ML13275A077
| ML13275A077 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 10/01/2013 |
| From: | Feintuch K Division of Operating Reactor Licensing |
| To: | Gadzala J Dominion Energy Kewaunee |
| References | |
| MF2743 | |
| Download: ML13275A077 (3) | |
Text
1 NRR-PMDAPEm Resource From:
Feintuch, Karl Sent:
Tuesday, October 01, 2013 6:01 PM To:
Jack Gadzala (jack.gadzala@dom.com)
Cc:
Keefe, Molly
Subject:
MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information Attachments:
MF2743-RAII-AHPB-Keefe-001-2013-10-01.docx DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING KEWAUNEE POWER STATIONS REQUEST FOR EXEMPTION FROM 10 CFR 50.54(m)
By letter dated August 30, 2013, (NRC ADAMS Accession number: ML13254A153), Dominion Energy Kewaunee, Inc. (DEK), the licensee for Kewaunee submitted a request for exemption to eliminate the requirement that on-site shifts be staffed with operators licensed under 10 CFR 55 and allow on-site shifts to be staffed with certified fuel handlers and non-licensed operators. The Health Physics and Human Performance Branch (AHPB) is responsible for the review of the exemption. AHPB finds that further information is needed to complete the staffs review. The licensees responses to the following question will allow the staff to complete its review in a timely manner.
MF2743-RAII-AHPB-Keefe-001-2013-10-01
RAI-1
Regulatory Basis 10 CFR 50.12(b)(4) states that the commission will grant an exemption considering The effect of delay in conducting such activities on the public interest, including the power needs to be used by the proposed facility, the availability of alternative sources, if any, to meet those needs on a timely basis and delay costs to the applicant and to consumers. However, in the exemption submittal dated August 30, 2013, this issue of consistency with public interest is not addressed.
RAI Item While recognizing that Kewaunee Power Station is no longer a source of energy for satisfying power needs in the public interest or a significant consumer of electrical power, please address how you perceive the exemption to be in the public interest.
Hearing Identifier:
NRR_PMDA Email Number:
861 Mail Envelope Properties (Karl.Feintuch@nrc.gov20131001180100)
Subject:
MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information Sent Date:
10/1/2013 6:01:05 PM Received Date:
10/1/2013 6:01:00 PM From:
Feintuch, Karl Created By:
Karl.Feintuch@nrc.gov Recipients:
"Keefe, Molly" <Molly.Keefe@nrc.gov>
Tracking Status: None "Jack Gadzala (jack.gadzala@dom.com)" <jack.gadzala@dom.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1683 10/1/2013 6:01:00 PM MF2743-RAII-AHPB-Keefe-001-2013-10-01.docx 20170 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING KEWAUNEE POWER STATIONS REQUEST FOR EXEMPTION FROM 10 CFR 50.54(m)
By letter dated August 30, 2013, (NRC ADAMS Accession number: ML13254A153), Dominion Energy Kewaunee, Inc. (DEK), the licensee for Kewaunee submitted a request for exemption to eliminate the requirement that on-site shifts be staffed with operators licensed under 10 CFR 55 and allow on-site shifts to be staffed with certified fuel handlers and non-licensed operators.
The Health Physics and Human Performance Branch (AHPB) is responsible for the review of the exemption. AHPB finds that further information is needed to complete the staffs review.
The licensees responses to the following questions will allow the staff to complete its review in a timely manner.
MF2743-RAII-AHPB-Keefe-001-2013-10-01
RAI-1
Regulatory Basis 10 CFR 50.12(b)(4) states that the commission will grant an exemption considering The effect of delay in conducting such activities on the public interest, including the power needs to be used by the proposed facility, the availability of alternative sources, if any, to meet those needs on a timely basis and delay costs to the applicant and to consumers. However, in the exemption submittal dated August 30, 2013, this issue of consistency with public interest is not addressed.
RAI Item While recognizing that Kewaunee Power Station is no longer a source of energy for satisfying power needs in the public interest or a significant consumer of electrical power, please address how you perceive the exemption to be in the public interest.