ML20063P300: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
d                                   CONSUMERS POWER COMPANY APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE DOCKET N0'50-329 DOCKET NO 50-330 AMENDMENT NO 109 Enclosed herewith, revising and supplementing the above-mentioned application are revised and new pages for incorporation in the Final Safety Analysis Report. The Final Safety Analysis Report was submitted with Amendment 33 to the above dockets on November 18, 1977. The enclosed material consists of the following:
d CONSUMERS POWER COMPANY APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE DOCKET N0'50-329 DOCKET NO 50-330 AMENDMENT NO 109 Enclosed herewith, revising and supplementing the above-mentioned application are revised and new pages for incorporation in the Final Safety Analysis Report. The Final Safety Analysis Report was submitted with Amendment 33 to the above dockets on November 18, 1977. The enclosed material consists of the following:
: 1. Revisions to FSAR Chapter 16 to incorporate updated Plant Technical Specifications reflecting Revision 4 to NUREG-0103 and Revision 2 to NUREG-0472 as well as Midland Plant Specific Technical Specifications.
1.
: 2. Additional information the FSAR stated would be submitted by amendment.
Revisions to FSAR Chapter 16 to incorporate updated Plant Technical Specifications reflecting Revision 4 to NUREG-0103 and Revision 2 to NUREG-0472 as well as Midland Plant Specific Technical Specifications.
: 3. Changes relating to the above (Tables of Contents, Figures, Tables, etc).
2.
These new and revised pages bear the notation " Revision 45 9/82" and are i
Additional information the FSAR stated would be submitted by amendment.
f'}
3.
Changes relating to the above (Tables of Contents, Figures, Tables, etc).
These new and revised pages bear the notation " Revision 45 9/82" and are f'}
marked in the margin to indicate where changes have been made. Additional pages and figures have been added as reflected on the revised Midland Plant i
s_ -
s_ -
marked in the margin to indicate where changes have been made. Additional pages and figures have been added as reflected on the revised Midland Plant FSAR " List of Effective Pages."
FSAR " List of Effective Pages."
Consumers Power Company By     /s/ J W' Cook James W Cook, Vice President i
Consumers Power Company By
/s/ J W' Cook James W Cook, Vice President i
~
~
Sworn and subscribed to before me on this 11 day of October 1982.
Sworn and subscribed to before me on this 11 day of October 1982.
                                                            /s/ Barbara P Townsend Notary Public, Jackson County, Michigan.
/s/ Barbara P Townsend Notary Public, Jackson County, Michigan.
My Commission Expires September 8, 1984 (S E A L)
My Commission Expires September 8, 1984 (S E A L)
K Ok PDR mi1082-0253b100
K Ok PDR mi1082-0253b100
* DISTRIBUTION AND ACKNOWLEDGEMENT FORM                           .-            ,
* DISTRIBUTION AND ACKNOWLEDGEMENT FORM Bechtel Associates Professional Corporation NRC To (D. Hood)
Bechtel Associates Professional Corporation NRC To         (D. Hood)                                       RETURN TO:
RETURN TO:
BECHTEL ASSOCIATES' HOLDER OF FSAR SET NUMBER                               140 PROFESSIONAL CORPORATION
BECHTEL ASSOCIATES' HOLDER OF FSAR SET NUMBER 140 PROFESSIONAL CORPORATION P.O. BOX 1000 REVISION NUMBER 45 ANN ARBOR, MICHIGAN 48106 SUBJECT DISTRIBUTION AND ACKNOWLEDGEMENT Attention: Dia Wesolowski Job 7220-FSAR The enclosed material is considered part of a controlled Midland Plant FSAR. Revisions should be incorporated in the FSAR by following the collating instructions attached to the revision. If any revision material is missing, please indicate in the space provided below. The holder of the FSAR is held responsible for the upkeep of its volumes.
.                                                                                  P.O. BOX 1000 REVISION NUMBER             45                             ANN ARBOR, MICHIGAN 48106 SUBJECT DISTRIBUTION AND ACKNOWLEDGEMENT                   Attention: Dia Wesolowski Job 7220-FSAR The enclosed material is considered part of a controlled Midland Plant FSAR. Revisions should be incorporated in the FSAR by following the collating instructions attached to the revision. If any revision material is missing, please indicate in the space provided below. The holder of the FSAR is held responsible for the upkeep of its volumes.
In order to verify receipt of the enclosed information, please sign' the acknowledgement below and return the entire form within 30 days to me at the above location.
In order to verify receipt of the enclosed information, please sign' the acknowledgement below and return the entire form within 30 days to me at the above location.
If you have transferred your assigned set (s), please indicate in the space below the set number (s), party (ies) and mailing address (es) so that further material can be sent directly to the new set holder (s).
If you have transferred your assigned set (s), please indicate in the space below the set number (s), party (ies) and mailing address (es) so that further material can be sent directly to the new set holder (s).
Line 43: Line 46:
Name of Party (ies)
Name of Party (ies)
Address (es) l The following material was missing from the revision (s):
Address (es) l The following material was missing from the revision (s):
REV NO.         PAGE NO.                     TABLE NO. FIGURE NO.       TAB i
REV NO.
PAGE NO.
TABLE NO.
FIGURE NO.
TAB i
l l
l l
l l
l l
I hereby certify that I have received the material, except as noted.
I hereby certify that I have received the material, except as noted.
Signature of Set Holder                                     Date
Signature of Set Holder Date
  - . _ _ . - - - - . . . . _            __ . .-. _ _ _ _ _ _ _ . _ . _                      _.            _. .  ._}}
._}}

Latest revision as of 21:19, 16 December 2024

Amend 109 to Application for CPs & Ols,Consisting of Revision 45 to FSAR
ML20063P300
Person / Time
Site: Midland
Issue date: 10/11/1982
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20063P298 List:
References
NUDOCS 8210130266
Download: ML20063P300 (2)


Text

_

d CONSUMERS POWER COMPANY APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE DOCKET N0'50-329 DOCKET NO 50-330 AMENDMENT NO 109 Enclosed herewith, revising and supplementing the above-mentioned application are revised and new pages for incorporation in the Final Safety Analysis Report. The Final Safety Analysis Report was submitted with Amendment 33 to the above dockets on November 18, 1977. The enclosed material consists of the following:

1.

Revisions to FSAR Chapter 16 to incorporate updated Plant Technical Specifications reflecting Revision 4 to NUREG-0103 and Revision 2 to NUREG-0472 as well as Midland Plant Specific Technical Specifications.

2.

Additional information the FSAR stated would be submitted by amendment.

3.

Changes relating to the above (Tables of Contents, Figures, Tables, etc).

These new and revised pages bear the notation " Revision 45 9/82" and are f'}

marked in the margin to indicate where changes have been made. Additional pages and figures have been added as reflected on the revised Midland Plant i

s_ -

FSAR " List of Effective Pages."

Consumers Power Company By

/s/ J W' Cook James W Cook, Vice President i

~

Sworn and subscribed to before me on this 11 day of October 1982.

/s/ Barbara P Townsend Notary Public, Jackson County, Michigan.

My Commission Expires September 8, 1984 (S E A L)

K Ok PDR mi1082-0253b100

  • DISTRIBUTION AND ACKNOWLEDGEMENT FORM Bechtel Associates Professional Corporation NRC To (D. Hood)

RETURN TO:

BECHTEL ASSOCIATES' HOLDER OF FSAR SET NUMBER 140 PROFESSIONAL CORPORATION P.O. BOX 1000 REVISION NUMBER 45 ANN ARBOR, MICHIGAN 48106 SUBJECT DISTRIBUTION AND ACKNOWLEDGEMENT Attention: Dia Wesolowski Job 7220-FSAR The enclosed material is considered part of a controlled Midland Plant FSAR. Revisions should be incorporated in the FSAR by following the collating instructions attached to the revision. If any revision material is missing, please indicate in the space provided below. The holder of the FSAR is held responsible for the upkeep of its volumes.

In order to verify receipt of the enclosed information, please sign' the acknowledgement below and return the entire form within 30 days to me at the above location.

If you have transferred your assigned set (s), please indicate in the space below the set number (s), party (ies) and mailing address (es) so that further material can be sent directly to the new set holder (s).

Set of Number (s)

Name of Party (ies)

Address (es) l The following material was missing from the revision (s):

REV NO.

PAGE NO.

TABLE NO.

FIGURE NO.

TAB i

l l

l l

I hereby certify that I have received the material, except as noted.

Signature of Set Holder Date

._