ML19260D391

From kanterella
Jump to navigation Jump to search
Application to Amend CPPR-81 & CPPR-82,revising FSAR
ML19260D391
Person / Time
Site: Midland
Issue date: 01/30/1980
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML19260D389 List:
References
NUDOCS 8002080656
Download: ML19260D391 (1)


Text

CONSUMERS POWER COMPANY APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE DOCKET NO 50-329 DOCKET NO 50-330 AM2IGIENT NO 73 Enclosed herewith, revising and supplementing the above-entitled application, are revised pages for incorporation in the Final Safety Analysis Report. The Final Safety Analysis Report was submitted with Amendment 33 to the above dockets on November 18, 1977.

The enclosed material consists of the following:

1) Responses to Mr L S Rubenstein letter (Attachment 2) of September 11, 1979 requesting additional information.
2) Revisions to various FSAR Sections and Staff Requests for Additional Infor-mation in response to certain Open Items associated with Staff Review of the Midland Plant.
3) Additional information the FSAR stated would be submitted.
4) Changes in various FSAR Sections resulting from routine design developments.

S) Changes in various FSAR Sections resulting from the FSAR Rereview Program.

6) Correction of minor errors and omissions.
7) Changes relating to the above (Tables of Contents, Figures, Tables, etc).

These new and revised pages bear the notation " Revision 2601/80," and are marked in the margin to i*.idicate where changes have been made. Additional pages and figures have been added as reflected on the revised Midland Plant FSAR " List of Effective Pages."

Consumers Power Company D

"i Dated: January 30, 1980 by 7

Stephen HWowell, Senior lice President Sworn and subscribed to before me on this 30th day of January,1980.

0 M)

NotaryPub$c,JacksonCountt, Michigan My commission expires September 21, 1982 fOo2o90 loo 1954 165 o

l DISTRIBUTION AND ACKNOWLEDGEMENT FORM Bechtel Associates ProfessionalCorporation TO b

RETURN TO:

BECHTEL ASSOCIATES HOLDER OF FSAR SET NUMBER

//d PROFESSIONAL CORPORATION P.O. BOX 1000 REVISION NUMBER 26 ANN ARBOR, MICHIGAN 48106 SUBJECT DISTRIBUTION AND ACKNOWLEDGEMENT Attention: Linda Hultquist Job 7220-FSAR The enclosed material is considered part of a controlled Midland Plant FSAR.

Revisions should be incorporated in the FSAR by following the collating in-structions attached to the revision.

If any revision material is missing, please indicate in the space provided below. The holder of the FSAR is held responsible for the upkeep of their volumes.

In order to verify receipt of the enclosed information, please sign the ac-knowledgement below and return the entire form within 30 days to me at the above location.

If you have transferred your assigned set (s), please indicate in the space below the set number (s), party (ies) and mailing address (es) so that further material can be sent airectly to the new set holder (s).

Set Number (s)

Name of Party (ies)

Addrese(es)

The following material was missing from the revision (s):

REV. NO.

PAGE NO.

TABLE NO.

FIGURE NO.

TAB I hereby certify that I have received the material, except as noted.

Signature of Set Holder Date 1954 166