{{#Wiki_filter:ATTACHMENT 2ATOAEP:NRC:1327 TECHNICAL SPECIFICATIONS PAGESMARKEDTOSHOWPROPOSEDCHANGESREVISEDPAGESUNIT13/41-23/41-33/41-73/41-113/41-133/41-153/43-73/44-43/48-93/49-13/49"2B3/41-1B3/41-3PDRADOCK05000 3/4LIMITINGCONDITIONS FOROPE<RATION ANDSURVEILLANCE REQUIREMENTS 3/4.1RI<ACIIVHYCONTROLSYSTEMSSURVEILLANCE REUIREMENTS Continued WheninMODES3or4,atleastonceper24hoursbyconsideration ofthefollowing factors:Reactorcoolantsystemboronconcentration, Controlrodposition, Reactorcoolantsystemaveragetemperature, Fuelburnupbasedongrossthermalenergygeneration, Xenonconcentration,-and Samariumconcentratio~an 4.1.1.1.2 Theoverallcorereactivity balanceshallbccomparedtopredicted valuestodemonstrate agreement withinplusorminus1%Deltak/katleastonceper31Effective FullPowerDays(EFPD).Thiscomparison shallconsideratleastthosefactorsstatedinSpecification 4.1.1.1.1.e, above.Thepredicted reactivity valuesshallbeadjusted(normalized) tocorrespond totheactualcoreconditions priortoexceeding afuelburnupof60Effective FullPowerDaysaftereachfuelloading.COOKNUCLEARPLANT-UNIT 1Page3/41-2 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVE<ILLANCE REQUIRE<ME<<TS 3/4.1RE<ACTIVITY CONTROLSYSTKMS~SHUTDOWNMARGINTvLESSTHANOREUALTO200FLIMITINGCONDITION FOROPERATION 3.1.1.2TheSHUTDOWNMARGINshallbegreaterthanorequalto1.0%Deltak/k.APPLICABILITY:
{{#Wiki_filter:ATTACHMENT 2A TO AEP:NRC:1327 TECHNICAL SPECIFICATIONS PAGES MARKED TO SHOW PROPOSED CHANGES REVISED PAGES UNIT 13/4 1-2 3/4 1-3 3/4 1-7 3/4 1-11 3/4 1-13 3/4 1-15 3/4 3-7 3/4 4-4 3/4 8-9 3/4 9-1 3/4 9"2 B 3/4 1-1 B 3/4 1-3 PDR ADOCK 05000 3/4 LIMITING CONDITIONS FOR OPE<RATION AND SURVEILLANCE REQUIREMENTS 3/4.1 RI<ACIIVHY CONTROL SYSTEMS SURVEILLANCE RE UIREMENTS Continued When in MODES 3 or 4, at least once per 24 hours by consideration of the following factors: Reactor coolant system boron concentration, Control rod position, Reactor coolant system average temperature, Fuel burnup based on gross thermal energy generation, Xenon concentration,-and Samarium concentratio~an 4.1.1.1.2 The overall core reactivity balance shall bc compared to predicted values to demonstrate agreement within plus or minus 1%Delta k/k at least once per 31 Effective Full Power Days (EFPD).This comparison shall consider at least those factors stated in Specification 4.1.1.1.1.e, above.The predicted reactivity values shall be adjusted (normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 Effective Full Power Days after each fuel loading.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-2 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVE<ILLANCE REQUIRE<ME<<TS 3/4.1 RE<ACTIVITY CONTROL SYSTKMS~SHUTDOWN MARGIN T v LESS THAN OR E UAL TO 200 F LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be greater than or equal to 1.0%Delta k/k.APPLICABILITY:
MODE5.ACTION:WiththeSHUTDOWNMARGINlessthan1.0%Deltak/k,immediately initiateandcontinueborationatgreaterIthanorequalto10gpmofasolutioncontaining greaterthanorequalto20,000ppmboronorequivalent untilIherequiredSHUTDOWNMARGINisrestored.
MODE 5.ACTION: With the SHUTDOWN MARGIN less than 1.0%Delta k/k, immediately initiate and continue boration at greater I than or equal to 10 gpm of a solution containing greater than or equal to 20,000 ppm boron or equivalent until Ihe required SHUTDOWN MARGIN is restored.SURVEILLANCE RE UIREMENTS 4.1.1.2 The SHUTDOWN MARGIN shall be determined to be greater than or equal to 1.0%Delta k/k: av Within one hour after detection of an inoperable control rod(s)and at least once per 12 hours thereafter while the rod(s)is inoperable.
SURVEILLANCE REUIREMENTS 4.1.1.2TheSHUTDOWNMARGINshallbedetermined tobegreaterthanorequalto1.0%Deltak/k:avWithinonehourafterdetection ofaninoperable controlrod(s)andatleastonceper12hoursthereafter whiletherod(s)isinoperable.
If the inoperable control rod is immovableor untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s).At least once per 24 hours by consideration of the following factors: 1.Reactor coolant system boron concentration, 2.Control rod position, 3.Reactor coolant system average temperature, 4.Fuel burnup based on gross thermal energy generation, 5.Xenon concentration, and 6.Samarium concentratio~an 7.foron~n~aity COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-3 AME<NDME<NT 420p 448 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATHS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.1 As a minimum, one of the following boron injection flow paths shall be OPERABLE: A flow path from the boric acid tanks via a boric acid transfer pump and charging pump to the Reactor Coolant System if only the boric acid storage tank in Specification 3.1.2.7a is OPERABLE, or The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if only the refueling water storage tank in Specification 3.1.2.7b is OPERABLE.APPLICABILITY:
Iftheinoperable controlrodisimmovable oruntrippable, theSHUTDOWNMARGINshallbeverifiedacceptable withanincreased allowance forthewithdrawn worthoftheimmovable oruntrippable controlrod(s).Atleastonceper24hoursbyconsideration ofthefollowing factors:1.Reactorcoolantsystemboronconcentration, 2.Controlrodposition, 3.Reactorcoolantsystemaveragetemperature, 4.Fuelburnupbasedongrossthermalenergygeneration, 5.Xenonconcentration, and6.Samariumconcentratio~an 7.foron~n~aity COOKNUCLEARPLANT-UNIT 1Page3/41-3AME<NDME<NT 420p448 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVITY CONTROLSYSTEMS3/4.1.2BORATIONSYSTEMSFLOWPATHS-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.1Asaminimum,oneofthefollowing boroninjection flowpathsshallbeOPERABLE:
ACTION: MODES 5 and 6.With none of the above flow paths OPERABLE, suspend all operations involving CORE ALTERATIONS or sitive reactivity changes~i f the'eacto'r''
AflowpathfromtheboricacidtanksviaaboricacidtransferpumpandchargingpumptotheReactorCoolantSystemifonlytheboricacidstoragetankinSpecification 3.1.2.7aisOPERABLE, orTheflowpathfromtherefueling waterstoragetankviaachargingpumptotheReactorCoolantSystemifonlytherefueling waterstoragetankinSpecification 3.1.2.7bisOPERABLE.
coolant volume"provIded" that SHUTDOWN MARGIN'ufficient to accommodate the change'-emperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1'in MODE 6 d;the heatup or'cooldown rate is, restricted to 50'F, or less in any one;hour.period in<MODE 5, or 2)addition of vater from the RWST, provided the boron concentration in the,RWST is eater than or nai to the minim Le aired b S ifteation9 1.2.7.b.2 SURVEILLANCE RE UIREMENTS 4.1.2.1 At least one of the above required flow paths shall be demonstrated OPERABLE: a.At least once per 7 days by verifying that the temperature of the heat traced portion of the flow path is greater than or equal to 145'F when a flow path from the boric acid tanks is used.b.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-7 AMENDMENT 420, 464 3/4 LIMI'HNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS CHARGING PUMP-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 a.One charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.b.One charging flowpath associated with support of Unit 2 shutdown functions shall be available APPLICABILITY:
APPLICABILITY:
ACTION:MODES5and6.WithnoneoftheaboveflowpathsOPERABLE, suspendalloperations involving COREALTERATIONS orsitivereactivity changes~ifthe'eacto'r''
coolantvolume"provIded" thatSHUTDOWNMARGIN'ufficient toaccommodate thechange'-emperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1'inMODE6d;theheatupor'cooldown rateis,restricted to50'F,orlessinanyone;hour.
periodin<MODE5,or2)additionofvaterfromtheRWST,providedtheboronconcentration inthe,RWSTiseaterthanornaitotheminimLeairedbSifteation9 1.2.7.b.2 SURVEILLANCE REUIREMENTS 4.1.2.1Atleastoneoftheaboverequiredflowpathsshallbedemonstrated OPERABLE:
a.Atleastonceper7daysbyverifying thatthetemperature oftheheattracedportionoftheflowpathisgreaterthanorequalto145'Fwhenaflowpathfromtheboricacidtanksisused.b.Atleastonceper31daysbyverifying thateachvalve(manual,poweroperatedorautomatic) intheflowpaththatisnotlocked,sealed,orotherwise securedinposition, isinitscorrectposition.
COOKNUCLEARPLANT-UNIT 1Page3/41-7AMENDMENT 420,464 3/4LIMI'HNGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVITY CONTROLSYSTEMSCHARGINGPUMP-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.3a.Onechargingpumpintheboroninjection flowpathrequiredbySpecification 3.1.2.1shallbeOPERABLEandcapableofbeingpoweredfromanOPERABLEemergency bus.b.Onechargingflowpathassociated withsupportofUnit2shutdownfunctions shallbeavailable APPLICABILITY:
Specification 3.1.2.3.a.
Specification 3.1.2.3.a.
-MODES5and6Specification 3.1.2.3.b.
-MODES 5 and 6 Specification 3.1.2.3.b.
-AtalltimeswhenUnit2isinMODES1,2,3,or4.ACTION:WithnochargingpumpOPERABLE, susndallorationsinvolving COREALTERATIONS orat'SHUTDOWN-MARGIN sufficient toaccommodate
-At all times when Unit 2 is in MODES 1, 2, 3, or 4.ACTION: With no charging pump OPERABLE, sus nd all o rations involving CORE ALTERATIONS or at'SHUTDOWN-MARGIN sufficient to accommodate
'thechangeintemperature ismaintained inccordance, withSpecification 3.1,1,2inMODES'-or Specification 3,9,1-inMODE,6,,-and theeatup'or'cooldown rate-isrestricted to50'Forlessinanyone-hourperiodinMODE5,or2dditioiiof':pater, from'.the RWST;providedtheboronconcentration intheRWSTisreatethreq&#x17d;:fthe'minimum' uire'dbSificatio3.2..b.2WithmorethanonechargingpumpOPERABLEorwithasafetyinjection pump(s)OPERABLEwhenthetemperature ofanyRCScoldlegislessthanorequalto152'F,unlessthereactorvesselheadisremoved,removetheadditional chargingpump(s)andthesafetyinjection pump(s)motorcircuitbreakersfromtheelectrical powercircuitwithinonehour.c.Theprovisions ofSpecification 3.0.3arenotapplicable.
'the change in temperature is maintained in ccordance, with Specification 3.1,1,2 in MODES'-or Specification 3,9,1-in MODE,6,,-and the eatup'or'cooldown rate-is restricted to 50'F or less in any one-hour period in MODE 5, or 2 dditioii of':pater, from'.the RWST;provided the boron concentration in the RWST is reate th req&#x17d;:f the'minimum' uire'db S ificatio 3.2..b.2 With more than one charging pump OPERABLE or with a safety injection pump(s)OPERABLE when the temperature of any RCS cold leg is less than or equal to 152'F, unless the reactor vessel head is removed, remove the additional charging pump(s)and the safety injection pump(s)motor circuit breakers from the electrical power circuit within one hour.c.The provisions of Specification 3.0.3 are not applicable.
Inadditiontotheabove,whenSpecification 3.1.2.3.b isapplicable andtherequiredflowpathisnotavailable, returntherequiredflowpathtoavailable statuswithin7days,orprovideequivalent shutdowncapability inUnit2andreturntherequiredflowpathtoavailable statuswithinthenext60days,orhaveUnit2inHOTSTANDBYwithinthenext12hoursandHOTSHUTDOWNwithinthefollowing 24hours.e.Therequirements ofSpecification
In addition to the above, when Specification 3.1.2.3.b is applicable and the required flow path is not available, return the required flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 2 and return the required flow path to available status within the next 60 days, or have Unit 2 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 hours.e.The requirements of Specification 3.0.4 are not applicable when Specification 3.1.2.3.b applies.SURVEILLANCE RE UIREMENTS 4.1.2.3.1 The above required charging pump shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5.RCS cold legs is less than or equal to 152'F.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-11 AMENDMENT 98, 4&#xc3;, 43k, 464, 46V, 89 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVI'IY CONTROL SYSTEMS BORIC ACID TRANSFER PUMPS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.5 At least one boric acid transfer pump shall be OPERABLE and capable of being powered from an OPERABLE emergency bus if only the flow path through the boric acid transfer pump of Specification 3.1.2.1a is OPERABLE.APPLICABILITY:
 
ACTION: MODES 5 and 6.With no boric acid transfer pump OPERABLE as required to complete the flow path of Specification 3.1.2.1a, suspend all operations involving CORE ALTERATIONS or sitive reactivi changes.I.except: 1 heatup or cooldown of'the reactor coolant volume royided that SHUTDOWN MARGIN s'ufficient to.accommodate the;change in temperature is maintained iq ccordance.
==3.0. 4arenotapplicable==
with Specification 3;1'.1'.'2'n M&#x17d;ODE'5.or,'Specification'3.9:I
whenSpecification 3.1.2.3.b applies.SURVEILLANCE REUIREMENTS 4.1.2.3.1 Theaboverequiredchargingpumpshallbedemonstrated OPERABLEbyverifying thatthepump'sdeveloped headatthetestflowpointisgreaterthanorequaltotherequireddeveloped headwhentestedpursuanttoSpecification 4.0.5.RCScoldlegsislessthanorequalto152'F.COOKNUCLEARPLANT-UNIT 1Page3/41-11AMENDMENT 98,4&#xc3;,43k,464,46V,89 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVI'IY CONTROLSYSTEMSBORICACIDTRANSFERPUMPS-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.5AtleastoneboricacidtransferpumpshallbeOPERABLEandcapableofbeingpoweredfromanOPERABLEemergency busifonlytheflowpaththroughtheboricacidtransferpumpofSpecification 3.1.2.1aisOPERABLE.
=in MODE'6, and'the heatup or''ooldow'n te is.restricted to 50'F,.-or less, in any, one-hour period in MODE 5, or 2)addition of-water from the RWSTJ provided th'-boroii co'ncentration in the R ST is greater than or ual to the minimuin re uired b'pecification
APPLICABILITY:
.1.2./.b 2 SURVEILLANCE RE UIREMENTS COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-13 AMENDMENT 420, 464 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMF<TS t 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.7 As a minimum, one of the following borated water sources shall be OPERABLE: A boric acid storage system and associated heat tracing with: 1.A minimum usable borated water volume of 4300 gallons, 2.Between 20,000 and 22,500 ppm of boron, and 3.A minimum solution temperature of 145'F.The refueling water storage tank with: 1.A minimum usable borated water volume of 90,000 gallons, 2.A minimum boron concentration of 2400 ppm, and 3.A minimum solution temperature of 70'F.APPLICABILITY:
ACTION:MODES5and6.WithnoboricacidtransferpumpOPERABLEasrequiredtocompletetheflowpathofSpecification 3.1.2.1a, suspendalloperations involving COREALTERATIONS orsitivereactivichanges.I.except:1heatuporcooldownof'thereactorcoolantvolumeroyidedthatSHUTDOWNMARGINs'ufficient to.accommodate the;changeintemperature ismaintained iqccordance.
ACTION: MODES 5 and 6.W ith no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or sitive reactivi~ch~an es'xcept: 1).heatup o Eoldown of the'reactor.coolant volume provided that SHUTDOWN MARGIN sufficierit,to accommodate the chang, temperature is', maintainediin accordance with Specification 3,1..1.2 in MODE 5 or Specification 3,9.1 in MODE 6 d the heatup or cooldown rate is iestricted'to 50'F or less in any one-hour'period in MODE 5, or-,2)addition of water from the RWST, prod'tdcd the boron concentranon in the RWS's eater dtan o e nai to the minima e a~fred b~Scidcdt ton 3;t'.2.7.b,d SURVEILLANCE RE UIREMENTS 4.1.2.7 The above required borated water source shall be demonstrated OPERABLE: At least once per 7 days by: 1.Verifying the boron concentration of the water, 2.Verifying the water level volume of the tank, and 3.Verifying the boric acid storage tank solution temperature when it is the source of borated water.At least once per 24 hours by verifying the RWST temperature when it is the source of borated water.COOK NUCLE<AR PLANT-UNIT 1 Page 3/4 1-15 AMENDMENT 53, kR, K4  
withSpecification 3;1'.1'.'2'n M&#x17d;ODE'5.or,'Specification'3.9:I
=inMODE'6,and'theheatupor''ooldow'n teis.restricted to50'F,.-or less,inany,one-hourperiodinMODE5,or2)additionof-waterfromtheRWSTJprovidedth'-boroii co'ncentration intheRSTisgreaterthanorualtotheminimuinreuiredb'pecification
.1.2./.b2SURVEILLANCE REUIREMENTS COOKNUCLEARPLANT-UNIT 1Page3/41-13AMENDMENT 420,464 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMF<TS t3/4.1REACTIVITY CONTROLSYSTEMSBORATEDWATERSOURCES-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.7Asaminimum,oneofthefollowing boratedwatersourcesshallbeOPERABLE:
Aboricacidstoragesystemandassociated heattracingwith:1.Aminimumusableboratedwatervolumeof4300gallons,2.Between20,000and22,500ppmofboron,and3.Aminimumsolutiontemperature of145'F.Therefueling waterstoragetankwith:1.Aminimumusableboratedwatervolumeof90,000gallons,2.Aminimumboronconcentration of2400ppm,and3.Aminimumsolutiontemperature of70'F.APPLICABILITY:
ACTION:MODES5and6.WithnoboratedwatersourceOPERABLE, suspendalloperations involving COREALTERATIONS orsitivereactivi~ch~an es'xcept:
1).heatup oEoldownofthe'reactor.coolant volumeprovidedthatSHUTDOWNMARGINsufficierit,to accommodate thechang,temperature is',maintainediin accordance withSpecification 3,1..1.2inMODE5orSpecification 3,9.1inMODE6dtheheatuporcooldownrateisiestricted'to 50'Forlessinanyone-hour'period inMODE5,or-,2)additionofwaterfromtheRWST,prod'tdcd theboronconcentranon intheRWS'seaterdtanoenaitotheminimaea~fredb~Scidcdtton3;t'.2.7.
b,dSURVEILLANCE REUIREMENTS 4.1.2.7Theaboverequiredboratedwatersourceshallbedemonstrated OPERABLE:
Atleastonceper7daysby:1.Verifying theboronconcentration ofthewater,2.Verifying thewaterlevelvolumeofthetank,and3.Verifying theboricacidstoragetanksolutiontemperature whenitisthesourceofboratedwater.Atleastonceper24hoursbyverifying theRWSTtemperature whenitisthesourceofboratedwater.COOKNUCLE<ARPLANT-UNIT 1Page3/41-15AMENDMENT 53,kR,K4  


3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.3INSTRUMENTATION TABLE3.3-1Continued BelowP-6,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabovetheP-6Setpoint.
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.3 INSTRUMENTATION TABLE 3.3-1 Continued Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.Above P-6 but below 5%of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 5%of RATED THERMAL POWER.c.Above 5%of RATED THERMAL POWER, POWER OPERATION may continue.ACTION 4-With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement and with the THERMAL POWER level: a.Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.ACTION 5-b.Above P-6, operation may continue.With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement:
AboveP-6butbelow5%ofRATEDTHERMALPOWER,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabove5%ofRATEDTHERMALPOWER.c.Above5%ofRATEDTHERMALPOWER,POWEROPERATION maycontinue.
Immediately suspend operations involving positive reactivity changes except addition of coveter froni the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.8.b.2 (MODES 3~or 4 or 3.1.2.7,b.2 gs Verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, within 1 hour and at least once per 12 hours thereafter Kd E,-Close the isolation valves for unboratcd water sources to the chemical and volume control ystem within 1 hour, In MODE 5, if the RWST boron concentration is less than the eactor coolant system boron concentration and less than the boron concentration required y Specification 3.<.2.7.b.2, isolate the RWST from the react~or coolant s stem within.1~hour ACTION 6-With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
ACTION4-WiththenumberofchannelsOPERABLEonelessthanrequiredbytheMinimumChannelsOPERABLErequirement andwiththeTHERMALPOWERlevel:a.BelowP-6,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabovetheP-6Setpoint.
a.The inoperable channel is placed in the tripped condition within 1 hour.b.The Minimum Channels OPERABLE requirement is met;however, the inoperable channel may be bypassed for up to 2 hours for surveillance testing of the other channels per Specification 4.3.1.1.1.
ACTION5-b.AboveP-6,operation maycontinue.
ACTION 7-With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 3-7 AMENDMENT V4 3/4 LIMrI'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.4 REACTOR COOLANT SYSIKM SAFETY VALVES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2 A minimum of one pressurizer code safety valve shall be OPERABLE with a lift setting of 2485 PSIG 2 3%.APPLICABILITY:
WiththenumberofchannelsOPERABLEonelessthanrequiredbytheMinimumChannelsOPERABLErequirement:
ACTION: MODES 4 and 5.With no pressurizer code safety valve OPERABLE: rom the".RWST,-
Immediately suspendoperations involving positivereactivity changesexceptadditionofcoveterfronitheRWST,providedtheboronconcentration intheRWSTisgreaterthantheminimumrequiredbySpecification 3.1.2.8.b.2 (MODES3~or4or3.1.2.7,b.2 gsVerifycompliance withtheSHUTDOWNMARGINrequirements ofSpecification 3.1.1.1or3.1.1.2,asapplicable, within1hourandatleastonceper12hoursthereafter KdE,-Closetheisolation valvesforunboratcd watersourcestothechemicalandvolumecontrolystemwithin1hour,InMODE5,iftheRWSTboronconcentration islessthantheeactorcoolantsystemboronconcentration andlessthantheboronconcentration requiredySpecification 3.<.2.7.b.2, isolatetheRWSTfromthereact~orcoolantsstemwithin.1~hourACTION6-WiththenumberofOPERABLEchannelsonelessthantheTotalNumberofChannels, STARTUPand/orPOWEROPERATION mayproceedprovidedthefollowing conditions aresatisfied:
piovided'he boron concentration in the RWST is greater than the minimm e tred-:b"S'cification 3-.2'.8.b.2 ODE or, 3,'1.2,7;b.2'MODE 5 and place an OPERABLE RHR loop into operation in the shutdown cooling mod.an Immediately render all Safety Injection pumps and all but one charging pump inoperable by removing the applicable motor circuit breakers from the electric power circuit within one hour.SURVEILLANCE RE UIREMENTS The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.COOK NUCLEAR PLANT-UNIT I Page 3/4 44 AMENDMENT 53, 420, S&$
a.Theinoperable channelisplacedinthetrippedcondition within1hour.b.TheMinimumChannelsOPERABLErequirement ismet;however,theinoperable channelmaybebypassedforupto2hoursforsurveillance testingoftheotherchannelsperSpecification 4.3.1.1.1.
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS e 3/4.8 ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C.electrical power sources shall be OPERABLE: One circuit between the offsite transmission network and the onsite Class 1E distribution system, and One diesel generator with: 1.A day fuel tank containing a minimum of 70 gallons of fuel, I 2.A fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and APPLICABILITY:
ACTION7-WiththenumberofOPERABLEchannelsonelessthantheTotalNumberofChannels, STARTUPand/orPOWEROPERATION mayproceeduntilperformance ofthenextrequiredCHANNELFUNCTIONAL TESTprovidedtheinoperable channelisplacedinthetrippedcondition within1hour.COOKNUCLEARPLANT-UNIT 1Page3/43-7AMENDMENT V4 3/4LIMrI'ING CONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.4REACTORCOOLANTSYSIKMSAFETYVALVES-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.4.2Aminimumofonepressurizer codesafetyvalveshallbeOPERABLEwithaliftsettingof2485PSIG23%.APPLICABILITY:
ACTION: 3.A fuel transfer pump.MODES 5 and 6.With less than the above minimum required A.C.electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS Q positive reactivi changes xcept: I)heatup or cooldown of the reactor coolant volume provided tha r HUTDOWN MARGIN"suf6cient to''accommodate the change in temperature is maintained in accordance ivitII pacification 3.1.1;2 in MODE 5 or Specification 3,9.1 in MODE 6, and the heatup or cooldown rate is restricted ttI 0'.p or less.in.any one-hour period:in;MODE 5, or 2)addition of water from the RWST,-provided the boron ncentrat'on in, the RWST is eater than ore ual to the mininium re a~trad b 3 ciftcation 3.1.2.7.b.2 SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C.electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.
ACTION:MODES4and5.Withnopressurizer codesafetyvalveOPERABLE:
COOK NUCLEAR PLANT-UNIT I Page 3/4 8-9 AMENDMENT 4953 445
romthe".RWST,-
piovided'he boronconcentration intheRWSTisgreaterthantheminimmetred-:b"S'cification 3-.2'.8.b.2 ODEor,3,'1.2,7;b.2'MODE 5andplaceanOPERABLERHRloopintooperation intheshutdowncoolingmod.anImmediately renderallSafetyInjection pumpsandallbutonechargingpumpinoperable byremovingtheapplicable motorcircuitbreakersfromtheelectricpowercircuitwithinonehour.SURVEILLANCE REUIREMENTS Theliftsettingpressureshallcorrespond toambientconditions ofthevalveatnominaloperating temperature andpressure.
COOKNUCLEARPLANT-UNIT IPage3/444AMENDMENT 53,420,S&$
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS e3/4.8ELECTRICAL POWERSYSTEMSSHUTDOWNLIMITINGCONDITION FOROPERATION 3.8.1.2Asaminimum,thefollowing A.C.electrical powersourcesshallbeOPERABLE:
Onecircuitbetweentheoffsitetransmission networkandtheonsiteClass1Edistribution system,andOnedieselgenerator with:1.Adayfueltankcontaining aminimumof70gallonsoffuel,I2.Afuelstoragesystemcontaining aminimumindicated volumeof46,000gallonsoffuel,andAPPLICABILITY:
ACTION:3.Afueltransferpump.MODES5and6.WithlessthantheaboveminimumrequiredA.C.electrical powersourcesOPERABLE, suspendalloperations involving COREALTERATIONS Qpositivereactivichangesxcept:I)heatuporcooldownofthereactorcoolantvolumeprovidedtharHUTDOWNMARGIN"suf6cient to''accommodate thechangeintemperature ismaintained inaccordance ivitIIpacification 3.1.1;2inMODE5orSpecification 3,9.1inMODE6,andtheheatuporcooldownrateisrestricted ttI0'.porless.in.anyone-hourperiod:in;MODE 5,or2)additionofwaterfromtheRWST,-provided theboronncentrat'on in,theRWSTiseaterthanoreualtothemininiumrea~tradb3ciftcation 3.1.2.7.b.2 SURVEILLANCE REUIREMENTS 4.8.1.2TheaboverequiredA.C.electrical powersourcesshallbedemonstrated OPERABLEbytheperformance ofeachoftheSurveillance Requirements of4.8.1.1.1 and4.8.1.1.2 exceptforrequirement 4.8.1.1.2.a.5.
COOKNUCLEARPLANT-UNIT IPage3/48-9AMENDMENT 4953445


3/4LIMINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.9REFUELING OPERATIONS BORONCONCENTRATION LIMITINGCONDITION FOROPERATION 3.9.1eboronconcentration ofallfilledportionsoftheReactorCoolantSystemandtherefueling canalshallbemaintained uniformandsufficient toensurethatthemorerestrictive ofthefollowing reactivity conditions ismet:EitheraK,of0.95orless,whichincludesa1%dk/kconservative allowance foruncertainties, orAboronconcentration ofgreaterthanorequalto2400ppm,whichincludesa50ppmconservative allowance foruncertainties.
3/4 LIMING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 e boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met: Either a K,of 0.95 or less, which includes a 1%dk/k conservative allowance for uncertainties, or A boron concentration of greater than or equal to 2400 ppm, which includes a 50 ppm conservative allowance for uncertainties.
APPLICABILITY:
APPLICABILITY:
MODEQiACTION:Withtherequirements oftheabovespecification notsatisfied, ttimmediately suspendaii*"''""*uqater:frOittrth'e";RWdST
MODE Qi ACTION: With the requirements of the above specification not satisfied, tt immediately suspend aii*"''""*u q ater:frOittrth'e";RWdST
-'prOVidedythe>bp'rpnqesOnCen 5tipngingthe'R ST8<re'at'e'i'thmayn*
-'prOVidedythe>bp'rpnqesOnCen 5tipngingthe'R ST 8<re'at'e'i'thmayn*
die"miiiimu
die"miiiimu
'b~tredib~Sifibangon:-'g!
'b~tredib~Sifibangon:-'g!
'!2!'.b:-2'nd initiateandcontinueborationatgreaterthanorequalto10gpmof20,000ppmboricacidsolutionoritsequivalent untilK,isreducedtolessthanorequalto0.95ortheboronconcentration isrestoredtogreaterthanorequalto2400ppm,whichever isthemorerestrictive.
'!2!'.b:-2'nd initiate and continue boration at greater than or equal to 10 gpm of 20,000 ppm boric acid solution or its equivalent until K,is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2400 ppm, whichever is the more restrictive.
Theprovisions ofSpecification 3.0.3arenotapplicable.
The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REUIREMENTS 4.9.1.1Themorerestrictive oftheabovetworeactivity conditions shallbedetermined priorto:a.Removingorunbolting thereactorvesselhead,andb.Withdrawal ofanyfulllengthcontrolrodinexcessof3feetfromitsfullyinsertedposition.
SURVEILLANCE RE UIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to: a.Removing or unbolting the reactor vessel head, and b.Withdrawal of any full length control rod in excess of 3 feet from its fully inserted position.4.9.1.2 The boron concentration of the reactor coolant system and the refueling canal shall be determined by chemical analysis at least 3 times per 7 days with a maximum time interval between samples of 72 hours.COOK NUCLE<AR PLANT-UNIY 1 Page 3/4 9-1 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment.
4.9.1.2Theboronconcentration ofthereactorcoolantsystemandtherefueling canalshallbedetermined bychemicalanalysisatleast3timesper7dayswithamaximumtimeintervalbetweensamplesof72hours.COOKNUCLE<ARPLANT-UNIY 1Page3/49-1 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.9REELINGOPERATIONS INSTRUMENTATION LIMITINGCONDITION FOROPERATION 3.9.2Asaminimum,twosourcerangeneutronfluxmonitorsshallbeoperating, eachwithcontinuous visualindication inthecontrolroomandonewithaudibleindication inthecontainment.
APPLICABILITY:
APPLICABILITY:
MODE6.ACTION:Withtherequirements oftheabovespecification notsatisfied, immediatel susndallorationsinvolvinCOREALTERATIONSor ositivereactivitychanges.
MODE 6.ACTION: With the requirements of the above specification not satisfied, immediatel sus nd all o rations involvin COREALTERATIONSor ositivereactivitychanges.
'xcept~ad ition",of:;water.';from"the ificatt6""1~2:7'.b2 QTheprovisions ofSpecification 3.0.3arenotapplicable.
'xcept~ad ition",of:;water.';from"the ificatt6""1~2:7'.b2 Q The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REUIREMENTS 4.9.2Eachsourcerangeneutronfluxmonitorshallbedemonstrated OPERABLEbyperformance of:a.ACHANNELFUNCTIONAL TESTatleastonceper7days,andb.ACHANNELFUNCTIONAL TESTwithin8hourspriortotheinitialstartofCOREALTERATIONS, andc.ACHANNELCHECKatleastonceper12hoursduringCOREALTERATIONS.
SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of: a.A CHANNEL FUNCTIONAL TEST at least once per 7 days, and b.A CHANNEL FUNCTIONAL TEST within 8 hours prior to the initial start of CORE ALTERATIONS, and c.A CHANNEL CHECK at least once per 12 hours during CORE ALTERATIONS.
COOKNUCLEARPLANT-UNIT 1Page3/49-2 3/4BASES3/4.1REACTIVITY CONTROLSYSTEMS3/4.1.1BORATIONCONTROL3/4.1.1.1 gild3/4.1.1.2 SHUTDOWNMARGINAsufficient SHUTDOWNMARGINensuresthat1)thereactorcanbemadesubcritical fromalloperating conditions, 2)thereactivity transients associated withpostulated accidentconditions arecontrollable withinacceptable limits,and3)thereactorwillbemaintained sufficiently subcritical toprecludeinadvertent criticality intheshutdowncondition.
COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-2 3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 BORATION CONTROL 3/4.1.1.1 gild 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1)the reactor can be made subcritical from all operating conditions, 2)the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3)the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.
SHUTDOWNMARGINrequirements varythroughout corelifeasafunctionoffueldepletion, RCSboronconcentration, andRCST,,.Themostrestrictive condition occursatEOL,withT,~atnoloadoperating temperature, andisassociated withapostulated steamlinebreakaccidentandresulting uncontrolled RCScooldown.
SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS T,,.The most restrictive condition occurs at EOL, with T,~at no load operating temperature, and is associated with a postulated steam line break accident and resulting uncontrolled RCS cooldown.In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1.3%Delta k/k is initially required to control the reactivity transient and automatic ESF is assumed to be available.
Intheanalysisofthisaccident, aminimumSHUTDOWNMARGINof1.3%Deltak/kisinitially requiredtocontrolthereactivity transient andautomatic ESFisassumedtobeavailable.
With T,~less than 200'F, the reactivity transients resulting from a postulated steam line break cooldown are minimal and a 1%Delta k/k SHUTDOWN MARGIN provides adequate protection for this event.The SHUTDOWN MARGIN requirements are based upon the limiting conditions described above and are consistent with FSAR safety analysis assumptions.
WithT,~lessthan200'F,thereactivity transients resulting fromapostulated steamlinebreakcooldownareminimalanda1%Deltak/kSHUTDOWNMARGINprovidesadequateprotection forthisevent.TheSHUTDOWNMARGINrequirements arebaseduponthelimitingconditions described aboveandareconsistent withFSARsafetyanalysisassumptions.
A boron penalty must be'applied when op'crating with no reactor coolant loops in operationbut o'e or more residual heat removal;loops pro'viding,shut'down cooling.The accessary penalty is included in the SHUTDOWN MARGIN ccurves.l 3/4.1.1.3 BORON DILUTION A minimum flow rate of at least 2000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during boron concentration reductions in the Reactor Coolant System.A flow rate of at least 2000 GPM will circulate an equivalent Reactor Coolant System volume of 12,612 plus or minus 100 cubic feet in approximately 30 minutes.The reactivity change rate associated with boron reductions will therefore be within the capability for operator recognition and control.3/4.1.1.4 MODERATOR TEMPERATURE COEFFICIENT MTC The limitations on MTC are provided to ensure that the assumptions used in the accident and transient analyses remain valid through each fuel cycle.The surveillance requirement for measurement of the MTC at the beginning, and near the end of each fuel cycle is adequate to confirm the MTC value since this coefficient changes slowly due principally to the reduction in RCS boron COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 1-1 AMENDMENT V4, 420, 448, S&$
Aboronpenaltymustbe'applied whenop'crating withnoreactorcoolantloopsinoperationbut o'eormoreresidualheatremoval;loops pro'viding,shut'down cooling.Theaccessary penaltyisincludedintheSHUTDOWNMARGINccurves.l3/4.1.1.3 BORONDILUTIONAminimumflowrateofatleast2000GPMprovidesadequatemixing,preventsstratification andensuresthatreactivity changeswillbegradualduringboronconcentration reductions intheReactorCoolantSystem.Aflowrateofatleast2000GPMwillcirculate anequivalent ReactorCoolantSystemvolumeof12,612plusorminus100cubicfeetinapproximately 30minutes.Thereactivity changerateassociated withboronreductions willtherefore bewithinthecapability foroperatorrecognition andcontrol.3/4.1.1.4 MODERATOR TEMPERATURE COEFFICIENT MTCThelimitations onMTCareprovidedtoensurethattheassumptions usedintheaccidentandtransient analysesremainvalidthrougheachfuelcycle.Thesurveillance requirement formeasurement oftheMTCatthebeginning, andneartheendofeachfuelcycleisadequatetoconfirmtheMTCvaluesincethiscoefficient changesslowlydueprincipally tothereduction inRCSboronCOOKNUCLEARPLANT-UNIT 1PageB3/41-1AMENDMENT V4,420,448,S&$
1Y 3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS Continued With the RCS average temperature above 200'F, one injection system is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and positive reactivity change in the event the single injection system becomes inoperable.
1Y 3/4BASES3/4.1REACTIVITY CONTROLSYSTEMS3/4.1.2BORATIONSYSTEMSContinued WiththeRCSaveragetemperature above200'F,oneinjection systemisacceptable withoutsinglefailureconsideration onthebasisofthestablereactivity condition ofthereactorandtheadditional restrictions prohibiting COREALTERATIONS andpositivereactivity changeintheeventthesingleinjection systembecomesinoperable.
The boration capability required below 200'F is sufficient to provide a SHUTDOWN MARGIN of 1%8, k/k after xenon decay and cooldown from 200'F to 140'F.This condition requires either 2890 gallons of 20,000 ppm borated water from the boric acid storage tanks or 76,937 gallons of 2400 ppm borated water from the refueling water storage tank.The charging flowpath of Unit 1 required for Unit 2 shutdown support ensures that flow is available to Unit 2 and addresses the requirements of 10 CFR 50 Appendix R.The flowpath consists of a charging pump powered from an electrical bus and associated water supplies and delivery system.Fire watches posted in the affected opposite unit areas (i.e., Unit 2 areas requiring use of the Unit 1 charging system in the event of a fire)may serve as the equivalent shutdown capability specified in the action statements of Specification 3.1.2.3.In the affected areas, either establish continuous fire watches or verify the OPERABILITY of fire detectors per Specification 4.3.3.7 and establish hourly fire watch patrols.The required opposite unit equipment along with the surveillance requirements necessary to ensure that this equipment is capable of fulfilling its intended Appendix R alternate safe shutdown function have been established and are included in a plant procedure.
Theborationcapability requiredbelow200'Fissufficient toprovideaSHUTDOWNMARGINof1%8,k/kafterxenondecayandcooldownfrom200'Fto140'F.Thiscondition requireseither2890gallonsof20,000ppmboratedwaterfromtheboricacidstoragetanksor76,937gallonsof2400ppmboratedwaterfromtherefueling waterstoragetank.ThechargingflowpathofUnit1requiredforUnit2shutdownsupportensuresthatflowisavailable toUnit2andaddresses therequirements of10CFR50AppendixR.Theflowpathconsistsofachargingpumppoweredfromanelectrical busandassociated watersuppliesanddeliverysystem.Firewatchespostedintheaffectedoppositeunitareas(i.e.,Unit2areasrequiring useoftheUnit1chargingsystemintheeventofafire)mayserveastheequivalent shutdowncapability specified intheactionstatements ofSpecification 3.1.2.3.Intheaffectedareas,eitherestablish continuous firewatchesorverifytheOPERABILITY offiredetectors perSpecification 4.3.3.7andestablish hourlyfirewatchpatrols.Therequiredoppositeunitequipment alongwiththesurveillance requirements necessary toensurethatthisequipment iscapableoffulfilling itsintendedAppendixRalternate safeshutdownfunctionhavebeenestablished andareincludedinaplantprocedure.
An additional plant procedure details how the above noted fire watches will be implemented.
Anadditional plantprocedure detailshowtheabovenotedfirewatcheswillbeimplemented.
The limits on contained water volume and boron concentration of the RWST also ensure a pH value of between 7.6 and 9.5 for the solution recirculated within containment after a LOCA.This pH band minimizes the evolution of iodine and minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components.
Thelimitsoncontained watervolumeandboronconcentration oftheRWSTalsoensureapHvalueofbetween7.6and9.5forthesolutionrecirculated withincontainment afteraLOCA.ThispHbandminimizes theevolution ofiodineandminimizes theeffectofchlorideandcausticstresscorrosion onmechanical systemsandcomponents.
The OPERABILITY of boron injection system during REFUELING ensures that this system is available for reactivity control while in MODE 6.Precluding.positivereactivity"addi ion'capable'"of..challenging'he,.
TheOPERABILITY ofboroninjection systemduringREFUELING ensuresthatthissystemisavailable forreactivity controlwhileinMODE6.Precluding.positivereactivity"addi ion'capable'"of..challenging'he,.
minimum".required:'SHUTDOWN',"MARGIN o REFUELING boron'con'centration;is:req'uired.'to assure'ontinued'afe, operation;
minimum".
.'ntioduction;of RCS temperature changes-mu'st,alsd:,be-evaluated,to,"not:,'increase-'jeactiVity',-'above-'the
required:'SHUTDOWN',"MARGIN oREFUELING boron'con'centration;is:req'uired.'to assure'ontinued'afe, operation;
<equired SHUTDOWNMARGI/;
.'ntioduction;of RCStemperature changes-mu'st,alsd:,be-evaluated,to,"not:,'increase-'jeactiVity',-'above-'the
'.The RCS heatup-'an'd cooldown-rate is restricted in, MODE.,5 to 50'&or less in'ny.,one-hour, pe'riod,to ens'ure.that the positive eactivity',increase du'e.to'emperature'changes;is comparable to'h'e UFSAR Chapter.14 analysis of a'boron,dilution ev'eiif" Iii':this'an'alysis it',:was" co'nciuChd.''that th'ere is sufficient:"time".'available; to'etect" the dilution with: the'*s'o'ur
<equiredSHUTDOWNMARGI/;
'" ange'neutron.flux;.
'.TheRCSheatup-'an'd cooldown-rate isrestricted in,MODE.,5to50'&orlessin'ny.,one-hour, pe'riod,to ens'ure.that thepositiveeactivity',increase du'e.to'emperature'changes;is comparable to'h'eUFSARChapter.14analysisofa'boron,dilution ev'eiif"Iii':this'an'alysis it',:was" co'nciuChd.''that th'ereissufficient:"time".'available; to'etect" thedilutionwith:the'*s'o'ur
monitors-.and teimIn'ate-the ev'ent.with'operator"action
'"ange'neutron.flux;.
-There is no additIonai.heatup or cooldow rate-restriction';in-;MODE~'6.because-.the',."'REFUEL'ING; boron>",concentration,':is above,.the-minimum"required, to maiIItain,the'r'equi*red'SHUTDOWN'-MARGIN
monitors-.and teimIn'ate-theev'ent.with'operator"action
'for'the R'CS temperatur'e'rarige defined'for MO'DE 6.'.*Introduc'tion o coolant,invento'ry,,fiom the,'RWST:-
-ThereisnoadditIonai.heatup orcooldowrate-restriction';in-;MODE~'6.because-.the',."'REFUEL'ING; boron>",concentration,':is above,.the-minimum"required, tomaiIItain,the'r'equi*red'SHUTDOWN'-MARGIN
'for'theR'CStemperatur'e'rarige defined'for MO'DE6.'.*Introduc'tion ocoolant,invento'ry,,fiom the,'RWST:-
is'acceptable>provided the'RWST" boron'oncentration:
is'acceptable>provided the'RWST" boron'oncentration:
is,above,the'minimum re'redtomaintairi'the
is, above, the'minimum re'red to maintairi'the
's"'ified'SHUTDOWN"M'ARGIN'
's"'ified'SHUTDOWN"M'ARGIN'
';;"-""'",
';;"-""'", 3/4.1.3 MOVABLE CONTROL ASSEMBLIES The specifications of this section ensure that (1)acceptable power distribution limits are maintained, (2)the minimum SHUTDOWN MARGIN is maintained, and (3)the potential effects of rod ejection accident are COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 1-3 AMENDMENT 88, 420, 43%
3/4.1.3MOVABLECONTROLASSEMBLIES Thespecifications ofthissectionensurethat(1)acceptable powerdistribution limitsaremaintained, (2)theminimumSHUTDOWNMARGINismaintained, and(3)thepotential effectsofrodejectionaccidentareCOOKNUCLEARPLANT-UNIT 1PageB3/41-3AMENDMENT 88,420,43%
ATTACHMENT 2B TO AEP:NRC:1327 TECHNICAL SPECIFICATIONS PAGES MARKED TO SHOW PROPOSED CHANGES REVISED PAGES UNIT 2 3/4 1-2 3/4 1-3 3/4 1-8 3/4 1-11 3/4 1-13 3/4 1-15 3/4 3-6 3/4 4-4 3/4 8-9 3/4 9-1 3/4 9-2 B 3/4 1-1 B 3/4 1-4 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS SURVEILLANCE RE UIREMENTS Continued When in MODES 3 or 4, at least once per 24 hours by consideration of the following factors: Reactor coolant system boron concentration, Control rod position, 4, Reactor coolant system average temperature, Fuel burnup based on gross thermal energy generation, Xenon concentration-,and Samarium concentration-.
ATTACHMENT 2BTOAEP:NRC:1327 TECHNICAL SPECIFICATIONS PAGESMARKEDTOSHOWPROPOSEDCHANGESREVISEDPAGESUNIT23/41-23/41-33/41-83/41-113/41-133/41-153/43-63/44-43/48-93/49-13/49-2B3/41-1B3/41-4 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVITY CONTROLSYSTEMSSURVEILLANCE REUIREMENTS Continued WheninMODES3or4,atleastonceper24hoursbyconsideration ofthefollowing factors:Reactorcoolantsystemboronconcentration, Controlrodposition, 4,Reactorcoolantsystemaveragetemperature, Fuelburnupbasedongrossthermalenergygeneration, Xenonconcentration-,and Samariumconcentration-.
~an 7i.ao'pro'" rial(~MOD arr'ooryr::.ra','re'!"'o o"'."-".!'a""9'-,"'r."'.4.1.1.1.2 The overall core reactivity balance shall be compared to predicted values to demonstrate agreement within plus or minus 1%Delta k/k at least once per 31 Effective Full Power Days (EFPD).This comparison shall consider at least those factors stated in Specification 4.1.1.1.1.e, above.The predicted reactivity values shall be adjusted (normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 Effective Full Power Days after each fuel loading.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-2 AMENDMENT SR, 488, 434 3/4 LIMrI'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACIIVITY CONTROL SYSTEMS SHUTDOWN MARGIN T v LESS THAN OR E UAL TO 200 F LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be greater than'or equal to 1.0%Delta k/k.APPLICABILITY:
~an7i.ao'pro'"rial(~MOD arr'ooryr::.ra','re'!"
MODE 5.ACTION: With the SHUTDOWN MARGIN less than 1.0%Delta k/k, immediately initiate and continue boration at greater'han or equal to 10 gpm of a solution containing greater than or equal to 20,000 ppm boron or equivalent until the required SHUTDOWN MARGIN is restored.SURVEILLANCE RE UIREMENTS 4.1.1.2 The SHUTDOWN MARGIN shall be determined to be greater than or equal to 1.0%Delta k/k: a.Within one hour after detection of an inoperable control rod(s)and at least once per 12 hours thereafter while the rod(s)is inoperable.
'oo"'."-".!'a""9'-,"'r."'.4.1.1.1.2 Theoverallcorereactivity balanceshallbecomparedtopredicted valuestodemonstrate agreement withinplusorminus1%Deltak/katleastonceper31Effective FullPowerDays(EFPD).Thiscomparison shallconsideratleastthosefactorsstatedinSpecification 4.1.1.1.1.e, above.Thepredicted reactivity valuesshallbeadjusted(normalized) tocorrespond totheactualcoreconditions priortoexceeding afuelburnupof60Effective FullPowerDaysaftereachfuelloading.COOKNUCLEARPLANT-UNIT 2Page3/41-2AMENDMENT SR,488,434 3/4LIMrI'ING CONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACIIVITY CONTROLSYSTEMSSHUTDOWNMARGINTvLESSTHANOREUALTO200FLIMITINGCONDITION FOROPERATION 3.1.1.2TheSHUTDOWNMARGINshallbegreaterthan'orequalto1.0%Deltak/k.APPLICABILITY:
If the inoperable control rod is immovable or untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s).At least once per 24 hours by consideration of the following factors: 1.Reactor coolant system boron concentration, 2.Control rod position, 3.Reactor coolant system average temperature, 4.Fuel burnup based on gross thermal energy generation, 5.Xenon concentration, and 6.Samarium concentratio~an 7.~oronPn~al COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-3 AMENDMENT$3, 4QV, 40S, 484 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVI'IY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATHS-SHUTDOWN LIMITING CONDITION FOR OPERATION As a minimum, one of the following boron injection flow paths shall be OPERABLE: a.A flow path from the boric acid tanks via a boric acid transfer pump and charging pump to the Reactor Coolant System if only the boric acid storage tank in Specification 3.1.2.7.a is OPERABLE, or b.The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if only the refueling water storage tank in Specification 3.1.2.7.b is OPERABLE.APPLICABILITY:
MODE5.ACTION:WiththeSHUTDOWNMARGINlessthan1.0%Deltak/k,immediately initiateandcontinueborationatgreater'hanorequalto10gpmofasolutioncontaining greaterthanorequalto20,000ppmboronorequivalent untiltherequiredSHUTDOWNMARGINisrestored.
ACTION: MODES 5 and 6.W ith none of the above flow paths OPERABLE, suspend all operations involving CORE ALTERATIONS or sitive reactivi~chan es.except:;:I):
SURVEILLANCE REUIREMENTS 4.1.1.2TheSHUTDOWNMARGINshallbedetermined tobegreaterthanorequalto1.0%Deltak/k:a.Withinonehourafterdetection ofaninoperable controlrod(s)andatleastonceper12hoursthereafter whiletherod(s)isinoperable.
Iftheinoperable controlrodisimmovable oruntrippable, theSHUTDOWNMARGINshallbeverifiedacceptable withanincreased allowance forthewithdrawn worthoftheimmovable oruntrippable controlrod(s).Atleastonceper24hoursbyconsideration ofthefollowing factors:1.Reactorcoolantsystemboronconcentration, 2.Controlrodposition, 3.Reactorcoolantsystemaveragetemperature, 4.Fuelburnupbasedongrossthermalenergygeneration, 5.Xenonconcentration, and6.Samariumconcentratio~an 7.~oronPn~al COOKNUCLEARPLANT-UNIT 2Page3/41-3AMENDMENT
$3,4QV,40S,484 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVI'IY CONTROLSYSTEMS3/4.1.2BORATIONSYSTEMSFLOWPATHS-SHUTDOWNLIMITINGCONDITION FOROPERATION Asaminimum,oneofthefollowing boroninjection flowpathsshallbeOPERABLE:
a.AflowpathfromtheboricacidtanksviaaboricacidtransferpumpandchargingpumptotheReactorCoolantSystemifonlytheboricacidstoragetankinSpecification 3.1.2.7.a isOPERABLE, orb.Theflowpathfromtherefueling waterstoragetankviaachargingpumptotheReactorCoolantSystemifonlytherefueling waterstoragetankinSpecification 3.1.2.7.b isOPERABLE.
APPLICABILITY:
ACTION:MODES5and6.WithnoneoftheaboveflowpathsOPERABLE, suspendalloperations involving COREALTERATIONS orsitivereactivi~chanes.except:;:I):
heatup'or''co'oldow
heatup'or''co'oldow
~f;.the-='reactor'-
~f;.the-='reactor'-
coolant''olume.provid
coolant''olume.provid
','that,SUTDOWN,.IvIARGIN'ufficient:
','that, S UTDOWN,.IvIARGIN'ufficient:
toaccominodate the'hange.-
to accominodate the'hange.-
idemperature is':maintained>in.
id emperature is':maintained>in.
a<ccordance:with,'-'Specificati<on 3;I';2'!in'ODE 5<or,Specific'atiori;3:.9<1"in, MODE.6)dthe"heatup'or"cootdown rate,is'restricted to,50;.F.
a<ccordance:with,'-'Specificati<on 3;I';2'!in'ODE 5<or,Specific'atiori;3:.9<1"in, MODE.6)d the"heatup'or"cootdown rate, is'restricted to,50;.F.or less in'a'ny,one-hour=p'eriod in.MODE 5,:.or.2)addition.of Rater,'from,;ifie''RWSTi;piovided,'.thetb'pron--'concentration>
orlessin'a'ny,one-hour=p'eriod in.MODE5,:.or.2)addition.
in the RWST"is"greater'hari or.'e" ua-'to"tliei-minimui
ofRater,'from,;ifie''RWSTi;piovided,'.thetb'pron--'concentration>
intheRWST"is"greater'hari or.'e"ua-'to"tliei-minimui
~euired~b'
~euired~b'
'ification 3'.2.7..b.2 SURVEILLANCE REUIREMENTS Atleastoneoftheaboverequiredflowpathsshallbedemonstrated OPERABLE:
'ification 3'.2.7..b.2 SURVEILLANCE RE UIREMENTS At least one of the above required flow paths shall be demonstrated OPERABLE: At least once per 7 days by verifying that the temperature of the heat traced portion of the flow path is greater than or equal to 145'F when a flow path from the boric acid tanks is used.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-8 AMENDMENT SP 3/4 LIMITING CONDITIONS FOR OPleeATION AND SURVEILLANCE<
Atleastonceper7daysbyverifying thatthetemperature oftheheattracedportionoftheflowpathisgreaterthanorequalto145'Fwhenaflowpathfromtheboricacidtanksisused.Atleastonceper31daysbyverifying thateachvalve(manual,poweroperatedorautomatic) intheflowpaththatisnotlocked,sealed,orotherwise securedinposition, isinitscorrectposition.
REQUIREMENTS 3/4.1 REACTIVHY CONTROL SYSTEMS CHARGING PUMP-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 One charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.One charging flow path associated with support of Unit 1 shutdown functions shall be available.*
COOKNUCLEARPLANT-UNIT 2Page3/41-8AMENDMENT SP 3/4LIMITINGCONDITIONS FOROPleeATION ANDSURVEILLANCE<
REQUIREMENTS 3/4.1REACTIVHY CONTROLSYSTEMSCHARGINGPUMP-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.3Onechargingpumpintheboroninjection flowpathrequiredbySpecification 3.1.2.1shallbeOPERABLEandcapableofbeingpoweredfromanOPERABLEemergency bus.Onechargingflowpathassociated withsupportofUnit1shutdownfunctions shallbeavailable.*
APPLICABILITY:
ACTION:Specification 3.1.2.3.a.
-MODES5and6Specification 3.1.2.3.b.
-AtalltimeswhenUnit1isinMODES1,2,3,or4.WithnochargingpumpOPERABLE, suspendallorationsinvolvinCOREALTERATIONS orsitivereactivichanes.xcept:1)heatuporcooldow'n oftheac'tor'coolant'yolu'me provided'-that SHUTDOWNMARGIN-sufficient to.accommodate e'change'n tempter'ature is'maintained inaccordance withSpecification 3.1,1.2'iqODE5.or.Specification.3.9.1rin MODE6;and'theheatuporcooldownrateisrestricted o,50;F,or,lessin'anyone-hourperiodinMODE5'r2),addition, of.waterfrom:theWST,provided, theboionconcentration intheRWSisreaterthanorequal.totheninimumre'~iredb~Scificeticn 3.1,2,7.b,2 WithmorethanonechargingpumpOPERABLEorwithasafetyinjection pump(s)OPERABLEwhenthetemperature ofanyRCScoldlegislessthanorequalto152'F,unlessthereactorvesselheadisremoved,removetheadditional chargingpump(s)andthesafetyinjection pump(s)motorcircuitbreakersfromtheelectrical powercircuitwithinonehour.Theprovisions ofSpecification 3.0.3arenotapplicable.
Inadditiontotheabove,whenSpecification 3.1.2.3.b isapplicable andtherequiredflowpathisnotavailable, returntherequiredflowpathtoavailable statuswithin7days,orprovideequivalent shutdowncapability inUnit1andreturntherequiredflowpathtoavailable statuswithinthenext60days,orhaveUnit1inHOTSTANDBYwithinthenext12hoursandHOTSHUTDOWNwithinthefollowing 24hours.Therequirements ofSpecification
 
==3.0. 4arenotapplicable==
whenSpecification 3.1.2.3.b applies.SURVEILLANCE REUIREMENTS 4.1.2.3.1 Theaboverequiredchargingpumpshallbedemonstrated OPERABLEbyverifying thatthepump'sdeveloped headatthetestflowpointisgreaterthanorequaltotherequireddeveloped headwhentestedpursuanttoSpecification
 
==4.0. 5Amaximumofonecentrifugal==
chargingpumpshallbeOPERABLEwheneverthetemperature ofoneormoreoftheRCScoldlegsislessthanorequalto152'F.COOKNUCLEARPLANT-UNIT 2Page3/41-11AMlesNDMENT 85,407,446,$$
3/4LIMI'HNGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS t3/4.1REACTIVITY CONTROLSYSTEMSBORICACIDTRANSFERPUMPS-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.5AtleastoneboricacidtransferpumpshallbeOPERABLEandcapableofbeingpoweredfromanOPERABLEemergency busifonlytheflowpaththroughtheboricacidtransferpumpofSpecification 3.1.2.1aisOPERABLE.
APPLICABILITY:
APPLICABILITY:
MODES5and6.ACTION:WithnoboricacidtransferpumpOPERABLEasrequiredtocompletetheflowpathofSpecification 3.1.2.1a, suspendalloperations involving COREALTERATIONS orsitivereactivity~chan esexcept:.1)heatuporcooldownofthereac'torcoolantvolumeprovidiat'HUTDOWN MARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance wipecification 3;-1.1.2;in'MGDE-5 orSpecification 3.9.1'nMODE6,andtheheatuporcooldownrateisrestricted t~60'Forlessinanyone-hourperiodinMODE5,or2)additionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisreaterthano'reu'altotheinimumreuiredbgcification 3.1.2.7.b SURVEILLANCE REUIREMENTS 4.1.2.5Noadditional Surveillance Requirements otherthanthoserequiredbySpecification 4.0.5.COOKNUCLEARPLANT-UNIT 2Page3/41-13AMENDMENT
ACTION: Specification 3.1.2.3.a.
$3  
-MODES 5 and 6 Specification 3.1.2.3.b.
-At all times when Unit 1 is in MODES 1, 2, 3, or 4.With no charging pump OPERABLE, suspend all o rations involvin CORE ALTERATIONS or sitive reactivi chan es.xcept: 1)heatup or cooldow'n of th eac'tor'coolant'yolu'me provided'-that SHUTDOWN MARGIN-sufficient to.accommodate e'change'n tempter'ature is'maintained in accordance with Specification 3.1,1.2'iq ODE 5.or.Specification.3.9.1rin MODE 6;and'the heatup or cooldown rate is restricted o,50;F, or, less in'any one-hour period in MODE5'r 2),addition, of.water from: the WST, provided, the boion concentration in the RWS is reater than or equal.to the ninimum re'~ired b~Scificeticn 3.1,2,7.b,2 With more than one charging pump OPERABLE or with a safety injection pump(s)OPERABLE when the temperature of any RCS cold leg is less than or equal to 152'F, unless the reactor vessel head is removed, remove the additional charging pump(s)and the safety injection pump(s)motor circuit breakers from the electrical power circuit within one hour.The provisions of Specification 3.0.3 are not applicable.
In addition to the above, when Specification 3.1.2.3.b is applicable and the required flow path is not available, return the required flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 1 and return the required flow path to available status within the next 60 days, or have Unit 1 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 hours.The requirements of Specification 3.0.4 are not applicable when Specification 3.1.2.3.b applies.SURVEILLANCE RE UIREMENTS 4.1.2.3.1 The above required charging pump shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5 A maximum of one centrifugal charging pump shall be OPERABLE whenever the temperature of one or more of the RCS cold legs is less than or equal to 152'F.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-11 AMlesNDMENT 85, 407, 446,$$
3/4 LIMI'HNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS t 3/4.1 REACTIVITY CONTROL SYSTEMS BORIC ACID TRANSFER PUMPS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.5 At least one boric acid transfer pump shall be OPERABLE and capable of being powered from an OPERABLE emergency bus if only the flow path through the boric acid transfer pump of Specification 3.1.2.1a is OPERABLE.APPLICABILITY:
MODES 5 and 6.ACTION: With no boric acid transfer pump OPERABLE as required to complete the flow path of Specification 3.1.2.1a, suspend all operations involving CORE ALTERATIONS or sitive reactivity~chan es except:.1)heatup or cooldown of the reac'tor coolant volume provid iat'HUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance wi pecification 3;-1.1.2;in'MGDE-5 or Specification 3.9.1'n MODE 6, and the heatup or cooldown rate is restricted t~60'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is reater than o'r e u'al to the inimum re uired b g cification 3.1.2.7.b SURVEILLANCE RE UIREMENTS 4.1.2.5 No additional Surveillance Requirements other than those required by Specification 4.0.5.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-13 AMENDMENT$3  
.~
.~
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVITY CONTROLSYSTEMSBORATEDWATERSOURCES-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.7Asaminimum,oneofthefollowing boratedwatersourcesshallbeOPERABLE:
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.7 As a minimum, one of the following borated water sources shall be OPERABLE: A boric acid storage system and associated heat tracting with: 1.A minimum usable borated water volume of 4300 gallons, 2.Between 20,000 and 22,500 ppm of boron, and 3.A minimum solution temperature of 145'F.The refueling water storage tank with: 1.A minimum usable borated water volume of 90,000 gallons, 2.A minimum boron concentration of 2400 ppm, and 3.A minimum solution temperature of 70'F.APPLICABILITY:
Aboricacidstoragesystemandassociated heattractingwith:1.Aminimumusableboratedwatervolumeof4300gallons,2.Between20,000and22,500ppmofboron,and3.Aminimumsolutiontemperature of145'F.Therefueling waterstoragetankwith:1.Aminimumusableboratedwatervolumeof90,000gallons,2.Aminimumboronconcentration of2400ppm,and3.Aminimumsolutiontemperature of70'F.APPLICABILITY:
ACTION: MODES 5 and 6.With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or sitive n t b 3 r reactivi chan es except', r1;heatup"o ooldown of thejre'a'ctorf'coolant:volume;provided,that'HUTDOWN'.MARGIN sufficient'<to:accommodate.
ACTION:MODES5and6.WithnoboratedwatersourceOPERABLE, suspendalloperations involving COREALTERATIONS orsitiventb3rreactivichanesexcept',r1;heatup "oooldownofthejre'a'ctorf'coolant:volume;provided,that'HUTDOWN'.MARGIN sufficient'<to:accommodate.
thefchange e b n u 3 temperafure'.is'-;maintained'in
thefchange ebnu3temperafure'.is'-;maintained'in
'accorda'nce, yiith Specificatio'n<
'accorda'nce, yiithSpecificatio'n<
3;1.1;2 in MODE.5'or,specification:3'.9;1 in MODF,6 id.the'hea'tup,'our<cooldown,'rate.'is,-r'eustr'icted>to<
3;1.1;2inMODE.5'or,specification:3'.9;1 inMODF,6id.the'hea'tup,'our<cooldown,'rate.'is,-r'eustr'icted>to<
50OF'or less in, any,'one-hour"period"",in'.MODE 5'ro 2)-.'addition.'-of Water fiOmf&e!RWST; jipuided;dt'e'bprcnnbdphCehtraiipn"tri'.the;.R ST'ie': ieatei tihan'Or.e uai"tu'.th'e mtdimuin e'biiedb S'widcea't'O c3..1 2".7'.b:2 SURVEILLANCE RE UIREMENTS 4.1.2.7 The above required boratcd water source shall be demonstrated OPERABLE: At least once per 7 days by: 1.2.3.Verifying the boron concentration of the water, Verifying the contained borated water volume, and Verifying the boric acid storage tank solution temperature when it is the source of borated water.At least once per 24 hours by verifying the RWST temperature when it is the source of borated water.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-15 AMENDMENT S3, 94, 499  
50OF'orlessin,any,'one-hour "period"",in'.MODE 5'ro2)-.'addition.'-of WaterfiOmf&e!RWST; jipuided;dt'e'bprcnnbdphCehtraiipn"tri'.the;.R ST'ie':ieateitihan'Or.
euai"tu'.th'e mtdimuine'biiedbS'widcea't'O c3..12".7'.b:2 SURVEILLANCE REUIREMENTS 4.1.2.7Theaboverequiredboratcdwatersourceshallbedemonstrated OPERABLE:
Atleastonceper7daysby:1.2.3.Verifying theboronconcentration ofthewater,Verifying thecontained boratedwatervolume,andVerifying theboricacidstoragetanksolutiontemperature whenitisthesourceofboratedwater.Atleastonceper24hoursbyverifying theRWSTtemperature whenitisthesourceofboratedwater.COOKNUCLEARPLANT-UNIT 2Page3/41-15AMENDMENT S3,94,499  


3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 34.3INTABLE3.3-1Continued a.BelowP-6,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabovetheP-6Setpoint.
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3 4.3 IN TABLE 3.3-1 Continued a.Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.b.Above P-6 but below 5%of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 5%of RATED THERMAL POWER c.Above 5%of RATED THERMAL POWER, POWER OPERATION may continue.ACTION 4-With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement and with the THERMAL POWER level: a.Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.b.Above P-6 operation may continue.ACTION 5 With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement:
b.AboveP-6butbelow5%ofRATEDTHERMALPOWER,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabove5%ofRATEDTHERMALPOWERc.Above5%ofRATEDTHERMALPOWER,POWEROPERATION maycontinue.
g mmediately.suspend operations, involving positive reactivity, changes except addition o(~~water from the RWST,,provided the boron concentration in the RWST is greater than the MODE 5~an bQ Verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, within I hour and at least once per 12 hours thereafteri and c.'Close'the isolation valves for unbo'rated water sources.to the chemical and volume contro f ystem within 1 hour.In MODE, 5, if the RWST boron concentration is less than the eactoi'coolant system" boron concentration and less than the'boron concentratio'n requiretI pi Specification 2.<.2.7.b.2 isolate the RsstST from the reactor coolant s~stem w'Ihbl''hour ACTION 6 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
ACTION4-WiththenumberofchannelsOPERABLEonelessthanrequiredbytheMinimumChannelsOPERABLErequirement andwiththeTHERMALPOWERlevel:a.BelowP-6,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabovetheP-6Setpoint.
a.The inoperable channel is placed in the tripped condition within 1 hour.b.The Minimum Channels OPERABLE requirement is met;however, the inoperable CHANNEL may be bypassed for up to 2 hours for surveillance testing of the other channels per Specification 4.3.1.1.1.
b.AboveP-6operation maycontinue.
ACTION 7 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 3-6 AMENDMENT V5 3/4 LIMKING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTI<'.M SAFETY VALVES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2 A minimum of one pressurizer code safety valve shall be OPERABLE with a lift setting of 2485 PSIG 2 1%.APPLICABILITY:
ACTION5WiththenumberofchannelsOPERABLEonelessthanrequiredbytheMinimumChannelsOPERABLErequirement:
ACTION: MODES 4 and 5.With no pressurizer code safety valve OPERABLE:-----b-'om'the'", W<, ST jpr'ovided'~the
gmmediately.suspend operations, involving positivereactivity, changesexceptadditiono(~~waterfromtheRWST,,provided theboronconcentration intheRWSTisgreaterthantheMODE5~anbQVerifycompliance withtheSHUTDOWNMARGINrequirements ofSpecification 3.1.1.1or3.1.1.2,asapplicable, withinIhourandatleastonceper12hoursthereafteri andc.'Close'the isolation valvesforunbo'rated watersources.to thechemicalandvolumecontrofystemwithin1hour.InMODE,5,iftheRWSTboronconcentration islessthantheeactoi'coolant system"boronconcentration andlessthanthe'boron concentratio'n requiretI piSpecification 2.<.2.7.b.2 isolatetheRsstSTfromthereactorcoolants~stemw'Ihbl''hourACTION6WiththenumberofOPERABLEchannelsonelessthantheTotalNumberofChannels, STARTUPand/orPOWEROPERATION mayproceedprovidedthefollowing conditions aresatisfied:
>boron'!',conce<iifratio'n'tin the8RWST.;'is:,<gr'eater-";.thaii'he"'minimums e u'iree,~b'-'ectficah'prie<'2:8&#x17d;2".
a.Theinoperable channelisplacedinthetrippedcondition within1hour.b.TheMinimumChannelsOPERABLErequirement ismet;however,theinoperable CHANNELmaybebypassedforupto2hoursforsurveillance testingoftheotherchannelsperSpecification 4.3.1.1.1.
ACTION7WiththenumberofOPERABLEchannelsonelessthantheTotalNumberofChannels, STARTUPand/orPOWEROPERATION mayproceeduntilperformance ofthenextrequiredCHANNELFUNCTIONAL TESTprovidedtheinoperable channelisplacedinthetrippedcondition within1hour.COOKNUCLEARPLANT-UNIT 2Page3/43-6AMENDMENT V5 3/4LIMKINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.4REACTORCOOLANTSYSTI<'.M SAFETYVALVES-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.4.2Aminimumofonepressurizer codesafetyvalveshallbeOPERABLEwithaliftsettingof2485PSIG21%.APPLICABILITY:
ACTION:MODES4and5.Withnopressurizer codesafetyvalveOPERABLE:
-----b-'om'the'",W<,STjpr'ovided'~the
>boron'!',conce<iifratio'n'tin the8RWST.;'is:,<gr'eater-";.thaii'he"'minimums eu'iree,~b'-'ectficah'prie<'2:8&#x17d;2".
ODE"'4"or='3".<<2!7!b'.2'-.'(MOD
ODE"'4"or='3".<<2!7!b'.2'-.'(MOD
-".-.5andplacean<<,<<'PERABLE RHRloopintooperation intheshutdowncoolingmod.="anImmediately renderallSafetyInjection pumpsandallbutonechargingpumpinoperable byremovingtheapplicable motorcircuitbreakersfromtheelectrical powercircuitwithinonehour.SURVEILLANCE REUIREMENTS 4.4.2Noadditional Surveillance Requirements otherthanthoserequiredbySpecification 4.0.5.Theliftsettingpressureshallcorrespond toambientconditions ofthevalveatnominaloperating temperature andpressure.
-".-.5 and place an<<,<<'PERABLE RHR loop into operation in the shutdown cooling mod.="an Immediately render all Safety Injection pumps and all but one charging pump inoperable by removing the applicable motor circuit breakers from the electrical power circuit within one hour.SURVEILLANCE RE UIREMENTS 4.4.2 No additional Surveillance Requirements other than those required by Specification 4.0.5.The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 4-4 AMENDMENT SR, 497  
COOKNUCLEARPLANT-UNIT 2Page3/44-4AMENDMENT SR,497  


3/4LIMITINGCONDITIONS FOROPE<RATION ANDSURVEILLANCE REQUIREMENTS 3/4.8ELECTRICAL POWERSYSTEMSSHUTDOWNLIMITINGCONDITION FOROPERATION 3.8.1.2Asaminimum,thefollowing A.C.electrical powersourcesshallbeOPERABLE:
3/4 LIMITING CONDITIONS FOR OPE<RATION AND SURVEILLANCE REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C.electrical power sources shall be OPERABLE: One circuit between the offsite transmission network and the onsite Class 1E distribution system, and One diesel generator with: 1.A day fuel tank containing a minimum of 70 gallons of fuel, A fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and APPLICABILITY:
Onecircuitbetweentheoffsitetransmission networkandtheonsiteClass1Edistribution system,andOnedieselgenerator with:1.Adayfueltankcontaining aminimumof70gallonsoffuel,Afuelstoragesystemcontaining aminimumindicated volumeof46,000gallonsoffuel,andAPPLICABILITY:
ACTION: 3.A fuel transfer pump.MODES 5 and 6.With less than the above minimum required A.C.electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivi~changes xcept: I)'heatup'or cooldown of the reactor coolant'oluine provided tha SHUTDOWN.MA'RGINusufficientbto-a'ccommodate the'.change in temperature is maintained, in accordance witII Itpectficat ion 31.L2c tnt MODE 5'o'r'Spcification 301 in MODE 6;snd the hea<up or cooldbwn rate is restiict ed fo)01'F or less in any cne:hour.period in, MODE 5, or 2)addition of'alei: from the<,.RWST, provided..the boron concentiation i'n the RWST is'ester than or e ual to the minimum re u~ired b S ciftcation 3.1.2.7.b.2 SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C.electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.+
ACTION:3.Afueltransferpump.MODES5and6.WithlessthantheaboveminimumrequiredA.C.electrical powersourcesOPERABLE, suspendalloperations involving COREALTERATIONS orpositivereactivi~changes xcept:I)'heatup
'The provisions of Technical Specification 4.0.8 are applicable.
'orcooldownofthereactorcoolant'oluine providedthaSHUTDOWN.MA'RGINusufficientbto-a'ccommodate the'.changeintemperature ismaintained, inaccordance witIIItpectficat ion31.L2ctntMODE5'o'r'Spcification 301inMODE6;sndthehea<uporcooldbwnrateisrestiictedfo)01'Forlessinanycne:hour.
COOK NUCLEAR PLANT-UNIT 2 Page 3/4 8-9 AMENDMENT 4483 4333 459 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 i e boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met: Either a K,pi of 0.95 or less, which includes a 1%bk/k conservative allowance for uncertainties, or b.A boron concentration of greater than or equal to 2400 ppm, which includes a 50 ppm conservative allowance for uncertainties.
periodin,MODE5,or2)additionof'alei:fromthe<,.RWST, provided..the boronconcentiation i'ntheRWSTis'esterthanoreualtotheminimumreu~iredbSciftcation 3.1.2.7.b.2 SURVEILLANCE REUIREMENTS 4.8.1.2TheaboverequiredA.C.electrical powersourcesshallbedemonstrated OPERABLEbytheperformance ofeachoftheSurveillance Requirements of4.8.1.1.1 and4.8.1.1.2 exceptforrequirement 4.8.1.1.2.a.5.+
'Theprovisions ofTechnical Specification 4.0.8areapplicable.
COOKNUCLEARPLANT-UNIT 2Page3/48-9AMENDMENT 44834333459 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.9REFUELING OPERATIONS BORONCONCENTRATION LIMITINGCONDITION FOROPERATION 3.9.1ieboronconcentration ofallfilledportionsoftheReactorCoolantSystemandtherefueling canalshallbemaintained uniformandsufficient toensurethatthemorerestrictive ofthefollowing reactivity conditions ismet:EitheraK,piof0.95orless,whichincludesa1%bk/kconservative allowance foruncertainties, orb.Aboronconcentration ofgreaterthanorequalto2400ppm,whichincludesa50ppmconservative allowance foruncertainties.
APPLICABILITY:
APPLICABILITY:
MODE6ACTION:tiWiththerequirements ofthe-above specification notsatisfied,-tt immrdiatet~sus ndaii.-=-orationsinvolvinCOREALTERATIONS orsitivereactivity changes~'xcept~andditioh
MODE 6 ACTION: ti With the requirements of the-above specification not satisfied,-tt immrdiatet~sus nd aii.-=-o rations involvin CORE ALTERATIONS or sitive reactivity changes~'xcept~andditioh
'omVhmnbedm,ater-.from, theRS7,'-,pro'videdjhetboion conceiitrati" niintthe,RWST'is~"
'o m V h m n b e d m ,ater-.from, the R S7,'-,pro'videdjhetboion conceiitrati" niint the,RWST'is~" eaterdthan'the'miiuinut e'redtb'.,'S'ficationa8i.'1".2 b 2"'and'nitiate and continue boration at greater than or equal to 10 gpm of 20,000 ppm boric acid solution or its equivalent until K,z is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2400 ppm, whichever is the more restrictive.
eaterdthan'the'miiuinut e'redtb'.,'S'ficationa8i.'1".2 b2"'and'nitiateandcontinueborationatgreaterthanorequalto10gpmof20,000ppmboricacidsolutionoritsequivalent untilK,zisreducedtolessthanorequalto0.95ortheboronconcentration isrestoredtogreaterthanorequalto2400ppm,whichever isthemorerestrictive.
H The provisions of Specification 3.0.3 are not applicable.
HTheprovisions ofSpecification 3.0.3arenotapplicable.
SURVEILLANCE RE UIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to: a.Removing or unbolting the reactor vessel head, and b.Withdrawal of any full length control rod in excess of 3 feet from its fully inserted position within the reactor pressure vessel.4.9.1.2 The boron concentration of the reactor coolant system and the refueling canal shall be determined by chemical analysis at least once per 72 hours.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-1'  
SURVEILLANCE REUIREMENTS 4.9.1.1Themorerestrictive oftheabovetworeactivity conditions shallbedetermined priorto:a.Removingorunbolting thereactorvesselhead,andb.Withdrawal ofanyfulllengthcontrolrodinexcessof3feetfromitsfullyinsertedpositionwithinthereactorpressurevessel.4.9.1.2Theboronconcentration ofthereactorcoolantsystemandtherefueling canalshallbedetermined bychemicalanalysisatleastonceper72hours.COOKNUCLEARPLANT-UNIT 2Page3/49-1'  


3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.9REI<<ELING OPERATIONS INSTRUMENTATION LIMITINGCONDITION FOROPERATION 3.9.2Asaminimum,twosourcerangeneutronfluxmonitorsshallbeoperating, eachwithcontinuous visualindication inthecontrolroomandonewithaudibleindication inthecontainment andcontrolroom.APPLICABILITY:
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REI<<ELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment and control room.APPLICABILITY:
MODE6.ACTION:Withtherequirements oftheabovespecification notsatisfied, immediatel susndallorationsinvolving COREALTERATIONS orsitivereactivichanes-.'c<ept''addition',of;;,water..'from,tli'ST~t providedt>the.boion
MODE 6.ACTION: With the requirements of the above specification not satisfied, immediatel sus nd all o rations involving CORE ALTERATIONS or sitive reactivi chan es-.'c<ept''addition',of;;,water..'from,tli'ST~t providedt>the.boion
'concentrationi
'concentrationi
'"RWSTis;"'eater;tha'n" the'.:minimiim'r<
'"RWST is;"'eater;tha'n" the'.:minimiim'r<
"'i'ed'''inca'tio 3->2'.'.b!2HTheprovisions ofSpecification 3.0.3arenotapplicable.
"'i'ed'''inca'tio 3->2'.'.b!2 H The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REUIREMENTS 4.9.2Eachsourcerangeneutronfluxmonitorshallbedemonstrated OPERABLEbyperformance of:a.ACHANNELFUNCTIONAL TESTatleastonceper7days,andb.ACHANNELFUNCTIONAL TESTwithin8hourspriortotheinitialstartofCOREALTERATIONS, andc.ACHANNELCHECKatleastonceper12hoursduringCOREALTERATIONS.
SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of: a.A CHANNEL FUNCTIONAL TEST at least once per 7 days, and b.A CHANNEL FUNCTIONAL TEST within 8 hours prior to the initial start of CORE ALTERATIONS, and c.A CHANNEL CHECK at least once per 12 hours during CORE ALTERATIONS.
B-.HhM~COOKNUCLEARPLANT-UNIT 2Page3/49-2AMENDMENT 68)SP  
B-.HhM~COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-2 AMENDMENT 68)SP  


3/4BASES3/4.1REACTIVITY.
3/4 BASES 3/4.1 REACTIVITY.
CONTROLSYSTI<MS3/4.1.1BORATIONCONTROL3/4.1.1.1 and3/4.1.1.2 SHUTDOWNMARGINAsufficient SHUTDOWNMARGINensuresthat1)thereactorcanbemadesubcritical fromalloperating conditions, 2)thereactivity transients associated withpostulated accidentconditions arecontrollable withinacceptable limits,and3)thereactorwillbemaintained sufficiently subcritical toprecludeinadvertent criticality intheshutdowncondition.
CONTROL SYSTI<MS 3/4.1.1 BORATION CONTROL 3/4.1.1.1 and 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1)the reactor can be made subcritical from all operating conditions, 2)the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3)the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.
SHUTDOWNMARGINrequirements varythroughout corelifeasafunctionoffueldepletion, RCSboronconcentration, andRCST,~.Themostrestrictive condition occursatEOL,withT,,atnoloadoperating temperature, andisassociated withapostulated steamlinebreakaccidentandresulting uncontrolled RCScooldown.
SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS T,~.The most restrictive condition occurs at EOL, with T,, at no load operating temperature, and is associated with a postulated steam line break accident and resulting uncontrolled RCS cooldown.In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1.3%Delta k/k is initially required to control the reactivity transient and automatic ESF is assumed to be available.
Intheanalysisofthisaccident, aminimumSHUTDOWNMARGINof1.3%Deltak/kisinitially requiredtocontrolthereactivity transient andautomatic ESFisassumedtobeavailable.
With T,~less than 200'F, the reactivity transients resulting from a postulated steam line break cooldown are minimal and a 1%Delta k/k SHUTDOWN MARGIN provides adequate protection for this event.The SHUTDOWN MARGIN requirements are based upon the-limiting conditions described-above and are consistent with FSAR safety analysis assumptions.
WithT,~lessthan200'F,thereactivity transients resulting fromapostulated steamlinebreakcooldownareminimalanda1%Deltak/kSHUTDOWNMARGINprovidesadequateprotection forthisevent.TheSHUTDOWNMARGINrequirements arebaseduponthe-limiting conditions described-above andareconsistent withFSARsafetyanalysisassumptions.
A'oron<penaltyimust;be".applied:when'opera g.pith'no",rcacto'r=codla'nt:
A'oron<penaltyimust;be".applied:when'opera g.pith'no",rcacto'r=codla'nt:
lo'opsin:oper'atiori'but~
lo'opsin:oper'atiori'but~
oneor=.mbr'e"residu ieatrettioyal'Io'ops~'providing sltut'down;cooling!'<.'.'The'necess'ary,,penalty, is,'.included'.jn theSHUTDOWNMARGI3/4.1.1.3 BORONDILUTIONAminimumflowrateofatleast2000GPMprovidesadequatemixing,preventsstratification andensuresthatreactivity changeswillbegradualduringboronconcentration reductions intheReactorCoolantSystem.Aflowrateofatleast2000GPMwillcirculate anequivalent ReactorCoolantSystemvolumeof12,612cubicfeetinapproximately 30minutes.Thereactivity changerateassociated withboronreductions willtherefore bewithinthecapability foroperatorrecognition andcontrol.COOKNUCLEARPLANT-UNIT 2PageB3/41>>1AMENDMENT 88,$$,484,499  
one or=.mbr'e"residu ieat rettioyal'Io'ops~'providing sltut'down;cooling!'<.'.'The'necess'ary,,penalty, is,'.included'.jn the SHUTDOWN MARGI 3/4.1.1.3 BORON DILUTION A minimum flow rate of at least 2000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during boron concentration reductions in the Reactor Coolant System.A flow rate of at least 2000 GPM will circulate an equivalent Reactor Coolant System volume of 12,612 cubic feet in approximately 30 minutes.The reactivity change rate associated with boron reductions will therefore be within the capability for operator recognition and control.COOK NUCLEAR PLANT-UNIT 2 Page B 3/4 1>>1 AMENDMENT 88,$$, 484, 499  


3/4BASES3/4.1REACI'IVITY CONTROLSYSTEMS3/4.1.2BORATIONSYSTEMSContinued ThechargingflowpathofUnit2requiredforUnit1shutdownsupportensuresthatflowisavailable toUnit1andaddresses therequirements of10CFR50AppendixR.Theflowpathconsistsofachargingpumppoweredfromanelectrical busandassociated watersuppliesanddeliverysystem.Firewatchespostedintheaffectedoppositeunitareas(i.e.,Unit1areasrequiring useoftheUnit2chargingsystemintheeventofafire)mayserveastheequivalent shutdowncapability specified intheactionstatements ofSpecification 3.1.2.3.Intheaffectedareas,eitherestablish continuous firewatchesorverifytheOPERABILITY offiredetectors perSpecification 4.3.3./andestablish hourlyfirewatchpatrols.Therequiredoppositeunitequipment alongwiththesurveillance requirements necessary toensurethatthisequipment iscapableoffulfilling itsintendedAppendixRalternate safeshutdownfunctionhavebeenestablished andareincludedinaplantprocedure.
3/4 BASES 3/4.1 REACI'IVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS Continued The charging flowpath of Unit 2 required for Unit 1 shutdown support ensures that flow is available to Unit 1 and addresses the requirements of 10 CFR 50 Appendix R.The flowpath consists of a charging pump powered from an electrical bus and associated water supplies and delivery system.Fire watches posted in the affected opposite unit areas (i.e., Unit 1 areas requiring use of the Unit 2 charging system in the event of a fire)may serve as the equivalent shutdown capability specified in the action statements of Specification 3.1.2.3.In the affected areas, either establish continuous fire watches or verify the OPERABILITY of fire detectors per Specification 4.3.3./and establish hourly fire watch patrols.The required opposite unit equipment along with the surveillance requirements necessary to ensure that this equipment is capable of fulfilling its intended Appendix R alternate safe shutdown function have been established and are included in a plant procedure.
Anadditional plantprocedure detailshowtheabovenotedfirewatcheswillbeimplemented.
An additional plant procedure details how the above noted fire watches will be implemented.
Precluding'~positive'jieactiyityjaddition',,capable,
Precluding'~positive'jieactiyityjaddition',,capable,'of,'challenging:,the niinimum-required SHUTDOWN MARGI'o FUELING'boro'ri'concentratto'n:is"required to."a'ssur'e
'of,'challenging:,the niinimum-requiredSHUTDOWNMARGI'oFUELING'boro'ri'concentratto'n:is "required to."a'ssur'e
'contfiiued.s'afe operation,-Introduction.'of RCS'temperatur changes,mus't;.'also~be
'contfiiued.s'afe operation,
-Introduction.'of RCS'temperatur changes,mus't;.'also~be
'evaluaibd.to'>not" iiicrease',,rea'c'tivi'ty,.'above the:required',:SHVTDOWN.'MARGIN:.,-The'.
'evaluaibd.to'>not" iiicrease',,rea'c'tivi'ty,.'above the:required',:SHVTDOWN.'MARGIN:.,-The'.
RCSeatupan'd'cooltlown-r'ate isiestricted.'in MODE-5to'50F,-or-.lessinanyonehourp'er'iod.'to:ensure.
RCS eatup an'd'cooltlown-r'ate is iestricted.'in MODE-5 to'50 F,-or-.less in any onehour p'er'iod.'to:ensure.
thatthe,positivereactivity'increatse'-"due"to
that the, positive reactivity'increatse'-"due"to
'temper'ature:changes is'co'inparable tothe'UFSA'R'hapter'14 aiialy*sis''o(a'or'oii
'temper'ature:changes is'co'inparable to the'UFSA'R'hapter'14 aiialy*sis''o(a'or'oii
'dilution event,-'..:.In'",.thisanalysis>."it'.was, coricluChd,'that there:is,'sufficient'ime, available,to~de't'e'ct thedilulionWith-,the sourcerange'neutron flux;moiutors'and teriiiiiiate.,the ey'entimthoperator.
'dilution event,-'..:.In'",.thisanalysis>."it'.was, coricluChd,'that there:is,'sufficient'ime, available,to~de't'e'ct the dilulion With-,the source range'neutron flux;moiutors'and teriiiiiiate.,the ey'ent imth operator.action.*'.There is no, additional heatup or'ooldo rate jestriciiori'jiii'.MODE, 6jbec'ause":,the,='REFUEL'ING"',byron, concentr'a'tion
action.*'.Thereisno,additional heatupor'ooldoratejestriciiori'jiii'.MODE, 6jbec'ause":,the,='REFUEL'ING"',byron, concentr'a'tion
'is'=aboye'he, minimum>'required.
'is'=aboye'he, minimum>'required.
tomaintain'the'requiinf SHUTDOWNS MARGIN.foi,the,RCS.;
to maintain'the'requiinf SHUTDOWNS MARGIN.foi,the,RCS.;
temperature rangedefined;-for'MODE;6:,,Introduction'o coolantinventoiy,",from,ithe',::RWS'Ii''js',;ace'eptable'provided'he,.RWST bo'ronconcentration, is'above,theminitnumrequired'to'maintainithe specific'd SUVDOWNMARGIN
temperature range defined;-for'MODE;6:,,Introduction'o coolant inventoiy,",from,ithe',::RWS'Ii''js',;ace'eptable'provided'he,.RWST bo'ron concentration, is'above, the minitnum required'to'maintainithe specific'd S UVDOWNMARGIN
'.;-3/4.1.3MOVABLECONTROLASSEMBLIES Thespecifications ofthissectionensurethat(1)acceptable powerdistribution limitsaremaintained, (2)theminimumSHUTDOWNMARGINismaintained, and(3)limitthepotential effectsofrodmisalignment onassociated accidentanalyses.
'.;-3/4.1.3 MOVABLE CONTROL ASSEMBLIES The specifications of this section ensure that (1)acceptable power distribution limits are maintained, (2)the minimum SHUTDOWN MARGIN is maintained, and (3)limit the potential effects of rod misalignment on associated accident analyses.OPERABILITY of the control rod position indicators is required to determine control rod positions and thereby ensure compliance with the control rod alignment and insertion limits.The ACTION statements which permit limited variations from the basic requirements are accompanied by additional restrictions which ensure that the original design criteria are met.Misalignment of a rod requires measurement of peaking factors or a restriction in THERMAL POWER;either of these restrictions provide assurance of fuel rod integrity during continued operation.
OPERABILITY ofthecontrolrodpositionindicators isrequiredtodetermine controlrodpositions andtherebyensurecompliance withthecontrolrodalignment andinsertion limits.TheACTIONstatements whichpermitlimitedvariations fromthebasicrequirements areaccompanied byadditional restrictions whichensurethattheoriginaldesigncriteriaaremet.Misalignment ofarodrequiresmeasurement ofpeakingfactorsorarestriction inTHERMALPOWER;eitheroftheserestrictions provideassurance offuelrodintegrity duringcontinued operation.
In addition, those accident analysis affected by a misaligned rod are reevaluated to confirm that the results remain valid during future operation.
Inaddition, thoseaccidentanalysisaffectedbyamisaligned rodarereevaluated toconfirmthattheresultsremainvalidduringfutureoperation.
The maximum rod drop time restriction is consistent with the assumed rod drop time used in the accident analyses.Measurement with T,~greater than or equal to 541'F and with all reactor coolant pumps operating ensures that the measured drop times will be representative of insertion times experienced during a reactor trip at operating conditions.
Themaximumroddroptimerestriction isconsistent withtheassumedroddroptimeusedintheaccidentanalyses.
Control rod positions and OPERABILITY of the rod position indicators are required to be verified on a nominal basis of once per 12 hours with more frequent verifications required if an automatic monitoring channel is inoperable.
Measurement withT,~greaterthanorequalto541'Fandwithallreactorcoolantpumpsoperating ensuresthatthemeasureddroptimeswillberepresentative ofinsertion timesexperienced duringareactortripatoperating conditions.
These verification frequencies are adequate for assuring that the applicable LCO's are satisfied.
Controlrodpositions andOPERABILITY oftherodpositionindicators arerequiredtobeverifiedonanominalbasisofonceper12hourswithmorefrequentverifications requiredifanautomatic monitoring channelisinoperable.
COOK NUCLEAR PLANT-UNIT 2 Page B 3/4 14 AMENDMENT 49, 446, 434  
Theseverification frequencies areadequateforassuringthattheapplicable LCO'saresatisfied.
COOKNUCLEARPLANT-UNIT 2PageB3/414AMENDMENT 49,446,434  


ATTACHMENT 3ATO,AEP:NRC:1327 PROPOSEDTECHNICAL SPECIFICATIONS PAGESREVISEDPAGESUNIT13/41-23/41-33/41-73/41-113/41-133/41-153/43-73/44-43/48-93/49-13/49-2B3/41-1B3/41-3 3/4LIMH'INGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4,1REACTIVITY CONTROLSYSTEMSSURVEILLANCE REUIREMENTS Continued WheninMODES3or4;atleastonceper24hoursbyconsideration ofthefollowing factors:1.Reactorcoolantsystemboronconcentration,-
ATTACHMENT 3A TO,AEP:NRC:1327 PROPOSED TECHNICAL SPECIFICATIONS PAGES REVISED PAGES UNIT 1 3/4 1-2 3/4 1-3 3/4 1-7 3/4 1-11 3/4 1-13 3/4 1-15 3/4 3-7 3/4 4-4 3/4 8-9 3/4 9-1 3/4 9-2 B 3/4 1-1 B 3/4 1-3 3/4 LIMH'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4,1 REACTIVITY CONTROL SYSTEMS SURVEILLANCE RE UIREMENTS Continued When in MODES 3 or 4;at least once per 24 hours by consideration of the following factors: 1.Reactor coolant system boron concentration,-
2.Controlrodposition, 3.Reactorcoolantsystemaveragetemperature, Fuelburnupbasedongrossthermalenergygeneration, 5.Xenonconcentration, 6.Samariumconcentration, and7.Boronpenalty(MODE4only).4.1.1.1.2 Theoverallcorereactivity balanceshallbecomparedtopredicted valuestodeinonstrate agreement withinplusorminus1%Deltak/katleastonceper31Effective FullPowerDays(EFPD).Thiscomparison shallconsideratleastthosefactorsstatedinSpecification 4.1.1.1.1.e, above.Thepredicted reactivity valuesshallbeadjusted(normalized) tocorrespond totheactualcoreconditions priortoexceeding afuelburnupof60Effective FullPowerDaysaftereachfuelloading.COOKNUCLEARPLANT-UNIT 1Page3/41-2 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVITY CONTROLSYSTEMSSHUTDOWNMARGINTvLESSTHANOREUALTO200FLIMITINGCONDITION FOROPERATION 3.1.1.2TheSHUTDOWNMARGINshallbegreaterthanorequalto1.0%Deltak/k.APPLICABILITY:
2.Control rod position, 3.Reactor coolant system average temperature, Fuel burnup based on gross thermal energy generation, 5.Xenon concentration, 6.Samarium concentration, and 7.Boron penalty (MODE 4 only).4.1.1.1.2 The overall core reactivity balance shall be compared to predicted values to deinonstrate agreement within plus or minus 1%Delta k/k at least once per 31 Effective Full Power Days (EFPD).This comparison shall consider at least those factors stated in Specification 4.1.1.1.1.e, above.The predicted reactivity values shall be adjusted (normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 Effective Full Power Days after each fuel loading.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-2 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN T v LESS THAN OR E UAL TO 200 F LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be greater than or equal to 1.0%Delta k/k.APPLICABILITY:
MODE5.ACTION:WiththeSHUTDOWNMARGINlessthan1.0%Deltak/k,immediately initiateandcontinueborationatgreaterthanorequalto10gpmofasolutioncontaining greaterthanorequalto20,000ppmboronorequivalent untiltherequired'SHUTDOWN MARGINisrestored.
MODE 5.ACTION: With the SHUTDOWN MARGIN less than 1.0%Delta k/k, immediately initiate and continue boration at greater than or equal to 10 gpm of a solution containing greater than or equal to 20,000 ppm boron or equivalent until the required'SHUTDOWN MARGIN is restored.SURVEILLANCE RE UIREMENTS 4.1.1.2 The SHUTDOWN MARGIN shall be determined to be greater than or equal to 1.0%Delta k/k: Within one hour after detection of an inoperable control rod(s)and at least once per 12 hours thereafter while the rod(s)is inoperable.
SURVEILLANCE REUIREMENTS 4.1.1.2TheSHUTDOWNMARGINshallbedetermined tobegreaterthanorequalto1.0%Deltak/k:Withinonehourafterdetection ofaninoperable controlrod(s)andatleastonceper12hoursthereafter whiletherod(s)isinoperable.
If the inoperable control rod is immovable or untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s).At least once per 24 hours by consideration of the following factors: 1.Reactor coolant system boron concentration, 2.Control rod position, 4, Reactor coolant system average temperature, Fuel burnup based on gross thermal energy generation, Xenon concentration, Samarium concentration, and 7.Boron penalty.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-3 3/4 LIMI'rlNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACI IVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATHS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.1 As a minimum, one of the following boron injection flow paths shall be OPERABLE: a.A flow path from the boric acid tanks via a boric acid transfer pump and charging pump to the Reactor Coolant System if only the boric acid storage tank in Specification 3.1.2.7a is OPERABLE, or The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if only the refueling water storage tank in Specification 3.1.2.7b is OPERABLE.APPLICABILITY:
Iftheinoperable controlrodisimmovable oruntrippable, theSHUTDOWNMARGINshallbeverifiedacceptable withanincreased allowance forthewithdrawn worthoftheimmovable oruntrippable controlrod(s).Atleastonceper24hoursbyconsideration ofthefollowing factors:1.Reactorcoolantsystemboronconcentration, 2.Controlrodposition, 4,Reactorcoolantsystemaveragetemperature, Fuelburnupbasedongrossthermalenergygeneration, Xenonconcentration, Samariumconcentration, and7.Boronpenalty.COOKNUCLEARPLANT-UNIT 1Page3/41-3 3/4LIMI'rlNG CONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACIIVITYCONTROLSYSTEMS3/4.1.2BORATIONSYSTEMSFLOWPATHS-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.1Asaminimum,oneofthefollowing boroninjection flowpathsshallbeOPERABLE:
MODES 5 and 6.ACTION: With none of the above flow paths OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.
a.AflowpathfromtheboricacidtanksviaaboricacidtransferpumpandchargingpumptotheReactorCoolantSystemifonlytheboricacidstoragetankinSpecification 3.1.2.7aisOPERABLE, orTheflowpathfromtherefueling waterstoragetankviaachargingpumptotheReactorCoolantSystemifonlytherefueling waterstoragetankinSpecification 3.1.2.7bisOPERABLE.
SURVEILLANCE RE UIREMENTS 4.1.2.1 At least one of the above required flow paths shall be demonstrated OPERABLE: At least once per 7 days by verifying that the temperature of the heat traced portion of the flow path is greater than or equal to 145'F when a flow path from the boric acid tanks is used.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-7 AMENDMENT 420, 464  
APPLICABILITY:
MODES5and6.ACTION:WithnoneoftheaboveflowpathsOPERABLE, suspendalloperations involving COREALTERATIONS orpositivereactivity changesexcept:1)heatuporcooldownofthereactorcoolantvolumeprovidedthatSHUTDOWNMARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1inMODE6,andtheheatuporcooldownrateisrestricted to50'Forlessinanyone-hourperiodinMODE5,or2)additionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthanorequaltotheminimumrequiredbySpecification 3.1.2.7.b.2.
SURVEILLANCE REUIREMENTS 4.1.2.1Atleastoneoftheaboverequiredflowpathsshallbedemonstrated OPERABLE:
Atleastonceper7daysbyverifying thatthetemperature oftheheattracedportionoftheflowpathisgreaterthanorequalto145'Fwhenaflowpathfromtheboricacidtanksisused.Atleastonceper31daysbyverifying thateachvalve(manual,poweroperatedorautomatic) intheflowpaththatisnotlocked,sealed,orotherwise securedinposition, isinitscorrectposition.
COOKNUCLEARPLANT-UNIT 1Page3/41-7AMENDMENT 420,464  


3/4LIMI'rlNG CONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACIIVHY CONTROLSYSTEMSCHARGINGPUMP-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.3a.Onechargingpumpintheboroninjection fiowpathrequiredbySpecification 3.1.2.1shallbeOPERABLEandcapableofbeingpoweredfromanOPERABLEemergency bus.b.Onechargingflowpathassociated withsupportofUnit2shutdownfunctions shallbeavailable APPLICABILITY:
3/4 LIMI'rlNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACIIVHY CONTROL SYSTEMS CHARGING PUMP-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 a.One charging pump in the boron injection fiow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.b.One charging flowpath associated with support of Unit 2 shutdown functions shall be available APPLICABILITY:
Specification 3.1.2.3.a.
Specification 3.1.2.3.a.
-MODES5and6Specification 3.1.2.3.b.
-MODES 5 and 6 Specification 3.1.2.3.b.
-AtalltimeswhenUnit2isinMODES1~2,3,or4.ACTION:WithnochargingpumpOPERABLE, suspendalloperations involving COREALTERATIONS orpositivereactivity changesexcept:1)heatuporcooldownofthereactorcoolantvolumeprovidedthatSHUTDOWNMARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1inMODE6,andtheheatuporcooldownrateisrestricted to50'Forlessinanyone-hourperiodinMODE5,or2)additionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthanorequaltotheminimumrequiredbySpecification 3.1.2.7.b.2.
-At all times when Unit 2 is in MODES 1~2, 3, or 4.ACTION: With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.
0b.WithmorethanonechargingpumpOPERABLEorwithasafetyinjection pump(s)OPERABLEwhenthetemperature ofanyRCScoldlegislessthanorequalto152'F,unlessthereactorvesselheadisremoved,removetheadditional chargingpump(s)andthesafetyinjection pump(s)motorcircuitbreakersfromtheelectrical powercircuitwithinonehour.c.Theprovisions ofSpecification 3.0.3arenotapplicable.
0 b.With more than one charging pump OPERABLE or with a safety injection pump(s)OPERABLE when the temperature of any RCS cold leg is less than or equal to 152'F, unless the reactor vessel head is removed, remove the additional charging pump(s)and the safety injection pump(s)motor circuit breakers from the electrical power circuit within one hour.c.The provisions of Specification 3.0.3 are not applicable.
Inadditiontotheabove,whenSpecification 3.1.2.3.b isapplicable andtherequiredflowpathisnotavailable, returntherequiredfiowpathtoavailable statuswithin7days,orprovideequivalent shutdowncapability inUnit2andreturntherequiredflowpathtoavailable statuswithinthenext60days,orhaveUnit2inHOTSTANDBYwithinthenext12hoursandHOTSHUTDOWNwithinthefollowing 24hours.e.Therequirements ofSpecification
In addition to the above, when Specification 3.1.2.3.b is applicable and the required flow path is not available, return the required fiow path to available status within 7 days, or provide equivalent shutdown capability in Unit 2 and return the required flow path to available status within the next 60 days, or have Unit 2 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 hours.e.The requirements of Specification 3.0.4 are not applicable when Specification 3.1.2.3.b applies.SURVEILLANCE RE UIREMENTS 4.1.2.3.1 The above required charging pump shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5.A maximum of one centrifugal charging pump shall be OPERABLE whenever the temperature of one or more of the RCS cold legs is less than or equal to 152'F.COOK NUCLEAR PLANT-UNIT 1 Page 3/41-11 AMENDMENTQSf 420$Sf 464 46V 89


==3.0. 4arenotapplicable==
3/4, LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVI'IY CONTROL SYSIZMS BORIC ACID TRANSFER PUMPS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.5 At least one boric acid transfer pump shall be OPERABLE and capable of being powered from an OPERABLE emergency bus if only the flow path through the boric acid transfer pump of Specification 3.1.2.1a is OPERABLE.APPLICABILITY:
whenSpecification 3.1.2.3.b applies.SURVEILLANCE REUIREMENTS 4.1.2.3.1 Theaboverequiredchargingpumpshallbedemonstrated OPERABLEbyverifying thatthepump'sdeveloped headatthetestflowpointisgreaterthanorequaltotherequireddeveloped headwhentestedpursuanttoSpecification 4.0.5.Amaximumofonecentrifugal chargingpumpshallbeOPERABLEwheneverthetemperature ofoneormoreoftheRCScoldlegsislessthanorequalto152'F.COOKNUCLEARPLANT-UNIT 1Page3/41-11AMENDMENTQSf 420$Sf46446V89
MODES 5 and 6.ACTION: With no boric acid transfer pump OPERABLE as required to complete the flow path of Specification 3.1.2.1a, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.
SURVEILLANCE RE UIREMENTS 4.1.2.5 No additional surveillance requirements other than those required by Specification 4.0.5.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-13 AMENDMENT 420, 464 3/4 LIMFI'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.7 As a minimum, one of the following borated water sources shall be OPERABLE: a.A boric acid storage system and associated heat tracing with: l.A minimum usable borated water volume of 4300 gallons, 2.Between 20,000 and 22,500 ppm of boron, and 3.A minimum solution temperature of 145'F.The refueling water storage tank with: 1.A minimum usable borated water volume of 90,000 gallons, 2.A minimum boron concentration of 2400 ppm, and 3.A minimum solution temperature of 70'F.APPLICABILITY ACTION: MODES 5 and 6.With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water fro'm the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.
SURVEILLANCE RE UIREMENTS 4.1.2.7 The above required borated water source shall be demonstrated OPERABLE: At least once per 7 days by: 1.Verifying the boron concentration of the water, 2.Verifying the water level volume of the tank, and 3.Verifying the boric acid storage tank solution temperature when it is the source of borated water.At least once per 24 hours by verifying the RWST temperature when it is the source of borated water.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-15 AMENDMENT 53, kR, S&$
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.3 INSTRUMENTATION TABLE 3.3-1 Continued Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.Above P-6 but below 5%of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 5%of RATED THERMAL POWER.C.Above 5%of RATED THERMAL POWER, POWER OPERATION may continue.ACTION 4-With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement and with the THERMAL POWER level: a.Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.b.Above P-6, operation may continue.ACTION 5-With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement:
Immediately suspend operations involving positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required'by Specification 3.1.2.8.b.2 (MODES 3 or 4)or 3.1.2.7.b.2 (MODE 5), and Verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, within 1 hour and at least once per 12 hours thereafter, and Close the isolation valves for unborated water sources to the chemical and volume control system within 1 hour.In MODE 5, if the RWST boron concentration is less than the reactor coolant system boron concentration and less than the boron concentration required by Specification 3.1.2.7.b.2, isolate the RWST from the reactor coolant system within 1 hour.ACTION 6-With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
The inoperable channel is placed in the tripped condition within 1 hour.ACTION 7-The Minimum Channels OPERABLE requirement is met;however, the inoperable channel may be bypassed for up to 2 hours for surveillance testing of the other channels per Specification 4.3.1.1.1.
With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 3-7 0
3/4 LIMH'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.4 REACTOR COOLANT SYSIXM SAFETY VALVES-SHUTDOWN , LIMITING CONDITION FOR OPERATION 3.4.2 A minimum of one pressurizer code safety valve shall be OPERABLE with a lift setting of 2485 PSIG 2 3%APPLICABILITY:
ACTION: MODES 4 and 5.With no pressurizer code safety valve OPERABLE: Immediately suspend all operations involving positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.8.b.2 (MODE 4)or 3.1.2.7.b.2 (MODE 5), and place an OPERABLE RHR loop into operation in the shutdown cooling mode, and b.Immediately render all Safety Injection pumps and all but one charging pump inoperable by removing the applicable motor circuit breakers from the electric power circuit within one hour.SURVEILLANCE RE UIREMENTS 4.4.2 The pressurizer code safety valve shall be demonstrated OPERABLE per Surveillance Requirement 4.4.3.The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.COOK NUCLEAR PLANT-UNIT I Page 3/4 44 AMENDMENT 53, 420, K4 e
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C.electrical power sources shall be OPERABLE: One circuit between the offsite transmission network and the onsite Class 1E distribution system, and One diesel generator with: A day fuel tank containing a minimum of 70 gallons of fuel, 2.A fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and APPLICABILITY:
ACTION: 3.A fuel transfer pump.MODES 5 and 6.With less than the above minimum required A.C.electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODES, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.
SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C.electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.
COOK NUCLEAR PLANT-UNIT 1 Page 3/4 8-9 AMENDMENT 485, 445


3/4,LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVI'IY CONTROLSYSIZMSBORICACIDTRANSFERPUMPS-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.5AtleastoneboricacidtransferpumpshallbeOPERABLEandcapableofbeingpoweredfromanOPERABLEemergency busifonlytheflowpaththroughtheboricacidtransferpumpofSpecification 3.1.2.1aisOPERABLE.
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met: a.Either a K,of 0.95 or less, which includes a 1%Ak/k conservative allowance for uncertainties, or A boron concentration of greater than or equal to 2400 ppm, which includes a 50 ppm conservative allowance for uncertainties.
APPLICABILITY:
APPLICABILITY:
MODES5and6.ACTION:WithnoboricacidtransferpumpOPERABLEasrequiredtocompletetheflowpathofSpecification 3.1.2.1a, suspendalloperations involving COREALTERATIONS orpositivereactivity changesexcept:1)heatuporcooldownofthereactorcoolantvolumeprovidedthatSHUTDOWNMARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1inMODE6,andtheheatuporcooldownrateisrestricted to50'Forlessinanyone-hourperiodinMODE5,or2)additionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthanorequaltotheminimumrequiredbySpecification 3.1.2.7.b.2.
MODE 6 ACTION: With the requirements of the above specification not satisfied, 1)immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2, and 2)initiate and continue boration at greater than or equal to 10 gpm of 20,000 ppm boric acid solution or its equivalent until K,is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2400 ppm, whichever is the more restrictive.
SURVEILLANCE REUIREMENTS 4.1.2.5Noadditional surveillance requirements otherthanthoserequiredbySpecification 4.0.5.COOKNUCLEARPLANT-UNIT 1Page3/41-13AMENDMENT 420,464 3/4LIMFI'ING CONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVITY CONTROLSYSTEMSBORATEDWATERSOURCES-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.7Asaminimum,oneofthefollowing boratedwatersourcesshallbeOPERABLE:
b.The provisions of Specification 3.0.3 are not applicable.
a.Aboricacidstoragesystemandassociated heattracingwith:l.Aminimumusableboratedwatervolumeof4300gallons,2.Between20,000and22,500ppmofboron,and3.Aminimumsolutiontemperature of145'F.Therefueling waterstoragetankwith:1.Aminimumusableboratedwatervolumeof90,000gallons,2.Aminimumboronconcentration of2400ppm,and3.Aminimumsolutiontemperature of70'F.APPLICABILITY ACTION:MODES5and6.WithnoboratedwatersourceOPERABLE, suspendalloperations involving COREALTERATIONS orpositivereactivity changesexcept:1)heatuporcooldownofthereactorcoolantvolumeprovidedthatSHUTDOWNMARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1inMODE6,andtheheatuporcooldownrateisrestricted to50'Forlessinanyone-hourperiodinMODE5,or2)additionofwaterfro'mtheRWST,providedtheboronconcentration intheRWSTisgreaterthanorequaltotheminimumrequiredbySpecification 3.1.2.7.b.2.
SURVEILLANCE RE UIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to: a.Removing or unbolting the reactor vessel head, and b.Withdrawal of any full length control rod in excess of 3 feet from its fully inserted position.4.9.1.2 The boron concentration of the reactor coolant system and the refueling canal shall be determined by chemical analysis at least 3 times per 7 days with a maximum time interval between samples of 72 hours.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-1 AMENDMENT 420 3/4 LIMI'HNG CONDlTIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment.
SURVEILLANCE REUIREMENTS 4.1.2.7Theaboverequiredboratedwatersourceshallbedemonstrated OPERABLE:
Atleastonceper7daysby:1.Verifying theboronconcentration ofthewater,2.Verifying thewaterlevelvolumeofthetank,and3.Verifying theboricacidstoragetanksolutiontemperature whenitisthesourceofboratedwater.Atleastonceper24hoursbyverifying theRWSTtemperature whenitisthesourceofboratedwater.COOKNUCLEARPLANT-UNIT 1Page3/41-15AMENDMENT 53,kR,S&$
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.3INSTRUMENTATION TABLE3.3-1Continued BelowP-6,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabovetheP-6Setpoint.
AboveP-6butbelow5%ofRATEDTHERMALPOWER,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabove5%ofRATEDTHERMALPOWER.C.Above5%ofRATEDTHERMALPOWER,POWEROPERATION maycontinue.
ACTION4-WiththenumberofchannelsOPERABLEonelessthanrequiredbytheMinimumChannelsOPERABLErequirement andwiththeTHERMALPOWERlevel:a.BelowP-6,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabovetheP-6Setpoint.
b.AboveP-6,operation maycontinue.
ACTION5-WiththenumberofchannelsOPERABLEonelessthanrequiredbytheMinimumChannelsOPERABLErequirement:
Immediately suspendoperations involving positivereactivity changesexceptadditionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthantheminimumrequired'bySpecification 3.1.2.8.b.2 (MODES3or4)or3.1.2.7.b.2 (MODE5),andVerifycompliance withtheSHUTDOWNMARGINrequirements ofSpecification 3.1.1.1or3.1.1.2,asapplicable, within1hourandatleastonceper12hoursthereafter, andClosetheisolation valvesforunborated watersourcestothechemicalandvolumecontrolsystemwithin1hour.InMODE5,iftheRWSTboronconcentration islessthanthereactorcoolantsystemboronconcentration andlessthantheboronconcentration requiredbySpecification 3.1.2.7.b.2, isolatetheRWSTfromthereactorcoolantsystemwithin1hour.ACTION6-WiththenumberofOPERABLEchannelsonelessthantheTotalNumberofChannels, STARTUPand/orPOWEROPERATION mayproceedprovidedthefollowing conditions aresatisfied:
Theinoperable channelisplacedinthetrippedcondition within1hour.ACTION7-TheMinimumChannelsOPERABLErequirement ismet;however,theinoperable channelmaybebypassedforupto2hoursforsurveillance testingoftheotherchannelsperSpecification 4.3.1.1.1.
WiththenumberofOPERABLEchannelsonelessthantheTotalNumberofChannels, STARTUPand/orPOWEROPERATION mayproceeduntilperformance ofthenextrequiredCHANNELFUNCTIONAL TESTprovidedtheinoperable channelisplacedinthetrippedcondition within1hour.COOKNUCLEARPLANT-UNIT 1Page3/43-7 0
3/4LIMH'INGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.4REACTORCOOLANTSYSIXMSAFETYVALVES-SHUTDOWN,LIMITINGCONDITION FOROPERATION 3.4.2Aminimumofonepressurizer codesafetyvalveshallbeOPERABLEwithaliftsettingof2485PSIG23%APPLICABILITY:
ACTION:MODES4and5.Withnopressurizer codesafetyvalveOPERABLE:
Immediately suspendalloperations involving positivereactivity changesexceptadditionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthantheminimumrequiredbySpecification 3.1.2.8.b.2 (MODE4)or3.1.2.7.b.2 (MODE5),andplaceanOPERABLERHRloopintooperation intheshutdowncoolingmode,andb.Immediately renderallSafetyInjection pumpsandallbutonechargingpumpinoperable byremovingtheapplicable motorcircuitbreakersfromtheelectricpowercircuitwithinonehour.SURVEILLANCE REUIREMENTS 4.4.2Thepressurizer codesafetyvalveshallbedemonstrated OPERABLEperSurveillance Requirement 4.4.3.Theliftsettingpressureshallcorrespond toambientconditions ofthevalveatnominaloperating temperature andpressure.
COOKNUCLEARPLANT-UNIT IPage3/444AMENDMENT 53,420,K4 e
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.8ELECTRICAL POWERSYSTEMSSHUTDOWNLIMITINGCONDITION FOROPERATION 3.8.1.2Asaminimum,thefollowing A.C.electrical powersourcesshallbeOPERABLE:
Onecircuitbetweentheoffsitetransmission networkandtheonsiteClass1Edistribution system,andOnedieselgenerator with:Adayfueltankcontaining aminimumof70gallonsoffuel,2.Afuelstoragesystemcontaining aminimumindicated volumeof46,000gallonsoffuel,andAPPLICABILITY:
ACTION:3.Afueltransferpump.MODES5and6.WithlessthantheaboveminimumrequiredA.C.electrical powersourcesOPERABLE, suspendalloperations involving COREALTERATIONS orpositivereactivity changesexcept:1)heatuporcooldownofthereactorcoolantvolumeprovidedthatSHUTDOWNMARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1inMODE6,andtheheatuporcooldownrateisrestricted to50'Forlessinanyone-hourperiodinMODES,or2)additionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthanorequaltotheminimumrequiredbySpecification 3.1.2.7.b.2.
SURVEILLANCE REUIREMENTS 4.8.1.2TheaboverequiredA.C.electrical powersourcesshallbedemonstrated OPERABLEbytheperformance ofeachoftheSurveillance Requirements of4.8.1.1.1 and4.8.1.1.2 exceptforrequirement 4.8.1.1.2.a.5.
COOKNUCLEARPLANT-UNIT 1Page3/48-9AMENDMENT 485,445
 
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.9REFUELING OPERATIONS BORONCONCENTRATION LIMITINGCONDITION FOROPERATION 3.9.1Theboronconcentration ofallfilledportionsoftheReactorCoolantSystemandtherefueling canalshallbemaintained uniformandsufficient toensurethatthemorerestrictive ofthefollowing reactivity conditions ismet:a.EitheraK,of0.95orless,whichincludesa1%Ak/kconservative allowance foruncertainties, orAboronconcentration ofgreaterthanorequalto2400ppm,whichincludesa50ppmconservative allowance foruncertainties.
APPLICABILITY:
MODE6ACTION:Withtherequirements oftheabovespecification notsatisfied, 1)immediately suspendalloperations involving COREALTERATIONS orpositivereactivity changesexceptadditionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthantheminimumrequiredbySpecification 3.1.2.7.b.2, and2)initiateandcontinueborationatgreaterthanorequalto10gpmof20,000ppmboricacidsolutionoritsequivalent untilK,isreducedtolessthanorequalto0.95ortheboronconcentration isrestoredtogreaterthanorequalto2400ppm,whichever isthemorerestrictive.
b.Theprovisions ofSpecification 3.0.3arenotapplicable.
SURVEILLANCE REUIREMENTS 4.9.1.1Themorerestrictive oftheabovetworeactivity conditions shallbedetermined priorto:a.Removingorunbolting thereactorvesselhead,andb.Withdrawal ofanyfulllengthcontrolrodinexcessof3feetfromitsfullyinsertedposition.
4.9.1.2Theboronconcentration ofthereactorcoolantsystemandtherefueling canalshallbedetermined bychemicalanalysisatleast3timesper7dayswithamaximumtimeintervalbetweensamplesof72hours.COOKNUCLEARPLANT-UNIT 1Page3/49-1AMENDMENT 420 3/4LIMI'HNGCONDlTIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.9REFUELING OPERATIONS INSTRUMENTATION LIMITINGCONDITION FOROPERATION 3.9.2Asaminimum,twosourcerangeneutronfluxmonitorsshallbeoperating, eachwithcontinuous visualindication inthecontrolroomandonewithaudibleindication inthecontainment.
APPLICABILITY:
MODE6.ACTION:Withtherequirements oftheabovespecification notsatisfied, immediately suspendalloperations involving COREALTERATIONS orpositivereactivity changesexceptadditionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthantheminimumrequiredbySpecification 3.1.2.7.b.2.
b.Theprovisions ofSpecification 3.0.3arenotapplicable.
SURVEILLANCE REUIREMENTS 4.9.2Eachsourcerangeneutronfluxmonitorshallbedemonstrated OPERABLEbyperformance of:a.ACHANNELFUNCTIONAL TESTatleastonceper7days,andb.ACHANNELFUNCTIONAL TESTwithin8hourspriortotheinitialstartofCOREALTERATIONS, andc.ACHANNELCHECKatleastonceper12hoursduringCOREALTERATIONS.
COOKNUCLEARPLANT-UNIT 1Page3/49-2 3/4BASES3/4.1REACTIVITY CONTROLSYSTEMS3/4.1.1BORATIONCONTROL3/4.1.1.1 and3/4.1.1.2 SHUTDOWNMARGINAsufficient SHUTDOWNMARGINensuresthat1)thereactorcanbemadesubcritical fromalloperating conditions, 2)thereactivity transients associated withpostulated accidentconditions arecontrollable withinacceptable limits,and3)thereactorwillbemaintained sufficiently subcritical toprecludeinadvertent criticality intheshutdowncondition.
SHUTDOWNMARGINrequirements varythroughout corelifeasafunctionoffueldepletion, RCSboronconcentration, andRCST,~.Themostrestrictive condition occursatEOL,withT,~atnoloadoperating temperature, andisassociated withapostulated steamlinebreakaccidentandresulting uncontrolled RCScooldown.
Intheanalysisofthisaccident, aminimumSHUTDOWNMARGINof1.3%Deltak/kisinitially requiredtocontrolthereactivity transient andautomatic ESFisassumedtobeavailable.
WithT,,lessthan200'F,thereactivity transients resulting fromapostulated steamlinebreakcooldownareminimalanda1%Deltak/kSHUTDOWNMARGINprovidesadequateprotection forthisevent.TheSHUTDOWNMARGINrequirements arebaseduponthelimitingconditions described aboveandareconsistent withFSARsafetyanalysisassumptions.
Aboronpenaltymustbeappliedwhenoperating withnoreactorcoolantloopsinoperation butoneormoreresidualheatremovalloopsproviding shutdowncooling.Thenecessary penaltyisincludedintheSHUTDOWNMARGINcurves.3/4.1.1.3 BORONDILUTIONminimumfiowrateofatAleast2000GPMprovidesadequatemixing,preventsstratification andensuresthatreactivity changeswillbegradualduringboronconcentration reductions intheReactorCoolantSystem.'flowrateofatleast2000GPMwillcirculate anequivalent ReactorCoolantSystemvolumeof12,612plusorminus100cubicfeetinapproximately 30minutes.Thereactivity changerateassociated withboronreductions willtherefore bewithinthecapability foroperatorrecognition andcontrol.3/4.1.1.4 MODERATOR TEMPERATURE COEFFICIENT TCThelimitations onMTCareprovidedtoensurethattheassumptions usedintheaccidentandtransient analysesremainvalidthrougheachfuelcycle.Thesurveillance requirement formeasurement oftheMTCatthebeginning, andneartheendofeachfuelcycleisadequatetoconfirmtheMTCvaluesincethiscoefficient changesslowlydueprincipally tothereduction inRCSboronCOOKNUCLEARPLANT-UNIT 1PageB3/41-1AMENDMENT V4,420,448,S&$
3/4BASES3/4.1REACTIVITY CONTROLSYSTEMS3/4.1.2BORATIONSYSTEMSContinued WiththeRCSaveragetemperature above200'F,oneinjection systemisacceptable withoutsinglefailureconsideration onthebasisofthestablereactivity condition ofthereactorandtheadditional restrictions prohibiting COREALTERATIONS andpositivereactivity changeintheeventthesingleinjection systembecomesinoperable.
Theborationcapability requiredbelow200'Fissufficient toprovideaSHUTDOWNMARGINof1%b,k/kafterxenondecayandcooldownfrom200'Fto140'F.Thiscondition requireseither2890gallonsof20,000ppmboratedwaterfromtheboricacidstoragetanksor76,937gallonsof2400ppmboratedwaterfromtherefueling waterstoragetank.ThechargingflowpathofUnit1requiredforUnit2shutdownsupportensuresthatflowisavailable toUnit2andaddresses therequirements of10CFR50AppendixR.Theflowpathconsistsofachargingpumppoweredfromanelectrical busandassociated watersuppliesanddeliverysystem.Firewatchespostedintheaffectedoppositeunitareas(i.e.,Unit2areasrequiring useoftheUnit1chargingsystemintheeventofafire)mayserveastheequivalent shutdowncapability specified intheactionstatements ofSpecification 3.1.2.3.Intheaffectedareas,eitherestablish continuous firewatchesorverifytheOPERABILITY offiredetectors perSpecification 4.3.3.7andestablish hourlyfirewatchpatrols.Therequiredoppositeunitequipment alongwiththesurveillance requirements necessary toensurethatthisequipment iscapableoffulfilling itsintendedAppendixRalternate safeshutdownfunctionhavebeenestablished andareincludedinaplantprocedure.
Anadditional plantprocedure detailshowtheabovenotedfirewatcheswillbeimplemented.
Thelimitsoncontained watervolumeandboronconcentration oftheRWSTalsoensureapHvalueofbetween7.6and9.5forthesolutionrecirculated withincontainment afteraLOCA.ThispHbandminimizes theevolution ofiodineandminimizes theeffectofchlorideandcausticstresscorrosion onmechanical systemsandcomponents.
TheOPERABILITY ofboroninjection systemduringREFUELING ensuresthatthissystemisavailable forreactivity controlwhileinMODE6.Precluding positivereactivity additioncapableofchallenging theminimumrequiredSHUTDOWNMARGINorREFUELING boronconcentration isrequiredtoassurecontinued safeoperation.
Introduction ofRCStemperature changesmustalsobeevaluated tonotincreasereactivity abovetherequiredSHUTDOWNMARGIN.TheRCSheatupandcooldownrateisrestricted inMODE5to50'Forlessinanyone-hourperiodtoensurethatthepositivereactivity increaseduetotemperature changesiscomparable totheUFSARChapter14analysisofaborondilutionevent.Inthisanalysis, itwasconcluded thatthereissufficient timeavailable todetectthedilutionwiththesourcerangeneutronfluxmonitorsandterminate theeventwithoperatoraction.Thereisnoadditional heatuporcooldownraterestriction inMODE6becausetheREFUELING boronconcentration isabovetheminimumrequiredtomaintaintherequiredSHUTDOWNMARGINfortheRCStemperature rangedefinedforMODE6.Introduction ofcoolantinventory fromtheRWSTisacceptable providedtheRWSTboronconcentration isabovetheminimumrequiredtomaintainthespecified SHUTDOWNMARGIN.3/4.1.3MOVABLECONTROLASSEMBLIES Thespecifications ofthissectionensurethat(1)acceptable powerdistribution limitsaremaintained, (2)theminimumSHUTDOWNMARGINismaintained, and(3)thepotential effectsofrodejectionaccidentareCOOKNUCLEARPLANT-UNIT 1PageB3/41-3AMENDMENT SS,420,48%
ATTACHMENT 3BTOAEP:NRC:1327 PROPOSEDTECHNICAL SPECIFICATIONS PAGESREVISEDPAGESUNIT23/41-23/41-33/41-83/4l-ll3/41-133/41-153/43-63/44-43/48-93/49-13/49-2B3/41-1B3/41-4 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVITY CONTROLSYSTEMSSURVEILLANCE REUIREMENTS Continued WheninMODES3or4,atleastonceper24hoursbyconsideration ofthefollowing factors:1.Reactorcoolantsystemboronconcentration, 2.Controlrodposition, 3.Reactorcoolantsystemaveragetemperature, 4.Fuelburnupbasedongrossthermalenergygeneration, 5.Xenonconcentration, 6.Samariumconcentration, and7.Boronpenalty(MODE4only).4.1.1.1.2 Theoverallcorereactivity balanceshallbecomparedtopredicted valuestodemonstrate agreement withinplusorminus1%Deltak/katleastonceper31Effective FullPowerDays(EFPD).Thiscomparison shallconsideratleastthosefactorsstatedinSpecification 4.1.1.1.1.e, above.Thepredicted reactivity valuesshallbeadjusted.
(normalized) tocorrespond totheactualcoreconditions priortoexceeding afuelburnupof60Effective FullPowerDaysaftereachfuelloading.COOKNUCLEARPLANT-UNIT 2Page3/41-2AMENDMENT 83,408,434 3/4LIMI'HNGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVITY CONTROLSYSTEMSSHUTDOWNMARGINTvLESSTHANOREUALTO200FLIMITINGCONDITION FOROPERATION 3.1.1.2TheSHUTDOWNMARGINshallbegreaterthanorequalto1.0%Deltak/k.APPLICABILITY:
ACTION:MODE5.WiththeSHUTDOWNMARGINlessthan1.0%Deltak/k,immediately initiateandcontinueborationatgreaterthanorequalto10gpmofasolutioncontaining greaterthanorequalto20,000ppmboronorequivalent untiltherequiredSHUTDOWNMARGINisrestored.
SURVEILLANCE REUIREMENTS TheSHUTDOWNMARGINshallbedetermined tobegreaterthanorequalto1.0%Deltak/k:a.Withinonehourafterdetection ofaninoperable controlrod(s)andatleastonceper12hoursthereafter whiletherod(s)isinoperable.
Iftheinoperable controlrodisimmovable oruntrippable, theSHUTDOWNMARGINshallbeverifiedacceptable withanincreased allowance forthewithdrawn worthoftheimmovable oruntrippable controlrod(s).Atleastonceper24hoursbyconsideration ofthefollowing factors:1.Reactorcoolantsystemboronconcentration, 2.Controlrodposition, 3.Reactorcoolantsystemaveragetemperature, 4.Fuelburnupbasedongrossthermalenergygeneration, Xenonconcentration, 6.Samariumconcentration, andBoronpenalty.COOKNUCLEARPLANT-UNIT 2Page3/41-3AMENDMENT%,
407)40S)434 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACTIVITY CONTROLSYSTEMS3/4.1.2BORATIONSYSTEMSFLOWPATHS-SHUTDOWNLIMITINGCONDITION FOROPERATION Asaminimum,oneofthefollowing boroninjection flowpathsshallbeOPERABLE:
AflowpathfromtheboricacidtanksviaaboricacidtransferpumpandchargingpumptotheReactorCoolantSystemifonlytheboricacidstoragetankinSpecification 3.1.2.7.a isOPERABLE, orTheflowpathfromtherefueling waterstoragetankviaachargingpumptotheReactorCoolantSystemifonlytherefueling waterstoragetankinSpecification 3.1.2.7.b isOPERABLE.
APPLICABILITY:
ACTION:MODES5and6.WithnoneoftheabovefiowpathsOPERABLE, suspendalloperations involving COREALTERATIONS orpositivereactivity changesexcept:1)heatuporcooldownofthereactorcoolantvolumeprovidedthatSHUTDOWNMARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1inMODE6,andtheheatuporcooldownrateisrestricted to50'Forlessinanyone-hourperiodinMODE5,or2)additionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthanorequaltotheminimumrequiredbySpecification 3.1.2.7.b.2.
SURVEILLANCE REUIREMENTS Atleastoneoftheaboverequiredflowpathsshallbedemonstrated OPERABLE:
Atleastonceper7daysbyverifying thatthetemperature oftheheattracedportionoftheflowpathisgreaterthanorequalto145'Fwhenaflowpathfromtheboricacidtanksisused.Atleastonceper31daysbyverifying thateachvalve(manual,poweroperatedorautomatic) inthefiowpaththatisnotlocked,sealed,orotherwise securedinposition, isinitscorrectposition.
COOKNUCLEARPLANT-UNIT 2Page3/414AMENDMENT 487 0
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REAC'IIVITY CONTROLSYSTEMSCHARGINGPUMP-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.3Onechargingpumpintheboroninjection flowpathrequiredbySpecification 3.1.2.1shallbeOPERABLEandcapableofbeingpoweredfromanOPERABLEemergency bus.Onechargingflowpathassociated withsupportofUnit1shutdownfunctions shallbeavailable.*
APPLICABILITY:,
Specification 3.1.2.3.a.
-MODES5and6Specification 3.1.2.3.b.
-AtalltimeswhenUnit1isinMODES1,2,3,or4.ACTION:WithnochargingpumpOPERABLE, suspendalloperations involving COREALTERATIONS orpositivereactivity changesexcept:1)heatuporcooldownofthereactorcoolantvolumeprovidedthatSHUTDOWNMARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1inMODE6,andtheheatuporcooldownrateisrestricted to50'Forlessinanyone-hourperiodinMODE5,or2)additionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthanorequaltotheminimumrequiredbySpecification 3.1.2.7.b.2.
b.WithmorethanonechargingpumpOPERABLEorwithasafetyinjection pump(s)OPERABLEwhenthetemperature ofanyRCScoldlegislessthanorequalto152'F,unlessthereactorvesselheadisremoved,removetheadditional chargingpump(s)andthesafetyinjection pump(s)motorcircuitbreakersfromtheelectrical powercircuitwithinonehour.c.Theprovisions ofSpecification 3.0.3arenotapplicable.
Inadditiontotheabove,whenSpecification 3.1.2.3.b isapplicable andtherequiredflowpathisnotavailable, returntherequiredflowpathtoavailable statuswithin7days,orprovideequivalent shutdowncapability inUnit1andreturntherequiredflowpathtoavailable statuswithinthenext60days,orhaveUnit1inHOTSTANDBYwithinthenext12hoursandHOTSHUTDOWNwithinthefollowing 24hours.Therequirements ofSpecification
 
==3.0. 4arenotapplicable==
whenSpecification 3.1.2.3.b applies.SURVEILLANCE REUIREMENTS 4.1.2.3.1 Theaboverequiredchargingpumpshallbedemonstrated OPERABLEbyverifying thatthepump'sdeveloped headatthetestflowpointisgreaterthanorequaltotherequireddeveloped headwhentestedpursuanttoSpecification
 
==4.0. 5Amaximumofonecentrifugal==
chargingpumpshallbeOPERABLEwheneverthetemperature ofoneormoreoftheRCScoldlegsislessthanorequalto152'F.COOKNUCLEARPLANT-UNIT 2Page3/41-11AMENDMENT 85,407,446,488 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVE<ILLANCE REQUIREMENTS 3/4.1REACTIVI'rY CONTROLSYSIKMSBORICACIDTRANSFERPUMPS-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.5AtleastoneboricacidtransferpumpshallbeOPERABLEandcapableofbeingpoweredfromanOPERABLEemergency busifonlytheflowpaththroughtheboricacidtransferpumpofSpecification 3.1.2.1aisOPERABLE.
APPLICABILITY:
APPLICABILITY:
MODES5and6.ACTION:WithnoboricacidtransferpumpOPERABLEasrequiredtocompletetheflowpathofSpecification 3.1.2.1a, suspendalloperations involving COREALTERATIONS orpositivereactivity changesexcept:1)heatuporcooldownofthereactorcoolantvolumeprovidedthatSHUTDOWNMARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1inMODE6,andtheheatuporcooldownrateisrestricted to50'Forlessinanyone-hourperiodinMODE5,or2)additionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthanorequaltotheminimumrequiredbySpecification 3.1.2.7.b.2.
MODE 6.ACTION: With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.
SURVEILLANCE REUIREMENTS 4.1.2.5Noadditional Surveillance Requirements otherthanthoserequiredbySpecification 4.0.5.COOKNUCLEARPLANT-UNIT 2Page3/41-13 3/4LIMI'riNG CONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.1REACIXVITY CONTROLSYSTEMSBORATEDWATERSOURCES-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.1.2.7Asaminimum,oneofthefollowing boratedwatersourcesshallbeOPERABLE:
b.The provisions of Specification 3.0.3 are not applicable.
a.Aboricacidstoragesystemandassociated heattracingwith:1.Aminimumusableboratedwatervolumeof4300gallons,2.Between20,000and22,500ppmofboron,and3.Aminimumsolutiontemperature of145'F.,b.Therefueling waterstoragetankwith:1.Aminimumusableboratedwatervolumeof90,000gallons,2.Aminimumboronconcentration of2400ppm,and3.Aminimumsolutiontemperature of70'F.APPLICABILITY:
SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of: a.A CHANNEL FUNCTIONAL TEST at least once per 7 days, and b.A CHANNEL FUNCTIONAL TEST within 8 hours prior to the initial start of CORE ALTERATIONS, and c.A CHANNEL CHECK at least once per 12 hours during CORE ALTERATIONS.
MODES5and6.ACTION:WithnoboratedwatersourceOPERABLE, suspendalloperations involving COREALTERATIONS orpositivereactivity changesexcept:1)heatuporcooldownofthereactorcoolantvolumeprovidedthatSHUTDOWN~~MARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1inMODE6,andtheheatuporcooldownrateisrestricted to50'Forlessinanyone-hourperiodinMODE5,or2)additionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthanorequaltotheminimumrequiredbySpecification 3.1.2.7.b.2.
COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-2 3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 BORATION CONTROL 3/4.1.1.1 and 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1)the reactor can be made subcritical from all operating conditions, 2)the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3)the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.
SURVEILLANCE REUIREMENTS 4.1.2.7Theaboverequiredboratedwatersourceshall,bedemonstrated OPERABLE:
SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS T,~.The most restrictive condition occurs at EOL, with T,~at no load operating temperature, and is associated with a postulated steam line break accident and resulting uncontrolled RCS cooldown.In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1.3%Delta k/k is initially required to control the reactivity transient and automatic ESF is assumed to be available.
Atleastonceper7daysby:2.3.Verifying theboronconcentration ofthewater,Verifying thecontained borated'water volume,andVerifying theboricacidstoragetanksolutiontemperature whenitisthesourceofboratedwater.Atleastonceper24hoursbyverifying theRWSTtemperature whenitisthesourceofboratedwater.COOKNUCLEARPLANT-UNIT 2Page3/41-15AMENDMENT
With T,, less than 200'F, the reactivity transients resulting from a postulated steam line break cooldown are minimal and a 1%Delta k/k SHUTDOWN MARGIN provides adequate protection for this event.The SHUTDOWN MARGIN requirements are based upon the limiting conditions described above and are consistent with FSAR safety analysis assumptions.
$3,94,499 0e 3/4LIMI'HNGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.TITABLE3.3-1Continued a.BelowP-6,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabovetheP-6Setpoint.
A boron penalty must be applied when operating with no reactor coolant loops in operation but one or more residual heat removal loops providing shutdown cooling.The necessary penalty is included in the SHUTDOWN MARGIN curves.3/4.1.1.3 BORON DILUTION minimum fiow rate of at A least 2000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during boron concentration reductions in the Reactor Coolant System.'flow rate of at least 2000 GPM will circulate an equivalent Reactor Coolant System volume of 12,612 plus or minus 100 cubic feet in approximately 30 minutes.The reactivity change rate associated with boron reductions will therefore be within the capability for operator recognition and control.3/4.1.1.4 MODERATOR TEMPERATURE COEFFICIENT TC The limitations on MTC are provided to ensure that the assumptions used in the accident and transient analyses remain valid through each fuel cycle.The surveillance requirement for measurement of the MTC at the beginning, and near the end of each fuel cycle is adequate to confirm the MTC value since this coefficient changes slowly due principally to the reduction in RCS boron COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 1-1 AMENDMENT V4, 420, 448, S&$
b.AboveP-6butbelow5%ofRATEDTHERMALPOWER,restoretheinoperable channeltoOPERABLEstatuspriortoincreasing THERMALPOWERabove5%ofRATEDTHERMALPOWERc.Above5%ofRATEDTHERMALPOWER,POWEROPERATION maycontinue.
3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS Continued With the RCS average temperature above 200'F, one injection system is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and positive reactivity change in the event the single injection system becomes inoperable.
ACTION4WiththenumberofchannelsOPERABLEonelessthanrequiredbytheMinimumChannelsOPERABLErequirement andwiththeTHERMALPOWERlevel:a.BelowP-6,,restore theinoperable channeltoOPERABLEstatuspriortoincreasing THERMAL'OWER abovetheP-6Setpoint.
The boration capability required below 200'F is sufficient to provide a SHUTDOWN MARGIN of 1%b, k/k after xenon decay and cooldown from 200'F to 140'F.This condition requires either 2890 gallons of 20,000 ppm borated water from the boric acid storage tanks or 76,937 gallons of 2400 ppm borated water from the refueling water storage tank.The charging flowpath of Unit 1 required for Unit 2 shutdown support ensures that flow is available to Unit 2 and addresses the requirements of 10 CFR 50 Appendix R.The flowpath consists of a charging pump powered from an electrical bus and associated water supplies and delivery system.Fire watches posted in the affected opposite unit areas (i.e., Unit 2 areas requiring use of the Unit 1 charging system in the event of a fire)may serve as the equivalent shutdown capability specified in the action statements of Specification 3.1.2.3.In the affected areas, either establish continuous fire watches or verify the OPERABILITY of fire detectors per Specification 4.3.3.7 and establish hourly fire watch patrols.The required opposite unit equipment along with the surveillance requirements necessary to ensure that this equipment is capable of fulfilling its intended Appendix R alternate safe shutdown function have been established and are included in a plant procedure.
b.AboveP-6,operation maycontinue.
An additional plant procedure details how the above noted fire watches will be implemented.
ACTION5WiththenumberofchannelsOPERABLEonelessthanrequiredbytheMinimumChannelsOPERABLErequirement:
The limits on contained water volume and boron concentration of the RWST also ensure a pH value of between 7.6 and 9.5 for the solution recirculated within containment after a LOCA.This pH band minimizes the evolution of iodine and minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components.
a.Immediately suspendoperations involving positivereactivity changesexceptadditionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthantheminimumrequiredbySpecification 3.1.2.8.b.2 (MODES3or4)or3:1.2.7.b.2 (MODE5),andb.Verifycompliance withtheSHUTDOWNMARGINrequirements ofSpecification 3.1.1.1or3.1.1.2,asapplicable, within1hourandatleastonceper12hoursthereafter, andc.Closetheisolation valvesforunborated watersourcestothechemicalandvolumecontrolsystemwithin1hour.InMODE5,iftheRWSTboronconcentration islessthanthereactorcoolantsystemboronconcentration andlessthantheboronconcentration requiredbySpecification 3.1.2.7.b.2, isolatetheRWSTfromthereactorcoolantsystemwithin1hour.ACTION6WiththenumberofOPERABLEchannelsonelessthantheTotalNumberofChannels, STARTUPand/orPOWEROPERATION mayproceedprovidedthefollowing conditions aresatisfied:
The OPERABILITY of boron injection system during REFUELING ensures that this system is available for reactivity control while in MODE 6.Precluding positive reactivity addition capable of challenging the minimum required SHUTDOWN MARGIN or REFUELING boron concentration is required to assure continued safe operation.
a.Theinoperable channelisplacedinthetrippedcondition within1hour.b.TheMinimumChannelsOPERABLErequirement ismet;however,theinoperable CHANNELmaybebypassedforupto2hoursforsurveillance testingoftheotherchannelsperSpecification 4.3.1.1.1.
Introduction of RCS temperature changes must also be evaluated to not increase reactivity above the required SHUTDOWN MARGIN.The RCS heatup and cooldown rate is restricted in MODE 5 to 50'F or less in any one-hour period to ensure that the positive reactivity increase due to temperature changes is comparable to the UFSAR Chapter 14 analysis of a boron dilution event.In this analysis, it was concluded that there is sufficient time available to detect the dilution with the source range neutron flux monitors and terminate the event with operator action.There is no additional heatup or cooldown rate restriction in MODE 6 because the REFUELING boron concentration is above the minimum required to maintain the required SHUTDOWN MARGIN for the RCS temperature range defined for MODE 6.Introduction of coolant inventory from the RWST is acceptable provided the RWST boron concentration is above the minimum required to maintain the specified SHUTDOWN MARGIN.3/4.1.3 MOVABLE CONTROL ASSEMBLIES The specifications of this section ensure that (1)acceptable power distribution limits are maintained, (2)the minimum SHUTDOWN MARGIN is maintained, and (3)the potential effects of rod ejection accident are COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 1-3 AMENDMENT SS, 420, 48%
ACTION7WiththenumberofOPERABLEchannelsonelessthantheTotalNumberofChannels, STARTUPand/orPOWEROPERATION mayproceeduntilperformance ofthenextrequiredCHANNELFUNCTIONAL TESTprovidedtheinoperable channelisplacedinthetrippedcondition within1hour.COOKNUCLEARPLANT-UNIT 2Page3/43-6AMENDMENT V5 rJ 3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.4REACTORCOOLANTSYSTEMSAFETYVALVES-SHUTDOWNLIMITINGCONDITION FOROPERATION 3.4.2Aminimumofonepressurizer codesafetyvalveshallbeOPERABLEwithaliftsettingof2485PSIG21%.APPLICABILITY:
ATTACHMENT 3B TO AEP:NRC:1327 PROPOSED TECHNICAL SPECIFICATIONS PAGES REVISED PAGES UNIT 2 3/4 1-2 3/4 1-3 3/4 1-8 3/4 l-ll 3/4 1-13 3/4 1-15 3/4 3-6 3/4 4-4 3/4 8-9 3/4 9-1 3/4 9-2 B 3/4 1-1 B 3/4 1-4 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS SURVEILLANCE RE UIREMENTS Continued When in MODES 3 or 4, at least once per 24 hours by consideration of the following factors: 1.Reactor coolant system boron concentration, 2.Control rod position, 3.Reactor coolant system average temperature, 4.Fuel burnup based on gross thermal energy generation, 5.Xenon concentration, 6.Samarium concentration, and 7.Boron penalty (MODE 4 only).4.1.1.1.2 The overall core reactivity balance shall be compared to predicted values to demonstrate agreement within plus or minus 1%Delta k/k at least once per 31 Effective Full Power Days (EFPD).This comparison shall consider at least those factors stated in Specification 4.1.1.1.1.e, above.The predicted reactivity values shall be adjusted.(normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 Effective Full Power Days after each fuel loading.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-2 AMENDMENT 83, 408, 434 3/4 LIMI'HNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN T v LESS THAN OR E UAL TO 200 F LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be greater than or equal to 1.0%Delta k/k.APPLICABILITY:
MODES4and5.ACTION:Withnopressurizer codesafetyvalveOPERABLE:
ACTION: MODE 5.With the SHUTDOWN MARGIN less than 1.0%Delta k/k, immediately initiate and continue boration at greater than or equal to 10 gpm of a solution containing greater than or equal to 20,000 ppm boron or equivalent until the required SHUTDOWN MARGIN is restored.SURVEILLANCE RE UIREMENTS The SHUTDOWN MARGIN shall be determined to be greater than or equal to 1.0%Delta k/k: a.Within one hour after detection of an inoperable control rod(s)and at least once per 12 hours thereafter while the rod(s)is inoperable.
aeImmediately suspendalloperations involving positivereactivity changesexceptadditionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthantheminimumrequiredbySpecification 3.1.2.8.b.2 (MODE4)or3.1.2.7.b.2 (MODE5),andplaceanOPERABLERHRloopintooperation intheshutdowncoolingmode,andImmediately renderallSafetyInjection pumpsandallbutonechargingpumpinoperable byremovingtheapplicable motorcircuitbreakersfromtheelectricpowercircuitwithinonehour.SURVEILLANCE REUIREMENTS 4.4.2Noadditional Surveillance Requirements otherthanthoserequiredbySpecification 4.0.5.Theliftsettingpressureshallcorrespond toambientconditions ofthevalveatnominaloperating temperature andpressure.
If the inoperable control rod is immovable or untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s).At least once per 24 hours by consideration of the following factors: 1.Reactor coolant system boron concentration, 2.Control rod position, 3.Reactor coolant system average temperature, 4.Fuel burnup based on gross thermal energy generation, Xenon concentration, 6.Samarium concentration, and Boron penalty.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-3 AMENDMENT%, 407)40S)434 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATHS-SHUTDOWN LIMITING CONDITION FOR OPERATION As a minimum, one of the following boron injection flow paths shall be OPERABLE: A flow path from the boric acid tanks via a boric acid transfer pump and charging pump to the Reactor Coolant System if only the boric acid storage tank in Specification 3.1.2.7.a is OPERABLE, or The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if only the refueling water storage tank in Specification 3.1.2.7.b is OPERABLE.APPLICABILITY:
COOKNUCLEARPLANT-UNIT 2Page3/444AMENDMENT SS487 0
ACTION: MODES 5 and 6.With none of the above fiow paths OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.8ELECTRICAL POWERSYSTEMSSHUTDOWNLIMITINGCONDITION FOROPERATION 3.8.1.2Asaminimum,thefollowing A.C.electrical powersourcesshallbeOPERABLE:
SURVEILLANCE RE UIREMENTS At least one of the above required flow paths shall be demonstrated OPERABLE: At least once per 7 days by verifying that the temperature of the heat traced portion of the flow path is greater than or equal to 145'F when a flow path from the boric acid tanks is used.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the fiow path that is not locked, sealed, or otherwise secured in position, is in its correct position.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 14 AMENDMENT 487 0
Onecircuitbetweentheoffsitetransmission networkandtheonsiteClass1Edistribution system,andOnedieselgenerator with:1.Adayfueltankcontaining aminimumof70gallonsoffuel,2.Afuelstoragesystemcontaining aminimumindicated volumeof46,000gallonsoffuel,andAPPLICABILITY:
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REAC'IIVITY CONTROL SYSTEMS CHARGING PUMP-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 One charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.One charging flow path associated with support of Unit 1 shutdown functions shall be available.*
3.Afueltransferpump.MODES5and6.ACTIONWithlessthantheaboveminimumrequiredA.C.electrical powersourcesOPERABLE, suspendalloperations involving COREALTERATIONS orpositivereactivity changesexcept:1)heatuporcooldownofthereactorcoolantvolumeprovidedthatSHUTDOWNMARGINsufficient toaccommodate thechangeintemperature ismaintained inaccordance withSpecification 3.1.1.2inMODE5orSpecification 3.9.1inMODE6,andtheheatuporcooldownrateisrestricted to50'Forlessinanyone-hourperiodinMODES,or2)additionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthanorequaltotheminimumrequiredbySpecification 3.1.2.7.b.2.
APPLICABILITY:, Specification 3.1.2.3.a.
SURVEILLANCE REUIREMENTS 4.8.1.2TheaboverequiredA.C.electrical powersourcesshallbedemonstrated OPERABLEbytheperformance ofeachoftheSurveillance Requirements of4.8.1.1.1 and4.8.1.1.2 exceptforrequirement 4.8.1.1.2.a.5.+
-MODES 5 and 6 Specification 3.1.2.3.b.
+Theprovisions ofTechnical Specification 4.0.8areapplicable.
-At all times when Unit 1 is in MODES 1, 2, 3, or 4.ACTION: With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.
COOKNUCLEARPLANT-UNIT 2Page3/48-9AMENDMENT 449,483,459 3/4LIMITINGCONDITIONS I'OROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.9REFUELING OPERATIONS BORONCONCENTRATION LIMITINGCONDITION FOROPERATION 3.9.1Theboronconcentration ofallfilledportionsoftheReactorCoolantSystemandtherefueling canalshallbemaintained uniformandsufficient toensurethatthemorerestrictive ofthefollowing reactivity conditions ismet:a.Eithera~of0.95orless,whichincludesa1%Ak/kconservative allowance foruncertainties, orb.Aboronconcentration ofgreaterthanorequalto2400ppm,whichincludesa50ppmconservative allowance foruncertainties.
b.With more than one charging pump OPERABLE or with a safety injection pump(s)OPERABLE when the temperature of any RCS cold leg is less than or equal to 152'F, unless the reactor vessel head is removed, remove the additional charging pump(s)and the safety injection pump(s)motor circuit breakers from the electrical power circuit within one hour.c.The provisions of Specification 3.0.3 are not applicable.
In addition to the above, when Specification 3.1.2.3.b is applicable and the required flow path is not available, return the required flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 1 and return the required flow path to available status within the next 60 days, or have Unit 1 in HOT STANDBY within the next 12 hours and HOT SHUTDOWN within the following 24 hours.The requirements of Specification 3.0.4 are not applicable when Specification 3.1.2.3.b applies.SURVEILLANCE RE UIREMENTS 4.1.2.3.1 The above required charging pump shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5 A maximum of one centrifugal charging pump shall be OPERABLE whenever the temperature of one or more of the RCS cold legs is less than or equal to 152'F.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-11 AMENDMENT 85, 407, 446, 488 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVE<ILLANCE REQUIREMENTS 3/4.1 REACTIVI'rY CONTROL SYSIKMS BORIC ACID TRANSFER PUMPS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.5 At least one boric acid transfer pump shall be OPERABLE and capable of being powered from an OPERABLE emergency bus if only the flow path through the boric acid transfer pump of Specification 3.1.2.1a is OPERABLE.APPLICABILITY:
MODES 5 and 6.ACTION: With no boric acid transfer pump OPERABLE as required to complete the flow path of Specification 3.1.2.1a, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.
SURVEILLANCE RE UIREMENTS 4.1.2.5 No additional Surveillance Requirements other than those required by Specification 4.0.5.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-13 3/4 LIMI'riNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACIXVITY CONTROL SYSTEMS BORATED WATER SOURCES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.7 As a minimum, one of the following borated water sources shall be OPERABLE: a.A boric acid storage system and associated heat tracing with: 1.A minimum usable borated water volume of 4300 gallons, 2.Between 20,000 and 22,500 ppm of boron, and 3.A minimum solution temperature of 145'F., b.The refueling water storage tank with: 1.A minimum usable borated water volume of 90,000 gallons, 2.A minimum boron concentration of 2400 ppm, and 3.A minimum solution temperature of 70'F.APPLICABILITY:
MODES 5 and 6.ACTION: With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN~~MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.
SURVEILLANCE RE UIREMENTS 4.1.2.7 The above required borated water source shall, be demonstrated OPERABLE: At least once per 7 days by: 2.3.Verifying the boron concentration of the water, Verifying the contained borated'water volume, and Verifying the boric acid storage tank solution temperature when it is the source of borated water.At least once per 24 hours by verifying the RWST temperature when it is the source of borated water.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-15 AMENDMENT$3, 94, 499 0 e 3/4 LIMI'HNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.TI TABLE 3.3-1 Continued a.Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.b.Above P-6 but below 5%of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 5%of RATED THERMAL POWER c.Above 5%of RATED THERMAL POWER, POWER OPERATION may continue.ACTION 4 With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement and with the THERMAL POWER level: a.Below P-6,,restore the inoperable channel to OPERABLE status prior to increasing THERMAL'OWER above the P-6 Setpoint.b.Above P-6, operation may continue.ACTION 5 With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement:
a.Immediately suspend operations involving positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.8.b.2 (MODES 3 or 4)or 3:1.2.7.b.2 (MODE 5), and b.Verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, within 1 hour and at least once per 12 hours thereafter, and c.Close the isolation valves for unborated water sources to the chemical and volume control system within 1 hour.In MODE 5, if the RWST boron concentration is less than the reactor coolant system boron concentration and less than the boron concentration required by Specification 3.1.2.7.b.2, isolate the RWST from the reactor coolant system within 1 hour.ACTION 6 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
a.The inoperable channel is placed in the tripped condition within 1 hour.b.The Minimum Channels OPERABLE requirement is met;however, the inoperable CHANNEL may be bypassed for up to 2 hours for surveillance testing of the other channels per Specification 4.3.1.1.1.
ACTION 7 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 3-6 AMENDMENT V5 r J 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM SAFETY VALVES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2 A minimum of one pressurizer code safety valve shall be OPERABLE with a lift setting of 2485 PSIG 2 1%.APPLICABILITY:
MODES 4 and 5.ACTION: With no pressurizer code safety valve OPERABLE: ae Immediately suspend all operations involving positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.8.b.2 (MODE 4)or 3.1.2.7.b.2 (MODE 5), and place an OPERABLE RHR loop into operation in the shutdown cooling mode, and Immediately render all Safety Injection pumps and all but one charging pump inoperable by removing the applicable motor circuit breakers from the electric power circuit within one hour.SURVEILLANCE RE UIREMENTS 4.4.2 No additional Surveillance Requirements other than those required by Specification 4.0.5.The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 44 AMENDMENT SS 487 0
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C.electrical power sources shall be OPERABLE: One circuit between the offsite transmission network and the onsite Class 1E distribution system, and One diesel generator with: 1.A day fuel tank containing a minimum of 70 gallons of fuel, 2.A fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and APPLICABILITY:
3.A fuel transfer pump.MODES 5 and 6.ACTION With less than the above minimum required A.C.electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODES, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.
SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C.electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.+
+The provisions of Technical Specification 4.0.8 are applicable.
COOK NUCLEAR PLANT-UNIT 2 Page 3/4 8-9 AMENDMENT 449, 483, 459 3/4 LIMITING CONDITIONS I'OR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met: a.Either a~of 0.95 or less, which includes a 1%Ak/k conservative allowance for uncertainties, or b.A boron concentration of greater than or equal to 2400 ppm, which includes a 50 ppm conservative allowance for uncertainties.
APPLICABILITY:
APPLICABILITY:
ACTION:MODE6Withtherequirements oftheabovespecification notsatisfied, 1)immediately suspendalloperations involving COREALTERATIONS orpositivereactivity changesexceptadditionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthantheminimumrequiredbySpecification 3.1.2.7.b.2, and2)initiateandcontinueborationatgreaterthanorequalto10gpmof20,000ppmboricacidsolutionoritsequivalent untilK,isreducedtolessthanorequalto0.95ortheboronconcentration isrestoredtogreaterthanorequalto2400ppm,whichever isthemorerestrictive.
ACTION: MODE 6 With the requirements of the above specification not satisfied, 1)immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2, and 2)initiate and continue boration at greater than or equal to 10 gpm of 20,000 ppm boric acid solution or its equivalent until K,is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2400 ppm, whichever is the more restrictive.
Theprovisions ofSpecification 3.0.3arenotapplicable.
The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REUIREMENTS 4.9.1.1Themorerestrictive oftheabovetworeactivity conditions shallbedetermined priorto:a.Removingorunbolting thereactorvesselhead,andb.Withdrawal ofanyfulllengthcontrolrodinexcessof3feetfromitsfullyinsertedpositionwithinthereactorpressurevessel.4.9.1.2Theboronconcentration ofthereactorcoolantsystemandtherefueling canalshallbedetermined bychemicalanalysisatleastonceper72hours.COOKNUCLEARPLANT-UNIT 2Page3/49-1  
SURVEILLANCE RE UIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to: a.Removing or unbolting the reactor vessel head, and b.Withdrawal of any full length control rod in excess of 3 feet from its fully inserted position within the reactor pressure vessel.4.9.1.2 The boron concentration of the reactor coolant system and the refueling canal shall be determined by chemical analysis at least once per 72 hours.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-1  


3/4LIMH'INGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.9RE%%LINGOPERATIONS INSTRUMENTATION LIMITINGCONDITION FOROPERATION 3.9.2Asaminimum,twosourcerangeneutronfluxmonitorsshallbeoperating, eachwithcontinuous visualindication inthecontrolroomandonewithaudibleindication inthecontainment andcontrolroom.APPLICABILITY:
3/4 LIMH'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 RE%%LING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment and control room.APPLICABILITY:
MODE6.ACTION:Withtherequirements oftheabovespecification notsatisfied, immediately suspendalloperations involving COREALTERATIONS orpositivereactivity changesexceptadditionofwaterfromtheRWST,providedtheboronconcentration intheRWSTisgreaterthantheminimumrequiredbySpecification 3.1.2.7.b.2.
MODE 6.ACTION: With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.
b.Theprovisions ofSpecification 3.0.3arenotapplicable.
b.The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REUIREMENTS 4.9.2Eachsourcerangeneutronfluxmonitorshallbedemonstrated OPERABLEbyperformance of:a.ACHANNELFUNCTIONAL TESTatleastonceper7days,andb.ACHANNELFUNCTIONAL TESTwithin8hourspriortotheinitialstartofCOREALTERATIONS, andc.ACHANNELCHECKatleastonceper12hoursduringCOREALTERATIONS.
SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of: a.A CHANNEL FUNCTIONAL TEST at least once per 7 days, and b.A CHANNEL FUNCTIONAL TEST within 8 hours prior to the initial start of CORE ALTERATIONS, and c.A CHANNEL CHECK at least once per 12 hours during CORE ALTERATIONS.
COOKNUCLEARPLANT-UNIT 2Page3/49-2AMENDMENT 63,40V 3/4BASES3/4.1REACTIVITY CONTROLSYSTEMS3/4.1.1BORATIONCONTROL3/4.1.1.1 Gild3/4.1.1.2 SHUTDOWNMARGINAsufficient SHUTDOWNMARGINensuresthat1)thereactorcanbemadesubcritical fromalloperating conditions, 2)thereactivity transients associated withpostulated accidentconditions arecontrollable withinacceptable limits,and3)thereactorwillbemaintained sufficiently subcritical toprecludeinadvertent criticality intheshutdowncondition.
COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-2 AMENDMENT 63, 40V 3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 BORATION CONTROL 3/4.1.1.1 Gild 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1)the reactor can be made subcritical from all operating conditions, 2)the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3)the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.
SHUTDOWNMARGINrequirements varythroughout corelifeasafunctionoffueldepletion, RCSboronconcentration, andRCST,,.Themostrestrictive condition occursatEOL,withT,~atnoloadoperating temperature, andisassociated withapostulated steamlinebreakaccidentandresulting uncontrolled RCScooldown.
SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS T,,.The most restrictive condition occurs at EOL, with T,~at no load operating temperature, and is associated with a postulated steam line break accident and resulting uncontrolled RCS cooldown.In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1.3%Delta k/k is initially required to control the reactivity transient and automatic ESF is assumed to be available.
Intheanalysisofthisaccident, aminimumSHUTDOWNMARGINof1.3%Deltak/kisinitially requiredtocontrolthereactivity transient andautomatic ESFisassumedtobeavailable.
With T,~less than 200'F, the reactivity transients resulting from a postulated steam line break cooldown are minimal and a 1%Delta k/k SHUTDOWN MARGIN provides adequate protection for this event.The SHUTDOWN MARGIN requirements are based upon the limiting conditions described above and are consistent with FSAR safety analysis assumptions.
WithT,~lessthan200'F,thereactivity transients resulting fromapostulated steamlinebreakcooldownareminimalanda1%Deltak/kSHUTDOWNMARGINprovidesadequateprotection forthisevent.TheSHUTDOWNMARGINrequirements arebaseduponthelimitingconditions described aboveandareconsistent withFSARsafetyanalysisassumptions.
A boron penalty must be applied when operating with no reactor coolant loops in operation but one or more residual heat removal loops providing shutdown cooling.The necessary penalty is included in the SHUTDOWN MARGIN curves.3/4.1.1.3 BORON DILUTION A minimum flow rate of at least 2000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during boron concentration reductions in the Reactor Coolant System.A fiow rate of at least 2000 GPM will circulate an equivalent Reactor Coolant System volume of 12,612 cubic feet in approximately 30 minutes.The reactivity change rate associated with boron reductions will therefore be within the capability for operator recognition and control.COOK NUCLEAR PLANT-UNIT 2 Page B 3/4 1-1 AMENDMENT$3, 488, 434, 499 3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS Continued The charging flowpath of Unit 2 required for Unit 1 shutdown support ensures that flow is available to Unit 1 and addresses the requirements of 10 CFR 50 Appendix R.The fiowpath consists of a charging pump powered from an electrical bus and associated water supplies and delivery system.Fire watches posted in the affected opposite unit areas (i.e., Unit 1 areas requiring use of the Unit 2 charging system in the event of a fire)may serve as the equivalent shutdown capability specified in the action statements of Specification 3.1.2.3.In the affected areas, either establish continuous fire watches or verify the OPERABILITY of fire detectors per Specification 4.3.3.7 and establish hourly fire watch patrols.The required opposite unit equipment along with the surveillance requirements necessary to ensure that this equipment is capable of fulfilling its intended Appendix R alternate safe shutdown function have been established and are included in a plant procedure.
Aboronpenaltymustbeappliedwhenoperating withnoreactorcoolantloopsinoperation butoneormoreresidualheatremovalloopsproviding shutdowncooling.Thenecessary penaltyisincludedintheSHUTDOWNMARGINcurves.3/4.1.1.3 BORONDILUTIONAminimumflowrateofatleast2000GPMprovidesadequatemixing,preventsstratification andensuresthatreactivity changeswillbegradualduringboronconcentration reductions intheReactorCoolantSystem.Afiowrateofatleast2000GPMwillcirculate anequivalent ReactorCoolantSystemvolumeof12,612cubicfeetinapproximately 30minutes.Thereactivity changerateassociated withboronreductions willtherefore bewithinthecapability foroperatorrecognition andcontrol.COOKNUCLEARPLANT-UNIT 2PageB3/41-1AMENDMENT
An additional plant procedure details how the above noted fire watches will be implemented.
$3,488,434,499 3/4BASES3/4.1REACTIVITY CONTROLSYSTEMS3/4.1.2BORATIONSYSTEMSContinued ThechargingflowpathofUnit2requiredforUnit1shutdownsupportensuresthatflowisavailable toUnit1andaddresses therequirements of10CFR50AppendixR.Thefiowpathconsistsofachargingpumppoweredfromanelectrical busandassociated watersuppliesanddeliverysystem.Firewatchespostedintheaffectedoppositeunitareas(i.e.,Unit1areasrequiring useoftheUnit2chargingsystemintheeventofafire)mayserveastheequivalent shutdowncapability specified intheactionstatements ofSpecification 3.1.2.3.Intheaffectedareas,eitherestablish continuous firewatchesorverifytheOPERABILITY offiredetectors perSpecification 4.3.3.7andestablish hourlyfirewatchpatrols.Therequiredoppositeunitequipment alongwiththesurveillance requirements necessary toensurethatthisequipment iscapableoffulfilling itsintendedAppendixRalternate safeshutdownfunctionhavebeenestablished andareincludedinaplantprocedure.
Precluding positive reactivity addition capable of challenging the minimum required SHUTDOWN MARGIN or REFUELING boron concentration is required to assure continued safe operation.
Anadditional plantprocedure detailshowtheabovenotedfirewatcheswillbeimplemented.
Introduction of RCS temperature changes must also be evaluated to not increase reactivity above the required SHUTDOWN MARGIN.The RCS heatup and cooldown rate is restricted in MODE 5 to 50'F or less in any one-hour period to ensure that the positive reactivity increase due to temperature changes is comparable to the UFSAR Chapter 14 analysis of a boron dilution event.In this analysis, it was concluded that there is sufficient time available to detect the dilution with the source range neutron flux monitors and terminate the event with operator action.There is no additional heatup or cooldown rate restriction in MODE 6 because the REFUELING boron concentration is above the minimum required to maintain the required SHUTDOWN MARGIN for the RCS temperature range defined for MODE 6.Introduction of coolant inventory from the RWST is acceptable provided the RWST boron concentration is above the minimum required to maintain the specified SHUTDOWN MARGIN.3/4.1.3 MOVABLE CONTROL ASSEMBLIES The specifications of this section ensure that (1)acceptable power distribution limits are maintained, (2)the minimum SHUTDOWN MARGIN is maintained, and (3)limit the potential effects of rod misalignment on associated accident analyses.OPERABILITY of the control rod position indicators is required to determine control rod positions and thereby ensure compliance with the control rod alignment and insertion limits.The ACTION statements which permit limited variations from the basic requirements are accompanied by additional restrictions which ensure that the original design criteria are met.Misalignment of a rod requires measurement of peaking factors or a restriction in THERMAL POWER;either of these restrictions provide assurance of fuel rod integrity during continued operation.
Precluding positivereactivity additioncapableofchallenging theminimumrequiredSHUTDOWNMARGINorREFUELING boronconcentration isrequiredtoassurecontinued safeoperation.
In addition, those accident analysis affected by a misaligned rod are reevaluated to confirm that the results remain valid during future operation.
Introduction ofRCStemperature changesmustalsobeevaluated tonotincreasereactivity abovetherequiredSHUTDOWNMARGIN.TheRCSheatupandcooldownrateisrestricted inMODE5to50'Forlessinanyone-hourperiodtoensurethatthepositivereactivity increaseduetotemperature changesiscomparable totheUFSARChapter14analysisofaborondilutionevent.Inthisanalysis, itwasconcluded thatthereissufficient timeavailable todetectthedilutionwiththesourcerangeneutronfluxmonitorsandterminate theeventwithoperatoraction.Thereisnoadditional heatuporcooldownraterestriction inMODE6becausetheREFUELING boronconcentration isabovetheminimumrequiredtomaintaintherequiredSHUTDOWNMARGINfortheRCStemperature rangedefinedforMODE6.Introduction ofcoolantinventory fromtheRWSTisacceptable providedtheRWSTboronconcentration isabovetheminimumrequiredtomaintainthespecified SHUTDOWNMARGIN.3/4.1.3MOVABLECONTROLASSEMBLIES Thespecifications ofthissectionensurethat(1)acceptable powerdistribution limitsaremaintained, (2)theminimumSHUTDOWNMARGINismaintained, and(3)limitthepotential effectsofrodmisalignment onassociated accidentanalyses.
The maximum rod drop time restriction is consistent with the assumed rod drop time used in the accident analyses.Measurement with T,~greater than or equal to 541'F and with all reactor coolant pumps operating ensures that the measured drop times will be representative of insertion times experienced during a reactor trip at operating conditions.
OPERABILITY ofthecontrolrodpositionindicators isrequiredtodetermine controlrodpositions andtherebyensurecompliance withthecontrolrodalignment andinsertion limits.TheACTIONstatements whichpermitlimitedvariations fromthebasicrequirements areaccompanied byadditional restrictions whichensurethattheoriginaldesigncriteriaaremet.Misalignment ofarodrequiresmeasurement ofpeakingfactorsorarestriction inTHERMALPOWER;eitheroftheserestrictions provideassurance offuelrodintegrity duringcontinued operation.
Control rod positions and OPERABILITY of the rod position indicators are required to be verified on a nominal basis of once per 12 hours with more frequent verifications required if an automatic monitoring channel is inoperable.
Inaddition, thoseaccidentanalysisaffectedbyamisaligned rodarereevaluated toconfirmthattheresultsremainvalidduringfutureoperation.
These verification frequencies are adequate for assuring that the applicable LCO's are satisfied.
Themaximumroddroptimerestriction isconsistent withtheassumedroddroptimeusedintheaccidentanalyses.
COOK NUCLEAR PLANT-UNIT 2 Page B 3/4 14 AMENDMENT 49, 446, 484  
Measurement withT,~greaterthanorequalto541'Fandwithallreactorcoolantpumpsoperating ensuresthatthemeasureddroptimeswillberepresentative ofinsertion timesexperienced duringareactortripatoperating conditions.
Controlrodpositions andOPERABILITY oftherodpositionindicators arerequiredtobeverifiedonanominalbasisofonceper12hourswithmorefrequentverifications requiredifanautomatic monitoring channelisinoperable.
Theseverification frequencies areadequateforassuringthattheapplicable LCO'saresatisfied.
COOKNUCLEARPLANT-UNIT 2PageB3/414AMENDMENT 49,446,484  


ATTACHMENT 4TOAEP:NRC:1327 NOSIGNIFICANT HAZARDSCONSIDERATION EVALUATION  
ATTACHMENT 4 TO AEP:NRC:1327 NO SIGNIFICANT HAZARDS CONSIDERATION EVALUATION  


Attachment 4TOAEP:NRC:1327 Page1NoSinificantHazardsConsideration Evaluation IndianaMichiganPowerCompany(I&M)hasevaluated thisproposedamendment anddetermined thatitinvolvesnosignificant hazardsconsideration.
Attachment 4 TO AEP:NRC:1327 Page 1 No Si nificant Hazards Consideration Evaluation Indiana Michigan Power Company (I&M)has evaluated this proposed amendment and determined that it involves no significant hazards consideration.
According to10CFR50.92(c),
According to 10 CFR 50.92(c), a proposed amendment to an operating license involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: 1.involve a significant increase in the probability of occurrence or consequences of an accident previously evaluated; 2.create the possibility of a new or different kind of accident from any previously analyzed;or 3.involve a significant reduction in a margin of safety.The proposed changes would revise limitations on positive reactivity additions in several technical specifications (T/S)action statements.
aproposedamendment toanoperating licenseinvolvesnosignificant hazardsconsideration ifoperation ofthefacilityinaccordance withtheproposedamendment wouldnot:1.involveasignificant increaseintheprobability ofoccurrence orconsequences ofanaccidentpreviously evaluated; 2.createthepossibility ofanewordifferent kindofaccidentfromanypreviously analyzed; or3.involveasignificant reduction inamarginofsafety.Theproposedchangeswouldreviselimitations onpositivereactivity additions inseveraltechnical specifications (T/S)actionstatements.
These changes would allow reactor coolant system (RCS)temperature changes in certain Mode 5 and 6 T/S action statements if the SDM is sufficient to accommodate the expected RCS temperature change.In addition, footnotes regarding additions of water from the refueling water storage tank (RWST)to the RCS are clarified and relocated to T/S action statements.
Thesechangeswouldallowreactorcoolantsystem(RCS)temperature changesincertainMode5and6T/Sactionstatements iftheSDMissufficient toaccommodate theexpectedRCStemperature change.Inaddition, footnotes regarding additions ofwaterfromtherefueling waterstoragetank(RWST)totheRCSareclarified andrelocated toT/Sactionstatements.
Additional T/S action statement requirements are added in Table 3.3-1,"Reactor Trip System Instrumentation," when the required source range neutron flux channel is inoperable.
Additional T/Sactionstatement requirements areaddedinTable3.3-1,"ReactorTripSystemInstrumentation,"
Corresponding changes are proposed for the bases for T/S 3/4.1.1,"Boration Control," and T/S 3/4.1.2,"Boration Systems." Administrative changes are made to improve clarity.Finally, additions are made to SDM T/S surveillance requirements (SRs)to identify use of a boron penalty (requirement for additional boron)during residual heat removal system operation in Modes 4 and 5.The determination that the criteria set forth in 10 CFR 50.92 are met for this amendment request is indicated below.1.Does'the change involve, a significant increase in the probability of occurrence or consequences of an accident previously evaluated?
whentherequiredsourcerangeneutronfluxchannelisinoperable.
No.I&M proposes to permit operators to make RCS temperature changes under conditions not previously allowed.RCS temperature changes may add positive reactivity to the reactor core that could reduce the SDM necessary to maintain subcritical conditions.
Corresponding changesareproposedforthebasesforT/S3/4.1.1,"Boration Control,"
Acceptable consequences for an inadvertent criticality rely on prevention.
andT/S3/4.1.2,"Boration Systems."
Maintaining an adequate SDM is an essential means to prevent an inadvertent criticality.
Administrative changesaremadetoimproveclarity.Finally,additions aremadetoSDMT/Ssurveillance requirements (SRs)toidentifyuseofaboronpenalty(requirement foradditional boron)duringresidualheatremovalsystemoperation inModes4and5.Thedetermination thatthecriteriasetforthin10CFR50.92aremetforthisamendment requestisindicated below.1.Does'thechangeinvolve,asignificant increaseintheprobability ofoccurrence orconsequences ofanaccidentpreviously evaluated?
Attachment 4 TO AEP:NRC:1327 Page 2 When equipment that is relied upon to prevent, detect, correct, or mitigate an unintentional approach to a critical condition-is unavailable or degraded, activities that may reduce the SDM must be precluded or adequately controlled.
No.I&Mproposestopermitoperators tomakeRCStemperature changesunderconditions notpreviously allowed.RCStemperature changesmayaddpositivereactivity tothereactorcorethatcouldreducetheSDMnecessary tomaintainsubcritical conditions.
This amendment request is based on maintaining adequate control of positive reactivity additions as a result of RCS temperature changes in Modes 5 and 6.The control is provided by requirements to confirm that the SDM required by the T/S is available to accommodate the expected RCS temperature change.This preserves the val,idity of accident analyses that assume the T/S SDM requirements are met when the accident is initiated.
Acceptable consequences foraninadvertent criticality relyonprevention.
The following accidents of potential applicability in Modes 5 and 6 are described in Section 14.2,"Standby Safeguards Analysis" of the Updated Final Safety Analysis Report (UFSAR).1.Fuel handling accident 2.Waste liquid release 3.Waste gas release 4.Steam generator tube rupture 5.Steam pipe rupture 6.Rupture of control rod mechanism housing-rod cluster control assembly (RCCA)ejection 7.Environmental consequences following secondary system accidents 8.Rupture of a feedline (Unit 2 only)The UFSAR also describes these events: 9.Uncontrolled RCCA withdrawal from a subcritical condition (Section 14.1.1)10.Uncontrolled boron dilution (Section 14.1.5)Accidents 4 through 8, above, are not credible in Modes 5 and 6 due to negligible stored energy (temperature and pressure)in the primary and secondary systems below the Mode 5 RCS temperature limit of 200'F.Therefore, they are not analyzed in Mode 5 and 6 and are not considered further.Remaining accidents 1, 2,,3, 9, and 10 are discussed below: 1.Fuel Handling Accident The only time a fuel handling accident could occur is during the handling of a fuel assembly.The required action to suspend core alterations is not changed.Changing RCS temperature in Modes 5 and 6 would not initiate this accident.SDM is not a factor or initial condition assumed in the analysis of a fuel handling accident.Therefore, since the requirements that would Attachment 4 TO AEP:NRC:1327 Page 3 preclude this accident are not affected, the probability of the accident is not changed.Similarly, a potential reduction in SDM does not increase the consequences of this accident.Waste Liquid Release The inadvertent release of radioactive liquid wastes to the environment was evaluated for the'waste evaporator condensate and monitor tanks, condensate storage tank, primary water storage tank, RWST, auxiliary building storage tanks, and chemical and volume control system (CVCS)holdup tanks.Et was concluded in the Updated Final Safety Analysis Report Chapter 14 evaluation that loss of liquid from these tanks to the environment is not a credible accident.This conclusion is not impacted by the thermal effects or reactivity changes due to RCS temperature while in Modes 5 and 6.3.Waste Gas Release Radioactive gases would be introduced into the RCS by the escape of fission products if defects existed in the fuel cladding.The processing of the reactor coolant by auxiliary systems results in the accumulation of radioactive gases in various tanks.The two main sources of any significant gaseous radioactivity that could occur would be the volume control tank and the gas decay tanks.Zt is assumed that a tank ruptures by an unspecified mechanism after the reactor has been operating for one core cycle with 1%defects in the fuel cladding.The integrity of these tanks is not affected by changes in RCS temperature and SDM is not a factor in the consequences of these events.Therefore, it is concluded that the probability of occurrence of a tank rupture and the consequences of a tank rupture are not significantly increased by this change.9.Uncontrolled RCCA Withdrawal from a Subcritical Condition The proposed changes specifically permit positive reactivity additions due to temperature changes.However, all other positive reactivity changes are suspended when the action applies.Therefore, intentional rod withdrawal would not be permitted.
Maintaining anadequateSDMisanessential meanstopreventaninadvertent criticality.
Additionally, this event could occur only when the reactor trip breakers are closed and the control rod drive mechanisms are energized.
Attachment 4TOAEP:NRC:1327 Page2Whenequipment thatisreliedupontoprevent,detect,correct,ormitigateanunintentional approachtoacriticalcondition
With the exception of testing or special maintenance, the rod drive motor generator set Attachment 4 TO AEP:HRC:1327 Page 4 remains tagged out (de-energized with administrative cards to alert operators) in Modes 4 and 5.This alone would preclude rod movement.If the physical conditions for rod withdrawal were intentionally met, T/S require that two source range neutron flux instruments, two reactor trip instrumentation channels, and associated reactor trip breakers, must be operable to automatically terminate the event.RCS temperature changes in Mode 5 and 6 are sufficiently below the normal operating and designed temperature of the drive mechanisms.
-isunavailable ordegraded, activities thatmayreducetheSDMmustbeprecluded oradequately controlled.
The thermal effects of the proposed RCS temperature changes are not a significant contributor to the possibility of a drive mechanism failure.Acceptable consequences for the rod withdrawal event rely on termination by an automatic reactor trip prior to criticality, and no assumptions are made in the analysis about the SDM existing at the start of rod withdrawal.
Thisamendment requestisbasedonmaintaining adequatecontrolofpositivereactivity additions asaresultofRCStemperature changesinModes5and6.Thecontrolisprovidedbyrequirements toconfirmthattheSDMrequiredbytheT/Sisavailable toaccommodate theexpectedRCStemperature change.Thispreserves theval,idity ofaccidentanalysesthatassumetheT/SSDMrequirements aremetwhentheaccidentisinitiated.
Therefore, it is=concluded that this proposed license amendment would have no impact on the probability or consequences of an uncontrolled rod withdrawal event.10.Uncontrolled Boron Dilution Uncontrolled boron dilution is analyzed for refueling, startup, and power operation described in UFSAR section 14.1.5 for Unit 1 and Unit 2.The source of water for this event is primary grade water from the reactor makeup portion of the CVCS.The CVCS is designed to limit, even under various postulated failure modes, the potential rate of dilution to a value that provides the operator sufficient time to correct the situation in a safe and orderly manner.Acceptable consequences for this event rely on preventing an uncontrolled dilution.The proposed change to allow RCS temperature changes below 200'F do not involve changes to the operating methods for the CVCS or modifications to the CVCS.Additionally, the CVCS pumps and valves required to add water to the RCS are not affected by the RCS temperature changes themselves.
Thefollowing accidents ofpotential applicability inModes5and6aredescribed inSection14.2,"StandbySafeguards Analysis" oftheUpdatedFinalSafetyAnalysisReport(UFSAR).1.Fuelhandlingaccident2.Wasteliquidrelease3.Wastegasrelease4.Steamgenerator tuberupture5.Steampiperupture6.Ruptureofcontrolrodmechanism housing-rodclustercontrolassembly(RCCA)ejection7.Environmental consequences following secondary systemaccidents 8.Ruptureofafeedline(Unit2only)TheUFSARalsodescribes theseevents:9.Uncontrolled RCCAwithdrawal fromasubcritical condition (Section14.1.1)10.Uncontrolled borondilution(Section14.1.5)Accidents 4through8,above,arenotcredibleinModes5and6duetonegligible storedenergy(temperature andpressure) intheprimaryandsecondary systemsbelowtheMode5RCStemperature limitof200'F.Therefore, theyarenotanalyzedinMode5and6andarenotconsidered further.Remaining accidents 1,2,,3,9,and10arediscussed below:1.FuelHandlingAccidentTheonlytimeafuelhandlingaccidentcouldoccurisduringthehandlingofafuelassembly.
Any such effects in the range of 68'F to 200'F that would be permitted would be small compared to changes between 200'F to normal RCS operating temperature.
Therequiredactiontosuspendcorealterations isnotchanged.ChangingRCStemperature inModes5and6wouldnotinitiatethisaccident.
Therefore, the thermal effects are significantly less than those that occur during normal operation.
SDMisnotafactororinitialcondition assumedintheanalysisofafuelhandlingaccident.
It is concluded that the probability and consequences of an uncontrolled boron dilution event are not significantly increased by the proposed license amendment.
Therefore, sincetherequirements thatwould Attachment 4TOAEP:NRC:1327 Page3precludethisaccidentarenotaffected, theprobability oftheaccidentisnotchanged.Similarly, apotential reduction inSDMdoesnotincreasetheconsequences ofthisaccident.
The initiators and precursors for the accidents described above are not changed.Therefore, the probability of their occurrence is not changed and the consequences are bounded by the current
WasteLiquidReleaseTheinadvertent releaseofradioactive liquidwastestotheenvironment wasevaluated forthe'wasteevaporator condensate andmonitortanks,condensate storagetank,primarywaterstoragetank,RWST,auxiliary buildingstoragetanks,andchemicalandvolumecontrolsystem(CVCS)holduptanks.Etwasconcluded intheUpdatedFinalSafetyAnalysisReportChapter14evaluation thatlossofliquidfromthesetankstotheenvironment isnotacredibleaccident.
Thisconclusion isnotimpactedbythethermaleffectsorreactivity changesduetoRCStemperature whileinModes5and6.3.WasteGasReleaseRadioactive gaseswouldbeintroduced intotheRCSbytheescapeoffissionproductsifdefectsexistedinthefuelcladding.
Theprocessing ofthereactorcoolantbyauxiliary systemsresultsintheaccumulation ofradioactive gasesinvarioustanks.Thetwomainsourcesofanysignificant gaseousradioactivity thatcouldoccurwouldbethevolumecontroltankandthegasdecaytanks.Ztisassumedthatatankrupturesbyanunspecified mechanism afterthereactorhasbeenoperating foronecorecyclewith1%defectsinthefuelcladding.
Theintegrity ofthesetanksisnotaffectedbychangesinRCStemperature andSDMisnotafactorintheconsequences oftheseevents.Therefore, itisconcluded thattheprobability ofoccurrence ofatankruptureandtheconsequences ofatankrupturearenotsignificantly increased bythischange.9.Uncontrolled RCCAWithdrawal fromaSubcritical Condition Theproposedchangesspecifically permitpositivereactivity additions duetotemperature changes.However,allotherpositivereactivity changesaresuspended whentheactionapplies.Therefore, intentional rodwithdrawal wouldnotbepermitted.
Additionally, thiseventcouldoccuronlywhenthereactortripbreakersareclosedandthecontrolroddrivemechanisms areenergized.
Withtheexception oftestingorspecialmaintenance, theroddrivemotorgenerator set Attachment 4TOAEP:HRC:1327 Page4remainstaggedout(de-energized withadministrative cardstoalertoperators) inModes4and5.Thisalonewouldprecluderodmovement.
Ifthephysicalconditions forrodwithdrawal wereintentionally met,T/Srequirethattwosourcerangeneutronfluxinstruments, tworeactortripinstrumentation
: channels, andassociated reactortripbreakers, mustbeoperabletoautomatically terminate theevent.RCStemperature changesinMode5and6aresufficiently belowthenormaloperating anddesignedtemperature ofthedrivemechanisms.
ThethermaleffectsoftheproposedRCStemperature changesarenotasignificant contributor tothepossibility ofadrivemechanism failure.Acceptable consequences fortherodwithdrawal eventrelyontermination byanautomatic reactortrippriortocriticality, andnoassumptions aremadeintheanalysisabouttheSDMexistingatthestartofrodwithdrawal.
Therefore, itis=concluded thatthisproposedlicenseamendment wouldhavenoimpactontheprobability orconsequences ofanuncontrolled rodwithdrawal event.10.Uncontrolled BoronDilutionUncontrolled borondilutionisanalyzedforrefueling, startup,andpoweroperation described inUFSARsection14.1.5forUnit1andUnit2.ThesourceofwaterforthiseventisprimarygradewaterfromthereactormakeupportionoftheCVCS.TheCVCSisdesignedtolimit,evenundervariouspostulated failuremodes,thepotential rateofdilutiontoavaluethatprovidestheoperatorsufficient timetocorrectthesituation inasafeandorderlymanner.Acceptable consequences forthiseventrelyonpreventing anuncontrolled dilution.
TheproposedchangetoallowRCStemperature changesbelow200'Fdonotinvolvechangestotheoperating methodsfortheCVCSormodifications totheCVCS.Additionally, theCVCSpumpsandvalvesrequiredtoaddwatertotheRCSarenotaffectedbytheRCStemperature changesthemselves.
Anysucheffectsintherangeof68'Fto200'Fthatwouldbepermitted wouldbesmallcomparedtochangesbetween200'FtonormalRCSoperating temperature.
Therefore, thethermaleffectsaresignificantly lessthanthosethatoccurduringnormaloperation.
Itisconcluded thattheprobability andconsequences ofanuncontrolled borondilutioneventarenotsignificantly increased bytheproposedlicenseamendment.
Theinitiators andprecursors fortheaccidents described abovearenotchanged.Therefore, theprobability oftheiroccurrence isnotchangedandtheconsequences areboundedbythecurrent


Attachment 4TOAEP:NRC:1327 Page5analyses.
Attachment 4 TO AEP:NRC:1327 Page 5 analyses.Therefore, there is no increase in the types or amounts of effluents released offsite.The proposed additions to action 5 of T/S Table 3.3-1 are conservative.
Therefore, thereisnoincreaseinthetypesoramountsofeffluents releasedoffsite.Theproposedadditions toaction5ofT/STable3.3-1areconservative.
They provide additional assurance that instrumentation would be available to alert operators to a dilution event.The requirement to isolate sources of dilution water removes potential initiators for an inadvertent dilution.The RWST would be considered a dilution source if the RWST boron concentration is less than the RCS boron concentration and less than the minimum boron concentration in T/S limiting condition for operation 3.1.2.7.b.2.
Theyprovideadditional assurance thatinstrumentation wouldbeavailable toalertoperators toadilutionevent.Therequirement toisolatesourcesofdilutionwaterremovespotential initiators foraninadvertent dilution.
Isolating the RWST in this case is appropriate because it eliminates a potential accident initiator.
TheRWSTwouldbeconsidered adilutionsourceiftheRWSTboronconcentration islessthantheRCSboronconcentration andlessthantheminimumboronconcentration inT/Slimitingcondition foroperation 3.1.2.7.b.2.
The borated water concentration and volume in Mode 5 are established to provide the required SDM after xenon decay and cooldown from 200'F to 140'F.The accidents described above do not require a minimum volume for reasons other than boration control.The addition to T/S SRs 4.1.1.1.e and 4.1.1.2.b, which requires application of a boron penalty, is an additional restriction that is imposed administratively already.The remaining changes are administrative.
Isolating theRWSTinthiscaseisappropriate becauseiteliminates apotential accidentinitiator.
They correct typographical errors or change format, and are not intended to change the meaning.They do not affect accident initiators or precursors.
Theboratedwaterconcentration andvolumeinMode5areestablished toprovidetherequiredSDMafterxenondecayandcooldownfrom200'Fto140'F.Theaccidents described abovedonotrequireaminimumvolumeforreasonsotherthanborationcontrol.TheadditiontoT/SSRs4.1.1.1.e and4.1.1.2.b, whichrequiresapplication ofaboronpenalty,isanadditional restriction thatisimposedadministratively already.Theremaining changesareadministrative.
In summary, based on the above, the probability of occurrence or the consequences of accidents previously evaluated are not increased.
Theycorrecttypographical errorsorchangeformat,andarenotintendedtochangethemeaning.Theydonotaffectaccidentinitiators orprecursors.
2.Does the change create the possibility of a new or different kind of accident from any accident previously evaluated?
Insummary,basedontheabove,theprobability ofoccurrence ortheconsequences ofaccidents previously evaluated arenotincreased.
No.The proposed changes permit RCS temperature changes under conditions"that were.previously prohibited.
2.Doesthechangecreatethepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated?
However, no new methods of changing RCS temperature are involved, and the T/S limits on the permissible rates of RCS temperature changes are not altered.Therefore, the integrity of the reactor vessel when subject to RCS temperature changes is not affected.The accident of concern for the proposed amendment is an unintentional reduction in SDM leading to an inadvertent criticality.
No.TheproposedchangespermitRCStemperature changesunderconditions "thatwere.previously prohibited.
This is not a new or different kind of accident, although the causal mechanism adding the positive reactivity is an RCS temperature change instead of a dilution event.As discussed in question 1, the requirement to maintain SDM during RCS temperature changes provides assurance that the probability of the SDM reduction is not increased.
However,nonewmethodsofchangingRCStemperature areinvolved, andtheT/Slimitsonthepermissible ratesofRCStemperature changesarenotaltered.Therefore, theintegrity ofthereactorvesselwhensubjecttoRCStemperature changesisnotaffected.
However, as an additional conservative measure, a maximum RCS heatup and
Theaccidentofconcernfortheproposedamendment isanunintentional reduction inSDMleadingtoaninadvertent criticality.
Thisisnotanewordifferent kindofaccident, althoughthecausalmechanism addingthepositivereactivity isanRCStemperature changeinsteadofadilutionevent.Asdiscussed inquestion1,therequirement tomaintainSDMduringRCStemperature changesprovidesassurance thattheprobability oftheSDMreduction isnotincreased.
However,asanadditional conservative measure,amaximumRCSheatupand


Attachment 4TOAEP:NRC:1327 Page6cooldownrateof,50'Finanyone-hourperiodisimposedwhentheactionapplies.Thisincreases thetimenecessary foraRCStemperature changetoreducetheSDMbyanunacceptable amount.Thus,ifaheatuporcooldownwasinitiated at50'F/hr,andinadvertently continued beyondtheintendedtemperature, sufficient timewouldbeavailable fortheoperators todetecttheSDMreduction withthesourcerangenuclearinstruments andsecurethetemperature change.Therateof50'Finanyone-hourperiodwasestimated toprovideatleastasmuchtimeaswasconsidered adequatefordetecting andcorrecting adilutionevent.Theacceptable timeforadilutioneventisdescribed inUFSARSect'ion14.1.5.Conservative assumptions ofthemaximumpositiveornegativemoderator temperature coefficient wereusedfortheestimate.
Attachment 4 TO AEP:NRC:1327 Page 6 cooldown rate of,50'F in any one-hour period is imposed when the action applies.This increases the time necessary for a RCS temperature change to reduce the SDM by an unacceptable amount.Thus, if a heatup or cooldown was initiated at 50'F/hr, and inadvertently continued beyond the intended temperature, sufficient time would be available for the operators to detect the SDM reduction with the source range nuclear instruments and secure the temperature change.The rate of 50'F in any one-hour period was estimated to provide at least as much time as was considered adequate for detecting and correcting a dilution event.The acceptable time for a dilution event is described in UFSAR Sect'ion 14.1.5.Conservative assumptions of the maximum positive or negative moderator temperature coefficient were used for the estimate.It should be noted that compliance with the current T/S action statements prohibit deliberate heatup and cooldown.However, it does not prevent use of the equipment involved in removing decay heat to maintain plant temperature (for example residual heat removal system pumps, valves, and heat exchangers).
Itshouldbenotedthatcompliance withthecurrentT/Sactionstatements prohibitdeliberate heatupandcooldown.
Therefore, the probability of a malfunction of this equipment during deliberate heatup and cooldown is not significantly greater than it is when the equipment is operated, as necessary, to maintain steady-state temperatures for decay heat removal.The addition to T/S SRs 4.1.l.l.e and 4.1.1.2.b, which requires application of a boron penalty, is an additional restriction that is imposed administratively already.The proposed additions to the T/S action statements for the source range neutron flux instrumentation provide additional controls to prevent an unmonitored positive reactivity addition.The remaining changes are administrative.
However,itdoesnotpreventuseoftheequipment involvedinremovingdecayheattomaintainplanttemperature (forexampleresidualheatremovalsystempumps,valves,andheatexchangers).
They correct typographical errors or change format, and are not intended to change the meaning.Isolating the RWST when it is a potential dilution source and when there are no source range neutron flux instrument.
Therefore, theprobability ofamalfunction ofthisequipment duringdeliberate heatupandcooldownisnotsignificantly greaterthanitiswhentheequipment isoperated, asnecessary, tomaintainsteady-state temperatures fordecayheatremoval.TheadditiontoT/SSRs4.1.l.l.e and4.1.1.2.b, whichrequiresapplication ofaboronpenalty,isanadditional restriction thatisimposedadministratively already.Theproposedadditions totheT/Sactionstatements forthesourcerangeneutronfluxinstrumentation provideadditional controlstopreventanunmonitored positivereactivity addition.
chahnels operable in Mode 5 is not an accident initiator.
Theremaining changesareadministrative.
Borated makeup to the RCS can be accomplished with the boric acid storage tank.Based on the above, it is concluded that the change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
Theycorrecttypographical errorsorchangeformat,andarenotintendedtochangethemeaning.Isolating theRWSTwhenitisapotential dilutionsourceandwhentherearenosourcerangeneutronfluxinstrument.
3.Does the change involve a significant reduction in a margin of safety?No.The margin of safety pertinent to the proposed changes is the T/S-required SDM.The additions to T/S SRs 4.1.1.1.e and 4.1.1.2.b require application of a boron penalty.Because this penalty is controlled administratively already and there are no
chahnelsoperableinMode5isnotanaccidentinitiator.
BoratedmakeuptotheRCScanbeaccomplished withtheboricacidstoragetank.Basedontheabove,itisconcluded thatthechangedoesnotcreatethepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously evaluated.
3.Doesthechangeinvolveasignificant reduction inamarginofsafety?No.Themarginofsafetypertinent totheproposedchangesistheT/S-required SDM.Theadditions toT/SSRs4.1.1.1.e and4.1.1.2.b requireapplication ofaboronpenalty.Becausethispenaltyiscontrolled administratively alreadyandthereareno


Attachment 4TOAEP:NRC:1327 Page7otherchangestotheSDMrequirements, themarginofsafetyismaintained.
Attachment 4 TO AEP:NRC:1327 Page 7 other changes to the SDM requirements, the margin of safety is maintained.
Additionally, theproposedchangetoisolatetheRWSTwhen*itisapotential dilutionsourcedoesnotimpacttheabilityoftheboricacidstoragetanktosupplytheboronrequiredforSDMduringcooldownfrom200'Fto140'Fincluding xenondecay.Theminimumtimeavailable, totheoperators todetectandterminate anunintentional additionofpositivereactivity couldalsobeconsidered amarginofsafety.Theproposedchangeslimittemperature changesto50'Finaone-hourperiodsoasnottoreducethis'ime.
Additionally, the proposed change to isolate the RWST when*it is a potential dilution source does not impact the ability of the boric acid storage tank to supply the boron required for SDM during cooldown from 200'F to 140'F including xenon decay.The minimum time available, to the operators to detect and terminate an unintentional addition of positive reactivity could also be considered a margin of safety.The proposed changes limit temperature changes to 50'F in a one-hour period so as not to reduce this'ime.Compliance with the proposed changes would continue to provide assurance that there is no significant reduction in these margins of safety.The remaining changes are administrative.
Compliance withtheproposedchangeswouldcontinuetoprovideassurance thatthereisnosignificant reduction inthesemarginsofsafety.Theremaining changesareadministrative.
They correct typographical errors or change format, and are not intended t'o change the meaning.Based on the above, the proposed changes do not involve a significant reduction in a margin of safety.In summary, based upon the above evaluation, l&M has concluded that the proposed amendment involves no significant hazards consideration.
Theycorrecttypographical errorsorchangeformat,andarenotintendedt'ochangethemeaning.Basedontheabove,theproposedchangesdonotinvolveasignificant reduction inamarginofsafety.Insummary,basedupontheaboveevaluation, l&Mhasconcluded thattheproposedamendment involvesnosignificant hazardsconsideration.
ATTACHMENT 5 TO AEP:NRC:1327 ENVIRONMENTAL ASSESSMENT  
ATTACHMENT 5TOAEP:NRC:1327 ENVIRONMENTAL ASSESSMENT  


Attachment 5toAEP:NRC:1327 Page1Environmental Assessment IndianaMichiganPowerCompany(I&M)hasevaluated thislicenseamendment requestagainstthecriteriaforidentification oflicensing andregulatory actionsrequiring environmental assessment inaccordance with10CFR51.21.I&Mhasdetermined thatthislicenseamendment requestmeetsthecriteriaforacategorical exclusion setforthin10CFR51.22(c)(9).
Attachment 5 to AEP:NRC:1327 Page 1 Environmental Assessment Indiana Michigan Power Company (I&M)has evaluated this license amendment request against the criteria for identification of licensing and regulatory actions requiring environmental assessment in accordance with 10 CFR 51.21.I&M has determined that this license amendment request meets the criteria for a categorical exclusion set forth in 10 CFR 51.22(c)(9).
Thisdetermination isbasedonthefactthatthischangeis'beingproposedasanamendment toalicenseissuedpursuantto10CFR50thatchangesarequirement withrespecttoinstallation oruseofafacilitycomponent locatedwithintherestricted area,asdefinedin10CFR20,orthatchangesaninspection orasurveillance requirement, andtheamendment meetsthefollowing specificcriteria.
This determination is based on the fact that this change is'being proposed as an amendment to a license issued pursuant to 10 CFR 50 that changes a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or that changes an inspection or a surveillance requirement, and the amendment meets the following specific criteria.(i)The amendment involves no significant hazards consideration.
(i)Theamendment involvesnosignificant hazardsconsideration.
As demonstrated in attachment 4, this proposed amendment does,not involve significant hazards consideration.(ii)There is no significant change in the types or significant increase in the amounts of any effluent'hat may be released offsite.As documented in attachment 1, there will be no significant change in the.types or significant increase in the amounts of any effluents released offsite.(iii)There is no significant increase in individual or cumulative occupational radiation exposure.The proposed changes will not result in significant changes in the operation or configuration of the facility.There will be no change in the level of controls or methodology used for processing of radioactive effluents or handling of solid radioactive waste, nor will the proposal result in any change in the normal radiation levels within the plant.Therefore, there will be no significant increase in individual or cumulative occupational radiation exposure resulting from this change.  
Asdemonstrated inattachment 4,thisproposedamendment does,notinvolvesignificant hazardsconsideration.
(ii)Thereisnosignificant changeinthetypesorsignificant increaseintheamountsofanyeffluent'hat maybereleasedoffsite.Asdocumented inattachment 1,therewillbenosignificant changeinthe.typesorsignificant increaseintheamountsofanyeffluents releasedoffsite.(iii)Thereisnosignificant increaseinindividual orcumulative occupational radiation exposure.
Theproposedchangeswillnotresultinsignificant changesintheoperation orconfiguration ofthefacility.
Therewillbenochangeinthelevelofcontrolsormethodology usedforprocessing ofradioactive effluents orhandlingofsolidradioactive waste,norwilltheproposalresultinanychangeinthenormalradiation levelswithintheplant.Therefore, therewillbenosignificant increaseinindividual orcumulative occupational radiation exposureresulting fromthischange.  


ATTACHMENT 1TOAEP:NRC:0433Q DESCRIPTION ANDSAFETYANALYSISFORPROPOSEDCHANGES
ATTACHMENT 1 TO AEP:NRC:0433Q DESCRIPTION AND SAFETY ANALYSIS FOR PROPOSED CHANGES


Attachment 1toNRC:AEP:0433Q Page1DescritionandSafetAnalsisForProosedChanesA.SummaryofProposedChangesTheLicenseeproposestomakeadministrative changestoseveraltechnical specifications (T/S)forDonaldC.CookNuclearPlantunit1andunit2.Theproposedchangesinclude:(1)revisingboronsamplingrequirements inmode6;(2)deletingareference toobsoleteequipment inafootnote, (3)deletingaredundant figure;(4)correcting areference toanotherrequirement; (5)deletingobsoletenotes;(6)addingtosurveillance requirements; (7)clarifying instrumentation configuration; and(8)correcting typographical errors.Thesechangesareproposedtoremoveobsoleteinformation, provideconsistency betweenunit1andunit2,provideconsistency withtheStandardTechnical Specifications, provideclarification, andcorrecttypographical errors.Theproposedchangesaredescribed indetailinSectionBofthisattachment.
Attachment 1 to NRC:AEP:0433Q Page 1 Descri tion and Safet Anal sis For Pro osed Chan es A.Summary of Proposed Changes The Licensee proposes to make administrative changes to several technical specifications (T/S)for Donald C.Cook Nuclear Plant unit 1 and unit 2.The proposed changes include: (1)revising boron sampling requirements in mode 6;(2)deleting a reference to obsolete equipment in a footnote, (3)deleting a redundant figure;(4)correcting a reference to another requirement; (5)deleting obsolete notes;(6)adding to surveillance requirements; (7)clarifying instrumentation configuration; and (8)correcting typographical errors.These changes are proposed to remove obsolete information, provide consistency between unit 1 and unit 2, provide consistency with the Standard Technical Specifications, provide clarification, and correct typographical errors.The proposed changes are described in detail in Section B of this attachment.
T/Spagesthataremarkedtoshowtheproposedchangesareprovidedinattachments 2Aand2Bforunit1andunit2,respectively.
T/S pages that are marked to show the proposed changes are provided in attachments 2A and 2B for unit 1 and unit 2, respectively.
TheproposedT/Spageswiththechangesincorporated areprovidedinattachments 3Aand3Bforunit1andunit2,respectively.
The proposed T/S pages with the changes incorporated are provided in attachments 3A and 3B for unit 1 and unit 2, respectively.
B.DetailedDescription ofProposedChangesProposedRevisiontoBoronSamplingRequirements inMode6Description andBasesoftheCurrentRequirement T/Ssurveillance requirement 4.9.1.2forunit1requiresthattheboronconcentration ofthereactorcoolantsystemandrefueling canalbedetermined atleastthreetimespersevendayswithamaximumtimeintervalbetweensamplesof72hours.Therequirement providesassurance thatauniformboronconcentration ismaintained forreactivity controlinthewatervolumehavingdirectaccesstothereactorvessel.Description andBasesoftheRequested RevisionTheLicenseeproposestoremovetheunit1restriction todetermine theconcentration atleastthreetimespersevendaysforconsistency withtheunit2surveillance requirement, NOREG-1431, "Standard Technical Specifications,"
B.Detailed Description of Proposed Changes Proposed Revision to Boron Sampling Requirements in Mode 6 Description and Bases of the Current Requirement T/S surveillance requirement 4.9.1.2 for unit 1 requires that the boron concentration of the reactor coolant system and refueling canal be determined at least three times per seven days with a maximum time interval between samples of 72 hours.The requirement provides assurance that a uniform boron concentration is maintained for reactivity control in the water volume having direct access to the reactor vessel.Description and Bases of the Requested Revision The Licensee proposes to remove the unit 1 restriction to determine the concentration at least three times per seven days for consistency with the unit 2 surveillance requirement, NOREG-1431,"Standard Technical Specifications," and its predecessor, NOREG-0452.
anditspredecessor, NOREG-0452.
The 72-hour maximum interval between samples is not changed.According to NOREG-1431, a minimum frequency of once every 72 hours is a reasonable amount'f time to verify the boron concentration of representative samples.The frequency is based on operating experience, which has shown 72 hours to be adequate.
The72-hourmaximumintervalbetweensamplesisnotchanged.According toNOREG-1431, aminimumfrequency ofonceevery72hoursisareasonable amount'ftimetoverifytheboronconcentration ofrepresentative samples.Thefrequency isbasedonoperating experience, whichhasshown72hourstobeadequate.
Attachment 1 to NRC:AEP:0433Q Page 2 2.Proposed Revision to Footnote for T/S 3.9.12, Action a Description and Bases of the Current Requirement T/S 3.9.12, Action a,, is modified by a footnote describing operation of the drumming room roll-up door.The crane bay roll-up door and the drumming room roll-up door provide a ventilation barrier to maintain negative pressure in the auxiliary building.These doors may be opened for personnel use provided established administrative controls are maintained.
Attachment 1toNRC:AEP:0433Q Page22.ProposedRevisiontoFootnoteforT/S3.9.12,ActionaDescription andBasesoftheCurrentRequirement T/S3.9.12,Actiona,,ismodifiedbyafootnotedescribing operation ofthedrummingroomroll-updoor.Thecranebayroll-updoorandthedrummingroomroll-updoorprovideaventilation barriertomaintainnegativepressureintheauxiliary building.
The footnote was added in amendment 124 to DPR-58 and amendment 111 to DPR-74.In the NRC's Safety Evaluation Report, the staff found that the operation of the doors met the intent of Standard Review Plan, Sections 9.4.2,"Spent Fuel Pool Area Ventilation System," and 15.7.4,"Radiological Consequences of Fuel Handling Accidents," and was, therefore, acceptable.
Thesedoorsmaybeopenedforpersonnel useprovidedestablished administrative controlsaremaintained.
Description and Bases of the Requested Revision'he Licensee proposes to remove"roll-up" from the description of the drumming room door.The door has been replaced by a door having a different design.The function of the door has not changed.The replacement door provides a ventilation barrier as required by the analysis used in support of the previous amendment request.In addition, the name of the door is changed to"south door of the auxiliary building crane bay" because it more accurately describes the door's current use.3.Proposed Change to Figure 5.6-3 Description and Bases of the Current Requirement T/S 5.6.1~1.c.3 includes equations for equivalent reactivity criteria for Region 2 and Region 3 in the spent fuel storage racks.The equations are graphically depicted in Figure 5.6-3.Either the equations or graph may be used to verify that fuel is stored in the appropriate region.Description and Bases of the Requested Revision The Licensee proposes to delete Figure 5.6-3 because the information is redundant to the equations provided in T/S 5.6.1.1.c.3.
Thefootnotewasaddedinamendment 124toDPR-58andamendment 111toDPR-74.IntheNRC'sSafetyEvaluation Report,thestafffoundthattheoperation ofthedoorsmettheintentofStandardReviewPlan,Sections9.4.2,"SpentFuelPoolAreaVentilation System,"and15.7.4,"Radiological Consequences ofFuelHandlingAccidents,"
It is normal practice to use the equations rather than the source plot in Figure 5.6-3;therefore, the redundant curves are not necessary.
andwas,therefore, acceptable.
The fuel storage requirements are not changed.Proposed Change to Reference in T/S 6.3.1 Description and Bases of the Current Requirement T/S 6'.1,"Facility Staff Qualifications," includes a requirement that the operations superintendent must hold or have held a senior operator license as specified in  
Description andBasesoftheRequested Revision'heLicenseeproposestoremove"roll-up" fromthedescription ofthedrummingroomdoor.Thedoorhasbeenreplacedbyadoorhavingadifferent design.Thefunctionofthedoorhasnotchanged.Thereplacement doorprovidesaventilation barrierasrequiredbytheanalysisusedinsupportofthepreviousamendment request.Inaddition, thenameofthedoorischangedto"southdooroftheauxiliary buildingcranebay"becauseitmoreaccurately describes thedoor'scurrentuse.3.ProposedChangetoFigure5.6-3Description andBasesoftheCurrentRequirement T/S5.6.1~1.c.3includesequations forequivalent reactivity criteriaforRegion2andRegion3inthespentfuelstorageracks.Theequations aregraphically depictedinFigure5.6-3.Eithertheequations orgraphmaybeusedtoverifythatfuelisstoredintheappropriate region.Description andBasesoftheRequested RevisionTheLicenseeproposestodeleteFigure5.6-3becausetheinformation isredundant totheequations providedinT/S5.6.1.1.c.3.
~I Attachment 1 to NRC:AEP:0433Q Page 3 T/S 6.2.2.h.The requirement provides assurance that operational activities are directed by an individual who has an appropriate level of knowledge.
Itisnormalpracticetousetheequations ratherthanthesourceplotinFigure5.6-3;therefore, theredundant curvesarenotnecessary.
Description and Bases of the Requested Revision The Licensee proposes to change the referenced section from 6.2.2.h to 6.2.2.g to correct an administrative error that was introduced in previous amendments.
Thefuelstoragerequirements arenotchanged.ProposedChangetoReference inT/S6.3.1Description andBasesoftheCurrentRequirement T/S6'.1,"Facility StaffQualifications,"
Section 6.2.2.h describes the senior operator license requirement.
includesarequirement thattheoperations superintendent mustholdorhaveheldasenioroperatorlicenseasspecified in  
Section 6.2.2.g no longer exists because it had been relabeled as 6.2.2.h;however, the corresponding reference in T/S 6'.1 was not changed at that time.This request corrects the error.The statement describing the senior operator license in 6.3.1 is deleted because the requirement is provided in detail in 6.2.2.h.The statement is not consistent with the requirements in 6.2.2.h because of a previous administrative error.The change provides a clear reference to the current T/S for qualifications.
~I Attachment 1toNRC:AEP:0433Q Page3T/S6.2.2.h.Therequirement providesassurance thatoperational activities aredirectedbyanindividual whohasanappropriate levelofknowledge.
5.Proposed Deletion of Obsolete Notes Description and Bases of the Current Requirement For unit 1, T/S 4.0.6 allows extensions for certain surveillances required to be performed on or before July 31, 1987, and until the end of the cycle 9-10 refueling outage.T/S 4.0.7 allows extensions for certain surveillances required to be performed on or before April 1, 1989, until the end of the cycle 10-11 refueling outage.These extensions were granted to accommodate scheduled work at the time.For unit 2, T/S 4.0.6 allows extensions for certain surveillances required to be performed on or before March 31, 1986, until the end of the cycle 5-6 refueling outage.T/S 4.0.7 allows extensions for certain surveillances required to be performed on or before July 1, 1988, until the end of the cycle 6-7 refueling outage.These extensions were granted to accommodate scheduled work at the time.For unit 2, T/S 4.0.8 allows extensions for certain surveillances required to be performed on or before August 13, 1994, and designated as 18-month or 36-month surveillances (or required as outage-related surveillances under the provisions of T/S 4.0.5).T/S 4.0.8 also affected the initiation date established during the unit 2 1994 refueling outage.Similarly, T/S 4.0.9 allowed surveillances that must be performed on or before September 7, 1994, and are designated as 18-month surveillances to be delayed until just prior to core reload in the unit 2 cycle 9-10 refueling outage.Each affected surveillance is modified by a note stating that the provisions of T/S 4.0.8 or T/S 4.0.9 (as appropriate) are applicable.
Description andBasesoftheRequested RevisionTheLicenseeproposestochangethereferenced sectionfrom6.2.2.hto6.2.2.gtocorrectanadministrative errorthatwasintroduced inpreviousamendments.
These extensions were granted to accommodate scheduled work at the time.
Section6.2.2.hdescribes thesenioroperatorlicenserequirement.
Attachment 1 to NRC:AEP:0433Q Page 4 For unit 2, Table 4.4-2 and T/S 3.3.3.1 include a note stating that the T/S will not be effective until after the 1982 refueling outage.For unit 1 and unit 2, surveillance requirements 4.4.12.1 and 4.4.12.2 are modified by notes stating that the surveillance requirements will be performed the next time the unit enters modes 5 or 6 following the issuance of the technical specification, and after the appropriate plant procedures have been written.Description and Bases of the Requested Revision For unit 1 and unit 2, T/S 4.0.6 and 4.0.7 are deleted because they no longer apply.Surveillances are scheduled in accordance with the applicable T/Ss.The references to 4.0.6 and 4.0.7 that indicated when the provision was applicable were deleted in previous amendments.
Section6.2.2.gnolongerexistsbecauseithadbeenrelabeled as6.2.2.h;however,thecorresponding reference inT/S6'.1wasnotchangedatthattime.Thisrequestcorrectstheerror.Thestatement describing thesenioroperatorlicensein6.3.1isdeletedbecausetherequirement isprovidedindetailin6.2.2.h.Thestatement isnotconsistent withtherequirements in6.2.2.hbecauseofapreviousadministrative error.Thechangeprovidesaclearreference tothecurrentT/Sforqualifications.
For unit 2, T/S 4.0.8 and 4.0.9.are deleted because they no longer apply.Surveillances are scheduled in accordance with the applicable T/Ss.References to T/S 4.0.8 are also deleted from the following:
5.ProposedDeletionofObsoleteNotesDescription andBasesoftheCurrentRequirement Forunit1,T/S4.0.6allowsextensions forcertainsurveillances requiredtobeperformed onorbeforeJuly31,1987,anduntiltheendofthecycle9-10refueling outage.T/S4.0.7allowsextensions forcertainsurveillances requiredtobeperformed onorbeforeApril1,1989,untiltheendofthecycle10-11refueling outage.Theseextensions weregrantedtoaccommodate scheduled workatthetime.Forunit2,T/S4.0.6allowsextensions forcertainsurveillances requiredtobeperformed onorbeforeMarch31,1986,untiltheendofthecycle5-6refueling outage.T/S4.0.7allowsextensions forcertainsurveillances requiredtobeperformed onorbeforeJuly1,1988,untiltheendofthecycle6-7refueling outage.Theseextensions weregrantedtoaccommodate scheduled workatthetime.Forunit2,T/S4.0.8allowsextensions forcertainsurveillances requiredtobeperformed onorbeforeAugust13,1994,anddesignated as18-monthor36-monthsurveillances (orrequiredasoutage-related surveillances undertheprovisions ofT/S4.0.5).T/S4.0.8alsoaffectedtheinitiation dateestablished duringtheunit21994refueling outage.Similarly, T/S4.0.9allowedsurveillances thatmustbeperformed onorbeforeSeptember 7,1994,andaredesignated as18-monthsurveillances tobedelayeduntiljustpriortocorereloadintheunit2cycle9-10refueling outage.Eachaffectedsurveillance ismodifiedbyanotestatingthattheprovisions ofT/S4.0.8orT/S4.0.9(asappropriate) areapplicable.
Table 4.3-1, functional units 7 through 11;Table 4.3-2, functional units 1.d, 4.d, and 6.d;Table 4.3-6A, instruments 5 through 8;Table 4.3-10, items 2, 3, 11, 15, and 16;surveillance requirement (SR)4.4.6.1.b; SR 4.4.11.1.d; SR 4.5.3.1;SR 4.6.2.2c;SR 4.6.3.1.2; SR 4.6.5.9;SR 4.7.3.1.b; SR 4.7.4.1.b; SR 4.7.5.1.e.2.a; SR 4.7.5.l.e.2.b; SR 4.7.7.1.a; and SR 4.8.1.2.References to T/S 4.0.9 are deleted from SR 4.8.2.3.2.d and SR 4.8.2.4.2.
Theseextensions weregrantedtoaccommodate scheduled workatthetime.
For unit 2, the notes for T/S 3.3.3.1 and Table 4.4-2 are deleted.The provision has expired and it is no longer required to be included.For unit 1 and unit 2, the notes for surveillance requirements 4.4.12.1 and 4.4.12.2 are deleted.Plant procedures 01-0HP-4030.STP.56 and 02-0HP-4030.STP.56 were developed to perform the surveillance.
Attachment 1toNRC:AEP:0433Q Page4Forunit2,Table4.4-2andT/S3.3.3.1includeanotestatingthattheT/Swillnotbeeffective untilafterthe1982refueling outage.Forunit1andunit2,surveillance requirements 4.4.12.1and4.4.12.2aremodifiedbynotesstatingthatthesurveillance requirements willbeperformed thenexttimetheunitentersmodes5or6following theissuanceofthetechnical specification, andaftertheappropriate plantprocedures havebeenwritten.Description andBasesoftheRequested RevisionForunit1andunit2,T/S4.0.6and4.0.7aredeletedbecausetheynolongerapply.Surveillances arescheduled inaccordance withtheapplicable T/Ss.Thereferences to4.0.6and4.0.7thatindicated whentheprovision wasapplicable weredeletedinpreviousamendments.
The surveillances are performed routinely as required, and the exception allowed in the footnote is no longer applicable.
Forunit2,T/S4.0.8and4.0.9.are deletedbecausetheynolongerapply.Surveillances arescheduled inaccordance withtheapplicable T/Ss.References toT/S4.0.8arealsodeletedfromthefollowing:
The exceptions that were granted in all of these notes are no longer applicable.
Table4.3-1,functional units7through11;Table4.3-2,functional units1.d,4.d,and6.d;Table4.3-6A,instruments 5through8;Table4.3-10,items2,3,11,15,and16;surveillance requirement (SR)4.4.6.1.b; SR4.4.11.1.d; SR4.5.3.1;SR4.6.2.2c; SR4.6.3.1.2; SR4.6.5.9;SR4.7.3.1.b; SR4.7.4.1.b; SR4.7.5.1.e.2.a; SR4.7.5.l.e.2.b; SR4.7.7.1.a; andSR4.8.1.2.References toT/S4.0.9aredeletedfromSR4.8.2.3.2.d andSR4.8.2.4.2.
Therefore, deleting the notes is considered to be an administrative change.6.Proposed Changes to T/S Surveillance Requirement 4.7.3.1 Description and Bases of the Current Requirement Unit 1 T/S surveillance requirement 4.7.3.1.d requires verification that the component cooling water system cross-tie valves can cycle full travel.
Forunit2,thenotesforT/S3.3.3.1andTable4.4-2aredeleted.Theprovision hasexpiredanditisnolongerrequiredtobeincluded.
4~I Attachment 1 to NRC:AEP:0433Q Page 5 Unit 2 T/S surveillance requirement 4.7.3.1 includes two requirements to demonstrate operability of the component cooling water loops.A third requirement is included in surveillance requirement 4.7.3.2.These surveillances support demonstration that the system is operable.Description and Bases of the Requested Revision For unit 1, a clarification is proposed to indicate that the cross-tie valves are the unit cross-tie valves.The change is consistent with the equivalent unit 2 requirement and is not intended to affect which valves are included in the surveillance.
Forunit1andunit2,thenotesforsurveillance requirements 4.4.12.1and4.4.12.2aredeleted.Plantprocedures 01-0HP-4030.STP.56 and02-0HP-4030.STP.56 weredeveloped toperformthesurveillance.
For unit 2, as described above, the Licensee proposes to add a new surveillance requirement, 4.7.1.3.c, to demonstrate operability by verifying pump performance pursuant to T/S 4.0.5.This change is consistent with the corresponding surveillance for unit 1.In amendment 164 to DPR-58 and amendment 149 to DPR-74, the NRC approved changes requiring that all safety-related pumps in the T/S be tested at a frequency specified in T/S 4.0.5.T/S 4.0.5 states that safety-related pumps shall be tested in accordance with ASME Code, Section XI, unless written relief has been granted.The proposed change is consistent with the changes approved in those amendments.
Thesurveillances areperformed routinely asrequired, andtheexception allowedinthefootnoteisnolongerapplicable.
Additionally, SR 4.7.3.2 is renumbered as 4.7.3.1.d for consistency with unit 1.This requirement supports demonstrating that the system is operable, and it is appropriate to include it with the related requirements.
Theexceptions thatweregrantedinallofthesenotesarenolongerapplicable.
Proposed Change to Degraded Bus Voltage Instrumentation Description and Bases of the Current Requirement Table 3.3-3 provides engineered safety features actuation system instrumentation.
Therefore, deletingthenotesisconsidered tobeanadministrative change.6.ProposedChangestoT/SSurveillance Requirement 4.7.3.1Description andBasesoftheCurrentRequirement Unit1T/Ssurveillance requirement 4.7.3.1.d requiresverification thatthecomponent coolingwatersystemcross-tievalvescancyclefulltravel.
Functional unit S.b provides instrumentation requirements for the 4 kV bus degraded voltage (loss of power).There are three channels per bus total.Two channels per bus are required to be operable in modes 1, 2, 3, and 4, and two channels per bus are required to trip.These requirements provide assurance that the actuation will occur when required.Description and Bases of the Requested Revisions The Licensee proposes to add clarifying information to reflect the configuration of the instrumentation used to detect degraded voltage.Three channels are installed on buses T11A and T11D for unit 1 and on buses T21A and T21D for unit 2.This instrumentation is not installed on buses T11B or T11C for unit 1 or on buses T21B or T21C for unit 2.Because of this design, the requirements for functional unit S.b of Table 3.3-3 may not be clear.The proposed changes add references to the buses with the appropriate instrumentation.
4~I Attachment 1toNRC:AEP:0433Q Page5Unit2T/Ssurveillance requirement 4.7.3.1includestworequirements todemonstrate operability ofthecomponent coolingwaterloops.Athirdrequirement isincludedinsurveillance requirement 4.7.3.2.Thesesurveillances supportdemonstration thatthesystemisoperable.
This is similar to functional unit 6.b,  
Description andBasesoftheRequested RevisionForunit1,aclarification isproposedtoindicatethatthecross-tie valvesaretheunitcross-tie valves.Thechangeisconsistent withtheequivalent unit2requirement andisnotintendedtoaffectwhichvalvesareincludedinthesurveillance.
Forunit2,asdescribed above,theLicenseeproposestoaddanewsurveillance requirement, 4.7.1.3.c, todemonstrate operability byverifying pumpperformance pursuanttoT/S4.0.5.Thischangeisconsistent withthecorresponding surveillance forunit1.Inamendment 164toDPR-58andamendment 149toDPR-74,theNRCapprovedchangesrequiring thatallsafety-related pumpsintheT/Sbetestedatafrequency specified inT/S4.0.5.T/S4.0.5statesthatsafety-related pumpsshallbetestedinaccordance withASMECode,SectionXI,unlesswrittenreliefhasbeengranted.Theproposedchangeisconsistent withthechangesapprovedinthoseamendments.
Additionally, SR4.7.3.2isrenumbered as4.7.3.1.d forconsistency withunit1.Thisrequirement supportsdemonstrating thatthesystemisoperable, anditisappropriate toincludeitwiththerelatedrequirements.
ProposedChangetoDegradedBusVoltageInstrumentation Description andBasesoftheCurrentRequirement Table3.3-3providesengineered safetyfeaturesactuation systeminstrumentation.
Functional unitS.bprovidesinstrumentation requirements forthe4kVbusdegradedvoltage(lossofpower).Therearethreechannelsperbustotal.Twochannelsperbusarerequiredtobeoperableinmodes1,2,3,and4,andtwochannelsperbusarerequiredtotrip.Theserequirements provideassurance thattheactuation willoccurwhenrequired.
Description andBasesoftheRequested Revisions TheLicenseeproposestoaddclarifying information toreflecttheconfiguration oftheinstrumentation usedtodetectdegradedvoltage.Threechannelsareinstalled onbusesT11AandT11Dforunit1andonbusesT21AandT21Dforunit2.Thisinstrumentation isnotinstalled onbusesT11BorT11Cforunit1oronbusesT21BorT21Cforunit2.Becauseofthisdesign,therequirements forfunctional unitS.bofTable3.3-3maynotbeclear.Theproposedchangesaddreferences tothebuseswiththeappropriate instrumentation.
Thisissimilartofunctional unit6.b,  


Attachment 1toNRC:AEP:0433Q Page6whichhasinstrumentation requirements for4kVbuslossofvoltage.Degradedgridvoltagerelaysareinstalled tosensedegradedgridvoltageatthe4kVsafetybusesand,onatwo-out-of-three coincident logicwithatwo-minute timedelay,tripopenthereservefeedbreakersandstartthedieselgenerators.
Attachment 1 to NRC:AEP:0433Q Page 6 which has instrumentation requirements for 4 kV bus loss of voltage.Degraded grid voltage relays are installed to sense degraded grid voltage at the 4kV safety buses and, on a two-out-of-three coincident logic with a two-minute time delay, trip open the reserve feed breakers and start the diesel generators.
Theinstrumentation wasinstalled inresponsetoaletterfromD.K.Davis,ActingChiefofOperating ReactorsBranchNo.2-DivisionofOperating
The instrumentation was installed in response to a letter from D.K.Davis, Acting Chief of Operating Reactors Branch No.2-Division of Operating Reactors, to Indiana&Michigan Electric Company, dated June 3, 1977.This letter addressed the susceptibility of the safety-related electrical equipment at Cook Plant to sustained degraded voltage conditions at the offsite power systems and interaction between the offsite and onsite emergency power systems.AEP:NRC:0268, dated December 17, 1979, provides the response to that letter.Attachment 7 to AEP:NRC:0268 describes a proposed modification to install 4 kV safety bus undervoltage protection at buses A and D for unit 1 and unit 2.The proposed modification was reviewed and documented in EG&G Idaho, Incorporated's Technical Evaluation Report (TER).Section 3.2 of the TER includes a detailed description of the proposed modification, which noted that three new undervoltage relays would be installed to protect each of the 4160 V safety trains.The TER also noted that these relays will be on buses TllA and T11D and , will be arranged in a two-out-of-three coincidence logic.The conclusion in the TER was that the proposed modifications met the NRC staff position in the June 3, 1977, letter and that the modifications would protect the class 1E equipment from a sustained degraded voltage condition.
: Reactors, toIndiana&MichiganElectricCompany,datedJune3,1977.Thisletteraddressed thesusceptibility ofthesafety-related electrical equipment atCookPlanttosustained degradedvoltageconditions attheoffsitepowersystemsandinteraction betweentheoffsiteandonsiteemergency powersystems.AEP:NRC:0268, datedDecember17,1979,providestheresponsetothatletter.Attachment 7toAEP:NRC:0268 describes aproposedmodification toinstall4kVsafetybusundervoltage protection atbusesAandDforunit1andunit2.Theproposedmodification wasreviewedanddocumented inEG&GIdaho,Incorporated's Technical Evaluation Report(TER).Section3.2oftheTERincludesadetaileddescription oftheproposedmodification, whichnotedthatthreenewundervoltage relayswouldbeinstalled toprotecteachofthe4160Vsafetytrains.TheTERalsonotedthattheserelayswillbeonbusesTllAandT11Dand,willbearrangedinatwo-out-of-three coincidence logic.Theconclusion intheTERwasthattheproposedmodifications mettheNRCstaffpositionintheJune3,1977,letterandthatthemodifications wouldprotecttheclass1Eequipment fromasustained degradedvoltagecondition.
The NRC approved the related T/S changes in amendment 39 for DPR-58 and Amendment 22 for DPR-74.In the NRC's Safety Evaluation Reports for the amendments, the NRC concurred with the findings in the TER.The NRC also described the modification as having three undervoltage relays on each of the two 4160 V Class 1E buses.The proposed change is intended to clarify functional unit 8.b by indicating that the instrumentation is installed only on buses T11A and TllD.Because the design has already been reviewed and approved by the NRC, and the design was installed as described in the TER, the change is considered administrative.  
TheNRCapprovedtherelatedT/Schangesinamendment 39forDPR-58andAmendment 22forDPR-74.IntheNRC'sSafetyEvaluation Reportsfortheamendments, theNRCconcurred withthefindingsintheTER.TheNRCalsodescribed themodification ashavingthreeundervoltage relaysoneachofthetwo4160VClass1Ebuses.Theproposedchangeisintendedtoclarifyfunctional unit8.bbyindicating thattheinstrumentation isinstalled onlyonbusesT11AandTllD.BecausethedesignhasalreadybeenreviewedandapprovedbytheNRC,andthedesignwasinstalled asdescribed intheTER,thechangeisconsidered administrative.  


Attachment 1toNRC:AEP:0433Q Page7ProposedCorrections toTypographical ErrorsDescription andBasesoftheRequested Revisions TheLicenseeproposestocorrecttwotypographical errorsthatwereintroduced inamendment 131toDPR-74(unit2).Theseerrorsweretoportionsofthetextthatwerenotaffectedbytheamendment.
Attachment 1 to NRC:AEP:0433Q Page 7 Proposed Corrections to Typographical Errors Description and Bases of the Requested Revisions The Licensee proposes to correct two typographical errors that were introduced in amendment 131 to DPR-74 (unit 2).These errors were to portions of the text that were not affected by the amendment.
Theproposedchangesrestorethetextasitwasissuedinthepreviousamendment (amendment 78).Thevalvenumberforlinedofsurveillance requirement 4.5.2.aischangedfromIMP-262toIMO-262.Theword"otherwise" iscorrected insurveillance requirement 4.5.2.b.Additional corrections areproposedtochange"once"to"one"and"with"to"when"inT/S3.7.3.1forunit1and"in"to"to"inT/S3.7.3.1forunit2.Thesechangesareconsidered editorial andarenotintendedtoimpacttherequirements.
The proposed changes restore the text as it was issued in the previous amendment (amendment 78).The valve number for line d of surveillance requirement 4.5.2.a is changed from IMP-262 to IMO-262.The word"otherwise" is corrected in surveillance requirement 4.5.2.b.Additional corrections are proposed to change"once" to"one" and"with" to"when" in T/S 3.7.3.1 for unit 1 and"in" to"to" in T/S 3.7.3.1 for unit 2.These changes are considered editorial and are not intended to impact the requirements.
C.ImpactofPreviousSubmittals Oneprevioussubmittal affectssomeofthepagesthatareaffectedbythisrequest.AEP:NRC:0433P wastransmitted onMarch26,1997,torequestadministrative changes.OneofthoseproposedchangeswastodeleteafootnotetoT/S3.9.12forunit1andunit2.Thatchangeisindependent oftheproposedchangetoadifferent footnotetoT/S3.9.12,described insectionB.2ofattachment 1tothisrequest.TheT/Spagesinattachments 2A,2B,3A,and3Bdonotreflectthechangesproposedintheprevioussubmittal.
C.Impact of Previous Submittals One previous submittal affects some of the pages that are affected by this request.AEP:NRC:0433P was transmitted on March 26, 1997, to request administrative changes.One of those proposed changes was to delete a footnote to T/S 3.9.12 for unit 1 and unit 2.That change is independent of the proposed change to a different footnote to T/S 3.9.12, described in section B.2 of attachment 1 to this request.The T/S pages in attachments 2A, 2B, 3A, and 3B do not reflect the changes proposed in the previous submittal.
Bothchangeswillbeincorporated basedonwheneachrequestisapproved.}}
Both changes will be incorporated based on when each request is approved.}}

Revision as of 09:21, 6 July 2018

Proposed Tech Specs Revising Limitations on Positive Reactivity Additions
ML17325B606
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/21/1999
From:
INDIANA MICHIGAN POWER CO.
To:
Shared Package
ML17325B605 List:
References
NUDOCS 9906020008
Download: ML17325B606 (106)


Text

ATTACHMENT 2A TO AEP:NRC:1327 TECHNICAL SPECIFICATIONS PAGES MARKED TO SHOW PROPOSED CHANGES REVISED PAGES UNIT 13/4 1-2 3/4 1-3 3/4 1-7 3/4 1-11 3/4 1-13 3/4 1-15 3/4 3-7 3/4 4-4 3/4 8-9 3/4 9-1 3/4 9"2 B 3/4 1-1 B 3/4 1-3 PDR ADOCK 05000 3/4 LIMITING CONDITIONS FOR OPE<RATION AND SURVEILLANCE REQUIREMENTS 3/4.1 RI<ACIIVHY CONTROL SYSTEMS SURVEILLANCE RE UIREMENTS Continued When in MODES 3 or 4, at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by consideration of the following factors: Reactor coolant system boron concentration, Control rod position, Reactor coolant system average temperature, Fuel burnup based on gross thermal energy generation, Xenon concentration,-and Samarium concentratio~an 4.1.1.1.2 The overall core reactivity balance shall bc compared to predicted values to demonstrate agreement within plus or minus 1%Delta k/k at least once per 31 Effective Full Power Days (EFPD).This comparison shall consider at least those factors stated in Specification 4.1.1.1.1.e, above.The predicted reactivity values shall be adjusted (normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 Effective Full Power Days after each fuel loading.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-2 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVE<ILLANCE REQUIRE<ME<<TS 3/4.1 RE<ACTIVITY CONTROL SYSTKMS~SHUTDOWN MARGIN T v LESS THAN OR E UAL TO 200 F LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be greater than or equal to 1.0%Delta k/k.APPLICABILITY:

MODE 5.ACTION: With the SHUTDOWN MARGIN less than 1.0%Delta k/k, immediately initiate and continue boration at greater I than or equal to 10 gpm of a solution containing greater than or equal to 20,000 ppm boron or equivalent until Ihe required SHUTDOWN MARGIN is restored.SURVEILLANCE RE UIREMENTS 4.1.1.2 The SHUTDOWN MARGIN shall be determined to be greater than or equal to 1.0%Delta k/k: av Within one hour after detection of an inoperable control rod(s)and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter while the rod(s)is inoperable.

If the inoperable control rod is immovableor untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s).At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by consideration of the following factors: 1.Reactor coolant system boron concentration, 2.Control rod position, 3.Reactor coolant system average temperature, 4.Fuel burnup based on gross thermal energy generation, 5.Xenon concentration, and 6.Samarium concentratio~an 7.foron~n~aity COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-3 AME<NDME<NT 420p 448 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATHS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.1 As a minimum, one of the following boron injection flow paths shall be OPERABLE: A flow path from the boric acid tanks via a boric acid transfer pump and charging pump to the Reactor Coolant System if only the boric acid storage tank in Specification 3.1.2.7a is OPERABLE, or The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if only the refueling water storage tank in Specification 3.1.2.7b is OPERABLE.APPLICABILITY:

ACTION: MODES 5 and 6.With none of the above flow paths OPERABLE, suspend all operations involving CORE ALTERATIONS or sitive reactivity changes~i f the'eacto'r

coolant volume"provIded" that SHUTDOWN MARGIN'ufficient to accommodate the change'-emperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1'in MODE 6 d;the heatup or'cooldown rate is, restricted to 50'F, or less in any one;hour.period in<MODE 5, or 2)addition of vater from the RWST, provided the boron concentration in the,RWST is eater than or nai to the minim Le aired b S ifteation9 1.2.7.b.2 SURVEILLANCE RE UIREMENTS 4.1.2.1 At least one of the above required flow paths shall be demonstrated OPERABLE: a.At least once per 7 days by verifying that the temperature of the heat traced portion of the flow path is greater than or equal to 145'F when a flow path from the boric acid tanks is used.b.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-7 AMENDMENT 420, 464 3/4 LIMI'HNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS CHARGING PUMP-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 a.One charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.b.One charging flowpath associated with support of Unit 2 shutdown functions shall be available APPLICABILITY:

Specification 3.1.2.3.a.

-MODES 5 and 6 Specification 3.1.2.3.b.

-At all times when Unit 2 is in MODES 1, 2, 3, or 4.ACTION: With no charging pump OPERABLE, sus nd all o rations involving CORE ALTERATIONS or at'SHUTDOWN-MARGIN sufficient to accommodate

'the change in temperature is maintained in ccordance, with Specification 3.1,1,2 in MODES'-or Specification 3,9,1-in MODE,6,,-and the eatup'or'cooldown rate-is restricted to 50'F or less in any one-hour period in MODE 5, or 2 dditioii of':pater, from'.the RWST;provided the boron concentration in the RWST is reate th reqŽ:f the'minimum' uire'db S ificatio 3.2..b.2 With more than one charging pump OPERABLE or with a safety injection pump(s)OPERABLE when the temperature of any RCS cold leg is less than or equal to 152'F, unless the reactor vessel head is removed, remove the additional charging pump(s)and the safety injection pump(s)motor circuit breakers from the electrical power circuit within one hour.c.The provisions of Specification 3.0.3 are not applicable.

In addition to the above, when Specification 3.1.2.3.b is applicable and the required flow path is not available, return the required flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 2 and return the required flow path to available status within the next 60 days, or have Unit 2 in HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and HOT SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.e.The requirements of Specification 3.0.4 are not applicable when Specification 3.1.2.3.b applies.SURVEILLANCE RE UIREMENTS 4.1.2.3.1 The above required charging pump shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5.RCS cold legs is less than or equal to 152'F.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-11 AMENDMENT 98, 4Ã, 43k, 464, 46V, 89 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVI'IY CONTROL SYSTEMS BORIC ACID TRANSFER PUMPS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.5 At least one boric acid transfer pump shall be OPERABLE and capable of being powered from an OPERABLE emergency bus if only the flow path through the boric acid transfer pump of Specification 3.1.2.1a is OPERABLE.APPLICABILITY:

ACTION: MODES 5 and 6.With no boric acid transfer pump OPERABLE as required to complete the flow path of Specification 3.1.2.1a, suspend all operations involving CORE ALTERATIONS or sitive reactivi changes.I.except: 1 heatup or cooldown of'the reactor coolant volume royided that SHUTDOWN MARGIN s'ufficient to.accommodate the;change in temperature is maintained iq ccordance.

with Specification 3;1'.1'.'2'n MŽODE'5.or,'Specification'3.9:I

=in MODE'6, and'the heatup orooldow'n te is.restricted to 50'F,.-or less, in any, one-hour period in MODE 5, or 2)addition of-water from the RWSTJ provided th'-boroii co'ncentration in the R ST is greater than or ual to the minimuin re uired b'pecification

.1.2./.b 2 SURVEILLANCE RE UIREMENTS COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-13 AMENDMENT 420, 464 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMF<TS t 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.7 As a minimum, one of the following borated water sources shall be OPERABLE: A boric acid storage system and associated heat tracing with: 1.A minimum usable borated water volume of 4300 gallons, 2.Between 20,000 and 22,500 ppm of boron, and 3.A minimum solution temperature of 145'F.The refueling water storage tank with: 1.A minimum usable borated water volume of 90,000 gallons, 2.A minimum boron concentration of 2400 ppm, and 3.A minimum solution temperature of 70'F.APPLICABILITY:

ACTION: MODES 5 and 6.W ith no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or sitive reactivi~ch~an es'xcept: 1).heatup o Eoldown of the'reactor.coolant volume provided that SHUTDOWN MARGIN sufficierit,to accommodate the chang, temperature is', maintainediin accordance with Specification 3,1..1.2 in MODE 5 or Specification 3,9.1 in MODE 6 d the heatup or cooldown rate is iestricted'to 50'F or less in any one-hour'period in MODE 5, or-,2)addition of water from the RWST, prod'tdcd the boron concentranon in the RWS's eater dtan o e nai to the minima e a~fred b~Scidcdt ton 3;t'.2.7.b,d SURVEILLANCE RE UIREMENTS 4.1.2.7 The above required borated water source shall be demonstrated OPERABLE: At least once per 7 days by: 1.Verifying the boron concentration of the water, 2.Verifying the water level volume of the tank, and 3.Verifying the boric acid storage tank solution temperature when it is the source of borated water.At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature when it is the source of borated water.COOK NUCLE<AR PLANT-UNIT 1 Page 3/4 1-15 AMENDMENT 53, kR, K4

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.3 INSTRUMENTATION TABLE 3.3-1 Continued Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.Above P-6 but below 5%of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 5%of RATED THERMAL POWER.c.Above 5%of RATED THERMAL POWER, POWER OPERATION may continue.ACTION 4-With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement and with the THERMAL POWER level: a.Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.ACTION 5-b.Above P-6, operation may continue.With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement:

Immediately suspend operations involving positive reactivity changes except addition of coveter froni the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.8.b.2 (MODES 3~or 4 or 3.1.2.7,b.2 gs Verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter Kd E,-Close the isolation valves for unboratcd water sources to the chemical and volume control ystem within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, In MODE 5, if the RWST boron concentration is less than the eactor coolant system boron concentration and less than the boron concentration required y Specification 3.<.2.7.b.2, isolate the RWST from the react~or coolant s stem within.1~hour ACTION 6-With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.b.The Minimum Channels OPERABLE requirement is met;however, the inoperable channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of the other channels per Specification 4.3.1.1.1.

ACTION 7-With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 3-7 AMENDMENT V4 3/4 LIMrI'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.4 REACTOR COOLANT SYSIKM SAFETY VALVES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2 A minimum of one pressurizer code safety valve shall be OPERABLE with a lift setting of 2485 PSIG 2 3%.APPLICABILITY:

ACTION: MODES 4 and 5.With no pressurizer code safety valve OPERABLE: rom the".RWST,-

piovided'he boron concentration in the RWST is greater than the minimm e tred-:b"S'cification 3-.2'.8.b.2 ODE or, 3,'1.2,7;b.2'MODE 5 and place an OPERABLE RHR loop into operation in the shutdown cooling mod.an Immediately render all Safety Injection pumps and all but one charging pump inoperable by removing the applicable motor circuit breakers from the electric power circuit within one hour.SURVEILLANCE RE UIREMENTS The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.COOK NUCLEAR PLANT-UNIT I Page 3/4 44 AMENDMENT 53, 420, S&$

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS e 3/4.8 ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C.electrical power sources shall be OPERABLE: One circuit between the offsite transmission network and the onsite Class 1E distribution system, and One diesel generator with: 1.A day fuel tank containing a minimum of 70 gallons of fuel, I 2.A fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and APPLICABILITY:

ACTION: 3.A fuel transfer pump.MODES 5 and 6.With less than the above minimum required A.C.electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS Q positive reactivi changes xcept: I)heatup or cooldown of the reactor coolant volume provided tha r HUTDOWN MARGIN"suf6cient toaccommodate the change in temperature is maintained in accordance ivitII pacification 3.1.1;2 in MODE 5 or Specification 3,9.1 in MODE 6, and the heatup or cooldown rate is restricted ttI 0'.p or less.in.any one-hour period:in;MODE 5, or 2)addition of water from the RWST,-provided the boron ncentrat'on in, the RWST is eater than ore ual to the mininium re a~trad b 3 ciftcation 3.1.2.7.b.2 SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C.electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.

COOK NUCLEAR PLANT-UNIT I Page 3/4 8-9 AMENDMENT 4953 445

3/4 LIMING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 e boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met: Either a K,of 0.95 or less, which includes a 1%dk/k conservative allowance for uncertainties, or A boron concentration of greater than or equal to 2400 ppm, which includes a 50 ppm conservative allowance for uncertainties.

APPLICABILITY:

MODE Qi ACTION: With the requirements of the above specification not satisfied, tt immediately suspend aii*"""*u q ater:frOittrth'e";RWdST

-'prOVidedythe>bp'rpnqesOnCen 5tipngingthe'R ST 8<re'at'e'i'thmayn*

die"miiiimu

'b~tredib~Sifibangon:-'g!

'!2!'.b:-2'nd initiate and continue boration at greater than or equal to 10 gpm of 20,000 ppm boric acid solution or its equivalent until K,is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2400 ppm, whichever is the more restrictive.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to: a.Removing or unbolting the reactor vessel head, and b.Withdrawal of any full length control rod in excess of 3 feet from its fully inserted position.4.9.1.2 The boron concentration of the reactor coolant system and the refueling canal shall be determined by chemical analysis at least 3 times per 7 days with a maximum time interval between samples of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.COOK NUCLE<AR PLANT-UNIY 1 Page 3/4 9-1 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment.

APPLICABILITY:

MODE 6.ACTION: With the requirements of the above specification not satisfied, immediatel sus nd all o rations involvin COREALTERATIONSor ositivereactivitychanges.

'xcept~ad ition",of:;water.';from"the ificatt6""1~2:7'.b2 Q The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of: a.A CHANNEL FUNCTIONAL TEST at least once per 7 days, and b.A CHANNEL FUNCTIONAL TEST within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to the initial start of CORE ALTERATIONS, and c.A CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-2 3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 BORATION CONTROL 3/4.1.1.1 gild 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1)the reactor can be made subcritical from all operating conditions, 2)the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3)the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.

SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS T,,.The most restrictive condition occurs at EOL, with T,~at no load operating temperature, and is associated with a postulated steam line break accident and resulting uncontrolled RCS cooldown.In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1.3%Delta k/k is initially required to control the reactivity transient and automatic ESF is assumed to be available.

With T,~less than 200'F, the reactivity transients resulting from a postulated steam line break cooldown are minimal and a 1%Delta k/k SHUTDOWN MARGIN provides adequate protection for this event.The SHUTDOWN MARGIN requirements are based upon the limiting conditions described above and are consistent with FSAR safety analysis assumptions.

A boron penalty must be'applied when op'crating with no reactor coolant loops in operationbut o'e or more residual heat removal;loops pro'viding,shut'down cooling.The accessary penalty is included in the SHUTDOWN MARGIN ccurves.l 3/4.1.1.3 BORON DILUTION A minimum flow rate of at least 2000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during boron concentration reductions in the Reactor Coolant System.A flow rate of at least 2000 GPM will circulate an equivalent Reactor Coolant System volume of 12,612 plus or minus 100 cubic feet in approximately 30 minutes.The reactivity change rate associated with boron reductions will therefore be within the capability for operator recognition and control.3/4.1.1.4 MODERATOR TEMPERATURE COEFFICIENT MTC The limitations on MTC are provided to ensure that the assumptions used in the accident and transient analyses remain valid through each fuel cycle.The surveillance requirement for measurement of the MTC at the beginning, and near the end of each fuel cycle is adequate to confirm the MTC value since this coefficient changes slowly due principally to the reduction in RCS boron COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 1-1 AMENDMENT V4, 420, 448, S&$

1Y 3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS Continued With the RCS average temperature above 200'F, one injection system is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and positive reactivity change in the event the single injection system becomes inoperable.

The boration capability required below 200'F is sufficient to provide a SHUTDOWN MARGIN of 1%8, k/k after xenon decay and cooldown from 200'F to 140'F.This condition requires either 2890 gallons of 20,000 ppm borated water from the boric acid storage tanks or 76,937 gallons of 2400 ppm borated water from the refueling water storage tank.The charging flowpath of Unit 1 required for Unit 2 shutdown support ensures that flow is available to Unit 2 and addresses the requirements of 10 CFR 50 Appendix R.The flowpath consists of a charging pump powered from an electrical bus and associated water supplies and delivery system.Fire watches posted in the affected opposite unit areas (i.e., Unit 2 areas requiring use of the Unit 1 charging system in the event of a fire)may serve as the equivalent shutdown capability specified in the action statements of Specification 3.1.2.3.In the affected areas, either establish continuous fire watches or verify the OPERABILITY of fire detectors per Specification 4.3.3.7 and establish hourly fire watch patrols.The required opposite unit equipment along with the surveillance requirements necessary to ensure that this equipment is capable of fulfilling its intended Appendix R alternate safe shutdown function have been established and are included in a plant procedure.

An additional plant procedure details how the above noted fire watches will be implemented.

The limits on contained water volume and boron concentration of the RWST also ensure a pH value of between 7.6 and 9.5 for the solution recirculated within containment after a LOCA.This pH band minimizes the evolution of iodine and minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components.

The OPERABILITY of boron injection system during REFUELING ensures that this system is available for reactivity control while in MODE 6.Precluding.positivereactivity"addi ion'capable'"of..challenging'he,.

minimum".required:'SHUTDOWN',"MARGIN o REFUELING boron'con'centration;is:req'uired.'to assure'ontinued'afe, operation;

.'ntioduction;of RCS temperature changes-mu'st,alsd:,be-evaluated,to,"not:,'increase-'jeactiVity',-'above-'the

<equired SHUTDOWNMARGI/;

'.The RCS heatup-'an'd cooldown-rate is restricted in, MODE.,5 to 50'&or less in'ny.,one-hour, pe'riod,to ens'ure.that the positive eactivity',increase du'e.to'emperature'changes;is comparable to'h'e UFSAR Chapter.14 analysis of a'boron,dilution ev'eiif" Iii':this'an'alysis it',:was" co'nciuChd.that th'ere is sufficient:"time".'available; to'etect" the dilution with: the'*s'o'ur

'" ange'neutron.flux;.

monitors-.and teimIn'ate-the ev'ent.with'operator"action

-There is no additIonai.heatup or cooldow rate-restriction';in-;MODE~'6.because-.the',."'REFUEL'ING; boron>",concentration,':is above,.the-minimum"required, to maiIItain,the'r'equi*red'SHUTDOWN'-MARGIN

'for'the R'CS temperatur'e'rarige defined'for MO'DE 6.'.*Introduc'tion o coolant,invento'ry,,fiom the,'RWST:-

is'acceptable>provided the'RWST" boron'oncentration:

is, above, the'minimum re'red to maintairi'the

's"'ified'SHUTDOWN"M'ARGIN'

';;"-""'", 3/4.1.3 MOVABLE CONTROL ASSEMBLIES The specifications of this section ensure that (1)acceptable power distribution limits are maintained, (2)the minimum SHUTDOWN MARGIN is maintained, and (3)the potential effects of rod ejection accident are COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 1-3 AMENDMENT 88, 420, 43%

ATTACHMENT 2B TO AEP:NRC:1327 TECHNICAL SPECIFICATIONS PAGES MARKED TO SHOW PROPOSED CHANGES REVISED PAGES UNIT 2 3/4 1-2 3/4 1-3 3/4 1-8 3/4 1-11 3/4 1-13 3/4 1-15 3/4 3-6 3/4 4-4 3/4 8-9 3/4 9-1 3/4 9-2 B 3/4 1-1 B 3/4 1-4 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS SURVEILLANCE RE UIREMENTS Continued When in MODES 3 or 4, at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by consideration of the following factors: Reactor coolant system boron concentration, Control rod position, 4, Reactor coolant system average temperature, Fuel burnup based on gross thermal energy generation, Xenon concentration-,and Samarium concentration-.

~an 7i.ao'pro'" rial(~MOD arr'ooryr::.ra','re'!"'o o"'."-".!'a""9'-,"'r."'.4.1.1.1.2 The overall core reactivity balance shall be compared to predicted values to demonstrate agreement within plus or minus 1%Delta k/k at least once per 31 Effective Full Power Days (EFPD).This comparison shall consider at least those factors stated in Specification 4.1.1.1.1.e, above.The predicted reactivity values shall be adjusted (normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 Effective Full Power Days after each fuel loading.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-2 AMENDMENT SR, 488, 434 3/4 LIMrI'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACIIVITY CONTROL SYSTEMS SHUTDOWN MARGIN T v LESS THAN OR E UAL TO 200 F LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be greater than'or equal to 1.0%Delta k/k.APPLICABILITY:

MODE 5.ACTION: With the SHUTDOWN MARGIN less than 1.0%Delta k/k, immediately initiate and continue boration at greater'han or equal to 10 gpm of a solution containing greater than or equal to 20,000 ppm boron or equivalent until the required SHUTDOWN MARGIN is restored.SURVEILLANCE RE UIREMENTS 4.1.1.2 The SHUTDOWN MARGIN shall be determined to be greater than or equal to 1.0%Delta k/k: a.Within one hour after detection of an inoperable control rod(s)and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter while the rod(s)is inoperable.

If the inoperable control rod is immovable or untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s).At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by consideration of the following factors: 1.Reactor coolant system boron concentration, 2.Control rod position, 3.Reactor coolant system average temperature, 4.Fuel burnup based on gross thermal energy generation, 5.Xenon concentration, and 6.Samarium concentratio~an 7.~oronPn~al COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-3 AMENDMENT$3, 4QV, 40S, 484 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVI'IY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATHS-SHUTDOWN LIMITING CONDITION FOR OPERATION As a minimum, one of the following boron injection flow paths shall be OPERABLE: a.A flow path from the boric acid tanks via a boric acid transfer pump and charging pump to the Reactor Coolant System if only the boric acid storage tank in Specification 3.1.2.7.a is OPERABLE, or b.The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if only the refueling water storage tank in Specification 3.1.2.7.b is OPERABLE.APPLICABILITY:

ACTION: MODES 5 and 6.W ith none of the above flow paths OPERABLE, suspend all operations involving CORE ALTERATIONS or sitive reactivi~chan es.except:;:I):

heatup'orco'oldow

~f;.the-='reactor'-

coolantolume.provid

','that, S UTDOWN,.IvIARGIN'ufficient:

to accominodate the'hange.-

id emperature is':maintained>in.

a<ccordance:with,'-'Specificati<on 3;I';2'!in'ODE 5<or,Specific'atiori;3:.9<1"in, MODE.6)d the"heatup'or"cootdown rate, is'restricted to,50;.F.or less in'a'ny,one-hour=p'eriod in.MODE 5,:.or.2)addition.of Rater,'from,;ifieRWSTi;piovided,'.thetb'pron--'concentration>

in the RWST"is"greater'hari or.'e" ua-'to"tliei-minimui

~euired~b'

'ification 3'.2.7..b.2 SURVEILLANCE RE UIREMENTS At least one of the above required flow paths shall be demonstrated OPERABLE: At least once per 7 days by verifying that the temperature of the heat traced portion of the flow path is greater than or equal to 145'F when a flow path from the boric acid tanks is used.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-8 AMENDMENT SP 3/4 LIMITING CONDITIONS FOR OPleeATION AND SURVEILLANCE<

REQUIREMENTS 3/4.1 REACTIVHY CONTROL SYSTEMS CHARGING PUMP-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 One charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.One charging flow path associated with support of Unit 1 shutdown functions shall be available.*

APPLICABILITY:

ACTION: Specification 3.1.2.3.a.

-MODES 5 and 6 Specification 3.1.2.3.b.

-At all times when Unit 1 is in MODES 1, 2, 3, or 4.With no charging pump OPERABLE, suspend all o rations involvin CORE ALTERATIONS or sitive reactivi chan es.xcept: 1)heatup or cooldow'n of th eac'tor'coolant'yolu'me provided'-that SHUTDOWN MARGIN-sufficient to.accommodate e'change'n tempter'ature is'maintained in accordance with Specification 3.1,1.2'iq ODE 5.or.Specification.3.9.1rin MODE 6;and'the heatup or cooldown rate is restricted o,50;F, or, less in'any one-hour period in MODE5'r 2),addition, of.water from: the WST, provided, the boion concentration in the RWS is reater than or equal.to the ninimum re'~ired b~Scificeticn 3.1,2,7.b,2 With more than one charging pump OPERABLE or with a safety injection pump(s)OPERABLE when the temperature of any RCS cold leg is less than or equal to 152'F, unless the reactor vessel head is removed, remove the additional charging pump(s)and the safety injection pump(s)motor circuit breakers from the electrical power circuit within one hour.The provisions of Specification 3.0.3 are not applicable.

In addition to the above, when Specification 3.1.2.3.b is applicable and the required flow path is not available, return the required flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 1 and return the required flow path to available status within the next 60 days, or have Unit 1 in HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and HOT SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.The requirements of Specification 3.0.4 are not applicable when Specification 3.1.2.3.b applies.SURVEILLANCE RE UIREMENTS 4.1.2.3.1 The above required charging pump shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5 A maximum of one centrifugal charging pump shall be OPERABLE whenever the temperature of one or more of the RCS cold legs is less than or equal to 152'F.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-11 AMlesNDMENT 85, 407, 446,$$

3/4 LIMI'HNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS t 3/4.1 REACTIVITY CONTROL SYSTEMS BORIC ACID TRANSFER PUMPS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.5 At least one boric acid transfer pump shall be OPERABLE and capable of being powered from an OPERABLE emergency bus if only the flow path through the boric acid transfer pump of Specification 3.1.2.1a is OPERABLE.APPLICABILITY:

MODES 5 and 6.ACTION: With no boric acid transfer pump OPERABLE as required to complete the flow path of Specification 3.1.2.1a, suspend all operations involving CORE ALTERATIONS or sitive reactivity~chan es except:.1)heatup or cooldown of the reac'tor coolant volume provid iat'HUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance wi pecification 3;-1.1.2;in'MGDE-5 or Specification 3.9.1'n MODE 6, and the heatup or cooldown rate is restricted t~60'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is reater than o'r e u'al to the inimum re uired b g cification 3.1.2.7.b SURVEILLANCE RE UIREMENTS 4.1.2.5 No additional Surveillance Requirements other than those required by Specification 4.0.5.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-13 AMENDMENT$3

.~

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.7 As a minimum, one of the following borated water sources shall be OPERABLE: A boric acid storage system and associated heat tracting with: 1.A minimum usable borated water volume of 4300 gallons, 2.Between 20,000 and 22,500 ppm of boron, and 3.A minimum solution temperature of 145'F.The refueling water storage tank with: 1.A minimum usable borated water volume of 90,000 gallons, 2.A minimum boron concentration of 2400 ppm, and 3.A minimum solution temperature of 70'F.APPLICABILITY:

ACTION: MODES 5 and 6.With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or sitive n t b 3 r reactivi chan es except', r1;heatup"o ooldown of thejre'a'ctorf'coolant:volume;provided,that'HUTDOWN'.MARGIN sufficient'<to:accommodate.

thefchange e b n u 3 temperafure'.is'-;maintained'in

'accorda'nce, yiith Specificatio'n<

3;1.1;2 in MODE.5'or,specification:3'.9;1 in MODF,6 id.the'hea'tup,'our<cooldown,'rate.'is,-r'eustr'icted>to<

50OF'or less in, any,'one-hour"period"",in'.MODE 5'ro 2)-.'addition.'-of Water fiOmf&e!RWST; jipuided;dt'e'bprcnnbdphCehtraiipn"tri'.the;.R ST'ie': ieatei tihan'Or.e uai"tu'.th'e mtdimuin e'biiedb S'widcea't'O c3..1 2".7'.b:2 SURVEILLANCE RE UIREMENTS 4.1.2.7 The above required boratcd water source shall be demonstrated OPERABLE: At least once per 7 days by: 1.2.3.Verifying the boron concentration of the water, Verifying the contained borated water volume, and Verifying the boric acid storage tank solution temperature when it is the source of borated water.At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature when it is the source of borated water.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-15 AMENDMENT S3, 94, 499

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3 4.3 IN TABLE 3.3-1 Continued a.Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.b.Above P-6 but below 5%of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 5%of RATED THERMAL POWER c.Above 5%of RATED THERMAL POWER, POWER OPERATION may continue.ACTION 4-With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement and with the THERMAL POWER level: a.Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.b.Above P-6 operation may continue.ACTION 5 With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement:

g mmediately.suspend operations, involving positive reactivity, changes except addition o(~~water from the RWST,,provided the boron concentration in the RWST is greater than the MODE 5~an bQ Verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, within I hour and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafteri and c.'Close'the isolation valves for unbo'rated water sources.to the chemical and volume contro f ystem within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.In MODE, 5, if the RWST boron concentration is less than the eactoi'coolant system" boron concentration and less than the'boron concentratio'n requiretI pi Specification 2.<.2.7.b.2 isolate the RsstST from the reactor coolant s~stem w'Ihblhour ACTION 6 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.b.The Minimum Channels OPERABLE requirement is met;however, the inoperable CHANNEL may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of the other channels per Specification 4.3.1.1.1.

ACTION 7 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 3-6 AMENDMENT V5 3/4 LIMKING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTI<'.M SAFETY VALVES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2 A minimum of one pressurizer code safety valve shall be OPERABLE with a lift setting of 2485 PSIG 2 1%.APPLICABILITY:

ACTION: MODES 4 and 5.With no pressurizer code safety valve OPERABLE:-----b-'om'the'", W<, ST jpr'ovided'~the

>boron'!',conce<iifratio'n'tin the8RWST.;'is:,<gr'eater-";.thaii'he"'minimums e u'iree,~b'-'ectficah'prie<'2:8Ž2".

ODE"'4"or='3".<<2!7!b'.2'-.'(MOD

-".-.5 and place an<<,<<'PERABLE RHR loop into operation in the shutdown cooling mod.="an Immediately render all Safety Injection pumps and all but one charging pump inoperable by removing the applicable motor circuit breakers from the electrical power circuit within one hour.SURVEILLANCE RE UIREMENTS 4.4.2 No additional Surveillance Requirements other than those required by Specification 4.0.5.The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 4-4 AMENDMENT SR, 497

3/4 LIMITING CONDITIONS FOR OPE<RATION AND SURVEILLANCE REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C.electrical power sources shall be OPERABLE: One circuit between the offsite transmission network and the onsite Class 1E distribution system, and One diesel generator with: 1.A day fuel tank containing a minimum of 70 gallons of fuel, A fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and APPLICABILITY:

ACTION: 3.A fuel transfer pump.MODES 5 and 6.With less than the above minimum required A.C.electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivi~changes xcept: I)'heatup'or cooldown of the reactor coolant'oluine provided tha SHUTDOWN.MA'RGINusufficientbto-a'ccommodate the'.change in temperature is maintained, in accordance witII Itpectficat ion 31.L2c tnt MODE 5'o'r'Spcification 301 in MODE 6;snd the hea<up or cooldbwn rate is restiict ed fo)01'F or less in any cne:hour.period in, MODE 5, or 2)addition of'alei: from the<,.RWST, provided..the boron concentiation i'n the RWST is'ester than or e ual to the minimum re u~ired b S ciftcation 3.1.2.7.b.2 SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C.electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.+

'The provisions of Technical Specification 4.0.8 are applicable.

COOK NUCLEAR PLANT-UNIT 2 Page 3/4 8-9 AMENDMENT 4483 4333 459 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 i e boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met: Either a K,pi of 0.95 or less, which includes a 1%bk/k conservative allowance for uncertainties, or b.A boron concentration of greater than or equal to 2400 ppm, which includes a 50 ppm conservative allowance for uncertainties.

APPLICABILITY:

MODE 6 ACTION: ti With the requirements of the-above specification not satisfied,-tt immrdiatet~sus nd aii.-=-o rations involvin CORE ALTERATIONS or sitive reactivity changes~'xcept~andditioh

'o m V h m n b e d m ,ater-.from, the R S7,'-,pro'videdjhetboion conceiitrati" niint the,RWST'is~" eaterdthan'the'miiuinut e'redtb'.,'S'ficationa8i.'1".2 b 2"'and'nitiate and continue boration at greater than or equal to 10 gpm of 20,000 ppm boric acid solution or its equivalent until K,z is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2400 ppm, whichever is the more restrictive.

H The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to: a.Removing or unbolting the reactor vessel head, and b.Withdrawal of any full length control rod in excess of 3 feet from its fully inserted position within the reactor pressure vessel.4.9.1.2 The boron concentration of the reactor coolant system and the refueling canal shall be determined by chemical analysis at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-1'

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REI<<ELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment and control room.APPLICABILITY:

MODE 6.ACTION: With the requirements of the above specification not satisfied, immediatel sus nd all o rations involving CORE ALTERATIONS or sitive reactivi chan es-.'c<eptaddition',of;;,water..'from,tli'ST~t providedt>the.boion

'concentrationi

'"RWST is;"'eater;tha'n" the'.:minimiim'r<

"'i'edinca'tio 3->2'.'.b!2 H The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of: a.A CHANNEL FUNCTIONAL TEST at least once per 7 days, and b.A CHANNEL FUNCTIONAL TEST within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to the initial start of CORE ALTERATIONS, and c.A CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS.

B-.HhM~COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-2 AMENDMENT 68)SP

3/4 BASES 3/4.1 REACTIVITY.

CONTROL SYSTI<MS 3/4.1.1 BORATION CONTROL 3/4.1.1.1 and 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1)the reactor can be made subcritical from all operating conditions, 2)the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3)the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.

SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS T,~.The most restrictive condition occurs at EOL, with T,, at no load operating temperature, and is associated with a postulated steam line break accident and resulting uncontrolled RCS cooldown.In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1.3%Delta k/k is initially required to control the reactivity transient and automatic ESF is assumed to be available.

With T,~less than 200'F, the reactivity transients resulting from a postulated steam line break cooldown are minimal and a 1%Delta k/k SHUTDOWN MARGIN provides adequate protection for this event.The SHUTDOWN MARGIN requirements are based upon the-limiting conditions described-above and are consistent with FSAR safety analysis assumptions.

A'oron<penaltyimust;be".applied:when'opera g.pith'no",rcacto'r=codla'nt:

lo'opsin:oper'atiori'but~

one or=.mbr'e"residu ieat rettioyal'Io'ops~'providing sltut'down;cooling!'<.'.'The'necess'ary,,penalty, is,'.included'.jn the SHUTDOWN MARGI 3/4.1.1.3 BORON DILUTION A minimum flow rate of at least 2000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during boron concentration reductions in the Reactor Coolant System.A flow rate of at least 2000 GPM will circulate an equivalent Reactor Coolant System volume of 12,612 cubic feet in approximately 30 minutes.The reactivity change rate associated with boron reductions will therefore be within the capability for operator recognition and control.COOK NUCLEAR PLANT-UNIT 2 Page B 3/4 1>>1 AMENDMENT 88,$$, 484, 499

3/4 BASES 3/4.1 REACI'IVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS Continued The charging flowpath of Unit 2 required for Unit 1 shutdown support ensures that flow is available to Unit 1 and addresses the requirements of 10 CFR 50 Appendix R.The flowpath consists of a charging pump powered from an electrical bus and associated water supplies and delivery system.Fire watches posted in the affected opposite unit areas (i.e., Unit 1 areas requiring use of the Unit 2 charging system in the event of a fire)may serve as the equivalent shutdown capability specified in the action statements of Specification 3.1.2.3.In the affected areas, either establish continuous fire watches or verify the OPERABILITY of fire detectors per Specification 4.3.3./and establish hourly fire watch patrols.The required opposite unit equipment along with the surveillance requirements necessary to ensure that this equipment is capable of fulfilling its intended Appendix R alternate safe shutdown function have been established and are included in a plant procedure.

An additional plant procedure details how the above noted fire watches will be implemented.

Precluding'~positive'jieactiyityjaddition',,capable,'of,'challenging:,the niinimum-required SHUTDOWN MARGI'o FUELING'boro'ri'concentratto'n:is"required to."a'ssur'e

'contfiiued.s'afe operation,-Introduction.'of RCS'temperatur changes,mus't;.'also~be

'evaluaibd.to'>not" iiicrease',,rea'c'tivi'ty,.'above the:required',:SHVTDOWN.'MARGIN:.,-The'.

RCS eatup an'd'cooltlown-r'ate is iestricted.'in MODE-5 to'50 F,-or-.less in any onehour p'er'iod.'to:ensure.

that the, positive reactivity'increatse'-"due"to

'temper'ature:changes is'co'inparable to the'UFSA'R'hapter'14 aiialy*siso(a'or'oii

'dilution event,-'..:.In'",.thisanalysis>."it'.was, coricluChd,'that there:is,'sufficient'ime, available,to~de't'e'ct the dilulion With-,the source range'neutron flux;moiutors'and teriiiiiiate.,the ey'ent imth operator.action.*'.There is no, additional heatup or'ooldo rate jestriciiori'jiii'.MODE, 6jbec'ause":,the,='REFUEL'ING"',byron, concentr'a'tion

'is'=aboye'he, minimum>'required.

to maintain'the'requiinf SHUTDOWNS MARGIN.foi,the,RCS.;

temperature range defined;-for'MODE;6:,,Introduction'o coolant inventoiy,",from,ithe',::RWS'Iijs',;ace'eptable'provided'he,.RWST bo'ron concentration, is'above, the minitnum required'to'maintainithe specific'd S UVDOWNMARGIN

'.;-3/4.1.3 MOVABLE CONTROL ASSEMBLIES The specifications of this section ensure that (1)acceptable power distribution limits are maintained, (2)the minimum SHUTDOWN MARGIN is maintained, and (3)limit the potential effects of rod misalignment on associated accident analyses.OPERABILITY of the control rod position indicators is required to determine control rod positions and thereby ensure compliance with the control rod alignment and insertion limits.The ACTION statements which permit limited variations from the basic requirements are accompanied by additional restrictions which ensure that the original design criteria are met.Misalignment of a rod requires measurement of peaking factors or a restriction in THERMAL POWER;either of these restrictions provide assurance of fuel rod integrity during continued operation.

In addition, those accident analysis affected by a misaligned rod are reevaluated to confirm that the results remain valid during future operation.

The maximum rod drop time restriction is consistent with the assumed rod drop time used in the accident analyses.Measurement with T,~greater than or equal to 541'F and with all reactor coolant pumps operating ensures that the measured drop times will be representative of insertion times experienced during a reactor trip at operating conditions.

Control rod positions and OPERABILITY of the rod position indicators are required to be verified on a nominal basis of once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with more frequent verifications required if an automatic monitoring channel is inoperable.

These verification frequencies are adequate for assuring that the applicable LCO's are satisfied.

COOK NUCLEAR PLANT-UNIT 2 Page B 3/4 14 AMENDMENT 49, 446, 434

ATTACHMENT 3A TO,AEP:NRC:1327 PROPOSED TECHNICAL SPECIFICATIONS PAGES REVISED PAGES UNIT 1 3/4 1-2 3/4 1-3 3/4 1-7 3/4 1-11 3/4 1-13 3/4 1-15 3/4 3-7 3/4 4-4 3/4 8-9 3/4 9-1 3/4 9-2 B 3/4 1-1 B 3/4 1-3 3/4 LIMH'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4,1 REACTIVITY CONTROL SYSTEMS SURVEILLANCE RE UIREMENTS Continued When in MODES 3 or 4;at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by consideration of the following factors: 1.Reactor coolant system boron concentration,-

2.Control rod position, 3.Reactor coolant system average temperature, Fuel burnup based on gross thermal energy generation, 5.Xenon concentration, 6.Samarium concentration, and 7.Boron penalty (MODE 4 only).4.1.1.1.2 The overall core reactivity balance shall be compared to predicted values to deinonstrate agreement within plus or minus 1%Delta k/k at least once per 31 Effective Full Power Days (EFPD).This comparison shall consider at least those factors stated in Specification 4.1.1.1.1.e, above.The predicted reactivity values shall be adjusted (normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 Effective Full Power Days after each fuel loading.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-2 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN T v LESS THAN OR E UAL TO 200 F LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be greater than or equal to 1.0%Delta k/k.APPLICABILITY:

MODE 5.ACTION: With the SHUTDOWN MARGIN less than 1.0%Delta k/k, immediately initiate and continue boration at greater than or equal to 10 gpm of a solution containing greater than or equal to 20,000 ppm boron or equivalent until the required'SHUTDOWN MARGIN is restored.SURVEILLANCE RE UIREMENTS 4.1.1.2 The SHUTDOWN MARGIN shall be determined to be greater than or equal to 1.0%Delta k/k: Within one hour after detection of an inoperable control rod(s)and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter while the rod(s)is inoperable.

If the inoperable control rod is immovable or untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s).At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by consideration of the following factors: 1.Reactor coolant system boron concentration, 2.Control rod position, 4, Reactor coolant system average temperature, Fuel burnup based on gross thermal energy generation, Xenon concentration, Samarium concentration, and 7.Boron penalty.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-3 3/4 LIMI'rlNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACI IVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATHS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.1 As a minimum, one of the following boron injection flow paths shall be OPERABLE: a.A flow path from the boric acid tanks via a boric acid transfer pump and charging pump to the Reactor Coolant System if only the boric acid storage tank in Specification 3.1.2.7a is OPERABLE, or The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if only the refueling water storage tank in Specification 3.1.2.7b is OPERABLE.APPLICABILITY:

MODES 5 and 6.ACTION: With none of the above flow paths OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.

SURVEILLANCE RE UIREMENTS 4.1.2.1 At least one of the above required flow paths shall be demonstrated OPERABLE: At least once per 7 days by verifying that the temperature of the heat traced portion of the flow path is greater than or equal to 145'F when a flow path from the boric acid tanks is used.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-7 AMENDMENT 420, 464

3/4 LIMI'rlNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACIIVHY CONTROL SYSTEMS CHARGING PUMP-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 a.One charging pump in the boron injection fiow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.b.One charging flowpath associated with support of Unit 2 shutdown functions shall be available APPLICABILITY:

Specification 3.1.2.3.a.

-MODES 5 and 6 Specification 3.1.2.3.b.

-At all times when Unit 2 is in MODES 1~2, 3, or 4.ACTION: With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.

0 b.With more than one charging pump OPERABLE or with a safety injection pump(s)OPERABLE when the temperature of any RCS cold leg is less than or equal to 152'F, unless the reactor vessel head is removed, remove the additional charging pump(s)and the safety injection pump(s)motor circuit breakers from the electrical power circuit within one hour.c.The provisions of Specification 3.0.3 are not applicable.

In addition to the above, when Specification 3.1.2.3.b is applicable and the required flow path is not available, return the required fiow path to available status within 7 days, or provide equivalent shutdown capability in Unit 2 and return the required flow path to available status within the next 60 days, or have Unit 2 in HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and HOT SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.e.The requirements of Specification 3.0.4 are not applicable when Specification 3.1.2.3.b applies.SURVEILLANCE RE UIREMENTS 4.1.2.3.1 The above required charging pump shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5.A maximum of one centrifugal charging pump shall be OPERABLE whenever the temperature of one or more of the RCS cold legs is less than or equal to 152'F.COOK NUCLEAR PLANT-UNIT 1 Page 3/41-11 AMENDMENTQSf 420$Sf 464 46V 89

3/4, LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVI'IY CONTROL SYSIZMS BORIC ACID TRANSFER PUMPS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.5 At least one boric acid transfer pump shall be OPERABLE and capable of being powered from an OPERABLE emergency bus if only the flow path through the boric acid transfer pump of Specification 3.1.2.1a is OPERABLE.APPLICABILITY:

MODES 5 and 6.ACTION: With no boric acid transfer pump OPERABLE as required to complete the flow path of Specification 3.1.2.1a, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.

SURVEILLANCE RE UIREMENTS 4.1.2.5 No additional surveillance requirements other than those required by Specification 4.0.5.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-13 AMENDMENT 420, 464 3/4 LIMFI'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.7 As a minimum, one of the following borated water sources shall be OPERABLE: a.A boric acid storage system and associated heat tracing with: l.A minimum usable borated water volume of 4300 gallons, 2.Between 20,000 and 22,500 ppm of boron, and 3.A minimum solution temperature of 145'F.The refueling water storage tank with: 1.A minimum usable borated water volume of 90,000 gallons, 2.A minimum boron concentration of 2400 ppm, and 3.A minimum solution temperature of 70'F.APPLICABILITY ACTION: MODES 5 and 6.With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water fro'm the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.

SURVEILLANCE RE UIREMENTS 4.1.2.7 The above required borated water source shall be demonstrated OPERABLE: At least once per 7 days by: 1.Verifying the boron concentration of the water, 2.Verifying the water level volume of the tank, and 3.Verifying the boric acid storage tank solution temperature when it is the source of borated water.At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature when it is the source of borated water.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 1-15 AMENDMENT 53, kR, S&$

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.3 INSTRUMENTATION TABLE 3.3-1 Continued Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.Above P-6 but below 5%of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 5%of RATED THERMAL POWER.C.Above 5%of RATED THERMAL POWER, POWER OPERATION may continue.ACTION 4-With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement and with the THERMAL POWER level: a.Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.b.Above P-6, operation may continue.ACTION 5-With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement:

Immediately suspend operations involving positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required'by Specification 3.1.2.8.b.2 (MODES 3 or 4)or 3.1.2.7.b.2 (MODE 5), and Verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter, and Close the isolation valves for unborated water sources to the chemical and volume control system within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.In MODE 5, if the RWST boron concentration is less than the reactor coolant system boron concentration and less than the boron concentration required by Specification 3.1.2.7.b.2, isolate the RWST from the reactor coolant system within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.ACTION 6-With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.ACTION 7-The Minimum Channels OPERABLE requirement is met;however, the inoperable channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of the other channels per Specification 4.3.1.1.1.

With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 3-7 0

3/4 LIMH'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.4 REACTOR COOLANT SYSIXM SAFETY VALVES-SHUTDOWN , LIMITING CONDITION FOR OPERATION 3.4.2 A minimum of one pressurizer code safety valve shall be OPERABLE with a lift setting of 2485 PSIG 2 3%APPLICABILITY:

ACTION: MODES 4 and 5.With no pressurizer code safety valve OPERABLE: Immediately suspend all operations involving positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.8.b.2 (MODE 4)or 3.1.2.7.b.2 (MODE 5), and place an OPERABLE RHR loop into operation in the shutdown cooling mode, and b.Immediately render all Safety Injection pumps and all but one charging pump inoperable by removing the applicable motor circuit breakers from the electric power circuit within one hour.SURVEILLANCE RE UIREMENTS 4.4.2 The pressurizer code safety valve shall be demonstrated OPERABLE per Surveillance Requirement 4.4.3.The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.COOK NUCLEAR PLANT-UNIT I Page 3/4 44 AMENDMENT 53, 420, K4 e

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C.electrical power sources shall be OPERABLE: One circuit between the offsite transmission network and the onsite Class 1E distribution system, and One diesel generator with: A day fuel tank containing a minimum of 70 gallons of fuel, 2.A fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and APPLICABILITY:

ACTION: 3.A fuel transfer pump.MODES 5 and 6.With less than the above minimum required A.C.electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODES, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.

SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C.electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 8-9 AMENDMENT 485, 445

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met: a.Either a K,of 0.95 or less, which includes a 1%Ak/k conservative allowance for uncertainties, or A boron concentration of greater than or equal to 2400 ppm, which includes a 50 ppm conservative allowance for uncertainties.

APPLICABILITY:

MODE 6 ACTION: With the requirements of the above specification not satisfied, 1)immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2, and 2)initiate and continue boration at greater than or equal to 10 gpm of 20,000 ppm boric acid solution or its equivalent until K,is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2400 ppm, whichever is the more restrictive.

b.The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to: a.Removing or unbolting the reactor vessel head, and b.Withdrawal of any full length control rod in excess of 3 feet from its fully inserted position.4.9.1.2 The boron concentration of the reactor coolant system and the refueling canal shall be determined by chemical analysis at least 3 times per 7 days with a maximum time interval between samples of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-1 AMENDMENT 420 3/4 LIMI'HNG CONDlTIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment.

APPLICABILITY:

MODE 6.ACTION: With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.

b.The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of: a.A CHANNEL FUNCTIONAL TEST at least once per 7 days, and b.A CHANNEL FUNCTIONAL TEST within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to the initial start of CORE ALTERATIONS, and c.A CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-2 3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 BORATION CONTROL 3/4.1.1.1 and 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1)the reactor can be made subcritical from all operating conditions, 2)the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3)the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.

SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS T,~.The most restrictive condition occurs at EOL, with T,~at no load operating temperature, and is associated with a postulated steam line break accident and resulting uncontrolled RCS cooldown.In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1.3%Delta k/k is initially required to control the reactivity transient and automatic ESF is assumed to be available.

With T,, less than 200'F, the reactivity transients resulting from a postulated steam line break cooldown are minimal and a 1%Delta k/k SHUTDOWN MARGIN provides adequate protection for this event.The SHUTDOWN MARGIN requirements are based upon the limiting conditions described above and are consistent with FSAR safety analysis assumptions.

A boron penalty must be applied when operating with no reactor coolant loops in operation but one or more residual heat removal loops providing shutdown cooling.The necessary penalty is included in the SHUTDOWN MARGIN curves.3/4.1.1.3 BORON DILUTION minimum fiow rate of at A least 2000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during boron concentration reductions in the Reactor Coolant System.'flow rate of at least 2000 GPM will circulate an equivalent Reactor Coolant System volume of 12,612 plus or minus 100 cubic feet in approximately 30 minutes.The reactivity change rate associated with boron reductions will therefore be within the capability for operator recognition and control.3/4.1.1.4 MODERATOR TEMPERATURE COEFFICIENT TC The limitations on MTC are provided to ensure that the assumptions used in the accident and transient analyses remain valid through each fuel cycle.The surveillance requirement for measurement of the MTC at the beginning, and near the end of each fuel cycle is adequate to confirm the MTC value since this coefficient changes slowly due principally to the reduction in RCS boron COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 1-1 AMENDMENT V4, 420, 448, S&$

3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS Continued With the RCS average temperature above 200'F, one injection system is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and positive reactivity change in the event the single injection system becomes inoperable.

The boration capability required below 200'F is sufficient to provide a SHUTDOWN MARGIN of 1%b, k/k after xenon decay and cooldown from 200'F to 140'F.This condition requires either 2890 gallons of 20,000 ppm borated water from the boric acid storage tanks or 76,937 gallons of 2400 ppm borated water from the refueling water storage tank.The charging flowpath of Unit 1 required for Unit 2 shutdown support ensures that flow is available to Unit 2 and addresses the requirements of 10 CFR 50 Appendix R.The flowpath consists of a charging pump powered from an electrical bus and associated water supplies and delivery system.Fire watches posted in the affected opposite unit areas (i.e., Unit 2 areas requiring use of the Unit 1 charging system in the event of a fire)may serve as the equivalent shutdown capability specified in the action statements of Specification 3.1.2.3.In the affected areas, either establish continuous fire watches or verify the OPERABILITY of fire detectors per Specification 4.3.3.7 and establish hourly fire watch patrols.The required opposite unit equipment along with the surveillance requirements necessary to ensure that this equipment is capable of fulfilling its intended Appendix R alternate safe shutdown function have been established and are included in a plant procedure.

An additional plant procedure details how the above noted fire watches will be implemented.

The limits on contained water volume and boron concentration of the RWST also ensure a pH value of between 7.6 and 9.5 for the solution recirculated within containment after a LOCA.This pH band minimizes the evolution of iodine and minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components.

The OPERABILITY of boron injection system during REFUELING ensures that this system is available for reactivity control while in MODE 6.Precluding positive reactivity addition capable of challenging the minimum required SHUTDOWN MARGIN or REFUELING boron concentration is required to assure continued safe operation.

Introduction of RCS temperature changes must also be evaluated to not increase reactivity above the required SHUTDOWN MARGIN.The RCS heatup and cooldown rate is restricted in MODE 5 to 50'F or less in any one-hour period to ensure that the positive reactivity increase due to temperature changes is comparable to the UFSAR Chapter 14 analysis of a boron dilution event.In this analysis, it was concluded that there is sufficient time available to detect the dilution with the source range neutron flux monitors and terminate the event with operator action.There is no additional heatup or cooldown rate restriction in MODE 6 because the REFUELING boron concentration is above the minimum required to maintain the required SHUTDOWN MARGIN for the RCS temperature range defined for MODE 6.Introduction of coolant inventory from the RWST is acceptable provided the RWST boron concentration is above the minimum required to maintain the specified SHUTDOWN MARGIN.3/4.1.3 MOVABLE CONTROL ASSEMBLIES The specifications of this section ensure that (1)acceptable power distribution limits are maintained, (2)the minimum SHUTDOWN MARGIN is maintained, and (3)the potential effects of rod ejection accident are COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 1-3 AMENDMENT SS, 420, 48%

ATTACHMENT 3B TO AEP:NRC:1327 PROPOSED TECHNICAL SPECIFICATIONS PAGES REVISED PAGES UNIT 2 3/4 1-2 3/4 1-3 3/4 1-8 3/4 l-ll 3/4 1-13 3/4 1-15 3/4 3-6 3/4 4-4 3/4 8-9 3/4 9-1 3/4 9-2 B 3/4 1-1 B 3/4 1-4 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS SURVEILLANCE RE UIREMENTS Continued When in MODES 3 or 4, at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by consideration of the following factors: 1.Reactor coolant system boron concentration, 2.Control rod position, 3.Reactor coolant system average temperature, 4.Fuel burnup based on gross thermal energy generation, 5.Xenon concentration, 6.Samarium concentration, and 7.Boron penalty (MODE 4 only).4.1.1.1.2 The overall core reactivity balance shall be compared to predicted values to demonstrate agreement within plus or minus 1%Delta k/k at least once per 31 Effective Full Power Days (EFPD).This comparison shall consider at least those factors stated in Specification 4.1.1.1.1.e, above.The predicted reactivity values shall be adjusted.(normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 Effective Full Power Days after each fuel loading.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-2 AMENDMENT 83, 408, 434 3/4 LIMI'HNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN T v LESS THAN OR E UAL TO 200 F LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be greater than or equal to 1.0%Delta k/k.APPLICABILITY:

ACTION: MODE 5.With the SHUTDOWN MARGIN less than 1.0%Delta k/k, immediately initiate and continue boration at greater than or equal to 10 gpm of a solution containing greater than or equal to 20,000 ppm boron or equivalent until the required SHUTDOWN MARGIN is restored.SURVEILLANCE RE UIREMENTS The SHUTDOWN MARGIN shall be determined to be greater than or equal to 1.0%Delta k/k: a.Within one hour after detection of an inoperable control rod(s)and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter while the rod(s)is inoperable.

If the inoperable control rod is immovable or untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s).At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by consideration of the following factors: 1.Reactor coolant system boron concentration, 2.Control rod position, 3.Reactor coolant system average temperature, 4.Fuel burnup based on gross thermal energy generation, Xenon concentration, 6.Samarium concentration, and Boron penalty.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-3 AMENDMENT%, 407)40S)434 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS FLOW PATHS-SHUTDOWN LIMITING CONDITION FOR OPERATION As a minimum, one of the following boron injection flow paths shall be OPERABLE: A flow path from the boric acid tanks via a boric acid transfer pump and charging pump to the Reactor Coolant System if only the boric acid storage tank in Specification 3.1.2.7.a is OPERABLE, or The flow path from the refueling water storage tank via a charging pump to the Reactor Coolant System if only the refueling water storage tank in Specification 3.1.2.7.b is OPERABLE.APPLICABILITY:

ACTION: MODES 5 and 6.With none of the above fiow paths OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.

SURVEILLANCE RE UIREMENTS At least one of the above required flow paths shall be demonstrated OPERABLE: At least once per 7 days by verifying that the temperature of the heat traced portion of the flow path is greater than or equal to 145'F when a flow path from the boric acid tanks is used.At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the fiow path that is not locked, sealed, or otherwise secured in position, is in its correct position.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 14 AMENDMENT 487 0

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REAC'IIVITY CONTROL SYSTEMS CHARGING PUMP-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 One charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.One charging flow path associated with support of Unit 1 shutdown functions shall be available.*

APPLICABILITY:, Specification 3.1.2.3.a.

-MODES 5 and 6 Specification 3.1.2.3.b.

-At all times when Unit 1 is in MODES 1, 2, 3, or 4.ACTION: With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.

b.With more than one charging pump OPERABLE or with a safety injection pump(s)OPERABLE when the temperature of any RCS cold leg is less than or equal to 152'F, unless the reactor vessel head is removed, remove the additional charging pump(s)and the safety injection pump(s)motor circuit breakers from the electrical power circuit within one hour.c.The provisions of Specification 3.0.3 are not applicable.

In addition to the above, when Specification 3.1.2.3.b is applicable and the required flow path is not available, return the required flow path to available status within 7 days, or provide equivalent shutdown capability in Unit 1 and return the required flow path to available status within the next 60 days, or have Unit 1 in HOT STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and HOT SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.The requirements of Specification 3.0.4 are not applicable when Specification 3.1.2.3.b applies.SURVEILLANCE RE UIREMENTS 4.1.2.3.1 The above required charging pump shall be demonstrated OPERABLE by verifying that the pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5 A maximum of one centrifugal charging pump shall be OPERABLE whenever the temperature of one or more of the RCS cold legs is less than or equal to 152'F.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-11 AMENDMENT 85, 407, 446, 488 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVE<ILLANCE REQUIREMENTS 3/4.1 REACTIVI'rY CONTROL SYSIKMS BORIC ACID TRANSFER PUMPS-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.5 At least one boric acid transfer pump shall be OPERABLE and capable of being powered from an OPERABLE emergency bus if only the flow path through the boric acid transfer pump of Specification 3.1.2.1a is OPERABLE.APPLICABILITY:

MODES 5 and 6.ACTION: With no boric acid transfer pump OPERABLE as required to complete the flow path of Specification 3.1.2.1a, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.

SURVEILLANCE RE UIREMENTS 4.1.2.5 No additional Surveillance Requirements other than those required by Specification 4.0.5.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-13 3/4 LIMI'riNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.1 REACIXVITY CONTROL SYSTEMS BORATED WATER SOURCES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.7 As a minimum, one of the following borated water sources shall be OPERABLE: a.A boric acid storage system and associated heat tracing with: 1.A minimum usable borated water volume of 4300 gallons, 2.Between 20,000 and 22,500 ppm of boron, and 3.A minimum solution temperature of 145'F., b.The refueling water storage tank with: 1.A minimum usable borated water volume of 90,000 gallons, 2.A minimum boron concentration of 2400 ppm, and 3.A minimum solution temperature of 70'F.APPLICABILITY:

MODES 5 and 6.ACTION: With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN~~MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODE 5, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.

SURVEILLANCE RE UIREMENTS 4.1.2.7 The above required borated water source shall, be demonstrated OPERABLE: At least once per 7 days by: 2.3.Verifying the boron concentration of the water, Verifying the contained borated'water volume, and Verifying the boric acid storage tank solution temperature when it is the source of borated water.At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature when it is the source of borated water.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 1-15 AMENDMENT$3, 94, 499 0 e 3/4 LIMI'HNG CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.TI TABLE 3.3-1 Continued a.Below P-6, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above the P-6 Setpoint.b.Above P-6 but below 5%of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing THERMAL POWER above 5%of RATED THERMAL POWER c.Above 5%of RATED THERMAL POWER, POWER OPERATION may continue.ACTION 4 With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement and with the THERMAL POWER level: a.Below P-6,,restore the inoperable channel to OPERABLE status prior to increasing THERMAL'OWER above the P-6 Setpoint.b.Above P-6, operation may continue.ACTION 5 With the number of channels OPERABLE one less than required by the Minimum Channels OPERABLE requirement:

a.Immediately suspend operations involving positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.8.b.2 (MODES 3 or 4)or 3:1.2.7.b.2 (MODE 5), and b.Verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter, and c.Close the isolation valves for unborated water sources to the chemical and volume control system within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.In MODE 5, if the RWST boron concentration is less than the reactor coolant system boron concentration and less than the boron concentration required by Specification 3.1.2.7.b.2, isolate the RWST from the reactor coolant system within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.ACTION 6 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.b.The Minimum Channels OPERABLE requirement is met;however, the inoperable CHANNEL may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of the other channels per Specification 4.3.1.1.1.

ACTION 7 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 3-6 AMENDMENT V5 r J 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM SAFETY VALVES-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2 A minimum of one pressurizer code safety valve shall be OPERABLE with a lift setting of 2485 PSIG 2 1%.APPLICABILITY:

MODES 4 and 5.ACTION: With no pressurizer code safety valve OPERABLE: ae Immediately suspend all operations involving positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.8.b.2 (MODE 4)or 3.1.2.7.b.2 (MODE 5), and place an OPERABLE RHR loop into operation in the shutdown cooling mode, and Immediately render all Safety Injection pumps and all but one charging pump inoperable by removing the applicable motor circuit breakers from the electric power circuit within one hour.SURVEILLANCE RE UIREMENTS 4.4.2 No additional Surveillance Requirements other than those required by Specification 4.0.5.The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 44 AMENDMENT SS 487 0

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.8 ELECTRICAL POWER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C.electrical power sources shall be OPERABLE: One circuit between the offsite transmission network and the onsite Class 1E distribution system, and One diesel generator with: 1.A day fuel tank containing a minimum of 70 gallons of fuel, 2.A fuel storage system containing a minimum indicated volume of 46,000 gallons of fuel, and APPLICABILITY:

3.A fuel transfer pump.MODES 5 and 6.ACTION With less than the above minimum required A.C.electrical power sources OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes except: 1)heatup or cooldown of the reactor coolant volume provided that SHUTDOWN MARGIN sufficient to accommodate the change in temperature is maintained in accordance with Specification 3.1.1.2 in MODE 5 or Specification 3.9.1 in MODE 6, and the heatup or cooldown rate is restricted to 50'F or less in any one-hour period in MODES, or 2)addition of water from the RWST, provided the boron concentration in the RWST is greater than or equal to the minimum required by Specification 3.1.2.7.b.2.

SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C.electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.+

+The provisions of Technical Specification 4.0.8 are applicable.

COOK NUCLEAR PLANT-UNIT 2 Page 3/4 8-9 AMENDMENT 449, 483, 459 3/4 LIMITING CONDITIONS I'OR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met: a.Either a~of 0.95 or less, which includes a 1%Ak/k conservative allowance for uncertainties, or b.A boron concentration of greater than or equal to 2400 ppm, which includes a 50 ppm conservative allowance for uncertainties.

APPLICABILITY:

ACTION: MODE 6 With the requirements of the above specification not satisfied, 1)immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2, and 2)initiate and continue boration at greater than or equal to 10 gpm of 20,000 ppm boric acid solution or its equivalent until K,is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2400 ppm, whichever is the more restrictive.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to: a.Removing or unbolting the reactor vessel head, and b.Withdrawal of any full length control rod in excess of 3 feet from its fully inserted position within the reactor pressure vessel.4.9.1.2 The boron concentration of the reactor coolant system and the refueling canal shall be determined by chemical analysis at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-1

3/4 LIMH'ING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 RE%%LING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment and control room.APPLICABILITY:

MODE 6.ACTION: With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes except addition of water from the RWST, provided the boron concentration in the RWST is greater than the minimum required by Specification 3.1.2.7.b.2.

b.The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of: a.A CHANNEL FUNCTIONAL TEST at least once per 7 days, and b.A CHANNEL FUNCTIONAL TEST within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to the initial start of CORE ALTERATIONS, and c.A CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS.

COOK NUCLEAR PLANT-UNIT 2 Page 3/4 9-2 AMENDMENT 63, 40V 3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 BORATION CONTROL 3/4.1.1.1 Gild 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that 1)the reactor can be made subcritical from all operating conditions, 2)the reactivity transients associated with postulated accident conditions are controllable within acceptable limits, and 3)the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.

SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration, and RCS T,,.The most restrictive condition occurs at EOL, with T,~at no load operating temperature, and is associated with a postulated steam line break accident and resulting uncontrolled RCS cooldown.In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1.3%Delta k/k is initially required to control the reactivity transient and automatic ESF is assumed to be available.

With T,~less than 200'F, the reactivity transients resulting from a postulated steam line break cooldown are minimal and a 1%Delta k/k SHUTDOWN MARGIN provides adequate protection for this event.The SHUTDOWN MARGIN requirements are based upon the limiting conditions described above and are consistent with FSAR safety analysis assumptions.

A boron penalty must be applied when operating with no reactor coolant loops in operation but one or more residual heat removal loops providing shutdown cooling.The necessary penalty is included in the SHUTDOWN MARGIN curves.3/4.1.1.3 BORON DILUTION A minimum flow rate of at least 2000 GPM provides adequate mixing, prevents stratification and ensures that reactivity changes will be gradual during boron concentration reductions in the Reactor Coolant System.A fiow rate of at least 2000 GPM will circulate an equivalent Reactor Coolant System volume of 12,612 cubic feet in approximately 30 minutes.The reactivity change rate associated with boron reductions will therefore be within the capability for operator recognition and control.COOK NUCLEAR PLANT-UNIT 2 Page B 3/4 1-1 AMENDMENT$3, 488, 434, 499 3/4 BASES 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.2 BORATION SYSTEMS Continued The charging flowpath of Unit 2 required for Unit 1 shutdown support ensures that flow is available to Unit 1 and addresses the requirements of 10 CFR 50 Appendix R.The fiowpath consists of a charging pump powered from an electrical bus and associated water supplies and delivery system.Fire watches posted in the affected opposite unit areas (i.e., Unit 1 areas requiring use of the Unit 2 charging system in the event of a fire)may serve as the equivalent shutdown capability specified in the action statements of Specification 3.1.2.3.In the affected areas, either establish continuous fire watches or verify the OPERABILITY of fire detectors per Specification 4.3.3.7 and establish hourly fire watch patrols.The required opposite unit equipment along with the surveillance requirements necessary to ensure that this equipment is capable of fulfilling its intended Appendix R alternate safe shutdown function have been established and are included in a plant procedure.

An additional plant procedure details how the above noted fire watches will be implemented.

Precluding positive reactivity addition capable of challenging the minimum required SHUTDOWN MARGIN or REFUELING boron concentration is required to assure continued safe operation.

Introduction of RCS temperature changes must also be evaluated to not increase reactivity above the required SHUTDOWN MARGIN.The RCS heatup and cooldown rate is restricted in MODE 5 to 50'F or less in any one-hour period to ensure that the positive reactivity increase due to temperature changes is comparable to the UFSAR Chapter 14 analysis of a boron dilution event.In this analysis, it was concluded that there is sufficient time available to detect the dilution with the source range neutron flux monitors and terminate the event with operator action.There is no additional heatup or cooldown rate restriction in MODE 6 because the REFUELING boron concentration is above the minimum required to maintain the required SHUTDOWN MARGIN for the RCS temperature range defined for MODE 6.Introduction of coolant inventory from the RWST is acceptable provided the RWST boron concentration is above the minimum required to maintain the specified SHUTDOWN MARGIN.3/4.1.3 MOVABLE CONTROL ASSEMBLIES The specifications of this section ensure that (1)acceptable power distribution limits are maintained, (2)the minimum SHUTDOWN MARGIN is maintained, and (3)limit the potential effects of rod misalignment on associated accident analyses.OPERABILITY of the control rod position indicators is required to determine control rod positions and thereby ensure compliance with the control rod alignment and insertion limits.The ACTION statements which permit limited variations from the basic requirements are accompanied by additional restrictions which ensure that the original design criteria are met.Misalignment of a rod requires measurement of peaking factors or a restriction in THERMAL POWER;either of these restrictions provide assurance of fuel rod integrity during continued operation.

In addition, those accident analysis affected by a misaligned rod are reevaluated to confirm that the results remain valid during future operation.

The maximum rod drop time restriction is consistent with the assumed rod drop time used in the accident analyses.Measurement with T,~greater than or equal to 541'F and with all reactor coolant pumps operating ensures that the measured drop times will be representative of insertion times experienced during a reactor trip at operating conditions.

Control rod positions and OPERABILITY of the rod position indicators are required to be verified on a nominal basis of once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with more frequent verifications required if an automatic monitoring channel is inoperable.

These verification frequencies are adequate for assuring that the applicable LCO's are satisfied.

COOK NUCLEAR PLANT-UNIT 2 Page B 3/4 14 AMENDMENT 49, 446, 484

ATTACHMENT 4 TO AEP:NRC:1327 NO SIGNIFICANT HAZARDS CONSIDERATION EVALUATION

Attachment 4 TO AEP:NRC:1327 Page 1 No Si nificant Hazards Consideration Evaluation Indiana Michigan Power Company (I&M)has evaluated this proposed amendment and determined that it involves no significant hazards consideration.

According to 10 CFR 50.92(c), a proposed amendment to an operating license involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: 1.involve a significant increase in the probability of occurrence or consequences of an accident previously evaluated; 2.create the possibility of a new or different kind of accident from any previously analyzed;or 3.involve a significant reduction in a margin of safety.The proposed changes would revise limitations on positive reactivity additions in several technical specifications (T/S)action statements.

These changes would allow reactor coolant system (RCS)temperature changes in certain Mode 5 and 6 T/S action statements if the SDM is sufficient to accommodate the expected RCS temperature change.In addition, footnotes regarding additions of water from the refueling water storage tank (RWST)to the RCS are clarified and relocated to T/S action statements.

Additional T/S action statement requirements are added in Table 3.3-1,"Reactor Trip System Instrumentation," when the required source range neutron flux channel is inoperable.

Corresponding changes are proposed for the bases for T/S 3/4.1.1,"Boration Control," and T/S 3/4.1.2,"Boration Systems." Administrative changes are made to improve clarity.Finally, additions are made to SDM T/S surveillance requirements (SRs)to identify use of a boron penalty (requirement for additional boron)during residual heat removal system operation in Modes 4 and 5.The determination that the criteria set forth in 10 CFR 50.92 are met for this amendment request is indicated below.1.Does'the change involve, a significant increase in the probability of occurrence or consequences of an accident previously evaluated?

No.I&M proposes to permit operators to make RCS temperature changes under conditions not previously allowed.RCS temperature changes may add positive reactivity to the reactor core that could reduce the SDM necessary to maintain subcritical conditions.

Acceptable consequences for an inadvertent criticality rely on prevention.

Maintaining an adequate SDM is an essential means to prevent an inadvertent criticality.

Attachment 4 TO AEP:NRC:1327 Page 2 When equipment that is relied upon to prevent, detect, correct, or mitigate an unintentional approach to a critical condition-is unavailable or degraded, activities that may reduce the SDM must be precluded or adequately controlled.

This amendment request is based on maintaining adequate control of positive reactivity additions as a result of RCS temperature changes in Modes 5 and 6.The control is provided by requirements to confirm that the SDM required by the T/S is available to accommodate the expected RCS temperature change.This preserves the val,idity of accident analyses that assume the T/S SDM requirements are met when the accident is initiated.

The following accidents of potential applicability in Modes 5 and 6 are described in Section 14.2,"Standby Safeguards Analysis" of the Updated Final Safety Analysis Report (UFSAR).1.Fuel handling accident 2.Waste liquid release 3.Waste gas release 4.Steam generator tube rupture 5.Steam pipe rupture 6.Rupture of control rod mechanism housing-rod cluster control assembly (RCCA)ejection 7.Environmental consequences following secondary system accidents 8.Rupture of a feedline (Unit 2 only)The UFSAR also describes these events: 9.Uncontrolled RCCA withdrawal from a subcritical condition (Section 14.1.1)10.Uncontrolled boron dilution (Section 14.1.5)Accidents 4 through 8, above, are not credible in Modes 5 and 6 due to negligible stored energy (temperature and pressure)in the primary and secondary systems below the Mode 5 RCS temperature limit of 200'F.Therefore, they are not analyzed in Mode 5 and 6 and are not considered further.Remaining accidents 1, 2,,3, 9, and 10 are discussed below: 1.Fuel Handling Accident The only time a fuel handling accident could occur is during the handling of a fuel assembly.The required action to suspend core alterations is not changed.Changing RCS temperature in Modes 5 and 6 would not initiate this accident.SDM is not a factor or initial condition assumed in the analysis of a fuel handling accident.Therefore, since the requirements that would Attachment 4 TO AEP:NRC:1327 Page 3 preclude this accident are not affected, the probability of the accident is not changed.Similarly, a potential reduction in SDM does not increase the consequences of this accident.Waste Liquid Release The inadvertent release of radioactive liquid wastes to the environment was evaluated for the'waste evaporator condensate and monitor tanks, condensate storage tank, primary water storage tank, RWST, auxiliary building storage tanks, and chemical and volume control system (CVCS)holdup tanks.Et was concluded in the Updated Final Safety Analysis Report Chapter 14 evaluation that loss of liquid from these tanks to the environment is not a credible accident.This conclusion is not impacted by the thermal effects or reactivity changes due to RCS temperature while in Modes 5 and 6.3.Waste Gas Release Radioactive gases would be introduced into the RCS by the escape of fission products if defects existed in the fuel cladding.The processing of the reactor coolant by auxiliary systems results in the accumulation of radioactive gases in various tanks.The two main sources of any significant gaseous radioactivity that could occur would be the volume control tank and the gas decay tanks.Zt is assumed that a tank ruptures by an unspecified mechanism after the reactor has been operating for one core cycle with 1%defects in the fuel cladding.The integrity of these tanks is not affected by changes in RCS temperature and SDM is not a factor in the consequences of these events.Therefore, it is concluded that the probability of occurrence of a tank rupture and the consequences of a tank rupture are not significantly increased by this change.9.Uncontrolled RCCA Withdrawal from a Subcritical Condition The proposed changes specifically permit positive reactivity additions due to temperature changes.However, all other positive reactivity changes are suspended when the action applies.Therefore, intentional rod withdrawal would not be permitted.

Additionally, this event could occur only when the reactor trip breakers are closed and the control rod drive mechanisms are energized.

With the exception of testing or special maintenance, the rod drive motor generator set Attachment 4 TO AEP:HRC:1327 Page 4 remains tagged out (de-energized with administrative cards to alert operators) in Modes 4 and 5.This alone would preclude rod movement.If the physical conditions for rod withdrawal were intentionally met, T/S require that two source range neutron flux instruments, two reactor trip instrumentation channels, and associated reactor trip breakers, must be operable to automatically terminate the event.RCS temperature changes in Mode 5 and 6 are sufficiently below the normal operating and designed temperature of the drive mechanisms.

The thermal effects of the proposed RCS temperature changes are not a significant contributor to the possibility of a drive mechanism failure.Acceptable consequences for the rod withdrawal event rely on termination by an automatic reactor trip prior to criticality, and no assumptions are made in the analysis about the SDM existing at the start of rod withdrawal.

Therefore, it is=concluded that this proposed license amendment would have no impact on the probability or consequences of an uncontrolled rod withdrawal event.10.Uncontrolled Boron Dilution Uncontrolled boron dilution is analyzed for refueling, startup, and power operation described in UFSAR section 14.1.5 for Unit 1 and Unit 2.The source of water for this event is primary grade water from the reactor makeup portion of the CVCS.The CVCS is designed to limit, even under various postulated failure modes, the potential rate of dilution to a value that provides the operator sufficient time to correct the situation in a safe and orderly manner.Acceptable consequences for this event rely on preventing an uncontrolled dilution.The proposed change to allow RCS temperature changes below 200'F do not involve changes to the operating methods for the CVCS or modifications to the CVCS.Additionally, the CVCS pumps and valves required to add water to the RCS are not affected by the RCS temperature changes themselves.

Any such effects in the range of 68'F to 200'F that would be permitted would be small compared to changes between 200'F to normal RCS operating temperature.

Therefore, the thermal effects are significantly less than those that occur during normal operation.

It is concluded that the probability and consequences of an uncontrolled boron dilution event are not significantly increased by the proposed license amendment.

The initiators and precursors for the accidents described above are not changed.Therefore, the probability of their occurrence is not changed and the consequences are bounded by the current

Attachment 4 TO AEP:NRC:1327 Page 5 analyses.Therefore, there is no increase in the types or amounts of effluents released offsite.The proposed additions to action 5 of T/S Table 3.3-1 are conservative.

They provide additional assurance that instrumentation would be available to alert operators to a dilution event.The requirement to isolate sources of dilution water removes potential initiators for an inadvertent dilution.The RWST would be considered a dilution source if the RWST boron concentration is less than the RCS boron concentration and less than the minimum boron concentration in T/S limiting condition for operation 3.1.2.7.b.2.

Isolating the RWST in this case is appropriate because it eliminates a potential accident initiator.

The borated water concentration and volume in Mode 5 are established to provide the required SDM after xenon decay and cooldown from 200'F to 140'F.The accidents described above do not require a minimum volume for reasons other than boration control.The addition to T/S SRs 4.1.1.1.e and 4.1.1.2.b, which requires application of a boron penalty, is an additional restriction that is imposed administratively already.The remaining changes are administrative.

They correct typographical errors or change format, and are not intended to change the meaning.They do not affect accident initiators or precursors.

In summary, based on the above, the probability of occurrence or the consequences of accidents previously evaluated are not increased.

2.Does the change create the possibility of a new or different kind of accident from any accident previously evaluated?

No.The proposed changes permit RCS temperature changes under conditions"that were.previously prohibited.

However, no new methods of changing RCS temperature are involved, and the T/S limits on the permissible rates of RCS temperature changes are not altered.Therefore, the integrity of the reactor vessel when subject to RCS temperature changes is not affected.The accident of concern for the proposed amendment is an unintentional reduction in SDM leading to an inadvertent criticality.

This is not a new or different kind of accident, although the causal mechanism adding the positive reactivity is an RCS temperature change instead of a dilution event.As discussed in question 1, the requirement to maintain SDM during RCS temperature changes provides assurance that the probability of the SDM reduction is not increased.

However, as an additional conservative measure, a maximum RCS heatup and

Attachment 4 TO AEP:NRC:1327 Page 6 cooldown rate of,50'F in any one-hour period is imposed when the action applies.This increases the time necessary for a RCS temperature change to reduce the SDM by an unacceptable amount.Thus, if a heatup or cooldown was initiated at 50'F/hr, and inadvertently continued beyond the intended temperature, sufficient time would be available for the operators to detect the SDM reduction with the source range nuclear instruments and secure the temperature change.The rate of 50'F in any one-hour period was estimated to provide at least as much time as was considered adequate for detecting and correcting a dilution event.The acceptable time for a dilution event is described in UFSAR Sect'ion 14.1.5.Conservative assumptions of the maximum positive or negative moderator temperature coefficient were used for the estimate.It should be noted that compliance with the current T/S action statements prohibit deliberate heatup and cooldown.However, it does not prevent use of the equipment involved in removing decay heat to maintain plant temperature (for example residual heat removal system pumps, valves, and heat exchangers).

Therefore, the probability of a malfunction of this equipment during deliberate heatup and cooldown is not significantly greater than it is when the equipment is operated, as necessary, to maintain steady-state temperatures for decay heat removal.The addition to T/S SRs 4.1.l.l.e and 4.1.1.2.b, which requires application of a boron penalty, is an additional restriction that is imposed administratively already.The proposed additions to the T/S action statements for the source range neutron flux instrumentation provide additional controls to prevent an unmonitored positive reactivity addition.The remaining changes are administrative.

They correct typographical errors or change format, and are not intended to change the meaning.Isolating the RWST when it is a potential dilution source and when there are no source range neutron flux instrument.

chahnels operable in Mode 5 is not an accident initiator.

Borated makeup to the RCS can be accomplished with the boric acid storage tank.Based on the above, it is concluded that the change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3.Does the change involve a significant reduction in a margin of safety?No.The margin of safety pertinent to the proposed changes is the T/S-required SDM.The additions to T/S SRs 4.1.1.1.e and 4.1.1.2.b require application of a boron penalty.Because this penalty is controlled administratively already and there are no

Attachment 4 TO AEP:NRC:1327 Page 7 other changes to the SDM requirements, the margin of safety is maintained.

Additionally, the proposed change to isolate the RWST when*it is a potential dilution source does not impact the ability of the boric acid storage tank to supply the boron required for SDM during cooldown from 200'F to 140'F including xenon decay.The minimum time available, to the operators to detect and terminate an unintentional addition of positive reactivity could also be considered a margin of safety.The proposed changes limit temperature changes to 50'F in a one-hour period so as not to reduce this'ime.Compliance with the proposed changes would continue to provide assurance that there is no significant reduction in these margins of safety.The remaining changes are administrative.

They correct typographical errors or change format, and are not intended t'o change the meaning.Based on the above, the proposed changes do not involve a significant reduction in a margin of safety.In summary, based upon the above evaluation, l&M has concluded that the proposed amendment involves no significant hazards consideration.

ATTACHMENT 5 TO AEP:NRC:1327 ENVIRONMENTAL ASSESSMENT

Attachment 5 to AEP:NRC:1327 Page 1 Environmental Assessment Indiana Michigan Power Company (I&M)has evaluated this license amendment request against the criteria for identification of licensing and regulatory actions requiring environmental assessment in accordance with 10 CFR 51.21.I&M has determined that this license amendment request meets the criteria for a categorical exclusion set forth in 10 CFR 51.22(c)(9).

This determination is based on the fact that this change is'being proposed as an amendment to a license issued pursuant to 10 CFR 50 that changes a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or that changes an inspection or a surveillance requirement, and the amendment meets the following specific criteria.(i)The amendment involves no significant hazards consideration.

As demonstrated in attachment 4, this proposed amendment does,not involve significant hazards consideration.(ii)There is no significant change in the types or significant increase in the amounts of any effluent'hat may be released offsite.As documented in attachment 1, there will be no significant change in the.types or significant increase in the amounts of any effluents released offsite.(iii)There is no significant increase in individual or cumulative occupational radiation exposure.The proposed changes will not result in significant changes in the operation or configuration of the facility.There will be no change in the level of controls or methodology used for processing of radioactive effluents or handling of solid radioactive waste, nor will the proposal result in any change in the normal radiation levels within the plant.Therefore, there will be no significant increase in individual or cumulative occupational radiation exposure resulting from this change.

ATTACHMENT 1 TO AEP:NRC:0433Q DESCRIPTION AND SAFETY ANALYSIS FOR PROPOSED CHANGES

Attachment 1 to NRC:AEP:0433Q Page 1 Descri tion and Safet Anal sis For Pro osed Chan es A.Summary of Proposed Changes The Licensee proposes to make administrative changes to several technical specifications (T/S)for Donald C.Cook Nuclear Plant unit 1 and unit 2.The proposed changes include: (1)revising boron sampling requirements in mode 6;(2)deleting a reference to obsolete equipment in a footnote, (3)deleting a redundant figure;(4)correcting a reference to another requirement; (5)deleting obsolete notes;(6)adding to surveillance requirements; (7)clarifying instrumentation configuration; and (8)correcting typographical errors.These changes are proposed to remove obsolete information, provide consistency between unit 1 and unit 2, provide consistency with the Standard Technical Specifications, provide clarification, and correct typographical errors.The proposed changes are described in detail in Section B of this attachment.

T/S pages that are marked to show the proposed changes are provided in attachments 2A and 2B for unit 1 and unit 2, respectively.

The proposed T/S pages with the changes incorporated are provided in attachments 3A and 3B for unit 1 and unit 2, respectively.

B.Detailed Description of Proposed Changes Proposed Revision to Boron Sampling Requirements in Mode 6 Description and Bases of the Current Requirement T/S surveillance requirement 4.9.1.2 for unit 1 requires that the boron concentration of the reactor coolant system and refueling canal be determined at least three times per seven days with a maximum time interval between samples of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.The requirement provides assurance that a uniform boron concentration is maintained for reactivity control in the water volume having direct access to the reactor vessel.Description and Bases of the Requested Revision The Licensee proposes to remove the unit 1 restriction to determine the concentration at least three times per seven days for consistency with the unit 2 surveillance requirement, NOREG-1431,"Standard Technical Specifications," and its predecessor, NOREG-0452.

The 72-hour maximum interval between samples is not changed.According to NOREG-1431, a minimum frequency of once every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is a reasonable amount'f time to verify the boron concentration of representative samples.The frequency is based on operating experience, which has shown 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to be adequate.

Attachment 1 to NRC:AEP:0433Q Page 2 2.Proposed Revision to Footnote for T/S 3.9.12, Action a Description and Bases of the Current Requirement T/S 3.9.12, Action a,, is modified by a footnote describing operation of the drumming room roll-up door.The crane bay roll-up door and the drumming room roll-up door provide a ventilation barrier to maintain negative pressure in the auxiliary building.These doors may be opened for personnel use provided established administrative controls are maintained.

The footnote was added in amendment 124 to DPR-58 and amendment 111 to DPR-74.In the NRC's Safety Evaluation Report, the staff found that the operation of the doors met the intent of Standard Review Plan, Sections 9.4.2,"Spent Fuel Pool Area Ventilation System," and 15.7.4,"Radiological Consequences of Fuel Handling Accidents," and was, therefore, acceptable.

Description and Bases of the Requested Revision'he Licensee proposes to remove"roll-up" from the description of the drumming room door.The door has been replaced by a door having a different design.The function of the door has not changed.The replacement door provides a ventilation barrier as required by the analysis used in support of the previous amendment request.In addition, the name of the door is changed to"south door of the auxiliary building crane bay" because it more accurately describes the door's current use.3.Proposed Change to Figure 5.6-3 Description and Bases of the Current Requirement T/S 5.6.1~1.c.3 includes equations for equivalent reactivity criteria for Region 2 and Region 3 in the spent fuel storage racks.The equations are graphically depicted in Figure 5.6-3.Either the equations or graph may be used to verify that fuel is stored in the appropriate region.Description and Bases of the Requested Revision The Licensee proposes to delete Figure 5.6-3 because the information is redundant to the equations provided in T/S 5.6.1.1.c.3.

It is normal practice to use the equations rather than the source plot in Figure 5.6-3;therefore, the redundant curves are not necessary.

The fuel storage requirements are not changed.Proposed Change to Reference in T/S 6.3.1 Description and Bases of the Current Requirement T/S 6'.1,"Facility Staff Qualifications," includes a requirement that the operations superintendent must hold or have held a senior operator license as specified in

~I Attachment 1 to NRC:AEP:0433Q Page 3 T/S 6.2.2.h.The requirement provides assurance that operational activities are directed by an individual who has an appropriate level of knowledge.

Description and Bases of the Requested Revision The Licensee proposes to change the referenced section from 6.2.2.h to 6.2.2.g to correct an administrative error that was introduced in previous amendments.

Section 6.2.2.h describes the senior operator license requirement.

Section 6.2.2.g no longer exists because it had been relabeled as 6.2.2.h;however, the corresponding reference in T/S 6'.1 was not changed at that time.This request corrects the error.The statement describing the senior operator license in 6.3.1 is deleted because the requirement is provided in detail in 6.2.2.h.The statement is not consistent with the requirements in 6.2.2.h because of a previous administrative error.The change provides a clear reference to the current T/S for qualifications.

5.Proposed Deletion of Obsolete Notes Description and Bases of the Current Requirement For unit 1, T/S 4.0.6 allows extensions for certain surveillances required to be performed on or before July 31, 1987, and until the end of the cycle 9-10 refueling outage.T/S 4.0.7 allows extensions for certain surveillances required to be performed on or before April 1, 1989, until the end of the cycle 10-11 refueling outage.These extensions were granted to accommodate scheduled work at the time.For unit 2, T/S 4.0.6 allows extensions for certain surveillances required to be performed on or before March 31, 1986, until the end of the cycle 5-6 refueling outage.T/S 4.0.7 allows extensions for certain surveillances required to be performed on or before July 1, 1988, until the end of the cycle 6-7 refueling outage.These extensions were granted to accommodate scheduled work at the time.For unit 2, T/S 4.0.8 allows extensions for certain surveillances required to be performed on or before August 13, 1994, and designated as 18-month or 36-month surveillances (or required as outage-related surveillances under the provisions of T/S 4.0.5).T/S 4.0.8 also affected the initiation date established during the unit 2 1994 refueling outage.Similarly, T/S 4.0.9 allowed surveillances that must be performed on or before September 7, 1994, and are designated as 18-month surveillances to be delayed until just prior to core reload in the unit 2 cycle 9-10 refueling outage.Each affected surveillance is modified by a note stating that the provisions of T/S 4.0.8 or T/S 4.0.9 (as appropriate) are applicable.

These extensions were granted to accommodate scheduled work at the time.

Attachment 1 to NRC:AEP:0433Q Page 4 For unit 2, Table 4.4-2 and T/S 3.3.3.1 include a note stating that the T/S will not be effective until after the 1982 refueling outage.For unit 1 and unit 2, surveillance requirements 4.4.12.1 and 4.4.12.2 are modified by notes stating that the surveillance requirements will be performed the next time the unit enters modes 5 or 6 following the issuance of the technical specification, and after the appropriate plant procedures have been written.Description and Bases of the Requested Revision For unit 1 and unit 2, T/S 4.0.6 and 4.0.7 are deleted because they no longer apply.Surveillances are scheduled in accordance with the applicable T/Ss.The references to 4.0.6 and 4.0.7 that indicated when the provision was applicable were deleted in previous amendments.

For unit 2, T/S 4.0.8 and 4.0.9.are deleted because they no longer apply.Surveillances are scheduled in accordance with the applicable T/Ss.References to T/S 4.0.8 are also deleted from the following:

Table 4.3-1, functional units 7 through 11;Table 4.3-2, functional units 1.d, 4.d, and 6.d;Table 4.3-6A, instruments 5 through 8;Table 4.3-10, items 2, 3, 11, 15, and 16;surveillance requirement (SR)4.4.6.1.b; SR 4.4.11.1.d; SR 4.5.3.1;SR 4.6.2.2c;SR 4.6.3.1.2; SR 4.6.5.9;SR 4.7.3.1.b; SR 4.7.4.1.b; SR 4.7.5.1.e.2.a; SR 4.7.5.l.e.2.b; SR 4.7.7.1.a; and SR 4.8.1.2.References to T/S 4.0.9 are deleted from SR 4.8.2.3.2.d and SR 4.8.2.4.2.

For unit 2, the notes for T/S 3.3.3.1 and Table 4.4-2 are deleted.The provision has expired and it is no longer required to be included.For unit 1 and unit 2, the notes for surveillance requirements 4.4.12.1 and 4.4.12.2 are deleted.Plant procedures 01-0HP-4030.STP.56 and 02-0HP-4030.STP.56 were developed to perform the surveillance.

The surveillances are performed routinely as required, and the exception allowed in the footnote is no longer applicable.

The exceptions that were granted in all of these notes are no longer applicable.

Therefore, deleting the notes is considered to be an administrative change.6.Proposed Changes to T/S Surveillance Requirement 4.7.3.1 Description and Bases of the Current Requirement Unit 1 T/S surveillance requirement 4.7.3.1.d requires verification that the component cooling water system cross-tie valves can cycle full travel.

4~I Attachment 1 to NRC:AEP:0433Q Page 5 Unit 2 T/S surveillance requirement 4.7.3.1 includes two requirements to demonstrate operability of the component cooling water loops.A third requirement is included in surveillance requirement 4.7.3.2.These surveillances support demonstration that the system is operable.Description and Bases of the Requested Revision For unit 1, a clarification is proposed to indicate that the cross-tie valves are the unit cross-tie valves.The change is consistent with the equivalent unit 2 requirement and is not intended to affect which valves are included in the surveillance.

For unit 2, as described above, the Licensee proposes to add a new surveillance requirement, 4.7.1.3.c, to demonstrate operability by verifying pump performance pursuant to T/S 4.0.5.This change is consistent with the corresponding surveillance for unit 1.In amendment 164 to DPR-58 and amendment 149 to DPR-74, the NRC approved changes requiring that all safety-related pumps in the T/S be tested at a frequency specified in T/S 4.0.5.T/S 4.0.5 states that safety-related pumps shall be tested in accordance with ASME Code,Section XI, unless written relief has been granted.The proposed change is consistent with the changes approved in those amendments.

Additionally, SR 4.7.3.2 is renumbered as 4.7.3.1.d for consistency with unit 1.This requirement supports demonstrating that the system is operable, and it is appropriate to include it with the related requirements.

Proposed Change to Degraded Bus Voltage Instrumentation Description and Bases of the Current Requirement Table 3.3-3 provides engineered safety features actuation system instrumentation.

Functional unit S.b provides instrumentation requirements for the 4 kV bus degraded voltage (loss of power).There are three channels per bus total.Two channels per bus are required to be operable in modes 1, 2, 3, and 4, and two channels per bus are required to trip.These requirements provide assurance that the actuation will occur when required.Description and Bases of the Requested Revisions The Licensee proposes to add clarifying information to reflect the configuration of the instrumentation used to detect degraded voltage.Three channels are installed on buses T11A and T11D for unit 1 and on buses T21A and T21D for unit 2.This instrumentation is not installed on buses T11B or T11C for unit 1 or on buses T21B or T21C for unit 2.Because of this design, the requirements for functional unit S.b of Table 3.3-3 may not be clear.The proposed changes add references to the buses with the appropriate instrumentation.

This is similar to functional unit 6.b,

Attachment 1 to NRC:AEP:0433Q Page 6 which has instrumentation requirements for 4 kV bus loss of voltage.Degraded grid voltage relays are installed to sense degraded grid voltage at the 4kV safety buses and, on a two-out-of-three coincident logic with a two-minute time delay, trip open the reserve feed breakers and start the diesel generators.

The instrumentation was installed in response to a letter from D.K.Davis, Acting Chief of Operating Reactors Branch No.2-Division of Operating Reactors, to Indiana&Michigan Electric Company, dated June 3, 1977.This letter addressed the susceptibility of the safety-related electrical equipment at Cook Plant to sustained degraded voltage conditions at the offsite power systems and interaction between the offsite and onsite emergency power systems.AEP:NRC:0268, dated December 17, 1979, provides the response to that letter.Attachment 7 to AEP:NRC:0268 describes a proposed modification to install 4 kV safety bus undervoltage protection at buses A and D for unit 1 and unit 2.The proposed modification was reviewed and documented in EG&G Idaho, Incorporated's Technical Evaluation Report (TER).Section 3.2 of the TER includes a detailed description of the proposed modification, which noted that three new undervoltage relays would be installed to protect each of the 4160 V safety trains.The TER also noted that these relays will be on buses TllA and T11D and , will be arranged in a two-out-of-three coincidence logic.The conclusion in the TER was that the proposed modifications met the NRC staff position in the June 3, 1977, letter and that the modifications would protect the class 1E equipment from a sustained degraded voltage condition.

The NRC approved the related T/S changes in amendment 39 for DPR-58 and Amendment 22 for DPR-74.In the NRC's Safety Evaluation Reports for the amendments, the NRC concurred with the findings in the TER.The NRC also described the modification as having three undervoltage relays on each of the two 4160 V Class 1E buses.The proposed change is intended to clarify functional unit 8.b by indicating that the instrumentation is installed only on buses T11A and TllD.Because the design has already been reviewed and approved by the NRC, and the design was installed as described in the TER, the change is considered administrative.

Attachment 1 to NRC:AEP:0433Q Page 7 Proposed Corrections to Typographical Errors Description and Bases of the Requested Revisions The Licensee proposes to correct two typographical errors that were introduced in amendment 131 to DPR-74 (unit 2).These errors were to portions of the text that were not affected by the amendment.

The proposed changes restore the text as it was issued in the previous amendment (amendment 78).The valve number for line d of surveillance requirement 4.5.2.a is changed from IMP-262 to IMO-262.The word"otherwise" is corrected in surveillance requirement 4.5.2.b.Additional corrections are proposed to change"once" to"one" and"with" to"when" in T/S 3.7.3.1 for unit 1 and"in" to"to" in T/S 3.7.3.1 for unit 2.These changes are considered editorial and are not intended to impact the requirements.

C.Impact of Previous Submittals One previous submittal affects some of the pages that are affected by this request.AEP:NRC:0433P was transmitted on March 26, 1997, to request administrative changes.One of those proposed changes was to delete a footnote to T/S 3.9.12 for unit 1 and unit 2.That change is independent of the proposed change to a different footnote to T/S 3.9.12, described in section B.2 of attachment 1 to this request.The T/S pages in attachments 2A, 2B, 3A, and 3B do not reflect the changes proposed in the previous submittal.

Both changes will be incorporated based on when each request is approved.