ML23097A016: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
                            NUCLEAR REGULATORY COMMISSION
                        NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                                          REGION IV
                                          1600 E. LAMAR BLVD
                                      1600 E. LAMAR BLVD
                                      ARLINGTON, TX 76011-4511
                                  ARLINGTON, TX 76011-4511
                                            April 07, 2023
 
 
                                        April 07, 2023
 
 
Cleve Reasoner, Chief Executive Officer
Cleve Reasoner, Chief Executive Officer
   and Chief Nuclear Officer
   and Chief Nuclear Officer
Wolf Creek Nuclear Operating Corp.
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
P.O. Box 411
Burlington, KS 66839
Burlington, KS 66839
SUBJECT:       WOLF CREEK - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
 
                EXAMINATION 05000482/2023301
 
SUBJECT:     WOLF CREEK - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
              EXAMINATION 05000482/2023301
 
Dear Cleve Reasoner:
Dear Cleve Reasoner:
In a telephone conversation on March 20, 2023, between myself, Kelly Clayton, Senior
In a telephone conversation on March 20, 2023, between myself, Kelly Clayton, Senior
Operations Engineer, and Andrew Servaes, Initial Exam Supervisor, arrangements were made
Operations Engineer, and Andrew Servaes, Initial Exam Supervisor, arrangements were made
for the administration of the operator licensing examinations at Wolf Creek during the week of
for the administration of the operator licensing examinations at Wolf Creek during the week of
October 16, 2023.
October 16, 2023.
As agreed during the telephone conversation, your staff will prepare the examinations based on
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 12 of NUREG-1021, Operator Licensing Examination Standards for
the guidelines in Revision 12 of NUREG-1021, Operator Licensing Examination Standards for
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
be necessary before the examinations are administered.
be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outlines by May 11, 2023. The NRC staff provided the written examination outlines on March
outlines by May 11, 2023. The NRC staff provided the written examination outlines on March
30, 2023. The written examinations, operating tests, and supporting reference materials
30, 2023. The written examinations, operating tests, and supporting reference materials
identified in NUREG 1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing
identified in NUREG 1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing
Examinations, will be due by July 27, 2023. Pursuant to Title 10, Section 55.40(b)(3), of the
Examinations, will be due by July 27, 2023. Pursuant to Title 10, Section 55.40(b)(3), of the
Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility
Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility
licensee shall approve the examinations, and tests before they are submitted to the NRC for
licensee shall approve the examinations, and tests before they are submitted to the NRC for
review and approval. All materials shall be complete and ready-to-use.
review and approval. All materials shall be complete and ready-to-use.
 
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Delays in
your response be contained in a separate enclosure and appropriately marked. Delays in
Line 53: Line 64:
contents of the examinations. In addition, your support for onsite validation of the examinations
contents of the examinations. In addition, your support for onsite validation of the examinations
is required the week of September 11, 2023.
is required the week of September 11, 2023.
C. Reasoner                                                    2


C. Reasoner                                    2
To conduct the requested written examinations and operating tests, it will be necessary for your
To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with NUREG 1021, and to
staff to provide adequate space and accommodations in accordance with NUREG 1021, and to
make the simulation facility available on the dates noted above. In accordance with ES-3.5,
make the simulation facility available on the dates noted above. In accordance with ES-3.5,
Administering Operating Tests, your staff should retain the original simulator performance data
Administering Operating Tests, your staff should retain the original simulator performance data
(e.g., system pressures, temperatures, and levels) generated during the dynamic operating
(e.g., system pressures, temperatures, and levels) generated during the dynamic operating
tests until the NRC takes its licensing action on all the applications and any adjudicatory actions
tests until the NRC takes its licensing action on all the applications and any adjudicatory actions
on any hearing demands are complete.
on any hearing demands are complete.
ES-1.2, Guidelines for Taking NRC Examinations, contains NRC guidelines for the written
ES-1.2, Guidelines for Taking NRC Examinations, contains NRC guidelines for the written
examinations and operating tests as they are being administered.
examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
Line 75: Line 89:
completed and requesting any waivers or excusals, as applicable, should be submitted at least
completed and requesting any waivers or excusals, as applicable, should be submitted at least
14 days before the first examination date.
14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests is 30 days before the first
Although the guidelines for receiving waiver or excusal requests is 30 days before the first
examination date (preliminary) and 14 days before the first examination date (final), the
examination date (preliminary) and 14 days before the first examination date (final), the
Line 84: Line 99:
NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final
NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final
application is submitted to the agency.
application is submitted to the agency.
Paperwork Reduction Act Statement
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management and Budget, approval number 3150-0018.
by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average
The burden to the public for these mandatory information collections is estimated to average
400 hours per examination or response, including the time for reviewing instructions, searching
400 hours per examination or response, including the time for reviewing instructions, searching
Line 93: Line 111:
reviewing the information collection. Send comments regarding this information collection to the
reviewing the information collection. Send comments regarding this information collection to the
FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory
FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and
Commission, Washington, DC 20555-0001, or by e-mail to     Infocollects.Resource@nrc.gov, and
to the OMB reviewer at: OMB Office of Information and Regulatory Affairs Desk Officer, Office
to the OMB reviewer at: OMB Office of Information and Regulatory Affairs Desk Officer, Office
of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory
of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory
Commission, 725 17th Street, NW Washington, DC 20503, e-mail:
Commission, 725 17        th Street, NW Washington, DC 20503, e-mail:
oria_submission@omb.eop.gov.
oria_submission@omb.eop.gov.
 
C. Reasoner 3
C. Reasoner                                     3
Public Protection Notification
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection  
of information unless the document requesting or requiring the collection displays a currently
of information unless the document requesting or requiring the collection displays a currently  
valid OMB approval number.
valid OMB approval number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,  
a copy of this letter will be made available electronically for public inspection through the NRCs
a copy of this letter will be made available electronically for public inspection through the NRCs  
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on  
the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Andrew Servaes has been advised of the policies
Thank you for your cooperation in this matter. Andrew Servaes has been advised of the policies  
and guidelines referenced in this letter. If you have any questions regarding the NRCs
and guidelines referenced in this letter. If you have any questions regarding the NRCs  
examination procedures and guidelines, please contact me at 817-200-1216.
examination procedures and guidelines, please contact me at 817-200-1216.
                                                Sincerely,
Sincerely,  
                                                                        Signed by Clayton, Kelly
                                                                     
                                                                        on 04/07/23
Kelly D. Clayton, Chief Examiner
                                                Kelly D. Clayton, Chief Examiner
Operations Branch
                                                Operations Branch
Division of Reactor Safety
                                                Division of Reactor Safety
Docket No. 50-482
Docket No. 50-482
License No. NPF-42
License No. NPF-42
cc:
cc:
Electronic Distribution for Wolf Creek ListServ
Electronic Distribution for Wolf Creek ListServ
Signed by Clayton, Kelly
on 04/07/23




  ML23097A016
  ML23097A016
  SUNSI Review:         ADAMS:         Non-Publicly Available Non-Sensitive Keyword:
  SUNSI Review:               ADAMS:   Non-Publicly Available   Non-Sensitive       Keyword:
  By: KDC               Yes  No      Publicly Available     Sensitive     NRR-079
  By: KDC       Yes     No Publicly Available       Sensitive               NRR-079
  OFFICE         SOE:OB
  OFFICE       SOE:OB
  NAME           KClayton
  NAME         KClayton
  SIGNATURE     KDC
  SIGNATURE     KDC
  DATE           04/07/2023
  DATE         04/07/2023
}}
}}

Latest revision as of 20:51, 14 November 2024

Notification of NRC Initial Operator Licensing Examination 05000482/2023301
ML23097A016
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/07/2023
From: Kelly Clayton
NRC/RGN-IV/DORS/OB
To: Reasoner C
Wolf Creek
Clayton K
References
Download: ML23097A016 (5)


See also: IR 05000482/2023301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

April 07, 2023

Cleve Reasoner, Chief Executive Officer

and Chief Nuclear Officer

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING

EXAMINATION 05000482/2023301

Dear Cleve Reasoner:

In a telephone conversation on March 20, 2023, between myself, Kelly Clayton, Senior

Operations Engineer, and Andrew Servaes, Initial Exam Supervisor, arrangements were made

for the administration of the operator licensing examinations at Wolf Creek during the week of

October 16, 2023.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 12 of NUREG-1021, Operator Licensing Examination Standards for

Power Reactors. The NRCs regional office will discuss with your staff any changes that might

be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outlines by May 11, 2023. The NRC staff provided the written examination outlines on March

30, 2023. The written examinations, operating tests, and supporting reference materials

identified in NUREG 1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing

Examinations, will be due by July 27, 2023. Pursuant to Title 10, Section 55.40(b)(3), of the

Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility

licensee shall approve the examinations, and tests before they are submitted to the NRC for

review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Delays in

receiving the required materials, or the submittal of inadequate or incomplete materials, may

cause the examinations to be rescheduled. Also, your staff should inform me as soon as

possible concerning any changes to procedures and/or training materials that could impact the

contents of the examinations. In addition, your support for onsite validation of the examinations

is required the week of September 11, 2023.

C. Reasoner 2

To conduct the requested written examinations and operating tests, it will be necessary for your

staff to provide adequate space and accommodations in accordance with NUREG 1021, and to

make the simulation facility available on the dates noted above. In accordance with ES-3.5,

Administering Operating Tests, your staff should retain the original simulator performance data

(e.g., system pressures, temperatures, and levels) generated during the dynamic operating

tests until the NRC takes its licensing action on all the applications and any adjudicatory actions

on any hearing demands are complete.

ES-1.2, Guidelines for Taking NRC Examinations, contains NRC guidelines for the written

examinations and operating tests as they are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator waiver or excusal requests (if any) (Office of Management

and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination

date (if possible). I should be contacted to determine the method for submission of the waiver

and/or excusal requests. Preliminary reactor operator and senior reactor operator license

applications (OMB approval number 3150-0090) and, medical certifications (OMB approval

number 3150-0024) should be submitted at least 30 days before the first examination date. If

the preliminary applications are not received at least 30 days before the examination date, a

postponement may be necessary. Final, signed applications certifying that all training has been

completed and requesting any waivers or excusals, as applicable, should be submitted at least

14 days before the first examination date.

Although the guidelines for receiving waiver or excusal requests is 30 days before the first

examination date (preliminary) and 14 days before the first examination date (final), the

requests should be submitted as early in the process as possible (see the 60-day guideline,

above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers and/or excusals should be in writing (i.e., on NRC Form 398, or

as directed when I am contacted to determine the method for submission). The NRC will

document its final decision on whether to grant a waiver or excusal on the final (not preliminary)

NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final

application is submitted to the agency.

Paperwork Reduction Act Statement

This letter contains information collection requirements that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved

by the Office of Management and Budget, approval number 3150-0018.

The burden to the public for these mandatory information collections is estimated to average

400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination or response, including the time for reviewing instructions, searching

existing data sources, gathering and maintaining the data needed, and completing and

reviewing the information collection. Send comments regarding this information collection to the

FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and

to the OMB reviewer at: OMB Office of Information and Regulatory Affairs Desk Officer, Office

of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory

Commission, 725 17 th Street, NW Washington, DC 20503, e-mail:

oria_submission@omb.eop.gov.

C. Reasoner 3

Public Protection Notification

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless the document requesting or requiring the collection displays a currently

valid OMB approval number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

a copy of this letter will be made available electronically for public inspection through the NRCs

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on

the NRCs website at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Andrew Servaes has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact me at 817-200-1216.

Sincerely,

Kelly D. Clayton, Chief Examiner

Operations Branch

Division of Reactor Safety

Docket No. 50-482

License No. NPF-42

cc:

Electronic Distribution for Wolf Creek ListServ

Signed by Clayton, Kelly

on 04/07/23

ML23097A016

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: KDC Yes No Publicly Available Sensitive NRR-079

OFFICE SOE:OB

NAME KClayton

SIGNATURE KDC

DATE 04/07/2023