NRR E-mail Capture - FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) Training - (Corrected) Request for Additional Information (RAI)
ML13275A062
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 09/27/2013
From: Feintuch K
Division of Operating Reactor Licensing
To: Gadzala J, Sly C
Dominion Energy Kewaunee
References
MF2370
Download: ML13275A062 (6)


Text

NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Friday, September 27, 2013 7:09 PM To: Jack Gadzala; Craig D Sly (Generation - 6 Cc: Keefe, Molly; Shoop, Undine

Subject:

FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) training - [Corrected]

Request for Additional Information (RAI)

Attachments: MF2370-RAII-AHPB-Keefe-001 to 003 24Sep2013 [corrected].docx This is a corrected version of the document issued by email message dated September 25, 2013 12:31 PM. The corrections are indicated by the use of brackets [ ]. The corrections remove wording from a related action (TAC No.

MF1952) and apply wording pertaining to MF2370. However, responses to the MF2370 RAI items should be consistent with information in the related MF1952. The attachment is also a corrected copy.

This correction was pointed out to you soon after discovery. Please response or request clarification on the original planned schedule below.

From: Feintuch, Karl Sent: Wednesday, September 25, 2013 12:31 PM To: Jack Gadzala (jack.gadzala@dom.com); Craig D Sly (Generation - 6) (craig.d.sly@dom.com)

Cc: Keefe, Molly; Shoop, Undine

Subject:

MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) training - Request for Additional Information (RAI)

Please review the attached request for additional information and request clarification as needed. Reviewer Keefe is out of the office until September 30, 2013, and would be available for a clarification call during that week.

Karl Feintuch USNRC 301-415-3079 DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING KEWAUNEE POWER STATIONS [REQUEST FOR APPROVAL OF SHIFT MANAGER / CERTIFIED FUEL HANDLER TRAINING PROGRAM]

(TAC NO. [MF2370])

By letter dated [June 17, 2013], (NRC ADAMS Accession number: [ML13176A117]), Dominion Energy Kewaunee, Inc. (DEK), the licensee for Kewaunee submitted a [request for approval of the Kewaunee Power Station (KPS Shift Manager / Certified Fuel Handler Training Program (the Training Program)]. The Health Physics and Human Performance Branch (AHPB) is responsible for the review of [the Training Program].

AHPB finds that further information is needed to complete the staffs review. The licensees responses to the following questions will allow the staff to complete its review in a timely manner.

Regulatory Basis 10 CFR 50.120 requires that training for non-licensed operators be based on the systems approach to training (SAT) as defined in 10 CFR 55.4. 10 CFR 50.120(c)(3) provides details on the content of SAT-based training. NUREG-1220 Revision 1 provides direction to NRC personnel and guidance to others for reviewing training programs at nuclear power plants to verify compliance with the requirements of 10 CFR 50.120 and 10 CFR 55 as applicable.

1

MF2370-RAII-AHPB-Keefe-001-[2013-09-25]

RAI-1

Please describe the version control process(es) by which modifications to the training program, if any, are implemented for personnel who had completed their CFH qualification activities prior to when the modifications were or would be made. Of particular interest would be changes that might occur as a result of the NRC staff review of the CFH Training Program under TAC MF2370.

MF2370-RAII-AHPB-Keefe-002-[2013-09-25]

RAI-2

Section 6.7.2 of the Certified Fuel Handler Training Program describes exemptions for Initial and Continuing Training requirements and specifies that the Operations Manager can be the manager who decides these exemptions. NUREG-1625, Proposed Standard Technical Specifications for Permanently Defueled Westinghouse Plants, a draft NUREG dated March, 1998, which is based on approved Trojan defueled technical specifications, specifies that this responsibility is assigned to the position of the Plant Superintendent and intended for the management level having overall responsibility for the facility.

a. Does the Kewaunee Operations Manager have the overall responsibility for the facility?
b. Please describe the management organizational structure at the Kewaunee facility.

MF2370-RAII-AHPB-Keefe-003-[2013-09-25]

RAI-3

Has the licensee developed a program evaluation element, consistent with 10 CFR 55.4, Systems approach to training, (5), Evaluation and revision of the training ,in its proposed training program to assure continuing effective training over the long term? If so, please describe the program. If not, please identify why this is acceptable.

MF2370-RAII-AHPB-Keefe-004-[2013-09-25]

RAI-4

Please indicate whether the training program discussed in ADAMS Accession No. ML13176A117 (Dominion Letter 13-278) dated June 17, 2013, adheres to the guidelines of NUREG-1220, Training Review Criteria and Procedures. If there are deviations from the guidance of NUREG-1220, please describe how the training program complies with the requirements for SAT-based training.

2

3 Hearing Identifier: NRR_PMDA Email Number: 859 Mail Envelope Properties (Karl.Feintuch@nrc.gov20130927190800)

Subject:

FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) training -

[Corrected] Request for Additional Information (RAI)

Sent Date: 9/27/2013 7:08:36 PM Received Date: 9/27/2013 7:08:00 PM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:

"Keefe, Molly" <Molly.Keefe@nrc.gov>

Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov>

Tracking Status: None "Jack Gadzala" <jack.gadzala@dom.com>

Tracking Status: None "Craig D Sly (Generation - 6" <craig.d.sly@dom.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 4628 9/27/2013 7:08:00 PM MF2370-RAII-AHPB-Keefe-001 to 003 24Sep2013 [corrected].docx 22805 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING KEWAUNEE POWER STATIONS [REQUEST FOR APPROVAL OF SHIFT MANAGER /

CERTIFIED FUEL HANDLER TRAINING PROGRAM]

(TAC NO. [MF2370])

By letter dated [June 17, 2013], (NRC ADAMS Accession number: [ML13176A117]), Dominion Energy Kewaunee, Inc. (DEK), the licensee for Kewaunee submitted a [request for approval of the Kewaunee Power Station (KPS Shift Manager / Certified Fuel Handler Training Program (the Training Program)]. The Health Physics and Human Performance Branch (AHPB) is responsible for the review of [the Training Program]. AHPB finds that further information is needed to complete the staffs review. The licensees responses to the following questions will allow the staff to complete its review in a timely manner.

Regulatory Basis 10 CFR 50.120 requires that training for non-licensed operators be based on the systems approach to training (SAT) as defined in 10 CFR 55.4. 10 CFR 50.120(c)(3) provides details on the content of SAT-based training. NUREG-1220 Revision 1 provides direction to NRC personnel and guidance to others for reviewing training programs at nuclear power plants to verify compliance with the requirements of 10 CFR 50.120 and 10 CFR 55 as applicable.

MF2370-RAII-AHPB-Keefe-001-[2013-09-25]

RAI-1

Please describe the version control process(es) by which modifications to the training program, if any, are implemented for personnel who had completed their CFH qualification activities prior to when the modifications were or would be made. Of particular interest would be changes that might occur as a result of the NRC staff review of the CFH Training Program under TAC MF2370.

MF2370-RAII-AHPB-Keefe-002-[2013-09-25]

RAI-2

Section 6.7.2 of the Certified Fuel Handler Training Program describes exemptions for Initial and Continuing Training requirements and specifies that the Operations Manager can be the manager who decides these exemptions. NUREG-1625, Proposed Standard Technical Specifications for Permanently Defueled Westinghouse Plants, a draft NUREG dated March, 1998, which is based on approved Trojan defueled technical specifications, specifies that this responsibility is assigned to the position of the Plant Superintendent and intended for the management level having overall responsibility for the facility.

a. Does the Kewaunee Operations Manager have the overall responsibility for the facility?
b. Please describe the management organizational structure at the Kewaunee facility.

MF2370-RAII-AHPB-Keefe-003-[2013-09-25]

RAI-3

Has the licensee developed a program evaluation element, consistent with 10 CFR 55.4, Systems approach to training, (5), Evaluation and revision of the training ,in its proposed training program to assure continuing effective training over the long term? If so, please describe the program. If not, please identify why this is acceptable.

MF2370-RAII-AHPB-Keefe-004-[2013-09-25]

RAI-4

Please indicate whether the training program discussed in ADAMS Accession No. ML13176A117 (Dominion Letter 13-278) dated June 17, 2013, adheres to the guidelines of NUREG-1220, Training Review Criteria and Procedures. If there are deviations from the guidance of NUREG-1220, please describe how the training program complies with the requirements for SAT-based training.

.