ML19098A640

From kanterella
Jump to navigation Jump to search
April 24, 2019 Notice of Public Meeting to Present the NRCs Assessment of Safety Performance at the Seabrook Station, Unit 1, for 2018
ML19098A640
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/08/2019
From: Brice Bickett
Reactor Projects Branch 2
To:
Shared Package
ML19098A552 List:
References
MN 19-005
Download: ML19098A640 (4)


Text

U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 8, 2019 MN No.19-005 Licensee: NextEra Energy, Seabrook, LLC Facility: Seabrook Station, Unit 1 Docket No. 50-443 Date/Time: April 24, 2019 6:00 p.m. - 8:00 p.m.

Location: Best Western Plus - The Inn at Hampton 815 Lafayette Road Hampton, New Hampshire 03842

Purpose:

The Nuclear Regulatory Commission staff (NRC) will meet with the public to present the NRCs assessment of safety performance at the Seabrook Station for 2018. Additionally, the NRC and the Federal Emergency Management Agency (FEMA) will discuss their roles regarding emergency preparedness for Seabrook.

NRC

Participants:

J. Yerokun, Director, Division of Reactor Safety B. Bickett, Chief, Branch 3, Division of Reactor Projects P. Milligan, Senior Level Adviser, Division of Preparedness and Response P. Cataldo, Senior Resident Inspector, Seabrook Station E. Allen, Resident Inspector, Seabrook Station External: S. Colman, FEMA, Region I Public Participation: This is a Category 3 meeting. Following the short presentations the NRC will then respond to questions from the public.

Meeting

Contact:

B. Bickett, Chief, Division of Reactor Projects, Branch 3 (610) 337-5312 E-mail: Brice.Bickett@nrc.gov As a security precaution, local law enforcement officers will be present during the meeting.

Signs, banners, posters, and displays affixed to any sticks, poles, or other similar devices will not be permitted in the meeting room. Tables or displays are not permitted in the meeting room or the hotel lobby outside the room without permission of the NRC.

Members of the public who wish to speak during the Q&A portion of the meeting should sign up on a speaker card prior to entering the meeting room to enable effective facilitation of the meeting. Time for individual questions or comments may be limited to accommodate as many speakers as possible. Longer remarks may be submitted, in writing.

MN No.19-005 2 The NRCs annual assessment letter on Seabrooks performance during 2018 can be found on the NRC website at www.nrc.gov/reactors/operating/oversight/letters/seab_2017q4.pdf.

Information on the NRCs annual assessment process and the safety performance of Seabrook is posted on the NRC website at www.nrc.gov/reactors/operating/oversight.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement is found on the NRCs website, www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding meeting security.

The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. Those needing reasonable accommodation to participate in this meeting, or needing meeting information in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on such requests will be made on a case-by-case basis.

Persons requiring assistance to attend the meeting should make requests to the NRC meeting contact no later than two business days prior to the meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRCs website under public meetings.

/RA/

Approved by: _________________________

Brice Bickett, Chief Projects Branch 3 Division of Reactor Projects cc: Distribution via ListServ

ML19098A640 SUNSI REVIEW Non Sensitive Publicly Available OFFICE RI/DRP RI/DRP NAME PFinney BBickett DATE 04/08/19 04/07/19 MN No.19-005 4 NRC Annual Assessment Meeting for Seabrook Station April 24, 2019 6:00 p.m. - 8:00 p.m.

Hampton, NH Agenda NRC Introduction and Opening Remarks(5 minutes)

NRC Discussion of Seabrook Safety Performance...(10 minutes)

NRC Discussion of NRCs Role Regarding Emergency Response Plans (10 minutes)

FEMA Discussion of FEMAs Role Regarding Emergency Response Plans.(10 minutes)

Public Q&A session with the NRC(80 minutes)

NRC Closing Remarks(5 minutes)