{{#Wiki_filter:0FPL.April 29, 2014L-2014-11310 CFR 50.55a10 CFR 50.36U. S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555Re: St. Lucie Unit 1Docket No. 50-335Refueling Outage SL 1-25Steam Generator Tube Inspection Special ReportAttached is the St. Lucie Unit 1 Technical Specification 6.9.1.12 steam generator tube inserviceinspection special report for the Fall 2013 refueling outage (SL1-25). This submittal was madewithin 180 days after the initial entry into hot shutdown following the completion of the steamgenerator inspection that was performed in accordance with TS 6.8.4.1, Steam Generator (SG)Program.Please contact Ken Frehafer at (772) 467-7748 should you have any questions regarding thissubmittal.Very truly yours,Eric S. KatzmanLicensing ManagerSt. Lucie PlantESK/KWF | |||
==Attachment:== | |||
St. Lucie Unit 1 Steam Generator Tube Inspection Report for SL1-25Florida Power & Light Company6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2014-1 13AttachmentPage 1 of 22Engineenng Evaluation PSL-ENG-SESJ- 14-002 Attachment IEC# 280879 Page 1 of 12St. Lucie Unit 1Steam Generator Tube Inspection Report for SL1-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12BackgroundThis report is provided in accordance with St. Lucie Unit 1 Technical Specification 6.9.1.12, "SteamGenerator Tube Inspection Report" for the inspection conducted October 14-20, 2013 during the SL1-25 refueling outage .The SL1-25 outage designator is also commonly referred to as EOC-24 (End ofthe 24h Fuel Cycle). SL1-25 was the tenth refueling outage following installation of the Babcock &Wilcox Advanced Series PWR replacement steam generators (SGs) in 1997. At the SL1-25 refuelingoutage, the replacement SGs had accumulated approximately 13.85 EFPY (166.20 EFPM) ofcumulative operation since replacement in 1997. Following the SL1-25 refueling outage, St. Lucie Unit1 initially entered HOT SHUTDOWN (Mode 4) on November 1, 2013 @ 05:18, which marked thebeginning of the SL1 -25 operating cycle. Therefore, the report is due to the NRC by May 01, 2014.The SL1-25 SG tube inspections were conducted in both 'A' and 'B' SGs as described below and meetTechnical Specification (TS) Section 6.8.4.1.d.2 inspection requirements for the first half of the secondsequential period of 108 months.a. The scope of inspections performed on each SGThe scope of this examination is summarized in Table 1 below and is established to meet thefollowing requirements:a. Technical Specification 6.8.4.1 "Steam Generator (SG) Program"b. Technical Specification 6.8.4.1.d.2"Inspect 100% of the tubes at sequential periods of 144, 108, 72 and, thereafter, 60 effectivefull power months. The first sequential period shall be considered to begin after the first in-service inspection of the SGs. In addition, inspect 50% of the tubes by the refueling outagenearest the midpoint of the period and the remaining 50% by the refueling outages nearestthe end of the period. No SG shall operate for more than 72 effective full power months orthree refueling outages (whichever is less) without being inspected".c. Steam Generator Management Program: Pressurized Water Reactor Steam GeneratorExamination Guidelines: Revision 7. EPRI, Palo Alto, CA: 2007. 1013706.The basis for bobbin and +PointTM tube examinations is given in Table 1. Applicable industry qualifiededdy current examination techniques are provided in Table 2.Diagnostic rotating probe examinations (Special interest, SI) were completed as required based on theresults of the bobbin coil.Prior to starting the eddy current examination at the SL1-25 refueling outage in 2013, all of thepreviously installed hot-leg and cold-leg plugs in Steam Generator "A" and Steam Generator "B" wereconfirmed to be present in their correct locations and were confirmed to be free from degradation andvisible signs of leakage based on the visual examination.The plant TS requirement (TS Section 6.8.4.1.d.2) to inspect 50% of the tubes by the refueling outagenearest the midpoint of the 2nd 1 SI period of 108 months has been satisfied by the October 2013inspection. | |||
L-2014-113AttachmentPage 2 of 22Engineering Evaluation PSL.ENG-SESJ-14-002 Attachment IEC# 280879 Page 2 of 12St. Lucie Unit ISteam Generator Tube Inspection Report for SLI-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Secondary Side InspectionsSecondary Side Inspections (SSI) and cleaning during the SL1-25 refueling outage were performed inSGs "A" and "B", and included the following:* Sludge Lancing* FOSAR (Includes post sludge lancing visual assessment and foreign object retrieval)There are currently no known foreign objects remaining in the secondary side of the steam generatorsthat require tracking.Supplemental Primary Side Inspections to address Westinghouse NSAL 12-01Issue | |||
== Description:== | |||
Visual inspection of the SGs at a foreign Westinghouse designed plant showed indications ofdegradation in the cladding and/or divider plate-to-channel head weld, with exposure and wastage ofthe channel head base material. Westinghouse issued NSAL 12-01 "Steam Generator Channel HeadDegradation" on January 5, 2012 and included recommended actions for the visual inspection at otherplants.Although the degradation is not credible for St. Lucie Unit 1, a visual inspection of the primary sidechannel head bowl was performed in accordance with the requirements presented in WestinghouseNSAL 12-01.Results:Based on the visual inspections performed, no visible signs of degradation or other abnormalconditions were identified. | |||
L-2014-113AttachmentPage 3 of 22Engineering Evaluation PSL-ENG-SESJ-14-002EC# 280879St. Lucie Unit ISteam Generator Tube Inspection Report for SL1-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Table 1Basis for Tube ExaminationsAttachment IPage 3 of 12Technique Examination Sample Required or Basis DegradationSupplemental MechanismRequired to satisfy SR(1)100% full length of all active 4.4.5.1 and TS(2) sectiontubes in each SG Required 6.8.4.1.d.2 and to WearBobbin support 3 cyclesbetween inspectionsSupplementalScreen all dings/dents < 5.0 (included as Pro-Active PWSCCvolts in the freespan straight part of the (Per Degradation ODSCClengths 100% full length Assessment)exam)Supplemental BWI Bulletin No.DTF-Screen U-bends periphery (included as 61.1.00003tubes for proximity of part of the Wearadjacent tubes 100% full length (OEMexam) Recommendation)Tight radius u-bends Pro-Active PWSCC* 30% of Row 3 Supplemental (Per Degradation ODSCC* 30% of Row 2 Assessment)50% of HL Dings/Dents > 5.0 Pro-Active PWSCCvolts in the straight freespan Supplemental (Per Degradation ODSCC+PointTM sections Assessment)All Dings/Dents in the u- Pro-Activebends and at HL tube Supplemental (Per Degradation PWSCCsupports Assessment) ODSCCBWI Bulletin No. DTF-Test largest bobbin proximity 61.1.00003indications in U-bend (OEMRecommendation)Array All HL & CL expansionProbe transitions (+3.0" to -2.0)' in Pro-Active Foreignperipheral high flow regions upplemental (Per FPL Procedure) Object Wear(3)Notes:(1) SR -Surveillance Requirement in the plant Technical Specification (TS)(2) TS -Plant Technical Specification(3) "Peripheral high flow regions are defined to include the two outer-most tubes exposed to the annulus, all tubes inRows 1 through 4 along the tube free lane, and the innermost two tubes adjacent to the outer circumference of thestay cylinder. | |||
L-2014-1 13AttachmentPage 4 of 22Engineering Evaluation PSL-ENG-SESJ-14-002 Attachment IEC# 280879 Page 4 of 12St. Lucie Unit ISteam Generator Tube Inspection Report for SLI-25St. Lucie Unit 1 Technical Specification Section 6.9.1,12b. Active degradation mechanisms found (Note 1)The SL1-25 examination results for St. Lucie Unit 1 identified mechanical wear degradation atthe following locations:* Fan bar and connector bar tube contact points in the u-bends* Horizontal lattice grid tube contact pointsThere was no evidence of corrosion degradation during any of the SL1-25 examinations.Note 1 : "Active Degradation" is a term used in the Steam Generator Technical Specifications and is synonymous withthe term "Existing Degradation" used in EPRI Report 1019038 "Steam Generator Management Program:Steam Generator Integrity Assessment Guidelines" Revision 3, dated November 2009. | |||
L-2014-113AttachmentPage 5 of 22Engineering Evaluation PSL-ENG-SESJ-14-002Attachment IPage 5 of 12ECO 280879St. Lucie Unit 1Steam Generator Tube Inspection Report for SLI -25St. Lucie Unit 1 Tecluilcal Specification Section 6.9.1.12c. Nondestructive examination techniques utilized for each degradation mechanismTABLE 2TechniquesIndustry Damage Demonstrated Extended Site-Specific ReviewTechnique Qualification Mechanism Applicability Applicability Detection SizinA96004.11 Bobbin Revision 13 Wear Structures None Yes For Service96004.2 Contingent2 Bobbin Revision 13 Wear Structures None Yes Sizing ofWearWithin non denied3 Bobbin 1-28411 Axia ODSCC drilled TSP and within None Yes N/ARevision 3 drilled TSP with dents5 2.0 Vpp.Freespan with or4 Bobbin 1-28412 Axial ODSCC without dents _ 2.0 None Yes N/ARevision 3 VppWithin Freespan.1-28413 Sludge Pile region and5 Bobbin Reiso13 Axial ODSCC Broached TSP with or None Yes N/Awithout dents < 2.06 Bobbin 24013.1 Axial ODSCC Freespan. Dings None Yes N/ARevision 2 < 5.00 VoltsDrilled and10013.1 quatrefoilI tube7 BobbinI Axial ODSCC support plates with None Yes N/Adents_< 5.00 VoltsN/A -UseApplicableg Bobin 27091.2 PL erPLP Wear PLP Wear ApspliSSafro8Revision B01 (p.2 not present) IWhen Pa Present) yes ETSS fromReviionI PP War PP War LP earTechnique21Loose Part Tube to tube wear9 Bobbin 27091.3 Volumetric Wear Freespan, PLP in the freespan or in Yes NoRevision I (Part Not ar contact with artPresent) (part present) adjacent tube10 9603.1For+PoinC' 96703. 17 Axial PWSCC Dent or Ding Freespan Yes CM/OA ort Revision lnfo OnlyContingent11 96910.1 Lattice Grids and Contingent+Point- Revision 10 Wear Broached Supports Fan Bars Yes sizing ofwear L-2014-113AttachmentPage 6 of 22Engineering Evaluaton PSL-ENG-SESJ- 14-002EC# 280879St. Lucie Unit ISteam Generator Tube Inspection Report for SLI -25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Attachment IPage 6 of 12Industry Damage Demonstrated Extended Site-Specific ReviewTechnique Qualification Mechanism Applicability Applicability Detection SizingForCM/OA orInfo OnlyDings, Dents, See EPRI12 +Point- 1-11524 Ciuc Expansion Tubesheet and Non- Yes ETSSRevision 0 PWSCC Transition dented support 20510.1 forstructures curve andsizinginformation13 +Point' 20511.1 Axial PWSCC Expsnsion Transition Non-dented support For CM/GARevision 8 structure and Yes or mtfo Onlytubesheet21998.1 Contingent14 +Point4 R19so.1 Volumetric Freespan None Yes Sizing ofWearDent / Ding22401.1 Axial ODSCC Dented Support Freespan For CM/OA15 +Point" Revision 4 Structures Dent or Info OnlyU-bendFreespan21410.1 Dings. Dented and For CM/OAI6 + Pointr Revision 6 Circ ODSCC Expansion Transition Non-dented support Yesstructures, Sludge or Info OnlyPile, TubesheetSludge Pile; withinnon dented drilledR731-28424 Axial ODSCC TSP and within drilled For CM/OARevision 3 TSP with dents (or Expansion Transition Yes or Info OnlyDings)_<2.0 Vpp.Freespn. within non1-28425 dented broached TSP For CM/OA18 +Point' Revision 3 Axial ODSCC and within broached Expansion Transition Yes or Info onlyTSP with dents (orDings) _: 2.0 Vpp.Sludge Pile and1-28431 Drilled TSP with or For CM/OA19 +Point"M Revision 2 Axial ODSCC without dents None Yes or Info only___2.0 VppFIree Span, eggcrates1-28432 and broached TSP For CN/OA20 + PotntT Revision 2 Axial ODSCC with or without dents None Yes or Info OnlyI 1 1 _ý<2.0 Vpp L-2014-113AttachmentPage 7 of 22Engineering Evaluation PSL-ENG-SESJ-14-002ECO 280879St. Lucie Unit ISteam Generator Tube Inspection Report for SLI -25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Attachment IPage 7 of 12Industry Damage Demonstrated Extended Site-Specific ReviewTechnique Qualification Mechanism Applicability Applicability Detection SizingDetection of ForeignMaterial based onmaterial andproximity of foreignmaterial to the tube,27901.1 based on EPRI reports27902.1 Freespan, TSP and 1020631 andV101561.27903.1 Expansion Transition Yes27904.1 LP Wear For sizing of PLPYe21 +Point, 27904.1 PLP Wear Mphlogy wear when part is Yes When Part is27906.1 Dependent present based on EPRI NOT present27907.1 (part not present) Report 1020631 on anas needed basis.(Al I Rev. 1) For sizing of Tube toTube wear in thefreespan or when incontact with anadjacent tube based onEFI 102063196511.2 Axial & Circ Low Row For CM/OA22 +Point'T Revision 16 PWSCC U-bends None Yes orlnfo Only10411.1 Ax and Circand ODSCC, For CM/OA23 +Point" 10411.2 Axial ODSCC U-bend Row 3-5 Row 2 & Higher Yes or Info OnlyRevision 0 Rowo-ndl_______ ________________ _____________ _______________ U-b en d a_____Volumetricdegradation IPLPWear') at Top-of-Tubeshect and20400.1 Freespan.24 Array Revision 5 Circ ODSCC Expansion Transitions. Axial ODSCC at Yes N/AExpansion TransitionCirc ODSCCFreespast with/withoutDeposits (includingsludge pile) | |||
L-2014-113AttachmentPage 8 of 22Engineering Evaluation PSL-ENG-SESJ- 14-002EC# 280879St. Lucie Unit 1Steam Generator Tube Inspection Report for SLI-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Attachment 1Page 8 of 12d. Location orientation (if linear) and measured sizes (if available) of service inducedindicationsINDICATION LISTINGS FOR SL1 -25 (EOC-24)Indication Description Enclosure #SG 1A Wear at Fan bar/connector bar locations 1-19%TWD Enc 1 (2 pages)SG 1A Wear at Fan bar/connector bar locations 20-39%TWD Eric 2 (1 page)SG 1A Wear at Horizontal lattice grid locations 1-19%TWD Enc 3 (1 page)SG 1A Wear at Horizontal lattice grid locations 20-39%TWD Enc 4 (1 page)SG 1B Wear at Fan bar/connector bar locations 1-19%TWD Eric 5 (2 pages)SG 1 B Wear at Fan bar/connector bar locations 20-39%TWD Enc 6 (1 page)SG 1B Wear at Horizontal lattice grid locations 1-19%TWD Enc 7 (1 page)SG 1 B Wear at Horizontal lattice grid locations 20-39%TWD Enc 8 (1 page)e. Number of tubes plugged during the inspection outage for each active degradationmechanismSt. Lucie Unit I Tube Plugging EOC 24 (SLI -25)Degradation Mechanism SG A SG B TotalWear at Fan Bar Support (FBS) tube 79(1) 51(1) 130contacts (Preventive Plugging)Wear at Connector Bar Support (CBS) 4(1) 1(1)tube contacts (Preventive plugging)Total 83 52 135Note 1) All tubes exhibiting wear at FBS and CBS structures (in the ubend region) were preventatively plugged toprovide margin. No tubes required plugging per Plant Technical Specifications because no indications met orexceeded the Plant Technical Specification limit of a40% TW. | |||
L-2014-113AttachmentPage 9 of 22Engineenng Evaluation PSL-ENG-SESJ- 14-002Attachment IPage 9 of 12ECO 280879St. Lucie Unit ISteam Generator Tube Inspection Report for SL1-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12f. Total number and percentage of tubes plugged to dateSt. Lucie Unit 1 Steam Generator CumulativeTube Plugging Summary SL1-25SG # Plugged % Plugged1A 97 1.14%1B 53 0.62%g. The results of condition monitoring, including the results of the tubetestingpulls and in-situAll tubes satisfied the structural integrity and accident-induced leakage performance criteria basedon the condition monitoring (CM) evaluation performed at EOC-24. No tubes required in-situpressure testing for either tube burst or leakage. Therefore, all tubes met the structural andleakage integrity requirements of the St. Lucie Unit 1 Technical Specifications.No tube pulls were warranted or implemented.h. The effective plugging percentage for all plugging in each SGNo tube repair methods (i.e. sleeving) are approved for St. Lucie Unit 1 that would have aneffect on the effective plugging percentages. Therefore, the applicable effective pluggingpercentage is synonymous with the % Plugged in item f. above. | |||
L-2014-113AttachmentPage 10 of 22Engineering Evaluation PSL-ENG-SESJ- 14-002 Attachm ent IEC# 280879 Page 10 of 12St. Lucie Unit ISteam Generator Tube Inspection Report for SLI -25St. Lucie Unit 1 Technical Specification Section 6.9.1.12ADDITIONAL INFORMATIONThe following information is included to assist the staff in their review of the information provided in thisreport.Abbreviations and AcronymsEPRI Electric Power Research InstituteCBS Connecter Bar SupportCM Condition MonitoringFBS Fan Bar SupportISI In-service InspectionSG Steam GeneratorOutage NomenclatureEOC-24 End-of-Cycle 24 (Synonymous with SL1-25)SL1-25 St. Lucie Unit 1 Operating Cycle 25FIGURESFigure 1 provides a side view of the installed St. Lucie Unit 1 RSGs.Figure 2 provides a view of the fan bar arrangement, connector bar location and the top (#7) lattice gridsupport locations. | |||
L-2014-113AttachmentPage 11 of 22Engineering Evaluation PSL-ENG-SESJ-14-002 Attachment IEC# 280879 Page 11 of 12St. Lucie Unit 1Steam Generator Tube Inspection Report for SL 1-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Figure 1B&W Advanced Series PWRReplacement Steam Generators (RSG)BWI-222-7698-FIV- IFPL St. Lucie IReplacement Steam Generator L-2014-113AttachmentPage 12 of 22Epnee-,g PSL-EDtGSESJ- 14-002EC 28079St. Lucie Unit 1Steam Generator Tube Inspection Report for SLI-25St. Lucie Unit I Techmical Specification Section 6.9.1.12Attachmai 1Page 12 df 12Figure 2Detailed Fan Bar ViewLafi d o e 7 Lattice Grid Cold Legq 0CC L-2014-113AttachmentPage 13 of 22AREVA NP Inc 03/28/14 11:49:06Customer Name: St Lucie Unit I Component: S/G A Page 1 of 2Bobbin Fan/Connector Bar %TW Indications: 1-19%QUERY: QueryMl .qryROW COL %TW LOCATION71 10'0 15 F05 +0.9171 112 11 F06 -1.7073 94 10 F06 -1.4175 92 7 F09 -2.3977 58 12 FPO -1.1777 92 17 F09 -2.3079 92 13 F09 -2.3081 92 11 F04 -1.9281 98 9 F06 -0.6883 64 14 F06 +0.8684 99 15 F06 +1.3388 93 12 F04 -0.5190 93 9 F05 -1.6191 78 17 CBC +i1.7892 77 10 CBC +0.4294 93 8 F06 +0.9095 92 16 F09 -2.0596 95 9 F06 -1.7397 92 11 F09 -2.1298 77 11 CBC +0.5399 72 11 F04 -0.7713 F05 -0.979 F07 +0.629 F08 -1.0299 78 16 CBC +1.9299 106 14 F05 -1.02100 101 11 F04 +1.21100 105 12 F06 -1.0212 F07 -1 .3013 F08 -1.10102 99 13 F04 -1.2116 F05 -1.159 F07 -1 .089 F08 -1 .79102 111 8 P06 -1.08103 84 10 F05 +0.57103 92 12 F09 -1.99104 73 11 F05 +1 .26105 84 13 FlO +0.73105 106 11 F05 -1.21106 83 12 F06 +1.2314 FO5 -0.99107 58 11 FO5 +0.82107 62 8 F05 +1.28107 92 8 F09 -1.84107 94 8 F05 -0.63107 100 12 F05 -1.0810 FOB -0.57107 106 12 F05 +1.31108 55 7 F06 +1.64109 122 13 F05 +1.54110 67 14 F07 -1.1114 F08 -0.64110 101 10 F06 -1.01110 103 7 F05 -1.34111 94 16 F07 +1.39112 71 9 F05 +0.91112 73 16 FO5 +1.0412 F07 -1.0415 F08 -1.22112 79 15 F05 +0.429 F04 +0.3510 F07 +0.11112 93 8 F04 +1.088 F05 +1.1014 F07 -1.2712 F08 -1.23111 98 19 F06 -0.7414 F06 +1.08113 102 6 FO4 -0.5512 F05 -1.2515 F06 +1.237 F07 +0.708 F08 +0.71114 67 10 F04 +1.139 F05 -I1.0210 F07 -1.22114 75 17 P06 -0.94115 74 15 F04 -0.338 F05 -0.35 L-2014-113AttachmentPage 14 of 22AREVA NP IncCustomer Name: St Lucie Unit 103/28/14 11:49:06Component: S/G APage 2 of 21Bobbin Fan/Connectot Bar %TW Indications: 1-19%QUERY: QueryMl.qLyROW COL %TW11115 78 12115 82 15115 84 11115 92 111314115 96 9171210116 65 12116 97 1796116 105 14119 58 10119 60 14119 76 11119 92 9120 63 111219120 71 1611120 75 7121 100 12122 65 111810122 73 8128122 101 10124 71 131210131112126 63 101610127 70 1412128 51 10128 65 101399128 71 1412128 73 1416111515131 94 1318119132 71 1218133 84 17121715LOCATIONF06 +0.02FIO +2.09F05 +0.97F05 +0.11F04 -1.11F05 +0.96F06 +1.20F05 +1.21F06 +1.24F08 +1.39F09 +1.39F05 +1.22F03 +1.22F05 +1.19F06 -1.11F06 -1.08F06 -0.70F05 -1.17F03 -0.13F05 -0.53F02 -1.06F03 -1.19F05 41.15F06 +0.91F08 -1.57F08 -1.88F08 +1.17F05 +1.17F06 -1.00F09 -2.32F04 -1.55F08 -1.24F08 +1.19F06 -1.10F04 +1.66F06 -1.22F07 -1.19F07 +1.22£08 -1.06£08 +1.37F05 +1.15F06 -1.04F07 -1.06F06 +0.39F08 -0.83FI£ +0.51F06 -1.04F08 -1.28£04 +1.26£05 +1.50F09 +1.17£04 +1.62F03 +1.22F05 +0.93F06 +1.17F07 -1.35F08 -1.37F04 +1.34£06 +1.41F02 -0.46F03 +1.45F04 +1.30F06 -1.02F04 +0.00F06 +0.11F07 +0.11F08 -0.02Total Tubes : 83Total Records: 147 L-2014-113AttachmentPage 15 of 22AREVA NP Inc 03/28/14 11:50:16Customer Name: St Lucie Unit 1 Component: S/G A Page I of 1Bobbin Fan/Connector Bar %TW Indications: 20-39%QUERY: QueryMl.qryROW COL %TW LOCATION120 63 24 F06 -1.1323 F07 -1.15122 65 25 F07 -1.1124 F08 -0.93122 73 23 F07 -1.22128 71 21 F07 -1.3921 FOS +1.46128 73 23 F04 -1.02131 94 22 F07 +1.36132 71 20 F07 -1.17133 84 23 F05 +0.07Total Tubes : 8Total Records: 11 L-2014-113AttachmentPage 16 of 22AREVA NP IncName: St Lucie Unit 1Bobbin Lattice Grid %TW Indications: 1-19%QUERY: QueryMl.qryROW COL %TW LOCATION64 11 14 04C -1.5197 144 11 01C -1.52107 138 11 02C -1.43116 37 12 06H -0.70139 74 12 03H -0.7903/28/14 13:03:39Component: S/G APage 1 of 1Total Tubes : 5Total Records: 5 L-2014-113AttachmentPage 17 of 22AREVA NP IncCustomer Name: St Lucie Unit 1Bobbin Lattice GrAd %TW Indications: 20-39%QUERY: QueryMi.qryROW COL %TW LOCATION97 144 21 02C -1.5503/28/14 11:57:29Component: S/G APage 1 of 1Total Tubes : 1Total Records: 1 L-2014-113AttachmentPage 18 of 22AREVA NP Inc 03/28/14 12:04:32Custonler Name: St Lucie Unit 1 Component: S/G B Page 1 of 2Bobbin Fan/Connector Bar %TW: 1-19%QUERY: QueryMl[l] .qryROW COL %TW LOCATION27 68 13 CEH +1.1728 5 11 F05 +2.1659 86 9 F05 +1.2873 68 13 F05 -1.1272 94 8 F06 -0.7575 110 12 F06 -1.3278 91 8 F05 -1.7579 66 9 F07 +2.0381 76 7 F06 +1.2581 102 11 F04 -1.7084 81 10 F06 +1.138 F07 +1.1586 93 9 F05 -1.5892 75 9 F04 -1.5597 74 11 F06 +0.8097 144 6 F05 +1.3639 92 10 F06 -1.73101 72 9 F08 +1.34101 100 10 F05 -0.92103 90 11 F05 -1.14105 74 9 F06 +0.68109 64 8 F07 +2.7C109 68 11 F04 -1.41110 67 11 F05 +1.2910 F07 -1.11110 87 7 F05 -1.78110 91 8 F06 -1.29112 65 8 F04 +1.5612 F08 -1.36113 70 30 F05 -1.05114 51 10 F05 -1.32114 69 10 F05 +1.0812 F08 -1.23114 77 8 F04 +1.859 F05 +1.67116 77 10 F03 +1.78117 94 11 F04 -1.1710 F05 -1.06121 72 11 F06 +1.238 F08 -1.56123 68 11 F05 -1.0311 F06 +1.259 F07 +1.1217 F08 +1.30123 74 12 F07 -1.179 F09 -0.62123 98 14 F04 +1.19124 77 8 F03 +1.84125 72 9 F08 -1.06126 71 10 FO8 -1.17126 73 10 F04 +1.729 F05 +1.7711 F07 -1.3011 F09 +1.94126 77 12 F08 +1.23128 63 7 F03 +1.81129 64 13 F07 +0.02129 68 19 F07 +0.97130 63 7 F05 +1.81130 75 8 F02 +1.6711 F03 +1.5916 F04 +1.017 F05 +1.8111 F07 -1.1717 F08 -1.17130 95 11 F08 -0.82132 69 12 F04 -0.928 F05 +1.1214 F06 -0.9917 F07 -0.9916 F£0 +1.309 F09 +1.14132 73 16 F05 +1.0817 F07 +1.3812 F08 +1.3217 F09 +1.36134 77 12 F03 +1.8717 F05 +1.4514 F07 +1.2810 F01 -1.69 L-2014-113AttachmentPage 19 of 22AREVA NP IncCustomer Name: St Lucie Unit 1Bobbin Fan/Connector Bar %TW: 1-19%QUERY: QueryMI [(] .qryROW COL %TW LOCATION136 73 14 F08 +1.6315 F07 +1.3910 FOG +1.6110 F05 +1.67137 102 7 F02 +0.6003/28/14 12:04:-2Component: S/G BPage 2 of 2Total Tubes : 52Total Records: 85 L-2014-113AttachmentPage 20 of 22Page I of 1AREVA NP IncCustomer Name: St Lucie Unit 1Bobbin Fan/Connector Bar %TW: 20-39%03/28/14 12:05:02Component: S/G BQUERY: QueryMl[l] .qryROW COL %TW LOCATION134 77 24 F04 +1.25Total Tubes : 1Total Records: 1 L-2014-1 13AttachmentPage 21 of 22AREVA NP IncCustomer Name: St Lucie Unit 1Bobbin Lattice Grid %TW: 1-19%QUERY: QueryMl[l] .qryROW COL %TW LOCATION1 146 10 06C -1.472 127 11 05C +0.6797 144 7 05H +1.47107 138 12 05H +1.45133 60 12 020 -1.51139 92 17 04H -1.5203/28/14 12:06:13Component: S/G BPage 1 of 1Total Tubes : rTotal Records: 6 L-2014-113AttachmentPage.22 of 22AREVA NP IncCustomer Name: St Lucie Unit 1Bobbin Lattice Grid %TW: 20-39%03/28/14 12:05:45Component: S/G BPage 1 of 1QUERY: QueryMI[l] .qryROW COL %TW LOCATIONTotal Tubes : 0Total Records: 0}} |
Revision as of 15:39, 28 June 2018
ML14127A008 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 04/29/2014 |
From: | Katzman E S Florida Power & Light Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-2014-113 | |
Download: ML14127A008 (23) | |
Text
0FPL.April 29, 2014L-2014-11310 CFR 50.55a10 CFR 50.36U. S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, DC 20555Re: St. Lucie Unit 1Docket No. 50-335Refueling Outage SL 1-25Steam Generator Tube Inspection Special ReportAttached is the St. Lucie Unit 1 Technical Specification 6.9.1.12 steam generator tube inserviceinspection special report for the Fall 2013 refueling outage (SL1-25). This submittal was madewithin 180 days after the initial entry into hot shutdown following the completion of the steamgenerator inspection that was performed in accordance with TS 6.8.4.1, Steam Generator (SG)Program.Please contact Ken Frehafer at (772) 467-7748 should you have any questions regarding thissubmittal.Very truly yours,Eric S. KatzmanLicensing ManagerSt. Lucie PlantESK/KWF
Attachment:
St. Lucie Unit 1 Steam Generator Tube Inspection Report for SL1-25Florida Power & Light Company6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2014-1 13AttachmentPage 1 of 22Engineenng Evaluation PSL-ENG-SESJ- 14-002 Attachment IEC# 280879 Page 1 of 12St. Lucie Unit 1Steam Generator Tube Inspection Report for SL1-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12BackgroundThis report is provided in accordance with St. Lucie Unit 1 Technical Specification 6.9.1.12, "SteamGenerator Tube Inspection Report" for the inspection conducted October 14-20, 2013 during the SL1-25 refueling outage .The SL1-25 outage designator is also commonly referred to as EOC-24 (End ofthe 24h Fuel Cycle). SL1-25 was the tenth refueling outage following installation of the Babcock &Wilcox Advanced Series PWR replacement steam generators (SGs) in 1997. At the SL1-25 refuelingoutage, the replacement SGs had accumulated approximately 13.85 EFPY (166.20 EFPM) ofcumulative operation since replacement in 1997. Following the SL1-25 refueling outage, St. Lucie Unit1 initially entered HOT SHUTDOWN (Mode 4) on November 1, 2013 @ 05:18, which marked thebeginning of the SL1 -25 operating cycle. Therefore, the report is due to the NRC by May 01, 2014.The SL1-25 SG tube inspections were conducted in both 'A' and 'B' SGs as described below and meetTechnical Specification (TS) Section 6.8.4.1.d.2 inspection requirements for the first half of the secondsequential period of 108 months.a. The scope of inspections performed on each SGThe scope of this examination is summarized in Table 1 below and is established to meet thefollowing requirements:a. Technical Specification 6.8.4.1 "Steam Generator (SG) Program"b. Technical Specification 6.8.4.1.d.2"Inspect 100% of the tubes at sequential periods of 144, 108, 72 and, thereafter, 60 effectivefull power months. The first sequential period shall be considered to begin after the first in-service inspection of the SGs. In addition, inspect 50% of the tubes by the refueling outagenearest the midpoint of the period and the remaining 50% by the refueling outages nearestthe end of the period. No SG shall operate for more than 72 effective full power months orthree refueling outages (whichever is less) without being inspected".c. Steam Generator Management Program: Pressurized Water Reactor Steam GeneratorExamination Guidelines: Revision 7. EPRI, Palo Alto, CA: 2007. 1013706.The basis for bobbin and +PointTM tube examinations is given in Table 1. Applicable industry qualifiededdy current examination techniques are provided in Table 2.Diagnostic rotating probe examinations (Special interest, SI) were completed as required based on theresults of the bobbin coil.Prior to starting the eddy current examination at the SL1-25 refueling outage in 2013, all of thepreviously installed hot-leg and cold-leg plugs in Steam Generator "A" and Steam Generator "B" wereconfirmed to be present in their correct locations and were confirmed to be free from degradation andvisible signs of leakage based on the visual examination.The plant TS requirement (TS Section 6.8.4.1.d.2) to inspect 50% of the tubes by the refueling outagenearest the midpoint of the 2nd 1 SI period of 108 months has been satisfied by the October 2013inspection.
L-2014-113AttachmentPage 2 of 22Engineering Evaluation PSL.ENG-SESJ-14-002 Attachment IEC# 280879 Page 2 of 12St. Lucie Unit ISteam Generator Tube Inspection Report for SLI-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Secondary Side InspectionsSecondary Side Inspections (SSI) and cleaning during the SL1-25 refueling outage were performed inSGs "A" and "B", and included the following:* Sludge Lancing* FOSAR (Includes post sludge lancing visual assessment and foreign object retrieval)There are currently no known foreign objects remaining in the secondary side of the steam generatorsthat require tracking.Supplemental Primary Side Inspections to address Westinghouse NSAL 12-01Issue
Description:
Visual inspection of the SGs at a foreign Westinghouse designed plant showed indications ofdegradation in the cladding and/or divider plate-to-channel head weld, with exposure and wastage ofthe channel head base material. Westinghouse issued NSAL 12-01 "Steam Generator Channel HeadDegradation" on January 5, 2012 and included recommended actions for the visual inspection at otherplants.Although the degradation is not credible for St. Lucie Unit 1, a visual inspection of the primary sidechannel head bowl was performed in accordance with the requirements presented in WestinghouseNSAL 12-01.Results:Based on the visual inspections performed, no visible signs of degradation or other abnormalconditions were identified.
L-2014-113AttachmentPage 3 of 22Engineering Evaluation PSL-ENG-SESJ-14-002EC# 280879St. Lucie Unit ISteam Generator Tube Inspection Report for SL1-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Table 1Basis for Tube ExaminationsAttachment IPage 3 of 12Technique Examination Sample Required or Basis DegradationSupplemental MechanismRequired to satisfy SR(1)100% full length of all active 4.4.5.1 and TS(2) sectiontubes in each SG Required 6.8.4.1.d.2 and to WearBobbin support 3 cyclesbetween inspectionsSupplementalScreen all dings/dents < 5.0 (included as Pro-Active PWSCCvolts in the freespan straight part of the (Per Degradation ODSCClengths 100% full length Assessment)exam)Supplemental BWI Bulletin No.DTF-Screen U-bends periphery (included as 61.1.00003tubes for proximity of part of the Wearadjacent tubes 100% full length (OEMexam) Recommendation)Tight radius u-bends Pro-Active PWSCC* 30% of Row 3 Supplemental (Per Degradation ODSCC* 30% of Row 2 Assessment)50% of HL Dings/Dents > 5.0 Pro-Active PWSCCvolts in the straight freespan Supplemental (Per Degradation ODSCC+PointTM sections Assessment)All Dings/Dents in the u- Pro-Activebends and at HL tube Supplemental (Per Degradation PWSCCsupports Assessment) ODSCCBWI Bulletin No. DTF-Test largest bobbin proximity 61.1.00003indications in U-bend (OEMRecommendation)Array All HL & CL expansionProbe transitions (+3.0" to -2.0)' in Pro-Active Foreignperipheral high flow regions upplemental (Per FPL Procedure) Object Wear(3)Notes:(1) SR -Surveillance Requirement in the plant Technical Specification (TS)(2) TS -Plant Technical Specification(3) "Peripheral high flow regions are defined to include the two outer-most tubes exposed to the annulus, all tubes inRows 1 through 4 along the tube free lane, and the innermost two tubes adjacent to the outer circumference of thestay cylinder.
L-2014-1 13AttachmentPage 4 of 22Engineering Evaluation PSL-ENG-SESJ-14-002 Attachment IEC# 280879 Page 4 of 12St. Lucie Unit ISteam Generator Tube Inspection Report for SLI-25St. Lucie Unit 1 Technical Specification Section 6.9.1,12b. Active degradation mechanisms found (Note 1)The SL1-25 examination results for St. Lucie Unit 1 identified mechanical wear degradation atthe following locations:* Fan bar and connector bar tube contact points in the u-bends* Horizontal lattice grid tube contact pointsThere was no evidence of corrosion degradation during any of the SL1-25 examinations.Note 1 : "Active Degradation" is a term used in the Steam Generator Technical Specifications and is synonymous withthe term "Existing Degradation" used in EPRI Report 1019038 "Steam Generator Management Program:Steam Generator Integrity Assessment Guidelines" Revision 3, dated November 2009.
L-2014-113AttachmentPage 5 of 22Engineering Evaluation PSL-ENG-SESJ-14-002Attachment IPage 5 of 12ECO 280879St. Lucie Unit 1Steam Generator Tube Inspection Report for SLI -25St. Lucie Unit 1 Tecluilcal Specification Section 6.9.1.12c. Nondestructive examination techniques utilized for each degradation mechanismTABLE 2TechniquesIndustry Damage Demonstrated Extended Site-Specific ReviewTechnique Qualification Mechanism Applicability Applicability Detection SizinA96004.11 Bobbin Revision 13 Wear Structures None Yes For Service96004.2 Contingent2 Bobbin Revision 13 Wear Structures None Yes Sizing ofWearWithin non denied3 Bobbin 1-28411 Axia ODSCC drilled TSP and within None Yes N/ARevision 3 drilled TSP with dents5 2.0 Vpp.Freespan with or4 Bobbin 1-28412 Axial ODSCC without dents _ 2.0 None Yes N/ARevision 3 VppWithin Freespan.1-28413 Sludge Pile region and5 Bobbin Reiso13 Axial ODSCC Broached TSP with or None Yes N/Awithout dents < 2.06 Bobbin 24013.1 Axial ODSCC Freespan. Dings None Yes N/ARevision 2 < 5.00 VoltsDrilled and10013.1 quatrefoilI tube7 BobbinI Axial ODSCC support plates with None Yes N/Adents_< 5.00 VoltsN/A -UseApplicableg Bobin 27091.2 PL erPLP Wear PLP Wear ApspliSSafro8Revision B01 (p.2 not present) IWhen Pa Present) yes ETSS fromReviionI PP War PP War LP earTechnique21Loose Part Tube to tube wear9 Bobbin 27091.3 Volumetric Wear Freespan, PLP in the freespan or in Yes NoRevision I (Part Not ar contact with artPresent) (part present) adjacent tube10 9603.1For+PoinC' 96703. 17 Axial PWSCC Dent or Ding Freespan Yes CM/OA ort Revision lnfo OnlyContingent11 96910.1 Lattice Grids and Contingent+Point- Revision 10 Wear Broached Supports Fan Bars Yes sizing ofwear L-2014-113AttachmentPage 6 of 22Engineering Evaluaton PSL-ENG-SESJ- 14-002EC# 280879St. Lucie Unit ISteam Generator Tube Inspection Report for SLI -25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Attachment IPage 6 of 12Industry Damage Demonstrated Extended Site-Specific ReviewTechnique Qualification Mechanism Applicability Applicability Detection SizingForCM/OA orInfo OnlyDings, Dents, See EPRI12 +Point- 1-11524 Ciuc Expansion Tubesheet and Non- Yes ETSSRevision 0 PWSCC Transition dented support 20510.1 forstructures curve andsizinginformation13 +Point' 20511.1 Axial PWSCC Expsnsion Transition Non-dented support For CM/GARevision 8 structure and Yes or mtfo Onlytubesheet21998.1 Contingent14 +Point4 R19so.1 Volumetric Freespan None Yes Sizing ofWearDent / Ding22401.1 Axial ODSCC Dented Support Freespan For CM/OA15 +Point" Revision 4 Structures Dent or Info OnlyU-bendFreespan21410.1 Dings. Dented and For CM/OAI6 + Pointr Revision 6 Circ ODSCC Expansion Transition Non-dented support Yesstructures, Sludge or Info OnlyPile, TubesheetSludge Pile; withinnon dented drilledR731-28424 Axial ODSCC TSP and within drilled For CM/OARevision 3 TSP with dents (or Expansion Transition Yes or Info OnlyDings)_<2.0 Vpp.Freespn. within non1-28425 dented broached TSP For CM/OA18 +Point' Revision 3 Axial ODSCC and within broached Expansion Transition Yes or Info onlyTSP with dents (orDings) _: 2.0 Vpp.Sludge Pile and1-28431 Drilled TSP with or For CM/OA19 +Point"M Revision 2 Axial ODSCC without dents None Yes or Info only___2.0 VppFIree Span, eggcrates1-28432 and broached TSP For CN/OA20 + PotntT Revision 2 Axial ODSCC with or without dents None Yes or Info OnlyI 1 1 _ý<2.0 Vpp L-2014-113AttachmentPage 7 of 22Engineering Evaluation PSL-ENG-SESJ-14-002ECO 280879St. Lucie Unit ISteam Generator Tube Inspection Report for SLI -25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Attachment IPage 7 of 12Industry Damage Demonstrated Extended Site-Specific ReviewTechnique Qualification Mechanism Applicability Applicability Detection SizingDetection of ForeignMaterial based onmaterial andproximity of foreignmaterial to the tube,27901.1 based on EPRI reports27902.1 Freespan, TSP and 1020631 andV101561.27903.1 Expansion Transition Yes27904.1 LP Wear For sizing of PLPYe21 +Point, 27904.1 PLP Wear Mphlogy wear when part is Yes When Part is27906.1 Dependent present based on EPRI NOT present27907.1 (part not present) Report 1020631 on anas needed basis.(Al I Rev. 1) For sizing of Tube toTube wear in thefreespan or when incontact with anadjacent tube based onEFI 102063196511.2 Axial & Circ Low Row For CM/OA22 +Point'T Revision 16 PWSCC U-bends None Yes orlnfo Only10411.1 Ax and Circand ODSCC, For CM/OA23 +Point" 10411.2 Axial ODSCC U-bend Row 3-5 Row 2 & Higher Yes or Info OnlyRevision 0 Rowo-ndl_______ ________________ _____________ _______________ U-b en d a_____Volumetricdegradation IPLPWear') at Top-of-Tubeshect and20400.1 Freespan.24 Array Revision 5 Circ ODSCC Expansion Transitions. Axial ODSCC at Yes N/AExpansion TransitionCirc ODSCCFreespast with/withoutDeposits (includingsludge pile)
L-2014-113AttachmentPage 8 of 22Engineering Evaluation PSL-ENG-SESJ- 14-002EC# 280879St. Lucie Unit 1Steam Generator Tube Inspection Report for SLI-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Attachment 1Page 8 of 12d. Location orientation (if linear) and measured sizes (if available) of service inducedindicationsINDICATION LISTINGS FOR SL1 -25 (EOC-24)Indication Description Enclosure #SG 1A Wear at Fan bar/connector bar locations 1-19%TWD Enc 1 (2 pages)SG 1A Wear at Fan bar/connector bar locations 20-39%TWD Eric 2 (1 page)SG 1A Wear at Horizontal lattice grid locations 1-19%TWD Enc 3 (1 page)SG 1A Wear at Horizontal lattice grid locations 20-39%TWD Enc 4 (1 page)SG 1B Wear at Fan bar/connector bar locations 1-19%TWD Eric 5 (2 pages)SG 1 B Wear at Fan bar/connector bar locations 20-39%TWD Enc 6 (1 page)SG 1B Wear at Horizontal lattice grid locations 1-19%TWD Enc 7 (1 page)SG 1 B Wear at Horizontal lattice grid locations 20-39%TWD Enc 8 (1 page)e. Number of tubes plugged during the inspection outage for each active degradationmechanismSt. Lucie Unit I Tube Plugging EOC 24 (SLI -25)Degradation Mechanism SG A SG B TotalWear at Fan Bar Support (FBS) tube 79(1) 51(1) 130contacts (Preventive Plugging)Wear at Connector Bar Support (CBS) 4(1) 1(1)tube contacts (Preventive plugging)Total 83 52 135Note 1) All tubes exhibiting wear at FBS and CBS structures (in the ubend region) were preventatively plugged toprovide margin. No tubes required plugging per Plant Technical Specifications because no indications met orexceeded the Plant Technical Specification limit of a40% TW.
L-2014-113AttachmentPage 9 of 22Engineenng Evaluation PSL-ENG-SESJ- 14-002Attachment IPage 9 of 12ECO 280879St. Lucie Unit ISteam Generator Tube Inspection Report for SL1-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12f. Total number and percentage of tubes plugged to dateSt. Lucie Unit 1 Steam Generator CumulativeTube Plugging Summary SL1-25SG # Plugged % Plugged1A 97 1.14%1B 53 0.62%g. The results of condition monitoring, including the results of the tubetestingpulls and in-situAll tubes satisfied the structural integrity and accident-induced leakage performance criteria basedon the condition monitoring (CM) evaluation performed at EOC-24. No tubes required in-situpressure testing for either tube burst or leakage. Therefore, all tubes met the structural andleakage integrity requirements of the St. Lucie Unit 1 Technical Specifications.No tube pulls were warranted or implemented.h. The effective plugging percentage for all plugging in each SGNo tube repair methods (i.e. sleeving) are approved for St. Lucie Unit 1 that would have aneffect on the effective plugging percentages. Therefore, the applicable effective pluggingpercentage is synonymous with the % Plugged in item f. above.
L-2014-113AttachmentPage 10 of 22Engineering Evaluation PSL-ENG-SESJ- 14-002 Attachm ent IEC# 280879 Page 10 of 12St. Lucie Unit ISteam Generator Tube Inspection Report for SLI -25St. Lucie Unit 1 Technical Specification Section 6.9.1.12ADDITIONAL INFORMATIONThe following information is included to assist the staff in their review of the information provided in thisreport.Abbreviations and AcronymsEPRI Electric Power Research InstituteCBS Connecter Bar SupportCM Condition MonitoringFBS Fan Bar SupportISI In-service InspectionSG Steam GeneratorOutage NomenclatureEOC-24 End-of-Cycle 24 (Synonymous with SL1-25)SL1-25 St. Lucie Unit 1 Operating Cycle 25FIGURESFigure 1 provides a side view of the installed St. Lucie Unit 1 RSGs.Figure 2 provides a view of the fan bar arrangement, connector bar location and the top (#7) lattice gridsupport locations.
L-2014-113AttachmentPage 11 of 22Engineering Evaluation PSL-ENG-SESJ-14-002 Attachment IEC# 280879 Page 11 of 12St. Lucie Unit 1Steam Generator Tube Inspection Report for SL 1-25St. Lucie Unit 1 Technical Specification Section 6.9.1.12Figure 1B&W Advanced Series PWRReplacement Steam Generators (RSG)BWI-222-7698-FIV- IFPL St. Lucie IReplacement Steam Generator L-2014-113AttachmentPage 12 of 22Epnee-,g PSL-EDtGSESJ- 14-002EC 28079St. Lucie Unit 1Steam Generator Tube Inspection Report for SLI-25St. Lucie Unit I Techmical Specification Section 6.9.1.12Attachmai 1Page 12 df 12Figure 2Detailed Fan Bar ViewLafi d o e 7 Lattice Grid Cold Legq 0CC L-2014-113AttachmentPage 13 of 22AREVA NP Inc 03/28/14 11:49:06Customer Name: St Lucie Unit I Component: S/G A Page 1 of 2Bobbin Fan/Connector Bar %TW Indications: 1-19%QUERY: QueryMl .qryROW COL %TW LOCATION71 10'0 15 F05 +0.9171 112 11 F06 -1.7073 94 10 F06 -1.4175 92 7 F09 -2.3977 58 12 FPO -1.1777 92 17 F09 -2.3079 92 13 F09 -2.3081 92 11 F04 -1.9281 98 9 F06 -0.6883 64 14 F06 +0.8684 99 15 F06 +1.3388 93 12 F04 -0.5190 93 9 F05 -1.6191 78 17 CBC +i1.7892 77 10 CBC +0.4294 93 8 F06 +0.9095 92 16 F09 -2.0596 95 9 F06 -1.7397 92 11 F09 -2.1298 77 11 CBC +0.5399 72 11 F04 -0.7713 F05 -0.979 F07 +0.629 F08 -1.0299 78 16 CBC +1.9299 106 14 F05 -1.02100 101 11 F04 +1.21100 105 12 F06 -1.0212 F07 -1 .3013 F08 -1.10102 99 13 F04 -1.2116 F05 -1.159 F07 -1 .089 F08 -1 .79102 111 8 P06 -1.08103 84 10 F05 +0.57103 92 12 F09 -1.99104 73 11 F05 +1 .26105 84 13 FlO +0.73105 106 11 F05 -1.21106 83 12 F06 +1.2314 FO5 -0.99107 58 11 FO5 +0.82107 62 8 F05 +1.28107 92 8 F09 -1.84107 94 8 F05 -0.63107 100 12 F05 -1.0810 FOB -0.57107 106 12 F05 +1.31108 55 7 F06 +1.64109 122 13 F05 +1.54110 67 14 F07 -1.1114 F08 -0.64110 101 10 F06 -1.01110 103 7 F05 -1.34111 94 16 F07 +1.39112 71 9 F05 +0.91112 73 16 FO5 +1.0412 F07 -1.0415 F08 -1.22112 79 15 F05 +0.429 F04 +0.3510 F07 +0.11112 93 8 F04 +1.088 F05 +1.1014 F07 -1.2712 F08 -1.23111 98 19 F06 -0.7414 F06 +1.08113 102 6 FO4 -0.5512 F05 -1.2515 F06 +1.237 F07 +0.708 F08 +0.71114 67 10 F04 +1.139 F05 -I1.0210 F07 -1.22114 75 17 P06 -0.94115 74 15 F04 -0.338 F05 -0.35 L-2014-113AttachmentPage 14 of 22AREVA NP IncCustomer Name: St Lucie Unit 103/28/14 11:49:06Component: S/G APage 2 of 21Bobbin Fan/Connectot Bar %TW Indications: 1-19%QUERY: QueryMl.qLyROW COL %TW11115 78 12115 82 15115 84 11115 92 111314115 96 9171210116 65 12116 97 1796116 105 14119 58 10119 60 14119 76 11119 92 9120 63 111219120 71 1611120 75 7121 100 12122 65 111810122 73 8128122 101 10124 71 131210131112126 63 101610127 70 1412128 51 10128 65 101399128 71 1412128 73 1416111515131 94 1318119132 71 1218133 84 17121715LOCATIONF06 +0.02FIO +2.09F05 +0.97F05 +0.11F04 -1.11F05 +0.96F06 +1.20F05 +1.21F06 +1.24F08 +1.39F09 +1.39F05 +1.22F03 +1.22F05 +1.19F06 -1.11F06 -1.08F06 -0.70F05 -1.17F03 -0.13F05 -0.53F02 -1.06F03 -1.19F05 41.15F06 +0.91F08 -1.57F08 -1.88F08 +1.17F05 +1.17F06 -1.00F09 -2.32F04 -1.55F08 -1.24F08 +1.19F06 -1.10F04 +1.66F06 -1.22F07 -1.19F07 +1.22£08 -1.06£08 +1.37F05 +1.15F06 -1.04F07 -1.06F06 +0.39F08 -0.83FI£ +0.51F06 -1.04F08 -1.28£04 +1.26£05 +1.50F09 +1.17£04 +1.62F03 +1.22F05 +0.93F06 +1.17F07 -1.35F08 -1.37F04 +1.34£06 +1.41F02 -0.46F03 +1.45F04 +1.30F06 -1.02F04 +0.00F06 +0.11F07 +0.11F08 -0.02Total Tubes : 83Total Records: 147 L-2014-113AttachmentPage 15 of 22AREVA NP Inc 03/28/14 11:50:16Customer Name: St Lucie Unit 1 Component: S/G A Page I of 1Bobbin Fan/Connector Bar %TW Indications: 20-39%QUERY: QueryMl.qryROW COL %TW LOCATION120 63 24 F06 -1.1323 F07 -1.15122 65 25 F07 -1.1124 F08 -0.93122 73 23 F07 -1.22128 71 21 F07 -1.3921 FOS +1.46128 73 23 F04 -1.02131 94 22 F07 +1.36132 71 20 F07 -1.17133 84 23 F05 +0.07Total Tubes : 8Total Records: 11 L-2014-113AttachmentPage 16 of 22AREVA NP IncName: St Lucie Unit 1Bobbin Lattice Grid %TW Indications: 1-19%QUERY: QueryMl.qryROW COL %TW LOCATION64 11 14 04C -1.5197 144 11 01C -1.52107 138 11 02C -1.43116 37 12 06H -0.70139 74 12 03H -0.7903/28/14 13:03:39Component: S/G APage 1 of 1Total Tubes : 5Total Records: 5 L-2014-113AttachmentPage 17 of 22AREVA NP IncCustomer Name: St Lucie Unit 1Bobbin Lattice GrAd %TW Indications: 20-39%QUERY: QueryMi.qryROW COL %TW LOCATION97 144 21 02C -1.5503/28/14 11:57:29Component: S/G APage 1 of 1Total Tubes : 1Total Records: 1 L-2014-113AttachmentPage 18 of 22AREVA NP Inc 03/28/14 12:04:32Custonler Name: St Lucie Unit 1 Component: S/G B Page 1 of 2Bobbin Fan/Connector Bar %TW: 1-19%QUERY: QueryMl[l] .qryROW COL %TW LOCATION27 68 13 CEH +1.1728 5 11 F05 +2.1659 86 9 F05 +1.2873 68 13 F05 -1.1272 94 8 F06 -0.7575 110 12 F06 -1.3278 91 8 F05 -1.7579 66 9 F07 +2.0381 76 7 F06 +1.2581 102 11 F04 -1.7084 81 10 F06 +1.138 F07 +1.1586 93 9 F05 -1.5892 75 9 F04 -1.5597 74 11 F06 +0.8097 144 6 F05 +1.3639 92 10 F06 -1.73101 72 9 F08 +1.34101 100 10 F05 -0.92103 90 11 F05 -1.14105 74 9 F06 +0.68109 64 8 F07 +2.7C109 68 11 F04 -1.41110 67 11 F05 +1.2910 F07 -1.11110 87 7 F05 -1.78110 91 8 F06 -1.29112 65 8 F04 +1.5612 F08 -1.36113 70 30 F05 -1.05114 51 10 F05 -1.32114 69 10 F05 +1.0812 F08 -1.23114 77 8 F04 +1.859 F05 +1.67116 77 10 F03 +1.78117 94 11 F04 -1.1710 F05 -1.06121 72 11 F06 +1.238 F08 -1.56123 68 11 F05 -1.0311 F06 +1.259 F07 +1.1217 F08 +1.30123 74 12 F07 -1.179 F09 -0.62123 98 14 F04 +1.19124 77 8 F03 +1.84125 72 9 F08 -1.06126 71 10 FO8 -1.17126 73 10 F04 +1.729 F05 +1.7711 F07 -1.3011 F09 +1.94126 77 12 F08 +1.23128 63 7 F03 +1.81129 64 13 F07 +0.02129 68 19 F07 +0.97130 63 7 F05 +1.81130 75 8 F02 +1.6711 F03 +1.5916 F04 +1.017 F05 +1.8111 F07 -1.1717 F08 -1.17130 95 11 F08 -0.82132 69 12 F04 -0.928 F05 +1.1214 F06 -0.9917 F07 -0.9916 F£0 +1.309 F09 +1.14132 73 16 F05 +1.0817 F07 +1.3812 F08 +1.3217 F09 +1.36134 77 12 F03 +1.8717 F05 +1.4514 F07 +1.2810 F01 -1.69 L-2014-113AttachmentPage 19 of 22AREVA NP IncCustomer Name: St Lucie Unit 1Bobbin Fan/Connector Bar %TW: 1-19%QUERY: QueryMI [(] .qryROW COL %TW LOCATION136 73 14 F08 +1.6315 F07 +1.3910 FOG +1.6110 F05 +1.67137 102 7 F02 +0.6003/28/14 12:04:-2Component: S/G BPage 2 of 2Total Tubes : 52Total Records: 85 L-2014-113AttachmentPage 20 of 22Page I of 1AREVA NP IncCustomer Name: St Lucie Unit 1Bobbin Fan/Connector Bar %TW: 20-39%03/28/14 12:05:02Component: S/G BQUERY: QueryMl[l] .qryROW COL %TW LOCATION134 77 24 F04 +1.25Total Tubes : 1Total Records: 1 L-2014-1 13AttachmentPage 21 of 22AREVA NP IncCustomer Name: St Lucie Unit 1Bobbin Lattice Grid %TW: 1-19%QUERY: QueryMl[l] .qryROW COL %TW LOCATION1 146 10 06C -1.472 127 11 05C +0.6797 144 7 05H +1.47107 138 12 05H +1.45133 60 12 020 -1.51139 92 17 04H -1.5203/28/14 12:06:13Component: S/G BPage 1 of 1Total Tubes : rTotal Records: 6 L-2014-113AttachmentPage.22 of 22AREVA NP IncCustomer Name: St Lucie Unit 1Bobbin Lattice Grid %TW: 20-39%03/28/14 12:05:45Component: S/G BPage 1 of 1QUERY: QueryMI[l] .qryROW COL %TW LOCATIONTotal Tubes : 0Total Records: 0