Seabrook Station Annual Assessment Meeting

Welcome!

This meeting will start at 5:30pm.

Seabrook Station Annual Assessment Meeting

Reactor Oversight Process - 2021

May 12, 2022

2 Seabrook Annual Assessment Meeting

Meeting Facilitator

Brett Klukan Regional Counsel, Region I

3 Meeting Conduct

  • Please respect other members of the public
  • Please be conscious of your speaking time
  • Questions will be addressed during the Question-and-Answer session following the presentation.

4 Agenda - Seabrook

Dan Collins Director, Region I Division of Operating Reactor Safety

  • 2021 ROP Plant Performance Assessment and Inspection Activities
  • NRC Inspection of Alkali -Silica Reaction (ASR)
  • Public Question and Answer Session

5 NRC Panelists

Chris Newport Travis Daun Nik Floyd Sr. Resident InspectorResident Inspector Senior Inspector

Mel Gray Matt Young Engineering Branch Chief Branch Chief 6

NRC Independent Safety Inspections

Reactor Oversight Process

  • Full-time NRC resident inspectors
  • NRC specialists conduct additional inspections at each nuclear plant
  • NRC inspectors have unfettered access to all plant activities related to nuclear safety and security

7 NRC Independent Safety Inspections

Action Matrix Concept

8 2021 ROP Plant Performance Assessment at Seabrook

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • All Green Performance Indicators
  • All Very Low Safety Significance Findings
  • The plant will receive the baseline level of inspection in 2022

9 2021 NRC Inspection Activities at Seabrook

  • ~6000 hours of inspection and related activities

- Examples of Resident Inspections

  • maintenance activities
  • surveillance tests
  • operator performance in the simulator

- 2021 Team Inspections

  • Design Basis Assurance
  • Security
  • Radiation Protection
  • Evaluation of Modifications (50.59)
  • Refueling Outage Activities

10 NRC Actions in Response to COVID-19

  • Monitored plant activities through inspections and oversight
  • Maintained emergency response capabilities within Regional Incident Response Centers and NRC HQ
  • NRC resident inspectors currently full time on-site

11 NRC Inspection of ASR at Seabrook

  • In 2021, the NRC completed inspections to assess NextEras performance to manage the effects of ASR in Seabrook structures

- ASR inspections completed in each quarter

- Resident inspectors and specialists from Region I and NRC Headquarters involved

- Focused on compliance w ith NRC-approved methodology and license conditions

  • NRC inspections in 2021 determined Seabrook structures remain capable of performing their safety functions
  • NRC inspectors identified tw o findings of very low safety significance

12 NRC Inspection of ASR at Seabrook

  • 4Q2021 - Finding related to not properly evaluating ASR -related indications in the Containment Internal Structure per the Structures Monitoring Program

13 Seabrook Annual Assessment Meeting

Closing Remarks

14 NRC Social Media Channels

  • Facebook: www.facebook.com/nrcgov
  • Flickr: www.flickr.com/photos/nrcgov/
  • Tw itter: tw itter.com/#!/nrcgov
  • YouTube: www.youtube.com/user/NRCgov
  • RSS: w ww.nrc.gov/publicinvolve/listserver.html#rss
  • LinkedIn:www.linkedin.com/company/u-s--nuclearregulatory -

commission/

15 Annual Assessment Meeting Feedback

1. Mail in NRC 2. Scan QR Code on feedback form that - OR -back of form with will be emailed to smar t device all attendees - OR -
3. At any computer, go to the Public Meeting Schedule and press the Meeting Feedback link for this meeting - or - press the

[more] link for this meeting and then press the Meeting Feedback link on the Meeting Details page.

16 - OR -

4. Email Public Affairs - opa1.resource@nrc.gov

16 Question & Answer Session

Question & Answer Session

17 Thank you for your participation REFERENCE SLIDES NextEra Methodology for ASR

Methodology Document

Structural Analysis & Evaluation

Monitoring Parameters and Limits

Structures Monitoring Program

Corrective Action

20 Reactor Cavity Diagram

N West East Wall Wall

Deck Keyway Grate /

Wall Floor Slab Opening

Reactor Cavity Pit Overhead View Containment Side View

21 Structural Modification Examples

Example 1 - Example 2 -

Strong backs Corner Braces

22