ML16257A153: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:1IO--118 lo-289NOTES:1. CONTAINMENT SPRAYED VOLUME
{{#Wiki_filter:1 IO--11 8 lo-2 8 9 NOTES: 1. CONTAINMENT SPRAYED VOLUME
: 2. CONTAINMENT UNSPRAYED VOLUME SHIELD BUILDING 4. NEGATIVE PRESSURE AREA OF THE REACTOR AUXILIARY BUILDING
: 2. CONTAINMENT UNSPRAYED VOLUME SHIELD BUILDING 4. NEGATIVE PRESSURE AREA OF THE REACTOR AUXILIARY BUILDING
: 5. SHIELD BUILDING VENTILATION SYSTEM
: 5. SHIELD BUILDING VENTILATION SYSTEM
: 6. CONTROLLED VENTILATION AREA SYSTEM
: 6. CONTROLLED VENTILATION AREA SYSTEM
: 7. CONTAINMENT SPRAYS 12-6--t-48. AIR EXCHANGE BETWEEN REGIONS 1 AND 2
: 7. CONTAINMENT SPRAYS 12-6--t-4 8. AIR EXCHANGE BETWEEN REGIONS 1 AND 2
: 9. LEAKAGE INTO THE SHIELD BUILDING  
: 9. LEAKAGE INTO THE SHIELD BUILDING  
: 10. LEAKAGE INTO THE NEGATIVE PRESSURE AREA OF THE REACTOR AUXILIARY BUILDING
: 10. LEAKAGE INTO THE NEGATIVE PRESSURE AREA OF THE REACTOR AUXILIARY BUILDING

Revision as of 05:55, 8 July 2018

Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix B, Figure 15B-1
ML16257A153
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A153 (1)


Text

1 IO--11 8 lo-2 8 9 NOTES: 1. CONTAINMENT SPRAYED VOLUME

2. CONTAINMENT UNSPRAYED VOLUME SHIELD BUILDING 4. NEGATIVE PRESSURE AREA OF THE REACTOR AUXILIARY BUILDING
5. SHIELD BUILDING VENTILATION SYSTEM
6. CONTROLLED VENTILATION AREA SYSTEM
7. CONTAINMENT SPRAYS 12-6--t-4 8. AIR EXCHANGE BETWEEN REGIONS 1 AND 2
9. LEAKAGE INTO THE SHIELD BUILDING
10. LEAKAGE INTO THE NEGATIVE PRESSURE AREA OF THE REACTOR AUXILIARY BUILDING
11. BYPASS LEAKAGE12. SHIELD BUILDING VENTILATION SYSTEM RECIRCULATION
13. SHIELD BUILDING VENTILATION SYSTEM RELEASE
14. CONTROLLED VENTILATION AREA SYSTEM RELEASE