Line 49: |
Line 49: |
| 1. Apparent Violation 2. Factual Summary | | 1. Apparent Violation 2. Factual Summary |
|
| |
|
| cc: (See page 4) The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Should you have any questions concerning this letter, please contact Mr. Binoy Desai at 404-997-4519. | | cc: (See page 4) |
|
| |
|
| Sincerely,/RA/
| | _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED cc: Jeffrey Remick, Director Nuclear Plant Security H.B. Robinson Steam Electric Plant 3581 West Entrance Road, RNPA02 Hartsville, South Carolina 29550 Edward T. O'Neil, GM Nuclear Protective Services Duke Energy Corporation 526 South Church Street, Phase II, EC5ZD Charlotte, NC 28202 |
| Anthony T. Gody, Director Division of Reactor Safety
| |
| | |
| Docket No. 50-261 License No. DPR-23
| |
| | |
| ===Enclosures:===
| |
| 1. Apparent Violation 2. Factual Summary
| |
| | |
| cc: (See page 4) DISTRIBUTION: L. Wert, RII A. Gody, RII J. Munday, RII S. Rose, RII P. Jefferson, RII OI D. Jackson, RII S. Price, RII D. Kowal, RII S. Maxey, RII L. Casey, NRR S. Coker, NSIR D. Strauss, OGC D. Furst, OE OEMAIL Resource RidsNrrDirs Resource Public (Cover letter only)
| |
| PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSBII\REACTORS\ROBINSON\ENFORCEMENT\ROBINSON 2016 SGI\ROBINSON CHOICE LETTER OUO REMOVED.DOCX OFFICE RII:DRS RII:DRS RII:EICS RII:EICS RII:DRS SIGNATURE JOB2 BBD SAP1 MXK7 ATG NAME JBROWN BDESAI SPRICE MKOWAL AGODY DATE 12/12/2016 12/12/2016 12/19/2016 12/14/2016 12/27/2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc: Jeffrey Remick, Director Nuclear Plant Security H.B. Robinson Steam Electric Plant 3581 West Entrance Road, RNPA02 Hartsville, South Carolina 29550 Edward T. O'Neil, GM Nuclear Protective Services Duke Energy Corporation 526 South Church Street, Phase II, EC5ZD Charlotte, NC 28202
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] |
Text
December 27, 2016
EA-16-227
Mr. Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550
SUBJECT: U.S. NUCLEAR REGULATORY COMMISSION, OFFICE OF INVESTIGATIONS REPORT 2-2016-001; H.B. ROBINSON STEAM ELECTRIC PLANT - NRC INSPECTION REPORT 05000261/2016404
Dear Mr. Glover:
This refers to an investigation completed on September 30, 2016, by the Nuclear Regulatory Commission's (NRC) Office of Investigations (OI) concerning activities at Duke Energy's H. B. Robinson Steam Electric Plant (RNP). The purpose of the investigation was to review a security incident that was identified on September 23, 2015.
Based on the results of this investigation, one apparent violation (AV) was identified as documented in Enclosure 1, and is being considered for escalated enforcement action in accordance with the NRC's Enforcement Policy. The current Enforcement Policy is included on the NRC's Web site at http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html. Enclosure 2 contains a Factual Summary of the OI investigation.
The circumstances surrounding the apparent violation, your corrective actions, the significance of the issue, and the need for lasting and effective corrective action were previously discussed between members of your staff and the NRC. As a result, it may not be necessary to conduct a pre-decisional enforcement conference in order to enable the NRC to make an enforcement decision. In addition, because your facility has not been the subject of escalated enforcement within the past two years, and based on our understanding of your corrective actions, a civil penalty may not be warranted in accordance with Section 2.3.4 of the Enforcement Policy. The final decision will be based on you confirming on the license docket that the corrective actions previously described or discussed with the NRC staff have been or are being taken. Before the NRC makes its final enforcement decision, we are providing you an opportunity to (1) respond in writing to the AV in this inspection report within 30 days of the date of this letter, or (2) request a Pre-decisional Enforcement Conference (PEC). If a PEC is held, the NRC will issue a press release to announce the time and date of the conference, and the conference will be closed to public observation. The PEC will also be transcribed. If you decide to participate in a PEC, please contact Binoy Desai at 404-997-4519 within 10 days of the date of this letter. A PEC should be held within 30 days of the date of this letter. If you choose to provide a written response, it should be clearly marked as a "Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227" and should include (1) the reason for the AV or, if contested, the basis for disputing the AV; (2) the corrective steps that have been taken and the results achieved; (3) the corrective steps that will be taken; and (4) the date when full compliance will be achieved. Your response may reference or include previously docketed correspondence, if the correspondence adequately addresses the required response. Additionally, your response should be sent to the NRC's Document Control Center, with a copy mailed to Anthony T. Gody, Director of Reactor Safety, Region II, 245 Peachtree Center Avenue NE, Atlanta, GA 30303, within 30 days of the date of this letter. If an adequate response is not received within the time specified or an extension of time has not been granted by the NRC, the NRC will proceed with its enforcement decision or schedule a PEC.
If you choose to request a PEC, the conference will afford you the opportunity to provide your perspective on these matters and any other information that you believe the NRC should take into consideration before making an enforcement decision. The decision to hold a PEC does not mean that the NRC has determined that a violation has occurred or that enforcement action will be taken. This conference would be conducted to obtain information to assist the NRC in making an enforcement decision. The topics discussed during the conference may include information to determine whether a violation occurred, information to determine the significance of a violation, information related to the identification of a violation, and information related to any corrective actions, taken or planned.
In addition, please be advised that the number and characterization of the AV described in the enclosed inspection report may change as a result of further NRC review. You will be advised by separate correspondence of the results of our deliberations on this matter. For administrative purposes, this letter is issued as Inspection Report 05000261/2016404 and the apparent violation is designated as AV 05000260/2016404-01, Security Safeguards Control.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Security Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Should you have any questions concerning this letter, please contact Mr. Binoy Desai at 404-997-4519.
Sincerely,/RA/
Anthony T. Gody, Director Division of Reactor Safety
Docket No. 50-261 License No. DPR-23
Enclosures:
1. Apparent Violation 2. Factual Summary
cc: (See page 4)
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED cc: Jeffrey Remick, Director Nuclear Plant Security H.B. Robinson Steam Electric Plant 3581 West Entrance Road, RNPA02 Hartsville, South Carolina 29550 Edward T. O'Neil, GM Nuclear Protective Services Duke Energy Corporation 526 South Church Street, Phase II, EC5ZD Charlotte, NC 28202