ML19344A529
| ML19344A529 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 07/31/1980 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML19344A527 | List: |
| References | |
| NUDOCS 8008210073 | |
| Download: ML19344A529 (2) | |
Text
_
q rO -
U CONSUMERS POWER COMPANY APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE DOCKET NO 50-329 DOCIGT NO 50-330 AMENDMENT NO 79 Enclosed herewith, revising and supplementing the above-entitled application, are revised pages for incorporation in the Final Safety Analysis Report. The Final Safety Analysis Report was submitted with Amendment 33 to the above dockets on November 18, 1977 The enclosed material consists of the following:
- 1) Revisions to various FSAR Sections and Staff Requests for Additional Infor-mation in response to certain Open Items associated with Staff review of the Midland Plant.
- 2) Additional information the FSAR stated would be submitted by amendment.
- 3) Changes in various FSAR Sections resulting from routine design developments.
h) Changes in various FSAR Sections resulting from the FSAR Rereview Program.
- 5) Correction of minor errors and omissions.
- 6) Changes relating to the above (Tables of Contents, Figures, Tables, etc).
These new and revised pages bear the notation " Revision 29 7/80," and are marked in the margin to indicate where caanges have been made. Additional pages and figures have been added as reflected on the revised Midland Plant FSAR " List of Effective Paget Consumers Power Company 8Y Dated July 31, 1980 By de /./7 ames W Co'ok', Vice President Sworn and subscribed to before me on t 31st dry of July,1980.
^
Ll 1 YYs &h)
Mycommissio,c},JacksonCounty,6 Michigan Notary Publi '
n expires September 21, 1982
'lc.
sn o 8 'l 10 9
DISTRIBUTION AND ACKNOSLEDGEMENT FORM Bechtel Associates Professional Corporation TO AlRC RETURN TO:
BECHTEL ASSOCIATES HOLDER OF FSAR SET NUMBER lfd PROFESSIONAL CORPORATION P.O. BOX 1000 REVISION NUMBER 29 ANN ARBOR, MICHIGAN 48106 SUBJECT DISTRIBUTION A'J ACKNOWLEDGEMENT Attention: Linda Hultquist Job 7220-FSAR The enclosed material is considered part of a controlled Midland Plant FSAR.
Revisions should be incorporated in the FSAR by following the collating in-structions attached to the revision.
If any revision material is missing, please indicate in the space provided below. The holder of the FSAR is held responsible for the upkeep of their volumes.
In order to verify receipt of the enclosed infor::stion, please sign the ac-knowledgement below and return the entire form within 30 days to me at the above location.
If you have transferred your assigned set (s), please indicate in the space below the set number (s), party (ies) and mailing address (es) so that further material can be sent directly to the new set holder (s).
Set Number (s)
Name of Party (ies)
Address (es)
The following material was missing from the revision (s):
REV. NO.
PAGE NO.
TABLE NO.
FIGURE NO.
TAB I hereby certify that I have received the material, except as noted.
Signature of Set Holder Date
.._.