan - TAC MF5779 ML15057A2192015-02-25025 February 2015 NRR E-mail Capture - Acceptance Review: Dominion Fleet-Request for Approval of Cyber Security Plan (CSP) Revised Implementation Schedule ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14251A0972014-08-22022 August 2014 NRR E-mail Capture - Draft RAI to Kewaunee Power Station on Control Room Staffing Issue ML14164A0742014-06-0202 June 2014 NRR E-mail Capture - Draft Request for Additional Information Concerning Dek'S Request for Exemption from Conducting Annual Force-on-Force Exercises at Kewaunee Power Station ML14132A2062014-04-27027 April 2014 NRR E-mail Capture - Kewaunee Amendment Request for Emergency Plan Changes MF3411 - Draft RAIs ML14134A5872014-04-0707 April 2014 NRR E-mail Capture - Minor Editorial/Typographical Changes to License Condition TAC MF1771) ML14155A0402014-04-0707 April 2014 NRR E-mail Capture - Summarry of Kewaunee Mitigation Strategy Phone Call Last Week ML14097A5112014-04-0101 April 2014 NRR E-mail Capture - Draft RAI Related to Kewaunee Proposed Deletion of License Condition on Mitigation Strategy ML14069A3832014-03-0606 March 2014 NRR E-mail Capture - Draft RAI on Kewaunee Permanently Defueled Technical Specifications ML13312A2422013-11-0707 November 2013 NRR E-mail Capture - MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information ML13297A0482013-10-23023 October 2013 NRR E-mail Capture - MF2567 - Kewaunee Eplan RAI #1 and Comparable Wording from Other Eplans ML13295A5672013-10-22022 October 2013 NRR E-mail Capture - MF2567 Kewaunee Exemption Nlar 102 (50.47 and 10 CFR Appendix E) Includes Kewaunee EP Briefing - 19 June 2013 Handout ML13275A0722013-10-0101 October 2013 NRR E-mail Capture - FW: MF1771-MF1952 RAI 9-27-2013.docx ML13275A0772013-10-0101 October 2013 NRR E-mail Capture - MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information ML13275A0622013-09-27027 September 2013 NRR E-mail Capture - FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) Training - (Corrected) Request for Additional Information (RAI) ML13246A0032013-08-30030 August 2013 NRR E-mail Capture - Record of Docketing of Certifications Pertaining to Decommissioning of Kewaunee Power Station (KPS) ML13218B3722013-08-0606 August 2013 NRR E-mail Capture - MF1952 KPS Permanently Defueled License and TS - Request for Additional Information - MF1952-RAII-SCVB-Heida-001-2013-08-06 ML13186A0212013-07-0303 July 2013 NRR E-mail Capture - MF1771 - Correction to Stated Date Due for Request for Information Dated 6/26/2013 (ML13178A011) ML13178A0112013-06-26026 June 2013 NRR E-mail Capture - MF1771 (and Part of MF1952) - KPS - Record of Clarification Call and Associated Request for Additional Information (RAI) Deletion of License Condition 2.C.(15) ML13151A2452013-05-29029 May 2013 NRR E-mail Capture - Kewaunee Correspondence - Dispositioning Flawed Document, Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML13149A0412013-05-28028 May 2013 NRR E-mail Capture - MF1771 - Kewaunee LAR 255 Deletion of Licensing Condition 2.C.(15) - LIC-109 Acceptance Review Results ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13133A0862013-05-10010 May 2013 NRR E-mail Capture - FW: MF1438 KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events 2024-01-26
[Table view] |
Text
NRR-PMDAPEm Resource From: Huffman, William Sent: Monday, April 07, 2014 7:44 AM To: Bowman, Eric; Casto, Greg; Jones, Steve; Purdy, Gary; Cervera, Margaret; Anderson, Joseph; Norris, Michael; Wasem, Michael; Gratton, Christopher; Kim, James Cc: Wastler, Sandra; Broaddus, Doug
Subject:
Summarry of Kewaunee Mitigation Strategy Phone Call Last Week Please take a look at the conference call summary for last weeks Mitigation Strategy License Condition at Kewaunee.
Any corrections, improvements or requests for clarifications would be appreciated.
Bill Huffman Project Manager NRR/DORL/LPL4-2 U.S. Nuclear Regulatory Commission (301) 415-2046 Date: 04/02/2014 Time: 1000 EDT
Participants:
NRC DEK Eric Bowman - Mitigating Strategies, NRR Jack Gadzala - Decommissioning Licensing Greg Casto - BC, Plant Systems, NRR Rick Repshas - Licensing Steve Jones - Plant Systems (SFP), NRR Ethan Treptow - EP Gary Purdy - Material Securities, NSIR David Lohman - Engineering Projects Margaret Cervera - Material Securities, NSIR Brian Koehler - Engineering (FP)
Joe Anderson - Branch Chief, EP NSIR Michael Sortwell - Decommissioning Mike Norris - EP, NSIR Tim Olson - Assistant Plant Manager Mike Wasem - EP, NSIR Jeff Stafford - Director Safety Licensing Chris Gratton - NRR PM, Crystal River Craig Sly - Corp Licensing Jim Kim - NRR PM, Vermont Yankee Margaret Earle - Corp Licensing (Security)
Bill Huffman - NRR PM, KPS Topic: Mitigating Strategy License Condition Conference Call
References:
- 1. License Amendment (and safety evaluation), License Condition 2.C.(10), dated August 2, 2007
- 2. Permanently Defuel Tech Specs, dated May 29, 2013
- 3. NRC RAI dated April 1, 2014 Main Points of Discussion:
The NRC staff requested additional information (RAI) from Kewaunee Power Station (KPS) from the NRC regarding a proposal in its Permanently Defuel Tech Specs amendment request to delete License Condition 2.C.(10), Mitigating Strategy License Condition. The RAI requested additional justification for removing each of 1
the 14 elements in License Condition 2.C.(10); or maintaining the elements in effect. This conference call served to clarify that RAI and provide NRC staff with general information about mitigating strategies at KPS.
The NRC staff discussed its basis for issuing the RAI and provided further background on the statements contained within the RAI. The staffs primary point was that measures needed to maintain public health and safety and common defense and security specifically related to Mitigation Strategies should remain in place while fuel remained in the spent fuel pool (SFP).
Dominion Energy Kewaunee (DEK) staff discussed an alternative approach to the RAI (i.e., maintaining the elements of License Condition 2.C.(10) in effect). DEK premised this discussion on the ability to make changes to the underlying implementing details of License Condition 2.C.(10), as described in the NRC safety evaluation (SE) that issued this license condition. DEK noted that the required strategies for all phases would be covered by the license condition and all implementing details would be managed by NEI 99-04 [commitment management process].
DEK noted that the 34 measures that underlie the 14 elements of the license condition could be changed using the NEI 99-04 commitment management process. As such, this process could be used to eliminate those measures that are no longer needed to reflect the permanently defueled status of the facility (e.g., measures to provide alternative water for core cooling, containment isolation, starting AFW without DC power, etc.).
DEK also discussed a potential change to the introductory sentence for License Condition 2.C.(10) to clarify its applicability as being to the period when spent fuel assemblies are stored in the spent fuel pool; and that its current focus being the threat to the spent fuel pool.
The NRC staff did not note any objections to DEKs proposal. A point was made by the staff that any change to the license condition (other than a complete retraction of the originally proposed change) would necessitate a safety evaluation of that change. Additionally, the staff expressed interest in being kept abreast in a timely manner of commitment changes associated with this license condition. The staff also indicated their desire for DEK to coordinate proposed changes in this area with other decommissioning facilities.
A follow up discussion involved information regarding response capability and strategies for loss of spent fuel pool inventory that was described in the various submittals provided to NRC. This discussion included DEKs description of an external makeup strategy (using the diesel driven portable pump) that had been demonstrated to be capable of being deployed within two hours; and how this strategy related to other response strategies that discussed different time frames.
Actions:
DEK:
- 1) Supplement the Permanently Defuel Tech Specs, dated May 29, 2013, as discussed above.
- 2) Decide whether to change the introductory sentence in the license condition.
- 3) Coordinate the change with other decommissioning facilities.
2
Hearing Identifier: NRR_PMDA Email Number: 1334 Mail Envelope Properties (William.Huffman@nrc.gov20140407074400)
Subject:
Summarry of Kewaunee Mitigation Strategy Phone Call Last Week Sent Date: 4/7/2014 7:44:29 AM Received Date: 4/7/2014 7:44:00 AM From: Huffman, William Created By: William.Huffman@nrc.gov Recipients:
"Wastler, Sandra" <Sandra.Wastler@nrc.gov>
Tracking Status: None "Broaddus, Doug" <Doug.Broaddus@nrc.gov>
Tracking Status: None "Bowman, Eric" <Eric.Bowman@nrc.gov>
Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov>
Tracking Status: None "Jones, Steve" <Steve.Jones@nrc.gov>
Tracking Status: None "Purdy, Gary" <Gary.Purdy@nrc.gov>
Tracking Status: None "Cervera, Margaret" <Margaret.Cervera@nrc.gov>
Tracking Status: None "Anderson, Joseph" <Joseph.Anderson@nrc.gov>
Tracking Status: None "Norris, Michael" <Michael.Norris@nrc.gov>
Tracking Status: None "Wasem, Michael" <Michael.Wasem@nrc.gov>
Tracking Status: None "Gratton, Christopher" <Christopher.Gratton@nrc.gov>
Tracking Status: None "Kim, James" <James.Kim@nrc.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 5519 4/7/2014 7:44:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: