{{#Wiki_filter: | {{#Wiki_filter:1 1 Pilgrim Annual Assessment MeetingNuclear Regulatory Commission -Region IPlymouth, MA March 18, 2015 2 Agenda*Introductions *Reactor Oversight Process | ||
*Results of the supplemental inspection | *Results of the supplemental inspection | ||
*NRC and Entergy will discuss the company's 2014 performance and Entergy's efforts to address improvement initiatives *NRC Closing Remarks*Break | *NRC and Entergy will discuss the company's 2014 performance and Entergy's efforts to address improvement initiatives *NRC Closing Remarks*Break | ||
*Q and A session | *Q and A session 2 Performance Assessment *Pilgrim operated safely in 2014. *Pilgrim was in the degraded cornerstone column of the NRC Action Matrix throughout 2014 and | ||
remains in the degraded cornerstone as of this date-meaning the plant continues to get increased NRC | remains in the degraded cornerstone as of this date-meaning the plant continues to get increased NRC | ||
oversight. | oversight. | ||
3 4 Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas 3 5 Pilgrim 2014 Inspection Activities*Approximately 6500 hours of inspection & | |||
related activities*2 resident inspectors on site*Team and specialist inspections, including:-Dry cask storage operation-Supplemental inspection | related activities*2 resident inspectors on site*Team and specialist inspections, including:-Dry cask storage operation-Supplemental inspection 6 Pilgrim Assessment ResultsJanuary 1 -December 31, 2014-Two White Performance Indicators (PI's)*Unplanned scrams per 7000 critical hours returned to Green in the 1 st quarter of 2014*Unplanned scrams with complications returned to Green in the 3 rd quarter of 2014-Two "parallel" White Findings were assigned to replace the PI's noted above-All other PI's and Findings were Green 4Pilgrim's Performance Indicators 7 Pilgrim's Inspection Findings 8 | ||
5 Action Matrix DEGRADED CORNERSTONE 9 Licensee ResponseRegulatory Response Degraded CornerstoneMultiple Repetitive Degraded CornerstoneUnacceptable PerformanceAll Inputs are Green; Cornerstone Objectives Fully Met 1 or 2 White Inputs (in different cornerstones); | |||
Cornerstone Objectives Fully Met2 White or 1 Yellow Input; Cornerstone Objectives Met w/ Moderate Degradation in Safety PerformanceMultiple Yellow Inputs or 1 Red Input; Cornerstone Objectives Met w/ Significant Degradation in Safety Performance Overall Unacceptable Performance; Plants not permitted to Operate w/in this Column; Unacceptable Margin to Safety | Cornerstone Objectives Fully Met2 White or 1 Yellow Input; Cornerstone Objectives Met w/ Moderate Degradation in Safety PerformanceMultiple Yellow Inputs or 1 Red Input; Cornerstone Objectives Met w/ Significant Degradation in Safety Performance Overall Unacceptable Performance; Plants not permitted to Operate w/in this Column; Unacceptable Margin to Safety*Pending satisfactory completion of Supplemental Inspection IP-95002 Determine if: | ||
*Pending satisfactory completion of Supplemental Inspection IP-95002 Determine if: | |||
*the root and contributing causes of the performance issues were understood; | *the root and contributing causes of the performance issues were understood; | ||
*the extent of condition and extent of cause were understood; and | *the extent of condition and extent of cause were understood; and | ||
Line 37: | Line 36: | ||
of the issues.-Several examples in the root cause evaluations where corrective actions were not completed as intended or were closed prematurely; and-For one of the scrams, inspectors determined that Entergy failed to investig ate a deficient condition sufficiently to ensure they fully understood all of | of the issues.-Several examples in the root cause evaluations where corrective actions were not completed as intended or were closed prematurely; and-For one of the scrams, inspectors determined that Entergy failed to investig ate a deficient condition sufficiently to ensure they fully understood all of | ||
the causes.Unit 2 -95002 Supplemental Inspection -Results 11*These specific deficiencies in execution of corrective actions and causal analysis were indicative of the self-identified corrective act ion plan implementation weakness.-Entergy's actions to improve corrective action implementation have not been effective.*Inspectors determined that Entergy's actions did not provide assurance that Entergy understood the causes and had taken or planned adequate corrective actions to address the safety-significant PI.-Two parallel White PI inspection findings assigned.Unit 2 -95002 Supplemental Inspection -Results 12 7*Pilgrim will remain in the Degraded Cornerstone Column of the Action Matrix until the NRC verifies that Entergy has:-Addressed the specific deficiencies in execution of corrective actions; -Addressed the deficient cause evaluation; and-Taken action to understand why actions intended to address the identified CAP implementation weakness were not effect ive at ensuring the inspection objectives were satisfied.Unit 2 -95002 Supplemental Inspection -Results | the causes.Unit 2 -95002 Supplemental Inspection -Results 11*These specific deficiencies in execution of corrective actions and causal analysis were indicative of the self-identified corrective act ion plan implementation weakness.-Entergy's actions to improve corrective action implementation have not been effective.*Inspectors determined that Entergy's actions did not provide assurance that Entergy understood the causes and had taken or planned adequate corrective actions to address the safety-significant PI.-Two parallel White PI inspection findings assigned.Unit 2 -95002 Supplemental Inspection -Results 12 7*Pilgrim will remain in the Degraded Cornerstone Column of the Action Matrix until the NRC verifies that Entergy has:-Addressed the specific deficiencies in execution of corrective actions; -Addressed the deficient cause evaluation; and-Taken action to understand why actions intended to address the identified CAP implementation weakness were not effect ive at ensuring the inspection objectives were satisfied.Unit 2 -95002 Supplemental Inspection -Results 13 2015 Special Inspection Status*NRC Region I initiated a Special Inspection on February 2 following the partial loss of offsite power and unplanned reactor scram | ||
which occurred during a severe winter storm on January 27.*The inspection is still in progress and should complete within the next week.*The Special Inspection report will be issued and made public near the end of April. | which occurred during a severe winter storm on January 27.*The inspection is still in progress and should complete within the next week.*The Special Inspection report will be issued and made public near the end of April. | ||
14 | 14 8 15Licensee Response and Remarks John Dent Site Vice President Entergy Pilgrim, LLC 16*While Entergy operated Pilgrim in a manner that preserved public health and safety, performance deficiencies were identified that led to the plant being in the degraded cornerstone column of the | ||
action matrix.*The resulting action is increased oversight including a 95002 supplemental | action matrix.*The resulting action is increased oversight including a 95002 supplemental | ||
inspection. | inspection. | ||
Pilgrim 2014Annual Assessment Summary | Pilgrim 2014Annual Assessment Summary 9 17 Contacting the NRC*Public Affairs (Region I office)-(610) 337-5330/5331*Report a safety concern -(800) 695-7403 -Allegation@nrc.gov*General information or questions-www.nrc.gov | ||
-Select "What We Do" for Public Affairs | -Select "What We Do" for Public Affairs 18 Reference Sources*Reactor Oversight Process-http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html*Public Electronic Reading Room-http://www.nrc.gov/reading-rm.html*Public Document Room-800-397-4209 10 19 PilgrimAnnual Assessment Meeting*Short break*NRC to address public questions Pilgrim Annual Assessment Meeting Questions 20}} |
Revision as of 06:42, 9 July 2018
ML15084A053 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 03/18/2015 |
From: | Raymond McKinley NRC/RGN-I/DRP/PB5 |
To: | |
McKinley R R | |
References | |
Download: ML15084A053 (10) | |
Text
1 1 Pilgrim Annual Assessment MeetingNuclear Regulatory Commission -Region IPlymouth, MA March 18, 2015 2 Agenda*Introductions *Reactor Oversight Process
- Results of the supplemental inspection
- NRC and Entergy will discuss the company's 2014 performance and Entergy's efforts to address improvement initiatives *NRC Closing Remarks*Break
- Q and A session 2 Performance Assessment *Pilgrim operated safely in 2014. *Pilgrim was in the degraded cornerstone column of the NRC Action Matrix throughout 2014 and
remains in the degraded cornerstone as of this date-meaning the plant continues to get increased NRC
oversight.
3 4 Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas 3 5 Pilgrim 2014 Inspection Activities*Approximately 6500 hours0.0752 days <br />1.806 hours <br />0.0107 weeks <br />0.00247 months <br /> of inspection &
related activities*2 resident inspectors on site*Team and specialist inspections, including:-Dry cask storage operation-Supplemental inspection 6 Pilgrim Assessment ResultsJanuary 1 -December 31, 2014-Two White Performance Indicators (PI's)*Unplanned scrams per 7000 critical hours returned to Green in the 1 st quarter of 2014*Unplanned scrams with complications returned to Green in the 3 rd quarter of 2014-Two "parallel" White Findings were assigned to replace the PI's noted above-All other PI's and Findings were Green 4Pilgrim's Performance Indicators 7 Pilgrim's Inspection Findings 8
5 Action Matrix DEGRADED CORNERSTONE 9 Licensee ResponseRegulatory Response Degraded CornerstoneMultiple Repetitive Degraded CornerstoneUnacceptable PerformanceAll Inputs are Green; Cornerstone Objectives Fully Met 1 or 2 White Inputs (in different cornerstones);
Cornerstone Objectives Fully Met2 White or 1 Yellow Input; Cornerstone Objectives Met w/ Moderate Degradation in Safety PerformanceMultiple Yellow Inputs or 1 Red Input; Cornerstone Objectives Met w/ Significant Degradation in Safety Performance Overall Unacceptable Performance; Plants not permitted to Operate w/in this Column; Unacceptable Margin to Safety*Pending satisfactory completion of Supplemental Inspection IP-95002 Determine if:
- the root and contributing causes of the performance issues were understood;
- the extent of condition and extent of cause were understood; and
- Entergy's completed or planned corrective actions are sufficient to address th e root and contributing
causes and prevent recurrence.
Inspectors also independently reviewed the extent of condition and extent of cause and performed an independent assessment of the site's safety culture.Pilgrim-95002 Supplemental Inspection -Objectives 10 6*Inspectors identified deficiencies regarding Entergy's execution of corrective actions, as well as understanding of some of the causes
of the issues.-Several examples in the root cause evaluations where corrective actions were not completed as intended or were closed prematurely; and-For one of the scrams, inspectors determined that Entergy failed to investig ate a deficient condition sufficiently to ensure they fully understood all of
the causes.Unit 2 -95002 Supplemental Inspection -Results 11*These specific deficiencies in execution of corrective actions and causal analysis were indicative of the self-identified corrective act ion plan implementation weakness.-Entergy's actions to improve corrective action implementation have not been effective.*Inspectors determined that Entergy's actions did not provide assurance that Entergy understood the causes and had taken or planned adequate corrective actions to address the safety-significant PI.-Two parallel White PI inspection findings assigned.Unit 2 -95002 Supplemental Inspection -Results 12 7*Pilgrim will remain in the Degraded Cornerstone Column of the Action Matrix until the NRC verifies that Entergy has:-Addressed the specific deficiencies in execution of corrective actions; -Addressed the deficient cause evaluation; and-Taken action to understand why actions intended to address the identified CAP implementation weakness were not effect ive at ensuring the inspection objectives were satisfied.Unit 2 -95002 Supplemental Inspection -Results 13 2015 Special Inspection Status*NRC Region I initiated a Special Inspection on February 2 following the partial loss of offsite power and unplanned reactor scram
which occurred during a severe winter storm on January 27.*The inspection is still in progress and should complete within the next week.*The Special Inspection report will be issued and made public near the end of April.
14 8 15Licensee Response and Remarks John Dent Site Vice President Entergy Pilgrim, LLC 16*While Entergy operated Pilgrim in a manner that preserved public health and safety, performance deficiencies were identified that led to the plant being in the degraded cornerstone column of the
action matrix.*The resulting action is increased oversight including a 95002 supplemental
inspection.
Pilgrim 2014Annual Assessment Summary 9 17 Contacting the NRC*Public Affairs (Region I office)-(610) 337-5330/5331*Report a safety concern -(800) 695-7403 -Allegation@nrc.gov*General information or questions-www.nrc.gov
-Select "What We Do" for Public Affairs 18 Reference Sources*Reactor Oversight Process-http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html*Public Electronic Reading Room-http://www.nrc.gov/reading-rm.html*Public Document Room-800-397-4209 10 19 PilgrimAnnual Assessment Meeting*Short break*NRC to address public questions Pilgrim Annual Assessment Meeting Questions 20