Letter Sequence Request | |
---|---|
TAC:MB9644, (Open) | |
Initiation Administration Questions
| |
MONTHYEARML0322000892003-08-0808 August 2003
[Table View]Notice of Forthcoming Meeting Relaxation Request from Vessel Head Inspection Order Project stage: Request ML0323201802003-08-14014 August 2003 8/14/03, EOI Will Discuss Its May 8, June 11, & July 1, 2003, Relaxation Requests from Nrc'S Vessel Head Inspection Order Project stage: Other ML0324104502003-08-29029 August 2003 Summary of Meeting with Entergy to Discuss Its Relaxation Requests from the Vessel Head Inspection Order Project stage: Meeting ML0331401822003-11-0404 November 2003 Table, CEDM Nozzle Freespan Lengths Project stage: Request ML0331401672003-11-0404 November 2003 Table, CEDM Nozzle Freespan Lengths Project stage: Request ML0331601982003-11-12012 November 2003 Relaxation Request Regarding Control Element Drive Mechanism Nozzles Project stage: Acceptance Review ML0331601832003-11-12012 November 2003 Relaxation Request from U. S. Nuclear Regulatory Commission (NRC) Order EA-03-009 for the Control Element Drive Mechanism Nozzles Project stage: Acceptance Review 2003-08-14 |
ML033140167 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 11/04/2003 |
From: | Davant G Entergy Operations |
To: | Kalyanam N NRC/NRR/DLPM/LPD4 |
Kalyanam N, NRR/DLPM, 415-1480 | |
References | |
Download: ML033140167 (3) | |
Similar Documents at Waterford | |
---|---|
Category:Drawing
MONTHYEARML20258A0922019-09-11011 September 2019
[Table view]11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted W3F1-2016-0053, Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.8, Figures 3.8-1 Through 3.8-472016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.8, Figures 3.8-1 Through 3.8-47 ML16344A2502016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6A, Figures 3.6A-1 Through 3.6A-67 ML16257A1532016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix B, Figure 15B-1 ML16256A2102016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Section 4.3, Figures 4.3-1 Through 4.3-60 ML16344A2962016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.2, Figures 5.2-1 Through 5.2-30 ML16344A2712016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Appendix 4.3A, Figures 4.3A-1 Through 4.3A-19b ML16256A1842016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.7, Figures 3.7-1 Through 3.7-36 ML16257A1522016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 2, Figures 15.2-1 Through 15.2-65 ML16344A2932016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1, Figures 5.1-1 Through 5.1-4 ML16256A1852016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.7A, Figures 3.7A-1 Through 3.7A-4 ML16256A2132016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Section 4.4, Figures 4.4-1 Through 4.4-11 ML16256A1832016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6C, Figures 3.6C-1 Through 3.6C-9 ML16256A1982016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.9, Figures 3.9-1 Through 3.9-20 ML16256A1962016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6B, Figures 2.1.1 Through 4.19 ML16357A7602016-08-25025 August 2016 Redacted Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Section 4.2, Figures 4.2-1 Through 4.2-12 ML16257A2672015-07-0101 July 2015 Revision 309 to Final Safety Analysis Report, Drawing G162, Sh. 2, Rev. 37, Flow Diagram Sampling System. ML16257A2692014-11-13013 November 2014 Revision 309 to Final Safety Analysis Report, Drawing G162, Sh. 1, Rev. 24, Flow Diagram Sampling System. W3F1-2010-0050, Drawing G287, Revision 21, 125 Vdc and 120 Vac One Line Diagram. Sheet 12008-06-0202 June 2008 Drawing G287, Revision 21, 125 Vdc and 120 Vac One Line Diagram. Sheet 1 ML0612801112005-06-0606 June 2005 ER-W3-2004-0122-000, Pressurizer Heater Sleeve and Instrument Nozzle Repair ML0612800912005-02-25025 February 2005 ER-W3-2004-0122-000, Pressurizer Heater Sleeves and Instrument Nozzles Weld Repair ML0331401672003-11-0404 November 2003 Table, CEDM Nozzle Freespan Lengths ML0223202032002-07-30030 July 2002 Drawing SK-G-M-530, Rwsp Refuel Water Storage Purification System. ML0223201952002-07-30030 July 2002 Drawing SK-G-M-529, Rwsp Refuel Water Storage Purification System. ML0223201422002-07-30030 July 2002 Drawing SK-G-M-528, Rwsp Refuel Water Storage Purification System. 2019-09-11 Category:Graphics incl Charts and Tables MONTHYEARW3F1-2024-0018, Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 252024-05-0101 May 2024
[Table view]Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 25 / Refuel 25 W3F1-2024-0014, Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 20242024-04-29029 April 2024 Report of Facility Changes, Tests, and Experiments and Commitment Changes for Two Year Period Ending April 28, 2024 ML22224A2432022-08-19019 August 2022 Regulatory Conference Participant List July 29 2022 (No Numbers) (Enc 1) ML21354A7552021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 10 of 18 IR 05000382/20200122021-02-0202 February 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000382/2020012 CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table ML17150A2562017-06-0505 June 2017 Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) ML16090A3272016-04-12012 April 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition2010-08-12012 August 2010 Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition ML1019004182010-06-28028 June 2010 Quick View Chart ML1015404782009-11-0303 November 2009 Phased Array Ultrasonic Examination Record ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists CNRO-2005-00023, Response to Request for Additional Information Supporting Request for Alternative W3-R&R-003 Proposed Alternative to ASME Requirements for Weld Repairs2005-03-31031 March 2005 Response to Request for Additional Information Supporting Request for Alternative W3-R&R-003 Proposed Alternative to ASME Requirements for Weld Repairs ML0331401672003-11-0404 November 2003 Table, CEDM Nozzle Freespan Lengths 2024-05-01 |
Text