ML16257A152

From kanterella
Jump to navigation Jump to search
Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 2, Figures 15.2-1 Through 15.2-65
ML16257A152
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A152 (79)


Text

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Core Power vs. Time Figure 15.2-1

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Core Average Heat Flux vs. Time Figure 15.2-2

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Pressurizer Pressure vs. Time Figure 15.2-3

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Reactor Coolant System Pressure vs. Time Figure 15.2-3a Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Minimum DNBR vs. Time Figure 15.2-4

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Reactor Coolant System Temperatures vs. Time Figure 15.2-5

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Pressurizer Water Volume vs. Time Figure 15.2-6

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Steam Generator Pressure vs. Time Figure 15.2-7

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Total Steam Flowrate per Steam Generator vs. Time Figure 15.2-8

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Feedwater Mass Flowrate per Steam Generator vs. Time Figure 15.2-9

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Feedwater Enthalpy vs. Time Figure 15.2-10

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Secondary Liquid Mass vs. Time Figure 15.2-11

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Primary Safety Valve Flowrate vs. Time Figure 15.2-12

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Condenser Vacuum Steam Generator Safety Valve Flow vs. Time Figure 15.2-13 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figures 15.2-14 through 15.2-25 have been intentionally deleted. (DRN 05-543, R14)

WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)Figures 15.2-25a through 15.2-25j have been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Core Power vs. Time Figure 15.2-26

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Core Average Heat Flux vs. Time Figure 15.2-27

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Reactor Coolant System Pressure vs. Time Figure 15.2-28

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Reactor Coolant System Temperatures vs. Time Figure 15.2-29 Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Pressurizer Water Volume vs. Time Figure 15.2-30

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Steam Generator Pressure vs. Time Figure 15.2-31 Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Secondary Steam Flow Rate vs. Time Figure 15.2-32

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Feedwater Flowrate Per Steam Generator vs. Time Figure 15.2-33

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Feedwater Enthalpy vs. Time Figure 15.2-34 Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Secondary Liquid Mass vs. Time Figure 15.2-35

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Safety Valve Flow Rate Per Steam Generator vs. Time Figure 15.2-36

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow Minimum DNBR vs. Time Figure 15.2-36a

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Core Power vs. Time Figure 15.2-37

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Core Heat Flux vs. Time Figure 15.2-38

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) RCS Pressure vs. Time Figure 15.2-39 Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large)

Minimum DNBR vs. Time Figure 15.2-40

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) RCS Temperature vs. Time Figure 15.2-41

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Pressurizer Water Volume vs. Time Figure 15.2-42

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) SG Pressure vs. Time Figure 15.2-43 Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Steam Flowrate vs. Time Figure 15.2-44

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Feedwater Flow (Intact Side) vs. Time Figure 15.2-45

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Feedwater Enthalpy (Intact Side) vs. Time Figure 15.2-46

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) SG Liquid Mass vs. Time Figure 15.2-47

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Core Flow (Fraction) vs. Time Figure 15.2-48

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Pressurizer Safety Valve Flowrate vs. Time Figure 15.2-49

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Secondary Safety Valve Flowrate vs. Time Figure 15.2-50

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Rupture Discharge Flowrate vs. Time Figure 15.2-51

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) SG Water Level vs. Time Figure 15.2-52

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Rupture Discharge Enthalphy vs. Time Figure 15.2-52a

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large) Reactivity vs. Time Figure 15.2-53

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Large)

Maximum RCS Pressure vs. Break Size Figure 15.2-53a.1

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) RCS Pressure vs. Break Size Figure 15.2-53a.2

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) RCS Pressure vs. Time Figure 15.2-53b Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) SG Pressure vs. Time Figure 15.2-53c

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Pressurizer Water Volume vs. Time Figure 15.2-53d

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Core Power vs. Time Figure 15.2-53e

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Core Heat Flux vs. Time Figure 15.2-53f

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) RCS Temperature vs. Time Figure 15.2-53g

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Core Flow (Fraction) vs. Time Figure 15.2-53h

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Steam Flowrate vs. Time Figure 15.2-53i

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Feedwater Flow (Intact Side) vs. Time Figure 15.2-53j

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Feedwater Enthalpy (Intact Side) vs. Time Figure 15.2-53k

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) SG Liquid Mass vs. Time Figure 15.2-53l

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) SG Water Level vs. Time Figure 15.2-53m

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Pressurizer Safety Valve Flowrate vs. Time Figure 15.2-53n

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Secondary Safety Valve Flowrate vs. Time Figure 15.2-53o

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Reactivity vs. Time Figure 15.2-53p

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Rupture Discharge Flowrate vs. Time Figure 15.2-53q

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small) Rupture Discharge Enthalpy vs. Time Figure 15.2-53r

Revision 307 (07/13)Waterford Steam Electric Station #3 Feedwater System Pipe Break (Small)

Minimum DNBR vs. Time Figure 15.2-53s Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater Flow with an Active Failure in the SBCS Core Power vs. Time Figure 15.2-54 Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater with an Active Failure in the SBCS Core Heat Flux vs. Time Figure 15.2-55

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater with an Active Failure in the SBCS Pressurizer Pressure vs. Time Figure 15.2-56

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater with an Active Failure in the SBCS RCS Temperature vs. Time Figure 15.2-57 Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater with an Active Failure in the SBCS Pressurizer Water Volume vs. Time Figure 15.2-58 Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater with an Active Failure in the SBCS SG Pressure vs. Time Figure 15.2-59

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater with an Active Failure in the SBCS Secondary Steam Flowrate vs. Time Figure 15.2-60

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater with an Active Failure in the SBCS EFW Flowrate per SG vs. Time Figure 15.2-61 Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater with an Active Failure in the SBCS EFW Enthalpy vs. Time Figure 15.2-62

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater with an Active Failure in the SBCS Secondary Liquid Mass vs. Time Figure 15.2-63 WSES-FSAR-UNIT-3 Revision 14 (12/05)(DRN 05-543, R14)

Figure 15.2-64 has been intentionally deleted. (DRN 05-543, R14)

Revision 307 (07/13)Waterford Steam Electric Station #3 Loss of Normal Feedwater with an Active Failure in the SBCS Minimum DNBR vs. Time Figure 15.2-65