(CONSUMERS POWER COMPANY-ff 4
2 APPLICATION.FOR ~
v.
-REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE
' DOCKET 50-329 DOCKET 50-330 AMENDMENT 82-Enclosed herevith, revising.and supplementing the above-entitled application, are revisedipages, for incorporation in the Environmental Report -(OLS). The Environmental Report was submitted.vith1 Amendment h3 to the above dockets on
~
April 12,1978. -The enclosed material consists of the-following:
1.
Revised res'ponse :to;Mr W 'H Regan, Jr's letter of May 22, 1978 requesting
~~
additional information.
2.
Revised response' to Mr W H Regan, Jr's letter. of October 11, 1978 requesting-
~
additional infomation.
3.'
-Revised response to.Mr W H Regan Jr's. letter of December 22, 1978 requesting additional informati n.
i.,
k.
Revised material on; system demand and reliability,; aquatic and terrestrial preoperational measurement programs, plant geologic and foundation condi-i tions,' transmis'sion line archaeology, plant vnter use, plant vastewater,
)_
~
transmission line construction schedule, decommissioning and dismantling,
~ environmental technical specifications for terrestrial and meteorological j /c
- surveys, preoperational radiological monitoring, and the benefits and costs -
of the facility. -
2-
.5 Correction of r.inor errors and omissions.
6.' ~ Changes relating to -the above (Tables of Contents, Text, Figures, Tables, etc).-
These new and revised pages bear the notation " Revision 11 - September 1980" 4-
. and: are marked in.the margin tosindicate where changes have. been made. -Addi-tional pages and figures have been added as reflected on the revised Midland.
PlantiER " List of; Effective Pages."
Consumers Power Company 1-I
- Dated:~ LSestember 15, 1980 By-
/s/ James W Cook James W Cook, Vice. President z.
Sworn and subscribed to before me on this 15th day of. September,1980.
m-
,j jf,
/s/ Betty L Bishop
. 1
'(S E A~L)
"Y 7'
8""'
My; commission. expires September 21, 1982 t
- 80092301 1
~
+
n
.