==Dear Mr. Heflin:==
==Dear Mr. Heflin:==
By letter dated May 2, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13123A095), as supplemented by letter dated May 6,2013 (ADAMS Accession No. ML 13126A304), Union Electric Company (the licensee), submitted "Proposed Alternative to ASME [American Society of Mechanical Engineers] Section XI Requirements for Leakage Testing of Reactor Pressure Vessel Head Flange Leakoff Lines (Relief Request 13R-14}," for Nuclear Regulatory Commission (NRC) review and approval. The NRC staff provided verbal authorization on May 6, 2013, for the proposed alternative described in request 13R-14 for the remainder of the third 10-year inservice inspection interval, which is scheduled to end on December 18, 2014 (ADAMS Accession No. ML 13126A320). The staff has reviewed the information provided in your application and determined that additional information is required in order to complete its formal review.
By letter dated May 2, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13123A095), as supplemented by letter dated May 6,2013 (ADAMS Accession No. ML 13126A304), Union Electric Company (the licensee), submitted "Proposed Alternative to ASME [American Society of Mechanical Engineers]
A. Heflin -2 Please provide a response to the enclosed questions by July 10, 2013. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via mail at Fred.Lyon@nrc.gov. Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483  
Section XI Requirements for Leakage Testing of Reactor Pressure Vessel Head Flange Leakoff Lines (Relief Request 13R-14}," for Nuclear Regulatory Commission (NRC) review and approval.
The NRC staff provided verbal authorization on May 6, 2013, for the proposed alternative described in request 13R-14 for the remainder of the third 10-year inservice inspection interval, which is scheduled to end on December 18, 2014 (ADAMS Accession No. ML 13126A320).
The staff has reviewed the information provided in your application and determined that additional information is required in order to complete its formal review.
A. Heflin -2 Please provide a response to the enclosed questions by July 10, 2013. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via mail at Fred.Lyon@nrc.gov.
Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483  


==Enclosure:==
==Enclosure:==
As stated cc w/encl: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST 13R-14 UNION ELECTRIC COMPANY CALLAWAY PLANT. UNIT 1 DOCKET NO. 50-483 By letter dated May 2, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13123A095), as supplemented by letter dated May 6, 2013 (ADAMS Accession No. ML13126A304), Union Electric Company (dba Ameren Missouri, the licensee) submitted "Proposed Alternative to ASME Section XI Requirements for Leakage Testing of Reactor Pressure Vessel Head Flange Leakoff Lines (Relief Request 13R-14)," for Nuclear Regulatory Commission (NRC) review and approval. In lieu of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, paragraph IWC-5221, requirement to pressurize the subject leakoff lines to normal operating pressure prior to performing a VT-2 visual examination, the licensee proposes to use the pressure developed when the refueling cavity is filled to the normal refueling water level. In order to complete its review, the NRC staff requests the following additional information. Please describe any incidents of significant reactor pressure vessel flange O-ring leakage at Callaway Plant. When there is leakage past the inner O-ring and the valve on the inner O-ring leakage line is closed, the line between the flange and the closed valve may be pressurized to the reactor operating pressure, 2235 pounds per square inch gauge. Please describe any plans for performing a VT-2 visual examination on the inner O-ring line while it is pressurized to reactor operating pressure. Please provide the length of the line that can be visually inspected. Please describe how much of the inspected length is insulated. Please provide the hold time after the line is pressurized before a VT-2 visual examination is performed. Please describe any hardship associated with performing the examination (i.e., temperature, radiological dose, etc.). What would be the expected radiation field in the area being inspected during the time that the pressurized line could be examined? Please clarify the time needed to perform the VT-2 visual examination. Enclosure A. Heflin -Please provide a response to the enclosed questions by July 10, 2013. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via mail at Fred.Lyon@nrc.gov. Docket No. 50-483  
 
As stated cc w/encl: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST 13R-14 UNION ELECTRIC COMPANY CALLAWAY PLANT. UNIT 1 DOCKET NO. 50-483 By letter dated May 2, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13123A095), as supplemented by letter dated May 6, 2013 (ADAMS Accession No. ML 13126A304), Union Electric Company (dba Ameren Missouri, the licensee) submitted "Proposed Alternative to ASME Section XI Requirements for Leakage Testing of Reactor Pressure Vessel Head Flange Leakoff Lines (Relief Request 13R-14)," for Nuclear Regulatory Commission (NRC) review and approval.
In lieu of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code), Section XI, paragraph IWC-5221, requirement to pressurize the subject leakoff lines to normal operating pressure prior to performing a VT-2 visual examination, the licensee proposes to use the pressure developed when the refueling cavity is filled to the normal refueling water level. In order to complete its review, the NRC staff requests the following additional information. Please describe any incidents of significant reactor pressure vessel flange O-ring leakage at Callaway Plant. When there is leakage past the inner O-ring and the valve on the inner O-ring leakage line is closed, the line between the flange and the closed valve may be pressurized to the reactor operating pressure, 2235 pounds per square inch gauge. Please describe any plans for performing a VT-2 visual examination on the inner O-ring line while it is pressurized to reactor operating pressure. Please provide the length of the line that can be visually inspected. Please describe how much of the inspected length is insulated. Please provide the hold time after the line is pressurized before a VT-2 visual examination is performed. Please describe any hardship associated with performing the examination (i.e., temperature, radiological dose, etc.). What would be the expected radiation field in the area being inspected during the time that the pressurized line could be examined?
Please clarify the time needed to perform the VT-2 visual examination.
Enclosure A. Heflin -Please provide a response to the enclosed questions by July 10, 2013. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via mail at Fred.Lyon@nrc.gov.
Docket No. 50-483  


==Enclosure:==
==Enclosure:==
As stated cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPLIV Reading RidsAcrsAcnw _MaiICTR Resource RidsNrrDorlLpl4 Resource RidsNrrDeEpnb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMCallaway Resource RidsRgn4MailCenter Resource JTsao, NRRlDE/EPNB JWaliace, NRR/DE/EPNB ADAMS Accession No.: ML13136A059 Sincerely, IRA! Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation *email dated OFFICE NRRlDORLlLPL4/PM NRRlDORLlLPL4/LA NRRlDE/EPNB/BC NRRlDORULPL4/BC NRRlDORULPL4/PM NAME FLyon JBurkhardt* TLupold (JTsao for)
 
* MMarkley FLyon DATE 5/17113 5/16/13 5/13/13 5/17/13 5/17113 OFFICIAL RECORD COpy
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
}}
PUBLIC LPLIV Reading RidsAcrsAcnw
_MaiICTR Resource RidsNrrDorlLpl4 Resource RidsNrrDeEpnb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMCallaway Resource RidsRgn4MailCenter Resource JTsao, NRRlDE/EPNB JWaliace, NRR/DE/EPNB ADAMS Accession No.: ML13136A059 Sincerely, IRA! Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
*email dated OFFICE NRRlDORLlLPL4/PM NRRlDORLlLPL4/LA NRRlDE/EPNB/BC NRRlDORULPL4/BC NRRlDORULPL4/PM NAME FLyon JBurkhardt*
TLupold (JTsao for)
* MMarkley FLyon DATE 5/17113 5/16/13 5/13/13 5/17/13 5/17113 OFFICIAL RECORD COpy}}

Revision as of 11:12, 17 July 2018

Callaway Plant, Unit 1 - Request for Additional Information, Relief Request I3R-14, Proposed Alternative to ASME Code Requirements for Leakage Testing of RPV Head Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC No. MF
ML13136A059
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/17/2013
From: Lyon C F
Plant Licensing Branch IV
To: Heflin A C
Union Electric Co
Lyon C F
References
TAC MF1745
Download: ML13136A059 (4)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 May 17,2013 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251 CALLAWAY PLANT, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION RE: 13R-14, PROPOSED ALTERNATIVE TO ASME CODE, SECTION XI REQUIREMENTS FOR LEAKAGE TESTING OF REACTOR PRESSURE VESSEL HEAD FLANGE LEAKOFF LINES (TAC NO. MF1745)

Dear Mr. Heflin:

By letter dated May 2, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13123A095), as supplemented by letter dated May 6,2013 (ADAMS Accession No. ML 13126A304), Union Electric Company (the licensee), submitted "Proposed Alternative to ASME [American Society of Mechanical Engineers]

Section XI Requirements for Leakage Testing of Reactor Pressure Vessel Head Flange Leakoff Lines (Relief Request 13R-14}," for Nuclear Regulatory Commission (NRC) review and approval.

The NRC staff provided verbal authorization on May 6, 2013, for the proposed alternative described in request 13R-14 for the remainder of the third 10-year inservice inspection interval, which is scheduled to end on December 18, 2014 (ADAMS Accession No. ML 13126A320).

The staff has reviewed the information provided in your application and determined that additional information is required in order to complete its formal review.

A. Heflin -2 Please provide a response to the enclosed questions by July 10, 2013. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via mail at Fred.Lyon@nrc.gov.

Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosure:

As stated cc w/encl: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST 13R-14 UNION ELECTRIC COMPANY CALLAWAY PLANT. UNIT 1 DOCKET NO. 50-483 By letter dated May 2, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13123A095), as supplemented by letter dated May 6, 2013 (ADAMS Accession No. ML 13126A304), Union Electric Company (dba Ameren Missouri, the licensee) submitted "Proposed Alternative to ASME Section XI Requirements for Leakage Testing of Reactor Pressure Vessel Head Flange Leakoff Lines (Relief Request 13R-14)," for Nuclear Regulatory Commission (NRC) review and approval.

In lieu of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, paragraph IWC-5221, requirement to pressurize the subject leakoff lines to normal operating pressure prior to performing a VT-2 visual examination, the licensee proposes to use the pressure developed when the refueling cavity is filled to the normal refueling water level. In order to complete its review, the NRC staff requests the following additional information. Please describe any incidents of significant reactor pressure vessel flange O-ring leakage at Callaway Plant. When there is leakage past the inner O-ring and the valve on the inner O-ring leakage line is closed, the line between the flange and the closed valve may be pressurized to the reactor operating pressure, 2235 pounds per square inch gauge. Please describe any plans for performing a VT-2 visual examination on the inner O-ring line while it is pressurized to reactor operating pressure. Please provide the length of the line that can be visually inspected. Please describe how much of the inspected length is insulated. Please provide the hold time after the line is pressurized before a VT-2 visual examination is performed. Please describe any hardship associated with performing the examination (i.e., temperature, radiological dose, etc.). What would be the expected radiation field in the area being inspected during the time that the pressurized line could be examined?

Please clarify the time needed to perform the VT-2 visual examination.

Enclosure A. Heflin -Please provide a response to the enclosed questions by July 10, 2013. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via mail at Fred.Lyon@nrc.gov.

Docket No. 50-483

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPLIV Reading RidsAcrsAcnw

_MaiICTR Resource RidsNrrDorlLpl4 Resource RidsNrrDeEpnb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMCallaway Resource RidsRgn4MailCenter Resource JTsao, NRRlDE/EPNB JWaliace, NRR/DE/EPNB ADAMS Accession No.: ML13136A059 Sincerely, IRA! Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

  • email dated OFFICE NRRlDORLlLPL4/PM NRRlDORLlLPL4/LA NRRlDE/EPNB/BC NRRlDORULPL4/BC NRRlDORULPL4/PM NAME FLyon JBurkhardt*

TLupold (JTsao for)

  • MMarkley FLyon DATE 5/17113 5/16/13 5/13/13 5/17/13 5/17113 OFFICIAL RECORD COpy