ML23097A016: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E. LAMAR BLVD | |||
ARLINGTON, TX 76011-4511 | |||
April 07, 2023 | |||
Cleve Reasoner, Chief Executive Officer | Cleve Reasoner, Chief Executive Officer | ||
and Chief Nuclear Officer | and Chief Nuclear Officer | ||
Wolf Creek Nuclear Operating Corp. | Wolf Creek Nuclear Operating Corp. | ||
P.O. Box 411 | P.O. Box 411 | ||
Burlington, KS 66839 | Burlington, KS 66839 | ||
SUBJECT: | |||
SUBJECT: WOLF CREEK - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING | |||
EXAMINATION 05000482/2023301 | |||
Dear Cleve Reasoner: | Dear Cleve Reasoner: | ||
In a telephone conversation on March 20, 2023, between myself, Kelly Clayton, Senior | In a telephone conversation on March 20, 2023, between myself, Kelly Clayton, Senior | ||
Operations Engineer, and Andrew Servaes, Initial Exam Supervisor, arrangements were made | Operations Engineer, and Andrew Servaes, Initial Exam Supervisor, arrangements were made | ||
for the administration of the operator licensing examinations at Wolf Creek during the week of | for the administration of the operator licensing examinations at Wolf Creek during the week of | ||
October 16, 2023. | October 16, 2023. | ||
As agreed during the telephone conversation, your staff will prepare the examinations based on | As agreed during the telephone conversation, your staff will prepare the examinations based on | ||
the guidelines in Revision 12 of NUREG-1021, Operator Licensing Examination Standards for | the guidelines in Revision 12 of NUREG-1021, Operator Licensing Examination Standards for | ||
Power Reactors. The NRCs regional office will discuss with your staff any changes that might | Power Reactors. The NRCs regional office will discuss with your staff any changes that might | ||
be necessary before the examinations are administered. | be necessary before the examinations are administered. | ||
To meet the above schedule, it will be necessary for your staff to furnish the operating test | To meet the above schedule, it will be necessary for your staff to furnish the operating test | ||
outlines by May 11, 2023. The NRC staff provided the written examination outlines on March | outlines by May 11, 2023. The NRC staff provided the written examination outlines on March | ||
30, 2023. The written examinations, operating tests, and supporting reference materials | 30, 2023. The written examinations, operating tests, and supporting reference materials | ||
identified in NUREG 1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing | identified in NUREG 1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing | ||
Examinations, will be due by July 27, 2023. Pursuant to Title 10, Section 55.40(b)(3), of the | Examinations, will be due by July 27, 2023. Pursuant to Title 10, Section 55.40(b)(3), of the | ||
Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility | Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility | ||
licensee shall approve the examinations, and tests before they are submitted to the NRC for | licensee shall approve the examinations, and tests before they are submitted to the NRC for | ||
review and approval. All materials shall be complete and ready-to-use. | review and approval. All materials shall be complete and ready-to-use. | ||
We request that any personal, proprietary, sensitive unclassified, or safeguards information in | We request that any personal, proprietary, sensitive unclassified, or safeguards information in | ||
your response be contained in a separate enclosure and appropriately marked. Delays in | your response be contained in a separate enclosure and appropriately marked. Delays in | ||
Line 53: | Line 64: | ||
contents of the examinations. In addition, your support for onsite validation of the examinations | contents of the examinations. In addition, your support for onsite validation of the examinations | ||
is required the week of September 11, 2023. | is required the week of September 11, 2023. | ||
C. Reasoner 2 | |||
To conduct the requested written examinations and operating tests, it will be necessary for your | To conduct the requested written examinations and operating tests, it will be necessary for your | ||
staff to provide adequate space and accommodations in accordance with NUREG 1021, and to | staff to provide adequate space and accommodations in accordance with NUREG 1021, and to | ||
make the simulation facility available on the dates noted above. In accordance with ES-3.5, | make the simulation facility available on the dates noted above. In accordance with ES-3.5, | ||
Administering Operating Tests, your staff should retain the original simulator performance data | Administering Operating Tests, your staff should retain the original simulator performance data | ||
(e.g., system pressures, temperatures, and levels) generated during the dynamic operating | (e.g., system pressures, temperatures, and levels) generated during the dynamic operating | ||
tests until the NRC takes its licensing action on all the applications and any adjudicatory actions | tests until the NRC takes its licensing action on all the applications and any adjudicatory actions | ||
on any hearing demands are complete. | on any hearing demands are complete. | ||
ES-1.2, Guidelines for Taking NRC Examinations, contains NRC guidelines for the written | ES-1.2, Guidelines for Taking NRC Examinations, contains NRC guidelines for the written | ||
examinations and operating tests as they are being administered. | examinations and operating tests as they are being administered. | ||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor | To permit timely NRC review and evaluation, your staff should submit preliminary reactor | ||
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management | operator and senior reactor operator waiver or excusal requests (if any) (Office of Management | ||
Line 75: | Line 89: | ||
completed and requesting any waivers or excusals, as applicable, should be submitted at least | completed and requesting any waivers or excusals, as applicable, should be submitted at least | ||
14 days before the first examination date. | 14 days before the first examination date. | ||
Although the guidelines for receiving waiver or excusal requests is 30 days before the first | Although the guidelines for receiving waiver or excusal requests is 30 days before the first | ||
examination date (preliminary) and 14 days before the first examination date (final), the | examination date (preliminary) and 14 days before the first examination date (final), the | ||
Line 84: | Line 99: | ||
NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final | NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final | ||
application is submitted to the agency. | application is submitted to the agency. | ||
Paperwork Reduction Act Statement | Paperwork Reduction Act Statement | ||
This letter contains information collection requirements that are subject to the Paperwork | This letter contains information collection requirements that are subject to the Paperwork | ||
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved | Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved | ||
by the Office of Management and Budget, approval number 3150-0018. | by the Office of Management and Budget, approval number 3150-0018. | ||
The burden to the public for these mandatory information collections is estimated to average | The burden to the public for these mandatory information collections is estimated to average | ||
400 hours per examination or response, including the time for reviewing instructions, searching | 400 hours per examination or response, including the time for reviewing instructions, searching | ||
Line 93: | Line 111: | ||
reviewing the information collection. Send comments regarding this information collection to the | reviewing the information collection. Send comments regarding this information collection to the | ||
FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory | FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory | ||
Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and | Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and | ||
to the OMB reviewer at: OMB Office of Information and Regulatory Affairs Desk Officer, Office | to the OMB reviewer at: OMB Office of Information and Regulatory Affairs Desk Officer, Office | ||
of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory | of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory | ||
Commission, 725 | Commission, 725 17 th Street, NW Washington, DC 20503, e-mail: | ||
oria_submission@omb.eop.gov. | oria_submission@omb.eop.gov. | ||
C. Reasoner 3 | |||
C. Reasoner | |||
Public Protection Notification | Public Protection Notification | ||
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection | The NRC may not conduct or sponsor, and a person is not required to respond to, a collection | ||
of information unless the document requesting or requiring the collection displays a currently | of information unless the document requesting or requiring the collection displays a currently | ||
valid OMB approval number. | valid OMB approval number. | ||
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, | In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, | ||
a copy of this letter will be made available electronically for public inspection through the NRCs | a copy of this letter will be made available electronically for public inspection through the NRCs | ||
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on | Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on | ||
the NRCs website at http://www.nrc.gov/reading-rm/adams.html. | the NRCs website at http://www.nrc.gov/reading-rm/adams.html. | ||
Thank you for your cooperation in this matter. Andrew Servaes has been advised of the policies | Thank you for your cooperation in this matter. Andrew Servaes has been advised of the policies | ||
and guidelines referenced in this letter. If you have any questions regarding the NRCs | and guidelines referenced in this letter. If you have any questions regarding the NRCs | ||
examination procedures and guidelines, please contact me at 817-200-1216. | examination procedures and guidelines, please contact me at 817-200-1216. | ||
Sincerely, | |||
Kelly D. Clayton, Chief Examiner | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket No. 50-482 | Docket No. 50-482 | ||
License No. NPF-42 | License No. NPF-42 | ||
cc: | cc: | ||
Electronic Distribution for Wolf Creek ListServ | Electronic Distribution for Wolf Creek ListServ | ||
Signed by Clayton, Kelly | |||
on 04/07/23 | |||
ML23097A016 | ML23097A016 | ||
SUNSI Review: | SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: | ||
By: KDC Yes No Publicly Available Sensitive NRR-079 | |||
OFFICE | OFFICE SOE:OB | ||
NAME | NAME KClayton | ||
SIGNATURE | SIGNATURE KDC | ||
DATE | DATE 04/07/2023 | ||
}} | }} |
Latest revision as of 20:51, 14 November 2024
ML23097A016 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 04/07/2023 |
From: | Kelly Clayton NRC/RGN-IV/DORS/OB |
To: | Reasoner C Wolf Creek |
Clayton K | |
References | |
Download: ML23097A016 (5) | |
See also: IR 05000482/2023301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
April 07, 2023
Cleve Reasoner, Chief Executive Officer
and Chief Nuclear Officer
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
EXAMINATION 05000482/2023301
Dear Cleve Reasoner:
In a telephone conversation on March 20, 2023, between myself, Kelly Clayton, Senior
Operations Engineer, and Andrew Servaes, Initial Exam Supervisor, arrangements were made
for the administration of the operator licensing examinations at Wolf Creek during the week of
October 16, 2023.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 12 of NUREG-1021, Operator Licensing Examination Standards for
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines by May 11, 2023. The NRC staff provided the written examination outlines on March
30, 2023. The written examinations, operating tests, and supporting reference materials
identified in NUREG 1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing
Examinations, will be due by July 27, 2023. Pursuant to Title 10, Section 55.40(b)(3), of the
Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility
licensee shall approve the examinations, and tests before they are submitted to the NRC for
review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Delays in
receiving the required materials, or the submittal of inadequate or incomplete materials, may
cause the examinations to be rescheduled. Also, your staff should inform me as soon as
possible concerning any changes to procedures and/or training materials that could impact the
contents of the examinations. In addition, your support for onsite validation of the examinations
is required the week of September 11, 2023.
C. Reasoner 2
To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with NUREG 1021, and to
make the simulation facility available on the dates noted above. In accordance with ES-3.5,
Administering Operating Tests, your staff should retain the original simulator performance data
(e.g., system pressures, temperatures, and levels) generated during the dynamic operating
tests until the NRC takes its licensing action on all the applications and any adjudicatory actions
on any hearing demands are complete.
ES-1.2, Guidelines for Taking NRC Examinations, contains NRC guidelines for the written
examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination
date (if possible). I should be contacted to determine the method for submission of the waiver
and/or excusal requests. Preliminary reactor operator and senior reactor operator license
applications (OMB approval number 3150-0090) and, medical certifications (OMB approval
number 3150-0024) should be submitted at least 30 days before the first examination date. If
the preliminary applications are not received at least 30 days before the examination date, a
postponement may be necessary. Final, signed applications certifying that all training has been
completed and requesting any waivers or excusals, as applicable, should be submitted at least
14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests is 30 days before the first
examination date (preliminary) and 14 days before the first examination date (final), the
requests should be submitted as early in the process as possible (see the 60-day guideline,
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or
as directed when I am contacted to determine the method for submission). The NRC will
document its final decision on whether to grant a waiver or excusal on the final (not preliminary)
NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final
application is submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average
400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination or response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and
reviewing the information collection. Send comments regarding this information collection to the
FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and
to the OMB reviewer at: OMB Office of Information and Regulatory Affairs Desk Officer, Office
of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory
Commission, 725 17 th Street, NW Washington, DC 20503, e-mail:
oria_submission@omb.eop.gov.
C. Reasoner 3
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless the document requesting or requiring the collection displays a currently
valid OMB approval number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
a copy of this letter will be made available electronically for public inspection through the NRCs
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on
the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Andrew Servaes has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact me at 817-200-1216.
Sincerely,
Kelly D. Clayton, Chief Examiner
Operations Branch
Division of Reactor Safety
Docket No. 50-482
License No. NPF-42
cc:
Electronic Distribution for Wolf Creek ListServ
Signed by Clayton, Kelly
on 04/07/23
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: KDC Yes No Publicly Available Sensitive NRR-079
OFFICE SOE:OB
NAME KClayton
SIGNATURE KDC
DATE 04/07/2023