ML17292A476: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORYj.REGULARLY INFORMATION DZSTRZBUTIOYSTEM (RIDE)ACCESSIONrNBR:9609230116 DOC.DATE:
{{#Wiki_filter:CATEGORY j.REGULARLY INFORMATION DZSTRZBUTIOYSTEM (RIDE)ACCESSIONrNBR:9609230116 DOC.DATE: 96/08/31 NOTARIZED:
96/08/31NOTARIZED:
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITHF'G.O.
NOFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPoweAUTH.NAMEAUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITHF'G.O.
Washington Public Power Supply System RECIP.NAME RECIPIENT.
Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT.
AFFILIATION DOCKET 05000397
AFFILIATION DOCKET05000397


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforAug1996forWNP-2.W/960912ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLTITLE:MonthlyOperating Report(perTechSpecs)=NOTES:SIZE:ERECIPIENT IDCODE/NAME PD4-2PDCOPIESLTTRENCL11RECIPIENT IDCODE/NAME COLBURN,T COPIESLTTRENCL11INTERNAL:
Monthly operating rept for Aug 1996 for WNP-2.W/960912 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)=NOTES: SIZE: E RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME COLBURN,T COPIES LTTR ENCL 1 1 INTERNAL: ACRS CENTER 1 1 1 1 1 1 1 AEOD/SPD/RRAB NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCEFJ H NRC PDR 1 1 1 1 NOAC 1 1 D 0 M NOTE TO ALIi"RIDS" RECIPIENTS:
ACRSCENTER1111111AEOD/SPD/RRAB NRR/DRPM/PECB 1111EXTERNAL:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!i TOTAL NUMBER OF COPIES REQUIRED: LTTR'10,,ENCL'10
LITCOBRYCEFJHNRCPDR1111NOAC11D0MNOTETOALIi"RIDS"RECIPIENTS:
*I 0 a<~8$1 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352-0968
PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFNSD-5(EXT.
~(509)372-5000 September 12, 1996 G02-96-182 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
415-2083)
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!iTOTALNUMBEROFCOPIESREQUIRED:
LTTR'10,,ENCL'10
*I 0a<~8$1 WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~3000GeorgeWashington Way~Richland, Washington 99352-0968
~(509)372-5000September 12,1996G02-96-182 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:


==Subject:==
==Subject:==
WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTAUGUST1996Transmitted herewithistheMonthlyOperating ReportforthemonthofAugust1996asrequiredbyTechnical Specification 6.9;1.6.Respectfully, G.O.SmithPlantGeneralManagerMailDrop9270CC:LJCallan-NRCRIVTGColburn-NRRKEPerkins,Jr.-NRCRIV,WCFONRCSr.ResidentInspector
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT AUGUST 1996 Transmitted herewith is the Monthly Operating Report for the month of August 1996 as required by Technical Specification 6.9;1.6.Respectfully, G.O.Smith Plant General Manager Mail Drop 9270 CC: LJ Callan-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N NS Reynolds-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399 g~9609230i i 6 960832 P PDR ADQCK 05000397 R PDRt 23903' OPERATING STATUS REPORT for WNP-2 Date: September 1, 1996 2.3.4, 5.6.7.8.9.10.11.Outage+On-line Hours: 744.0 3486 1199 1153 1153 1107 none none Docket: 50-397 Reporting Period: AUGUST 1996 Utility Contact: Bernice Kasko (509)377-4473 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Gross MW,): Maximum Dependable Capacity-summer (Net MW,): If changes occur above since last report, give reasons: Power to which restricted, if any (Net MW,): Reasons for restrictions, if any: 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 1,665,767 532,550 507,382 100.0%100.0%61.6%59.1%0.0%0.0 YEAR 5,855.0 3,307.8 985.9 3,070.6 997.4 7,804,875 2,563,200 2,424,801 52.4%69.5%37.4%35.9%3.9%123.3 CUMULATIVE 102,703.2 72,943.6 1,730.8 70,321.1 1,956.2 208,262,425 70,140,680 67,183,119 68.5%70.4%59.9%59.0%10.7%8,443.0 26.Shutdowns scheduled over the next 6 months (type, date, duration):
-927NNSReynolds-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/399g~9609230ii6960832PPDRADQCK05000397RPDRt23903' OPERATING STATUSREPORTforWNP-2Date:September 1,19962.3.4,5.6.7.8.9.10.11.Outage+On-lineHours:744.034861199115311531107nonenoneDocket:50-397Reporting Period:AUGUST1996UtilityContact:BerniceKasko(509)377-4473LicensedThermalPower(MW,):Nameplate Rating(GrossMW,):DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(GrossMW,):MaximumDependable Capacity-summer(NetMW,):Ifchangesoccurabovesincelastreport,givereasons:Powertowhichrestricted, ifany(NetMW,):Reasonsforrestrictions, ifany:12.13.14.15.16.17.18.19.20.21.22.23.24.25.ReportPeriodHoursHoursReactorCriticalRxReserveShutdownHoursHoursGenerator On-LineUnitReserveShutdownHoursGrossThermalEnergy(MWH)GrossElectrical Energy(MWH)NetElectrical Energy(MWH)UnitServiceFactorUnitAvailability FactorUnitCapacityFactor(MDCNet)UnitCapacityFactor(DERNet)UnitForcedOutageRateForcedOutageHoursMONTH744.0744.00.0744.00.01,665,767 532,550507,382100.0%100.0%61.6%59.1%0.0%0.0YEAR5,855.03,307.8985.93,070.6997.47,804,875 2,563,200 2,424,801 52.4%69.5%37.4%35.9%3.9%123.3CUMULATIVE 102,703.2 72,943.61,730.870,321.11,956.2208,262,425 70,140,680 67,183,119 68.5%70.4%59.9%59.0%10.7%8,443.026.Shutdowns scheduled overthenext6months(type,date,duration):
None 27.If currently shutdown, estimated startup date: Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.
None27.Ifcurrently
AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: AUGUST 1996 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: September 1, 1996 COMPLETED BY: B Kasko TELEPHONE:
: shutdown, estimated startupdate:Note:Cumulative UnitCapacityFactors(MDC&DER)arecalculated withweightedaverages.
(509)377M73 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 635 692 694 697 695 691 689 677 666 686 702 682 677 678 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 678 682 686 685 679 683 680 678 677 674 673 668 711 679 669 729 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
AVERAGEDAILYUNITPOWERLEVELREPORTPERIOD:AUGUST1996DOCKETNO.:50-397UNIT:WNP-2DATE:September 1,1996COMPLETED BY:BKaskoTELEPHONE:
r UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: AUGUST 1996 DOCKET NO.: 50-397~UNIT NAME: WNP-2 DATE: September 1, 1996 COMPLETED BY: B Kasko TELEPHONE:
(509)377M73DAYAVERAGEDAILYPOWERLEVEL(NetMWe)AVERAGEDAILYPOWERLEVELDAY(NetMWe)101213141563569269469769569168967766668670268267767816171819202122232425262728293031678682686685679683680678677674673668711679669729INSTRUCTIONS Onthisform,listtheaveragedailyunitpowerlevelinMWe(net)foreachdayinthereporting month.Computetothenearestwholemegawatt.
(509)37W473 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None
Thesefigureswillbeusedtoplotagraphforeachreporting month.Notethatwhenmaximumdependable capacityisusedforthenetelectrical ratingoftheunit,theremaybeoccasions whenthedailyaveragepowerlevelexceedsthe100%line(ortherestricted powerlevelline).Insuchcases,theaveragedailyunitpoweroutputsheetshouldbefootnoted toexplaintheapparentanomaly.
 
r UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORTPERIOD:AUGUST1996DOCKETNO.:50-397~UNITNAME:WNP-2DATE:September 1,1996COMPLETED BY:BKaskoTELEPHONE:
==SUMMARY==
(509)37W473No.DateTypeHoursReasonMethodLERNumberSystemComponent CauseandCorrective ActionToPreventRecurrence NoneSUMMARY:WNP-2rampedupto68%powerandheldthereduetoproblemsencountered duringtestingofthenewlyinstalled ASDsandDigitalFeedwater ControlSystems.AttheendofthemonthWNP-2wasoperating at69%powerandcontinuing withtheASDandDigitalFeedwater testplan.TYPEforcedS-Scheduled REASON'AAquipmana FailumB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Operational ErrorH-01herMETHODanua2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-OtherSYSTEM&COMPONENT REG-011Extuits&H O.II~~Y}}
: WNP-2 ramped up to 68%power and held there due to problems encountered during testing of the newly installed ASDs and Digital Feedwater Control Systems.At the end of the month WNP-2 was operating at 69%power and continuing with the ASD and Digital Feedwater test plan.TYPE forced S-Scheduled REASON'AAquipmana Failum B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-01her METHOD anua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT REG-01 1 Extu its&H O.I I~~Y}}

Revision as of 12:27, 6 July 2018

Monthly Operating Rept for Aug 1996 for WNP-2. W/960912 Ltr
ML17292A476
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1996
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-182, NUDOCS 9609230116
Download: ML17292A476 (8)


Text

CATEGORY j.REGULARLY INFORMATION DZSTRZBUTIOYSTEM (RIDE)ACCESSIONrNBR:9609230116 DOC.DATE: 96/08/31 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITHF'G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT.

AFFILIATION DOCKET 05000397

SUBJECT:

Monthly operating rept for Aug 1996 for WNP-2.W/960912 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)=NOTES: SIZE: E RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME COLBURN,T COPIES LTTR ENCL 1 1 INTERNAL: ACRS CENTER 1 1 1 1 1 1 1 AEOD/SPD/RRAB NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCEFJ H NRC PDR 1 1 1 1 NOAC 1 1 D 0 M NOTE TO ALIi"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!i TOTAL NUMBER OF COPIES REQUIRED: LTTR'10,,ENCL'10

~(509)372-5000 September 12, 1996 G02-96-182 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT AUGUST 1996 Transmitted herewith is the Monthly Operating Report for the month of August 1996 as required by Technical Specification 6.9;1.6.Respectfully, G.O.Smith Plant General Manager Mail Drop 9270 CC: LJ Callan-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N NS Reynolds-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399 g~9609230i i 6 960832 P PDR ADQCK 05000397 R PDRt 23903' OPERATING STATUS REPORT for WNP-2 Date: September 1, 1996 2.3.4, 5.6.7.8.9.10.11.Outage+On-line Hours: 744.0 3486 1199 1153 1153 1107 none none Docket: 50-397 Reporting Period: AUGUST 1996 Utility Contact: Bernice Kasko (509)377-4473 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Gross MW,): Maximum Dependable Capacity-summer (Net MW,): If changes occur above since last report, give reasons: Power to which restricted, if any (Net MW,): Reasons for restrictions, if any: 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 1,665,767 532,550 507,382 100.0%100.0%61.6%59.1%0.0%0.0 YEAR 5,855.0 3,307.8 985.9 3,070.6 997.4 7,804,875 2,563,200 2,424,801 52.4%69.5%37.4%35.9%3.9%123.3 CUMULATIVE 102,703.2 72,943.6 1,730.8 70,321.1 1,956.2 208,262,425 70,140,680 67,183,119 68.5%70.4%59.9%59.0%10.7%8,443.0 26.Shutdowns scheduled over the next 6 months (type, date, duration):

None 27.If currently shutdown, estimated startup date: Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: AUGUST 1996 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: September 1, 1996 COMPLETED BY: B Kasko TELEPHONE:

(509)377M73 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 635 692 694 697 695 691 689 677 666 686 702 682 677 678 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 678 682 686 685 679 683 680 678 677 674 673 668 711 679 669 729 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

r UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: AUGUST 1996 DOCKET NO.: 50-397~UNIT NAME: WNP-2 DATE: September 1, 1996 COMPLETED BY: B Kasko TELEPHONE:

(509)37W473 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None

SUMMARY

WNP-2 ramped up to 68%power and held there due to problems encountered during testing of the newly installed ASDs and Digital Feedwater Control Systems.At the end of the month WNP-2 was operating at 69%power and continuing with the ASD and Digital Feedwater test plan.TYPE forced S-Scheduled REASON'AAquipmana Failum B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-01her METHOD anua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT REG-01 1 Extu its&H O.I I~~Y