Forwards Amend 109 to Application for CPs & Ols,Consisting of Revision 45 to FSAR
ML20063P297
Person / Time
Site: Midland
Issue date: 10/07/1982
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20063P298 List:
References
19366, NUDOCS 8210130264
Download: ML20063P297 (3)


Text

.

A CODSURIBl3 U

Power mm l

Vice President - Projects, Engineering and Construction General Offices: 1945 West Pernall Road, Jackson, MI 492o1 * (517) 788-o453 j

October 7, 1982 Harold R Denton, Director Office of Nuclear Reactor Regulation i

Division of Licensing US Nuclear Regulatory Commission l

Washington, DC 20555 l

l MIDLAND PROJECT l

DOCKET NO 50-329, 50-330 AMENDMENT 109 FILE:

0485.11 SERIAL.

19366 Enclosed herewith is Amendment 109 to the Company's application for construction permits and operating licenses, containing three (3) signed originals and sixty (60) copies of Revision 45 to the Final Safety Analysis

['

Report.

b Revision 45 of the FSAR encompasses only only Chapter 16, the Midland Plant Technical Specifications as detailed in the application page.

In addition to j

revising Chapter 16 of the FSAR, this submittal is provided for NRC review as the Company's formally proposed Appendix A Technical Specifications to the pending Operating Licenses for both Units 1 and 2, pursuant to Section 50.36 l

of 10 CFR Part 50.

In accordance with the Standard Review Plan, the enclosed Technical Specifications were prepared using Standard Technical Specifications for B&W PWRs, NUREG-0103, Revision 4 as the basis. The Company's prcposed Radiological Effluent Technical Specifications (RETS) are also incorporated into Chapter 16 by FSAR Revision 45 and were prepared using RETS for PWRs, NUREG-0472, Revision 2 as the basis. To assist your formal Technical l

Specification review process, enclosed is a crass-reference table of SER Chapter 16 issues and the Technical Specification which address these issues.

Proof of Service upon the parties listed in the Service List is being provided under separate cover.

3DO/

JWC/GEC/dsb y

l CC RJCook, Midland Resident Inspector

[

DSHood, NRC

/ O oc1082-0252a100

'8210130264 821007

~'

PDR ADOCK 05000329 s, K..

PDR

3 O

CROSS-REFERENCE TABLE OF SER CHAPTF.R 16 ISSUES AND TECHNICAL SPECIFICATIONS i

Cross-Reference.for Technical SER Chapter 16 Issue SER Section

- Specification (1) Surveillance for Cooling Pond Silting 2.4.5.2 16.3/4.7.5 (2) Loose-Parts Monitoring System Operation 4.4.4.2 16.3/4.3.3.11 (3) Procedures for Watertight Doors 2.4.4 16.3/4.7.6 During Floods (4)

Eeak Testing of HP-to-LP Valves RCS 3.9.6 16.3/4.4.7.2 (5) 48-Inch Purge System Isolation LCO 6.2.4 16.3/4.6.1.8 (6) Purge / Vent Isolation Valve Leakage Tests 6.2.6 16.3/4.6.4.1 i

(7) Large Purge Valve Isolation Verification 6.2.4 16.3/4.6.1.8 (8) Basis of Rod Bow Offset Margins 4.4.3.1 16.3/4.2.5 (9) Periodic Hydro of ECCS/ Containment Spray 6.2.6 16.3/4.5.2 (10) Containment Sump PH Chemical Inventory 6.1.1 16.3/4.6.2.2 I

(11) Reactor Vessel Pressure-Temperature Curve 5.3.2 16.3/4.4.10

. (12) Anticipatory Reactor Trip System Testing 7.2.3 16.3/4.3.5 t

l (13) Steam Generator Level Setpoint 7.3.3.1 16.3/4.3.2 (14) Response.- Time Testing 7.3.3.6 16.3/4.3.2 (15) Safe Shutdown System Testing 7.4.2.3 As Appropriate l

(16) Operation With Less Than Four RCPs 15.3.1 16.3/4.3 (17) Permanent Groundwater Monitoring System 2.4.6.4 16.3/4.13.3.1 (18) AFW Short - and Long - Term i

Recomunendation 10.4.9.2.2 16.3/4.7.1.2 oc1082-0252a100

-s y ya

<e-

-.e---

4__

y

,e

.e.e.w.

c..,___m.m_4

_y,y...

_,...-,_~n..,,.

,,,y-y.,-.-

,-,-----c.,

.-,- - - ~.

m.w e., r -

b

~

Cross-Reference for Technical SER Chapter 16 Issue SER Section Specification (19) Periodic Testing of Startup Transformer j

Shedding Logic 8.2 16.3/4.8.1 (20) De-Energization of Non-Class 1E Loads 8.4.3 16.3/4.8.3 i

Technical Specification requirements identified under SER Chapter 16, Item 21 on ECCS outages are under discussion with the NRC and are not included with this submittal.

o F

l l

l I

l oc1082-0252a100 I