ML20010J159

From kanterella
Jump to navigation Jump to search
Amend 96 to Application for CPs & Ols.Constitutes Revision 38 to FSAR
ML20010J159
Person / Time
Site: Midland
Issue date: 09/24/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20010J132 List:
References
ACPP-810924, NUDOCS 8109290648
Download: ML20010J159 (1)


Text

_.......

,. e CONSUMERS POWER COMPANY APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE DOCKET NO 50-329 DOCKET NO 50-330 AMENDMENT NO 96 Enclosed herewith, revising and supplementing the above-entitled application, are revised pages for incorporation in the Final Safety Analysis Report. The Final Safety Analysis Report was submitted with Amendment 33 to the above dockets on November 18, 1977. The enclosed material consists of the following:

1) Responses to the " Request for Additional Information on the Midland Plant, Units 1 and 2" t ransmitted with the August 21, 1981 letter from R L Tedesco to J W Cook.
2) Revisions to various FSAR Sections, Open Items associated with Staff review of the Midland Plant, and Responses to Post TMI-2 Issues and Events arising from the above " Request for Additional Information on Midland Plant, Units 1 and 2."
3) Changes relating to the above (Tables of Contents, Figures, Tables, etc).

These new and revised pages bear the notation " Revision 38 9/81," and are marked in the margin to indicate where changes have been made. Additional pages and figures have been added as reflected on the revised Midland Plant FSAR " List of Effective Pages."

Consumers Power Company Dated September 24, 1981 By MM Ja s'W Cook, Vice President '

Sworn and subscribed to before me on th s 24th day of September 1981.

O Wh.ew ww Notary Public, Jackson County, Michfgan My Commission Expires September 8, 1984 8109290648 810924 PDR ADOC4 05000329 PDR oc0981-0427a100 g

DISTRIBUTION ANT ACKNOWLEDGEMENT FORM Bechtel Associates Professiona! Corporation NRC s

TO RETURN TO

,m

,,__n

'"' ~"'

BECHTEL ASSOCIATES HOLDER OF FSAR SET NUMBER 273 PROFESSIONAI, CORPORATION P.O. BOX 1000 38 REVISION NUMBER ANN ARBOR, MICHIGAN 48106 SUBJECT DISTRIBUTION AND ACKNOWLEDGEMENT Attention: Linda Hultquist Job 7220-FSAR The enclosed material is considered part of a controlled Midland Plant FSAR.

Revisions should be incorporated in the FSAR by following the collating in-structions attached to the revision.

If any revision material is missing, please indicate in the space provided bt'ow.

The holder of the FSAR is held responsible for the upkeep of their volumes.

I In order to verify receipt of the enclosed information, please sign the ac-knowledgement below and return the entire form within 30 days to me at the abece location.

If you have transferred your assigned set (s), please indicate in the space below the set number (s), party (ies) and mailing address (es) so that further material can be sent directly to the new set holder (s).

Set Number (s)

Name of Party (ies)

Address (es)

The following material was missing from the revision (s):

REV. NO.

PAGE NO.

TABLE NO.

FIGURE NO.

TAB I hereby certify that I have received the material, except as noted.

Signature of Set Holder Date J