Mr. Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034
Mr. Randall K. Edington, Executive  
 
Vice President, Nuclear/CNO  
 
Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034


SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501


==Dear Mr. Edington:==
==Dear Mr. Edington:==
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003, and 2015-004.
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003,  
 
and 2015-004.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Line 33: Line 39:
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety  
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety  


Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74 cc: Electronic Distribution ML16007A764 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 Letter to Randall from Mark S. Haire, dated January 6, 2016
Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74  
 
cc: Electronic Distribution  
 
ML16007A764 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 Letter to Randall from Mark S. Haire, dated January 6, 2016
 
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501


SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501 DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov)
DISTRIBUTION
: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov) Resident Inspector (David.You@nrc.gov) Resident Inspector (Dustin.Reinert@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov)
PV Administrative Assistant (Yvonne.Dubay@nrc.gov)
Resident Inspector (David.You@nrc.gov) Resident Inspector (Dustin.Reinert@nrc.gov)
PV Administrative Assistant (Yvonne.Dubay@nrc.gov)  
 
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Jan.Tice@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Jan.Tice@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Margaret.Watford@nrc.gov)
Project Manager (Margaret.Watford@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)  
 
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Revision as of 14:30, 30 June 2018

Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - NRC Emergency Preparedness Annual Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501
ML16007A764
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/06/2016
From: Haire M S
Plant Support Branch-1
To: Edington R K
Arizona Public Service Co
References
IR 2015501
Download: ML16007A764 (3)


Text

January 6, 2016

Mr. Randall K. Edington, Executive

Vice President, Nuclear/CNO

Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501

Dear Mr. Edington:

On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003,

and 2015-004.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74

cc: Electronic Distribution

ML16007A764 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 Letter to Randall from Mark S. Haire, dated January 6, 2016

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501

DISTRIBUTION

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Charles.Peabody@nrc.gov)

Resident Inspector (David.You@nrc.gov) Resident Inspector (Dustin.Reinert@nrc.gov)

PV Administrative Assistant (Yvonne.Dubay@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Jan.Tice@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Margaret.Watford@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)