ML16256A198

From kanterella
Jump to navigation Jump to search
Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.9, Figures 3.9-1 Through 3.9-20
ML16256A198
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16256A198 (20)


Text

-- DETAIL A DETAIL A: SNUBBER SNUBBER ELEVATION ELEVATIONDETAILBDETAILA UPPER FLANGE tDETAILB LOWER FLANGE LOUISIANAPOWER LIGHT CO.

Waterford Steam Electric Station

.ASHSD FINITE ELEMENT MODEL OF THE CSB SYSTEM I 3.9-l 600 400 200 0-600AXIAL LOCATION IS AT NOZZLE LOCATION. ANGULAR LOCATION IS ADJACENT TO RUPTURED LEG.

CEFLASH -4 84.5 MSEC COMBINATION OF TWO CODES 60 84.5 WATER-HAMMER 0 60 MSEC 200 TIME, MSEC FULL POWER DE OUTLET BREAK RADIAL PRESSURE I I DIFFERENCE ACROSS 400-300 zoo--E.z loo--0-100-200 WATER-HAMMER 0-35MSEC AXIAL LOCATION IS AT NOZZLE LOCATION. ANGULAR LOCATION IS ADJACENT TO RUPTURED LEG NATION OF TWO CODES 35 55 MSEC CEFLASH4 55 400 MSEC-300 L I I II I II 0 100 200 300 TIME, MSEC LOUISIANAPOWER LIGHT CO.

Waterford Steam Electric Station Figure FULL POWER DE INLET BREAK RADIAL PRESSURE DIFFERENCE ACROSS CORE SUPPORT BARREL 3.9-3 DETAIL\UPPER BARREL CORE REGION LOWER BARREL--r DETAIL.DETAILB UPPER FLANGEDETAILA LOWER FLANGE LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station SAMMSOR/DYNASOR FINITE ELEMENT MODEL OF CORE SUPPORT BARREL Figure 3.9-4 FIGURE 3.9-5HAS BEEN INTENTIONALLY DELETED LOUISIANA POWER 8 LIGHT CO.Waterford Steam Statlon 50 N NODE NUMBER UGS FLANGE DOWN RING LINEAR SPRING NONLINEAR SPRING FRICTION ELEMENT REACTOR CEA SHROUDS VESSEL LEDGE CSB UPPER HOLD DOWN 9 SPRINGS 8 CORE SHROUD 7 15 CORE SUPPORT BARREL FUEL 14 5 4 13 3 18 2 COLUMNS CORE SUPPORT 12 LSS LSS CYLINDER CSB LOWER FLANGE 1 51 LOUISIANA POWER & LIGHT CO.

Figure DETAILED VERTICAL INTERNALS MODEL 3.9-6 Waterford Steam Electric Station 25 62 93 UGS CYLINDER &BEAMS 94 61 54 62 56 56 49 050 49 050 051 051 052 052 42 42 043 044 045 108 t36 39 39 47 3 40 106 4 24 23 2 t 5 CSB 6 7 19 t 18 t 17 8 16 15 8 9 14 II I 11 LSS COLUMNS CYLINDER BEAMS CYLINDER 12 , NOZZLE 28 30 PRESSURE 31 32 SNUBBERS LOUISIANAPOWER LIGHT CO.

Waterford Steam Electric Station DETAILED HORIZONTAL INTERNALS MODE Figure 3.9-7 Y X-DIR IS TO OUTLET NOZZLES LJGS 32 16 LATERAL DIRECTION 29 ONLY 28 26 FUEL 24 2 10 6 9 CORE SHROUD 5 14 LEGEND: A AXIAL GAP HORIZONTAL GAP PRELOADED COUPLING II GAP COUPLING CSB RV 36 LOUISIANAPOWER LIGHT CO.

Waterford Steam Electric Station REDUCED INTERNALS MODEL Figure 3.9-8

Revision 307 (07/13)LOUISIANA POWER & LIGHT CO. Waterford Steam Electric Station REACTOR VESSEL ARRANGEMENT Figure 3.9-9 WITHDRAWN)

ACTIVE CORE'LENGTH ALIGNMENT II I NOZZLE 33 THERMAL SUPPORT BARREL CORE STOP INSTRUMENTATION NOZZLE LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station MAINE YANKEE Figure3.9-l0 CONTROL ELEMENTASSEMBLY.FULLY WITHDRAWN ACTIVE CORE LENGTH SNUBBER CORE STOP CEDM NOZZL INSTRUMENTA NOZZLE E UPPER GUIDE STRUCTURE 24" ID INLET NOZZLE CORE SUPPORT BARREL I-I--CORE SHROUD FUEL ASSEMBLY CORE SUPPORT ASSEMBLY FLOW SKIRT LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station FORT CALHOUN UNIT 1 REACTOR VERTICAL ARRANGEMENT Figure 3.9-11 L OUTLET HEADER L/2 RESTRAINT VALVE OUTLET PIPE VALVE DISCHARGE FORCE VALVE INLET PIPE IN LET HEADER RESTRAINT . -- I LOUISIANA Figure K I I CLOSED SYSTEM ARRANGEMENT FOR SAFETY RELIEF VALVES --I Waterrora I I 3.9-12 Electric Station I

REED SWITCH ASSEMBLY REED SWITCH ACTUATING MAGNET LIFT COIL UPPER LATCH DRIVE SHAFT LOAD TRANSFER MAGNET ASSEMBLY LOWER LATCH REACTOR OMEGA SEAL UPPER PRESSURE HOUSING UPPER EXTENSION SHAFT OMEGA SEAL OPERATING ROD ELECTRICAL CONDUIT LIFT AND MAGNET ASSEMBLY UPPER LATCH COIL-COIL LOAD-TRANSFER COIL LOWER LATCH COIL LOWER PRESSURE HOUSING CONTROL ELEMENT DRIVE MECHANISM (MAGNETIC JACK)

CORE SUPPORT SNUBBER CORE SUPPORT BARREL REACTOR VESSEL SNUBBER LUG PIN (4 PER ASSEMBLY)

BOLT (4 REQ'D PER ASSEMB PRESSURE VESSEL SHIM PER ASSEMBLY)

LOUISIANA Figure POWER & LIGHT CO.

PRESSURE VESSEL, CORE SUPPORT BARREL Waterford Steam SNUBBER ASSEMBLY 3.9-14 Electric Station LOUISIANA POWER & LIGHT CO.

Waterford Steam Electric Station CORE SHROUD ASSEMBLY Figure 3.9-15 CEA SHROUD GRID ASSEM IN CORE INSTRUMENT

GUIDE TUBES FUEL ASSEMBLY ALIGNMENT PLATE LOUISIANA Figure POWER LIGHT CO.

UPPER GUIDE STRUCTURE ASSEMBLY Waterford Steam 3.9-16 Electric Station

Revision 307 (07/13)Waterford Steam Electric Station #3 IN-CORE INSTRUMENT NOZZLE Figure 3.9-18 FIGURE 3.9-19 HAS REVISION 5 Waterford Steam Electric Station3 Figure 3.9-19 LEVEL 1 VISUAL OBSERVATION r I POSITIVE RESULTS SIGN-OFF QUESTIONABLE LEVEL 2 HAND HELD AMPLITUDE INDICATOR 1 POSITIVE RESULTS STEADY-STATE LEVEL 3 AMPLITUDE/FREQUENCY INDICATORS POSITIVE RESULTS NEGATIVE CORRECTIVE SIGN-OFF ACTION, RE-TEST LEVEL 4 INSTRUMENT/

STRESS TESTING (EXAMPLES OF MODES:MS TURBINE STOP VALVE CLOSES, MS RV'S RELEASE)

QUESTIONABLE LINES

, .SIGN-OFF CORRECTIVE ACTION, E-TEST LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station I GENERAL FLOW CHART FOR PIPING VIBRATION TESTING I 3.9-20