Amend 82 to Application for OLs & CPs
ML19338D612
Person / Time
Site: Midland
Issue date: 09/15/1980
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML19338D606 List:
References
NUDOCS 8009230559
Download: ML19338D612 (1)


Text

y w

v

g.

-w

+

s

' - ' " " ^

Ir 1

(CONSUMERS POWER COMPANY-ff 4

2 APPLICATION.FOR ~

v.

-REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE

' DOCKET 50-329 DOCKET 50-330 AMENDMENT 82-Enclosed herevith, revising.and supplementing the above-entitled application, are revisedipages, for incorporation in the Environmental Report -(OLS). The Environmental Report was submitted.vith1 Amendment h3 to the above dockets on

~

April 12,1978. -The enclosed material consists of the-following:

1.

Revised res'ponse :to;Mr W 'H Regan, Jr's letter of May 22, 1978 requesting

~~

additional information.

2.

Revised response' to Mr W H Regan, Jr's letter. of October 11, 1978 requesting-

~

additional infomation.

3.'

-Revised response to.Mr W H Regan Jr's. letter of December 22, 1978 requesting additional informati n.

i.,

k.

Revised material on; system demand and reliability,; aquatic and terrestrial preoperational measurement programs, plant geologic and foundation condi-i tions,' transmis'sion line archaeology, plant vnter use, plant vastewater,

)_

~

transmission line construction schedule, decommissioning and dismantling,

~ environmental technical specifications for terrestrial and meteorological j /c

- surveys, preoperational radiological monitoring, and the benefits and costs -

of the facility. -

2-

.5 Correction of r.inor errors and omissions.

6.' ~ Changes relating to -the above (Tables of Contents, Text, Figures, Tables, etc).-

These new and revised pages bear the notation " Revision 11 - September 1980" 4-

. and: are marked in.the margin tosindicate where changes have. been made. -Addi-tional pages and figures have been added as reflected on the revised Midland.

PlantiER " List of; Effective Pages."

Consumers Power Company 1-I

- Dated:~ LSestember 15, 1980 By-

/s/ James W Cook James W Cook, Vice. President z.

Sworn and subscribed to before me on this 15th day of. September,1980.

m-

,j jf,

/s/ Betty L Bishop

. 1

'(S E A~L)

"Y 7'

8""'

My; commission. expires September 21, 1982 t