ML12346A247

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - MD7112 - November 27, 2012 Kewaunee Public Meeting - Presentation Notes (for Meeting Summary)
ML12346A247
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/11/2012
From: Feintuch K
Division of Operating Reactor Licensing
To: Feintuch K
Division of Operating Reactor Licensing
References
TAC MD7112
Download: ML12346A247 (11)


Text

1 NRR-PMDAPEm Resource From:

Feintuch, Karl Sent:

Tuesday, December 11, 2012 10:55 AM To:

Feintuch, Karl

Subject:

MD7112 - November 27, 2012 Kewaunee Public Meeting - Presentation Notes (for Meeting Summary)

Attachments:

KPS Cessation of Power Operations_ final.pptx

Subject:

MD7112 - November 27, 2012 Kewaunee Public Meeting - Presentation Notes Attached is PowerPoint by Dominion Energy Kewaunee at Public Meeting on November 27, 2012, as documented in the meeting summary.

Hearing Identifier:

NRR_PMDA Email Number:

554 Mail Envelope Properties (26E42474DB238C408C94990815A02F09A16927E933)

Subject:

MD7112 - November 27, 2012 Kewaunee Public Meeting - Presentation Notes (for Meeting Summary)

Sent Date:

12/11/2012 10:54:51 AM Received Date:

12/11/2012 10:54:56 AM From:

Feintuch, Karl Created By:

Karl.Feintuch@nrc.gov Recipients:

"Feintuch, Karl" <Karl.Feintuch@nrc.gov>

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 226 12/11/2012 10:54:56 AM KPS Cessation of Power Operations_ final.pptx 84538 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

DEK Considerations in Response to O d EA 12 049 d 051 Orders EA-12-049 and 051 NRC Public Meeting November 27, 2012 Kewaunee Power Station (KPS)

Kewaunee Power Station (KPS)

Dominion Energy Kewaunee, Inc.

(DEK)

(DEK)

Purpose

  • Kewaunee transition to permanent shutdown announced
  • Explore options to ensure compliance with orders if orders, if

- Full power on February 28 submittal date Defueled in advance of December 2016

- Defueled in advance of December 2016

  • Receive feedback from NRC 2

Major Milestones Milestone Date Submit Overall Integrated Plan Feb 2013 Shutdown and Defueled Expected 2Q 2013 First Six-month Update Aug 2013 First Six month Update Aug 2013 Order Compliance Dec 2016 3

Activities For Permanent Shutdown

  • DEK notified NRC on 11/2/12 of decision to permanently cease operation p

y p

  • Pending transmission operator review, shutdown expected in 2Q 2013 shutdown expected in 2Q 2013 4

Long Term Fuel Strategy

  • Fuel must remain in the spent fuel pool (SFP) for about eight years

(

)

g y

  • Logical progression to dry cask storage 5

Major Impact

  • SFP cooling only function relevant in orders

- At 12/31/16, TTB about 187 hours0.00216 days <br />0.0519 hours <br />3.091931e-4 weeks <br />7.11535e-5 months <br /> 6

Order EA-12-049 Mitigation Strategies Order EA-12-049 Mitigation Strategies for BDB External Events

  • Applicable strategies when plant ceases operation

- Functions of containment cooling and core cooling are not required after defueling S

f l

l li b

i i

d

- Spent fuel pool cooling must be maintained while heat load decays until dry storage

  • Decay heat load approaches steady state Decay heat load approaches steady state
  • Commercially available, portable equipment is adequate as backup 7

Order EA-12-051 Reliable Spent Order EA 12 051 Reliable Spent Fuel Pool Instrumentation

  • Currently use narrow range with local indication and control room alarm
  • Periodic verification of level preformed using existing instrumentation g
  • Response required for the applicable external event is long term g

- Many days available for response with onsite staff

- Level constant for about 187 hrs (7.8 days) 8

(

y )

Overall Integrated Plan

  • DEK will submit overall integrated plan on Feb 28, 2013 for both Orders
  • Proposed approach:

- Alternative approach to NEI 12-06 and 12-02

- High level plan appropriate for an operating unit; and

- A detailed plan reflecting a permanently defueled unit with implementation in December 2016 9

2016.