ML17333A312

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Section 3.6.1.6,removing Words Structure & Steel Liner to Be Consistent W/Unit 2 Containment Sys Wording
ML17333A312
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/16/1996
From:
CENTERIOR ENERGY
To:
Shared Package
ML17333A311 List:
References
NUDOCS 9602220308
Download: ML17333A312 (5)


Text

ATTACHMENT 2 TO AEP:NRC:1215D COOK NUCLEAR PLANT UNIT 1 TECHNICAL SPECIFICATION PAGE 3/4 6-9 MARKED TO REFLECT THE PROPOSED CHANGES 9b02220308 9b021b PDR ADQCK 050003i5 P

PDR

CONTAXKKHT SYSTEMS CONTAXHHEHT STRUCTURAL INTEGRITY

/RAN suggested rev sion]

LZMZTXHG CONDITION E'OK OPERATION 3.6.1-6 The scruccura1, integrity of 'the concainmenc shaLl be maintained ac a Level consiscanc vich criteria in.Specification 4.6.1.6.

e acceptance APPLICABILITY:

KODES 1, Z, 3 and 4.

Vith che scxuccuraL integrity of the concainmenc noc conforming to the abcvre requirements, restore their scxuccural integrity co vithin the limics prior to increasing the Reactor-Coolanc System temperature above 200 P.

o SURVEILLANCE RE UIRRKNTS 4.6.1.6 e

xuc aL ce cy che ca nc s c

and ceel 1

r al e

ce ed in the s

cdo or e A c ta nc ea ge ace esc ef ence pecif aci

.6.

'by W

1 ecci a

ac ssi a

s race of ch scxu a

sc 1

r an vex g

n app nc n

s in ppear ce 0 the ac ox'r no eg ac An ic re rt o ny oxma de ci of e co inme s

1 er d ecce ux ches ins cci s

be e vi 1

er d ecci f2 M i+4.

C.

4. 6.1.6 Th txuctural integrity of the containment structure and e

s steel liner shall be detexmined in accordance with 10 CFK Appendix J

Option B

and Regulatory Guide 1.163, dated September 1995.

COOK NUCLEAR PLANT - UHXT 1 3/4 6-9 hHRKMENT NO.~

ATTACHMENT 3 TO AEP:NRC:1215D PROPOSED REVISED COOK NUCLEAR PLANT UNIT 1 TECHNICAL SPECIFICATION PAGE 3/4 6-9

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS 3/4.6 CONTAINMENTSYSTEMS CONTAINMENTSTRUCTURAL INTEGRITY LIMITINGCONDITION FOR OPERATION 3.6.1.6 The structural integrity of the containment shall be maintained at a level consistent with the acceptance criteria in Specification 4.6.1.6.

APPLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

With the structural integrity of the containment not conforming to the above requirements, restore the structural integrity to within the limits prior to increasing the Reactor Coolant System temperature above 200'F.

SURVEILLANCERE UIREMENTS 4.6.1.6 The structural integrity of the containment structure and steel liner shall be determined in accordance with 10 CFR 50 Appendix J Option B and Regulatory Guide 1.163, dated September 1995.

COOK NUCLEAR PLANT-UNIT1 Page 3/4 6-9

~

AMENDMENT484,

0 t

J I