ML24145A001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 22: Line 22:


1 Meeting Conduct
1 Meeting Conduct
 
* Please respect other members of the public
*Please respect other members of the public
*Please be conscious of your speaking time
*Please be conscious of your speaking time
*Questions will be addressed during the Question-and-Answer session following the presentation.
*Questions will be addressed during the Question-and-Answer session following the presentation.

Latest revision as of 12:48, 7 October 2024

5/29/2024, Annual Assessment Meeting for Seabrook Station - NRC Presentation Slides
ML24145A001
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/24/2024
From:
NRC/RGN-I/DORS
To:
References
Download: ML24145A001 (1)


Text

Seabrook Station Annual Assessment Meeting

Reactor Oversight Process - 2023

May 29, 2024

1 Meeting Conduct

  • Please respect other members of the public
  • Please be conscious of your speaking time
  • Questions will be addressed during the Question-and-Answer session following the presentation.

2 Agenda - Seabrook

  • 2023 ROP Plant Performance Assessment and Inspection Activities

Ray McKinley

  • NRC Inspection of Alkali-Silica Deputy Director, Region I Division Reaction (ASR) of Operating Reactor Safety*Public Question and Answer

3 NRC Panelists

Travis Daun Eben Allen Nik Floyd Sr. Resident Inspector Resident Inspector Senior Engineer

4 Joe DeBoer Matt Young Sr. Emergency Preparedness Inspector Branch Chief 2023 ROP Plant Performance Assessment at Seabrook

  • Seabrook operated safely and in a manner that preserved the public health and safety and protected the environment
  • All green performance indicators
  • All very low safety significance findings
  • The plant will receive the baseline level of inspection in 2024

5 NRC Independent Safety Inspections

Reactor Oversight Process

  • Full-time NRC resident inspectors
  • NRC specialists conduct additional inspections at each nuclear plant
  • NRC inspectors have unfettered access to all plant activities related to nuclear safety and security

6 NRC Independent Safety Inspections

Reactor Oversight Process

7 2023 NRC Inspection Activities at Seabrook

~6700 hours of inspection and related activities

- Examples of Resident Inspections

  • maintenance activities
  • surveillance tests
  • operator performance
  • Refueling outage activities

- 2023 Team and Specialist Inspections

  • Security Baseline and Force-on-Force Exercise
  • Fire Protection Team Inspection
  • Health Physics and Radiation Safety 8

NRC Inspection of ASR at Seabrook

  • In 2023, the NRC completed inspections to assess NextEras performance to manage the effects of ASR in Seabrook structures

- Resident inspectors and specialist from Region I and NRC Headquarters involved

- Focused on compliance with NRC-approved methodology and license conditions

  • NRC inspections in 2023 determined Seabrook structures remain capable of performing their safety functions
  • NRC inspectors identified no findings related to ASR in 2023

9 Seabrook Annual Assessment Meeting

Closing Remarks

10 NRC Social Media Channels

Facebook www.facebook.com/nrcgov/

Twitter twitter.com/nrcgov Instagram https://www.instagram.com/nrcgov YouTube www.youtube.com/user/NRCgov Flickr www.flickr.com/photos/nrcgov/

LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/

RSS www.nrc.gov/public-involve/listserver.html#rss

11 Annual Assessment Meeting Feedback

1. Mail in NRC 2. Scan QR Code on feedback form - OR - back of form with smart device

- OR -

  • 3. On any computer visit the NRC Public Meeting Schedule
  • Click Meeting Feedback or
  • Click more on the Meeting Details page

Meeting number: 20240628

12 For Additional Information

Contact a Public Affairs Officer

Diane Screnci Sr. PAO 610/337-5330 Diane.screnci@nrc.gov

Neil Sheehan PAO 610/337-5331 Neil.sheehan@nrc.gov

13 Q&A Session

Question & Answer Session

14 Thank you for your participation Reference Slides

16 Structural Modification Examples

Example 1 - Example 2 -

Strong backs Corner braces

17 Structural Modification Examples

18 Throughwall Expansion Monitoring

Expansion

Through wall expansion with borehole extensometer