IR 05000528/2015403
| ML15257A335 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/11/2015 |
| From: | Mark Haire Plant Support Branch-1 |
| To: | Edington R Arizona Public Service Co |
| References | |
| IR 2015403 | |
| Download: ML15257A335 (4) | |
Text
September 11, 2015
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
NRC SECURITY INSPECTION REPORT 05000528/2015403, 05000529/2015403, AND 05000530/2015403
Dear Mr. Edington:
On August 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. An NRC inspector discussed the results of this inspection with Ms. M. Lacal, Vice President, Regulatory and Oversight, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
The NRC inspector did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS). If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Mark S. Haire
Chief, Plant Support Branch 1
Division of Reactor Safety
Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74
Nonpublic Enclosure:
NRC Inspection Report 05000528/2015403, 05000529/2015403, 05000530/2015403 w/Attachment: Supplemental Information
cc w/enclosure:
Mr. Michael J. Cosenza Department Leader, Nuclear Security Programs Arizona Public Service Company P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034
cc w/o enclosure: Electronic Distribution
ML15257A335 Entire Report:
SUNSI Review Complete By: MKB Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:
MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:
SUNSI Review Complete By: MKB Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword:
SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 C:PSB1 C:DRP/D C:PSB1
NAME MBrooks MHaire GMiller MHaire
SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE 9/6/15 9/10/15 9/11/15 9/11/15 Letter to Randall from Mark S. Haire, dated September 11, 2015
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
NRC SECURITY INSPECTION REPORT 05000528/2015403, 05000529/2015403, AND 05000530/2015403
Electronic distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov)
Electronic distribution by RIV w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov)
Resident Inspector (David.You@nrc.gov)
Resident Inspector (Dustin.Reinert@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Margaret.Watford@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
ROPReports