UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 8, 2014 Southern Nuclear Operating Company Joseph M. Farley, Unit 1 and 2 | |||
==SUMMARY== | |||
OF APRIL 23, 2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS GRID DESIGN CRITERIA (TAC NO. MF3716) On Apri123, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | |||
The purpose of the meeting was to discuss the design criteria being proposed by SNC for new grid voltage protective relaying at Edwin Hatch Nuclear Plant and Joseph M. Farley Nuclear plant. The meeting notice and agenda, dated April 9, 2014, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 14099A342. | The purpose of the meeting was to discuss the design criteria being proposed by SNC for new grid voltage protective relaying at Edwin Hatch Nuclear Plant and Joseph M. Farley Nuclear plant. The meeting notice and agenda, dated April 9, 2014, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 14099A342. | ||
A list of attendees is provided in Enclosure | A list of attendees is provided in Enclosure | ||
: 1. The licensee's presentation can be found at ADAMS Accession No. ML 141 08A005. SNC stated that they have initiated the design process for implementing the changes at both plants and presented the proposed design criteria for the new voltage protective relaying. | : 1. The licensee's presentation can be found at ADAMS Accession No. ML 141 08A005. SNC stated that they have initiated the design process for implementing the changes at both plants and presented the proposed design criteria for the new voltage protective relaying. | ||
SNC described the methodology being used to determine the voltage setpoints and time delays. SNC provided a step by step example of how the voltage setpoint analytical limits will be derived. | SNC described the methodology being used to determine the voltage setpoints and time delays. SNC provided a step by step example of how the voltage setpoint analytical limits will be derived. The NRC Staff found the information provided by SNC to be a useful description of the licensee's plans for this future license amendment. | ||
The NRC Staff found the information provided by SNC to be a useful description of the licensee's plans for this future license amendment. | No regulatory decisions or commitments were made during the meeting. Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-348, 50-364, 50-321, 50-366 | ||
No regulatory decisions or commitments were made during the meeting. | |||
Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-348, 50-364, 50-321, 50-366 | |||
==Enclosure:== | ==Enclosure:== | ||
List of Attendees cc w/encl: Distribution via Listserv LIST OF ATTENDEES APRIL 23,2014. | List of Attendees cc w/encl: Distribution via Listserv LIST OF ATTENDEES APRIL 23,2014. MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY GRID DESIGN CRITERIA Nuclear Regulatory Commission Staff Robert Pascarelli, NRRIDORL Robert Martin, NRRIDORL Jake Zimmerman, NRRIDE, Electrical Engineering Branch Roy Mathew, NRRIDE, Electrical Engineering Branch Singh Matharu, NRRIDE, Electrical Engineering Branch Khadijah Hemphill, NRRIDSS, Technical Specifications Branch Matthew Hamm, NRRIDSS, Technical Specifications Branch Licensee Participants Ken McElroy, SNC Licensing Manager Jamie Coleman, SNC Licensing Engineer Bonnie Goodwin -SNC Fleet Design Manager (Eiec/I&C) | ||
MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY GRID DESIGN CRITERIA Nuclear Regulatory Commission Staff Robert Pascarelli, NRRIDORL Robert Martin, NRRIDORL Jake Zimmerman, NRRIDE, Electrical Engineering Branch Roy Mathew, NRRIDE, Electrical Engineering Branch Singh Matharu, NRRIDE, Electrical Engineering Branch Khadijah | |||
Roy Lyon -SNC Fleet Design Engineer (Eiec/I&C) | Roy Lyon -SNC Fleet Design Engineer (Eiec/I&C) | ||
John Minley-SNC Fleet Design Engineer (Eiec/I&C Ashley Williams | John Minley-SNC Fleet Design Engineer (Eiec/I&C Ashley Williams -Farley Site Project Lead Tim Piette -Hatch Site Project Supervisor Enclosure LICENSEE: | ||
-Farley Site Project Lead Tim Piette -Hatch Site Project Supervisor Enclosure LICENSEE: | |||
FACILITY: | FACILITY: | ||
May 8, 2014 Southern Nuclear Operating Company Joseph M. Farley, Unit 1 and 2 | May 8, 2014 Southern Nuclear Operating Company Joseph M. Farley, Unit 1 and 2 | ||
Line 45: | Line 42: | ||
==SUBJECT:== | ==SUBJECT:== | ||
SUMMARY OF APRIL 23,2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS GRID DESIGN CRITERIA (TAC NO. MF3716) On Apri123, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | ==SUMMARY== | ||
OF APRIL 23,2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS GRID DESIGN CRITERIA (TAC NO. MF3716) On Apri123, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | |||
The purpose of the meeting was to discuss the design criteria being proposed by SNC for new grid voltage protective relaying at Edwin Hatch Nuclear Plant and Joseph M. Farley Nuclear plant. The meeting notice and agenda, dated April 9, 2014, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 14099A342. | The purpose of the meeting was to discuss the design criteria being proposed by SNC for new grid voltage protective relaying at Edwin Hatch Nuclear Plant and Joseph M. Farley Nuclear plant. The meeting notice and agenda, dated April 9, 2014, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 14099A342. | ||
A list of attendees is provided in Enclosure | A list of attendees is provided in Enclosure | ||
: 1. The licensee's presentation can be found at ADAMS Accession No. ML 14108A005. | : 1. The licensee's presentation can be found at ADAMS Accession No. ML 14108A005. | ||
SNC stated that they have initiated the design process for implementing the changes at both plants and presented the proposed design criteria for the new voltage protective relaying. | SNC stated that they have initiated the design process for implementing the changes at both plants and presented the proposed design criteria for the new voltage protective relaying. | ||
SNC described the methodology being used to determine the voltage setpoints and time delays. SNC provided a step by step example of how the voltage setpoint analytical limits will be derived. | SNC described the methodology being used to determine the voltage setpoints and time delays. SNC provided a step by step example of how the voltage setpoint analytical limits will be derived. The NRC Staff found the information provided by SNC to be a useful description of the licensee's plans for this future license amendment. | ||
The NRC Staff found the information provided by SNC to be a useful description of the licensee's plans for this future license amendment. | No regulatory decisions or commitments were made during the meeting. IRA/ Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-348, 50-364, 50-321, 50-366 | ||
No regulatory decisions or commitments were made during the meeting. | |||
IRA/ Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-348, 50-364, 50-321, 50-366 | |||
==Enclosure:== | ==Enclosure:== |
Revision as of 16:33, 9 July 2018
ML14122A037 | |
Person / Time | |
---|---|
Site: | Hatch, Farley |
Issue date: | 05/08/2014 |
From: | Williams S A Plant Licensing Branch II |
To: | Southern Nuclear Operating Co |
Williams S | |
References | |
TAC MF3716 | |
Download: ML14122A037 (3) | |
Text
LICENSEE:
FACILITY:
SUBJECT:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 8, 2014 Southern Nuclear Operating Company Joseph M. Farley, Unit 1 and 2
SUMMARY
OF APRIL 23, 2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS GRID DESIGN CRITERIA (TAC NO. MF3716) On Apri123, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was to discuss the design criteria being proposed by SNC for new grid voltage protective relaying at Edwin Hatch Nuclear Plant and Joseph M. Farley Nuclear plant. The meeting notice and agenda, dated April 9, 2014, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 14099A342.
A list of attendees is provided in Enclosure
- 1. The licensee's presentation can be found at ADAMS Accession No. ML 141 08A005. SNC stated that they have initiated the design process for implementing the changes at both plants and presented the proposed design criteria for the new voltage protective relaying.
SNC described the methodology being used to determine the voltage setpoints and time delays. SNC provided a step by step example of how the voltage setpoint analytical limits will be derived. The NRC Staff found the information provided by SNC to be a useful description of the licensee's plans for this future license amendment.
No regulatory decisions or commitments were made during the meeting. Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-348, 50-364, 50-321, 50-366
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv LIST OF ATTENDEES APRIL 23,2014. MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY GRID DESIGN CRITERIA Nuclear Regulatory Commission Staff Robert Pascarelli, NRRIDORL Robert Martin, NRRIDORL Jake Zimmerman, NRRIDE, Electrical Engineering Branch Roy Mathew, NRRIDE, Electrical Engineering Branch Singh Matharu, NRRIDE, Electrical Engineering Branch Khadijah Hemphill, NRRIDSS, Technical Specifications Branch Matthew Hamm, NRRIDSS, Technical Specifications Branch Licensee Participants Ken McElroy, SNC Licensing Manager Jamie Coleman, SNC Licensing Engineer Bonnie Goodwin -SNC Fleet Design Manager (Eiec/I&C)
Roy Lyon -SNC Fleet Design Engineer (Eiec/I&C)
John Minley-SNC Fleet Design Engineer (Eiec/I&C Ashley Williams -Farley Site Project Lead Tim Piette -Hatch Site Project Supervisor Enclosure LICENSEE:
FACILITY:
May 8, 2014 Southern Nuclear Operating Company Joseph M. Farley, Unit 1 and 2
SUBJECT:
SUMMARY
OF APRIL 23,2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS GRID DESIGN CRITERIA (TAC NO. MF3716) On Apri123, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was to discuss the design criteria being proposed by SNC for new grid voltage protective relaying at Edwin Hatch Nuclear Plant and Joseph M. Farley Nuclear plant. The meeting notice and agenda, dated April 9, 2014, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 14099A342.
A list of attendees is provided in Enclosure
- 1. The licensee's presentation can be found at ADAMS Accession No. ML 14108A005.
SNC stated that they have initiated the design process for implementing the changes at both plants and presented the proposed design criteria for the new voltage protective relaying.
SNC described the methodology being used to determine the voltage setpoints and time delays. SNC provided a step by step example of how the voltage setpoint analytical limits will be derived. The NRC Staff found the information provided by SNC to be a useful description of the licensee's plans for this future license amendment.
No regulatory decisions or commitments were made during the meeting. IRA/ Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-348, 50-364, 50-321, 50-366
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-1 R/F RidsNrrDorllp2-1 Resource RidsNrrPMSummer Resource RidsNrrLASFigueroa Resource RidsAcrsAcnw
_MaiiCTR Resource RidsRgn2MaiiCenter Resource RPascarelli, NRR RMartin, NRR ADAMS Accession No. ML14122A037 OFFICE LPL2-1/PM LPL2-1/LA LPL2-1/BC NAME SWilliams SFigueroa RPascarelli DATE 5/7114 5/6/14 5/8/14 OFFICIAL RECORD COPY JZimmerman, NRR RMathew, NRR SMatharu, NRR KHemphill, NRR MHamm, NRR LPL2-1/PM SWilliams 5/8/14