ML17266A247: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:P.o.BOX529100MIAMI,
{{#Wiki_filter:P.o.BOX 529100MIAMI, FL 33152"O JgL 3F FLORIDA POWER&LIGHT COMPANY July 24, 1980 L-80-235 Mr.James P.O'Reilly, Director, Region II Office of Inspection
FL33152"OJgL3FFLORIDAPOWER&LIGHTCOMPANYJuly24,1980L-80-235Mr.JamesP.O'Reilly,
and Enforcement
Director,
U.S.Nuclear Regulatory
RegionIIOfficeofInspection
andEnforcement
U.S.NuclearRegulatory
Commission
Commission
101MariettaStreet,Suite3100Atlanta,Georgia30303DearMr.O'Reilly:
101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr.O'Reilly: Re: RII:JH St.Lucie-Unit
Re:RII:JHSt.Lucie-Unit
2 Docket No.50-389 80-08 Florida Power 8 Light Company has reviewed the subject Inspection
2DocketNo.50-38980-08FloridaPower8LightCompanyhasreviewedthesubjectInspection
Report and our response is attached.There is no proprietary
Reportandourresponseisattached.
Thereisnoproprietary
information
information
contained
contained in the report.Very truly yours, Robert E.Uhrig Vice President Advanced Systems 8 Technology
inthereport.Verytrulyyours,RobertE.UhrigVicePresident
AdvancedSystems8Technology
REU/JRP/ah
REU/JRP/ah
Attachment
Attachment
cc:HaroldF.Reis,EsquirePEOPLE...
cc: Harold F.Reis, Esquire PEOPLE...SERVING PEOPLE
SERVINGPEOPLE
   
   
RII:JRH50-389/80-08
RI I: JRH 50-389/80-08
Infraction:
Infraction:
Sand-Cement
Sand-Cement
Fill-Procedure
Fill-Procedure Inadequate
Inadequate
As required by Criterion V of Appendix B to 10 CFR 50, and as implemented
AsrequiredbyCriterion
by Florida Power 8 Light Company PSAR Section 17.1A.5,"Activities
VofAppendixBto10CFR50,andasimplemented
affecting quality shall be prescribed
byFloridaPower8LightCompanyPSARSection17.1A.5,"Activities
by documented
affecting
instructions, procedures
qualityshallbeprescribed
or drawings....and
bydocumented
shall be accomplished
instructions,
in accordance
procedures
with these instructions, procedui es, or drawings." Paragraph TgR 5.1 of the Topical guality Assurance Report states,"Activities
ordrawings....and
affecting quality of nuclear safety related structures
shallbeaccomplished
systems and components
inaccordance
shall be prescribed
withtheseinstructions,
by documented
proceduies,ordrawings."
instructions, procedures
Paragraph
or drawings of a type appropriate
TgR5.1oftheTopicalgualityAssurance
to the circumstances
Reportstates,"Activities
and shall be accomplished
affecting
in accordance
qualityofnuclearsafetyrelatedstructures
with these instructions, procedures
systemsandcomponents
or drawings.These documents shall include appropriate
shallbeprescribed
bydocumented
instructions,
procedures
ordrawingsofatypeappropriate
tothecircumstances
andshallbeaccomplished
inaccordance
withtheseinstructions,
procedures
ordrawings.
Thesedocuments
shallincludeappropriate
quantitative
quantitative
criteriasuchasdimensions,
criteria such as dimensions, tolerances
tolerances
and operating limits and qualitative
andoperating
criteria such as comparative
limitsandqualitative
work-manship samples to assure that the quality assurance activity has been satisfactorily
criteriasuchascomparative
work-manshipsamplestoassurethatthequalityassurance
activityhasbeensatisfactorily
accomplished.
accomplished.
Contrarytotheabove,sand-cement
Contrary to the above, sand-cement
fillactivities
fill activities
inthedieselgenerating
in the diesel generating
buildingarenotbeingcontrolled
building are not being controlled
adequately
adequately
inthatprocedure
in that procedure drawings and instructions
drawingsandinstructions
are not clear as to whether the stated 1 to 20 ratio of cement to sand is by volume or weight, water and compactions
arenotclearastowhetherthestated1to20ratioofcementtosandisbyvolumeorweight,waterandcompactions
requirements
requirements
arenotspecific,
are not specific, amounts of ingredients
amountsofingredients
in the mix are not documented, and test data verifying design requirements
inthemixarenotdocumented,
are being met are not available.
andtestdataverifying
~Res onse: Florida Power a Light Company has evaluated the finding and submits the following response.During this inspection
designrequirements
DCN 513.822 was issued to clarify the ratio of cement to sand and to provide instructions
arebeingmetarenotavailable.
for placing the sand-cement
~Resonse:FloridaPoweraLightCompanyhasevaluated
fill.In addition, Construction
thefindingandsubmitsthefollowing
guality Control sampled a mix with the same mix properties
response.
used at the Diesel Generator Building.Five 6 inch diameter by 12 inch high cylinder specimens were prepared.The mix was 20: 1 by volume.Each specimen was prepared by filling the cylinder mold in six inch lifts, sprinkling
Duringthisinspection
the surface lightly with water and tamping to approximate
DCN513.822wasissuedtoclarifytheratioofcementtosandandtoprovideinstructions
the compacting
forplacingthesand-cement
efforts applied in the field.The first sample specimen was tested at seven days and reached 1110 psi.The twenty-eight
fill.Inaddition,
day strength cylinders averaged 1310 psi.Al']corrective
Construction
actions for this infraction
gualityControlsampledamixwiththesamemixproperties
are considered
usedattheDieselGenerator
Building.
Five6inchdiameterby12inchhighcylinderspecimens
wereprepared.
Themixwas20:1byvolume.Eachspecimenwaspreparedbyfillingthecylindermoldinsixinchlifts,sprinkling
thesurfacelightlywithwaterandtampingtoapproximate
thecompacting
effortsappliedinthefield.Thefirstsamplespecimenwastestedatsevendaysandreached1110psi.Thetwenty-eight
daystrengthcylinders
averaged1310psi.Al']corrective
actionsforthisinfraction
areconsidered
complete.
complete.
}}
}}

Revision as of 13:26, 7 July 2018

Responds to NRC 800623 Ltr Re Violations Noted in IE Insp Rept 50-389/80-08.Corrective Actions:Cement to Sand Ratio Clarified & Instructions Were Provided for Placing sand-cement Fill
ML17266A247
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/24/1980
From: UHRIG R E
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17208A918 List:
References
L-80-235, NUDOCS 8008220111
Download: ML17266A247 (3)


See also: IR 05000389/1980008

Text

P.o.BOX 529100MIAMI, FL 33152"O JgL 3F FLORIDA POWER&LIGHT COMPANY July 24, 1980 L-80-235 Mr.James P.O'Reilly, Director, Region II Office of Inspection

and Enforcement

U.S.Nuclear Regulatory

Commission

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr.O'Reilly: Re: RII:JH St.Lucie-Unit

2 Docket No.50-389 80-08 Florida Power 8 Light Company has reviewed the subject Inspection

Report and our response is attached.There is no proprietary

information

contained in the report.Very truly yours, Robert E.Uhrig Vice President Advanced Systems 8 Technology

REU/JRP/ah

Attachment

cc: Harold F.Reis, Esquire PEOPLE...SERVING PEOPLE

RI I: JRH 50-389/80-08

Infraction:

Sand-Cement

Fill-Procedure Inadequate

As required by Criterion V of Appendix B to 10 CFR 50, and as implemented

by Florida Power 8 Light Company PSAR Section 17.1A.5,"Activities

affecting quality shall be prescribed

by documented

instructions, procedures

or drawings....and

shall be accomplished

in accordance

with these instructions, procedui es, or drawings." Paragraph TgR 5.1 of the Topical guality Assurance Report states,"Activities

affecting quality of nuclear safety related structures

systems and components

shall be prescribed

by documented

instructions, procedures

or drawings of a type appropriate

to the circumstances

and shall be accomplished

in accordance

with these instructions, procedures

or drawings.These documents shall include appropriate

quantitative

criteria such as dimensions, tolerances

and operating limits and qualitative

criteria such as comparative

work-manship samples to assure that the quality assurance activity has been satisfactorily

accomplished.

Contrary to the above, sand-cement

fill activities

in the diesel generating

building are not being controlled

adequately

in that procedure drawings and instructions

are not clear as to whether the stated 1 to 20 ratio of cement to sand is by volume or weight, water and compactions

requirements

are not specific, amounts of ingredients

in the mix are not documented, and test data verifying design requirements

are being met are not available.

~Res onse: Florida Power a Light Company has evaluated the finding and submits the following response.During this inspection

DCN 513.822 was issued to clarify the ratio of cement to sand and to provide instructions

for placing the sand-cement

fill.In addition, Construction

guality Control sampled a mix with the same mix properties

used at the Diesel Generator Building.Five 6 inch diameter by 12 inch high cylinder specimens were prepared.The mix was 20: 1 by volume.Each specimen was prepared by filling the cylinder mold in six inch lifts, sprinkling

the surface lightly with water and tamping to approximate

the compacting

efforts applied in the field.The first sample specimen was tested at seven days and reached 1110 psi.The twenty-eight

day strength cylinders averaged 1310 psi.Al']corrective

actions for this infraction

are considered

complete.